Worcester County Government · Snow Hill, MD
Ocean Pines Biosolids Dewatering
- Response deadline
- Not confirmedConfirm the deadline with the buyer.
- Published project value
- Not confirmedCheck the pricing and payment terms below.
- Solicitation number
- Not confirmed
From the posting1 agency details · contact information and original wording
4 documents found2 need OCR55% of weighted requirement checks reviewed
Review first
Start with these requirements and unresolved points.- Must doJoint ventures & teaming
View 1 flagged requirement
- Requirement 1 ↗
The state of formation of the firm and the official address of the firm must be shown. 12.06 A Bid by an individual must show the Bidder’s name and official address. 12.07 A Bid by a joint venture must be executed by an authorized representative of each joint venturer in the mann
- Requirement 1 ↗
- Must doRequired licenses
State of Maryland license
- Must doSite visit / pre-bid meeting
Mandatory Site Visit
Eligibility & participation
Whether you can bid at all, and what you must already hold.
Registrations
A contract award (see 2 CFR 180.220) must not be made to parties listed on the governmentwide exclusions in the System for Award Management (SAM), in accordance with the OMB guidelines at 2 CFR 180 that implement Executive Orders 12549 (3 CFR part 1986 Comp., p. 189) and 12689 (3Close full requirement
A contract award (see 2 CFR 180.220) must not be made to parties listed on the governmentwide exclusions in the System for Award Management (SAM), in accordance with the OMB guidelines at 2 CFR 180 that implement Executive Orders 12549 (3 CFR part 1986 Comp., p. 189) and 12689 (3
View source 1
“A contract award (see 2 CFR 180.220) must not be made to parties listed on the governmentwide exclusions in the System for Award Management (SAM), in accordance with the OMB guidelines at 2 CFR 180 that implement Executive Orders 12549 (3 CFR part 1986 Comp., p. 189) and 12689 (3 CFR part 1989 Comp.”
Required licenses
3 findingsState of Maryland license
View source 1
“The successful vendor must be licensed to perform work in the state of Maryland.”
Source page 11
Page markings may include other requirements. The quotation above identifies this requirement.

Authorization to do business in project state
Applies when: within the time for acceptance of Bids and attach such certification to the BidMust be met by: within the time for acceptance of Bids and attach such certification to the Bid
View source 1
“The Bid must contain evidence of Bidder’s authority to do business in the state where the Project is located, or Bidder must certify in writing that it will obtain such authority within the time for acceptance of Bids and attach such certification to the Bid.”
Source page 42
Page markings may include other requirements. The quotation above identifies this requirement.

—
Needs confirmation
Applies when: within the time for acceptance of Bids and attach such certification to the Bid; If Bidder is required to be licensed to submit a Bid or perform the Work in the state where the Project is located, the Bid must contain evidence of Bidder’s licensure, or Bidder musMust be met by: within the time for acceptance of Bids and attach such certification to the Bid
View source 1
“If Bidder is required to be licensed to submit a Bid or perform the Work in the state where the Project is located, the Bid must contain evidence of Bidder’s licensure, or Bidder must certify in writing that it will obtain such licensure within the time for acceptance of Bids and attach such certification to the Bid.”
Source page 42
Page markings may include other requirements. The quotation above identifies this requirement.

Experience & references
5 findings3 count
Applies when: within the last 12-36 months
View source 1
“List three references for which the Vendor has provided Goods/Services similar to those requested in the Bid Document within the last 12-36 months.”
Source page 21
Page markings may include other requirements. The quotation above identifies this requirement.

—
Needs confirmation
View source 1
“Qualifications 1. All products specified in this section shall be furnished by a single manufacturer specializing in the fabrication of fiberglass doors and frames with no less than five (5) years of successful experience in the fabrication of fiberglass doors and frames of the type required for this project. 2. Instal”
—
Needs confirmation
Applies when: within 425 miles of Ocean Pines, MDMust be met by: within 425 miles of Ocean Pines, MD
View source 1
“The manufacturer shall have a minimum of 20 years of experience as a UL panel shop. 4. Full certified service manufacturing center located within 425 miles of Ocean Pines, MD.”
—
Needs confirmation
Applies when: at least three years after final payment, termination of the Contract, or until the conc
View source 1
“All other relevant records must be retained by Contractor and kept accessible for at least three years after final payment, termination of the Contract, or until the conclusion of any audit, controversy, or litigation related to the Contract.”
—
Needs confirmation
View source 1
“Company specializing in manufacturing products specified in this Section with minimum of ten years’ experience in the design and manufacture of similar products and systems.”
Key personnel
2 findingsProvide resumes for those individuals included in Schedule C.
View source 1
“Provide resumes for those individuals included in Schedule C.”
Schedule C (Key Individuals) and resumes for the key individuals listed, as required by Paragraph 8.05. I.
View source 1
“Schedule C (Key Individuals) and resumes for the key individuals listed, as required by Paragraph 8.05. I.”
Financial capacity
2 findingsProvide the most recent audited financial statement, and if such audited financial statement is not current, also provide the most current financial statement.
Applies when: if such audited financial statement is not current, also provide the most current financial statement
View source 1
“Provide the most recent audited financial statement, and if such audited financial statement is not current, also provide the most current financial statement.”
Date of Business’s most recent financial statement: ☐ Attached Date of Business’s most recent audited financial statement: ☐ Attached Financial indicators from the most recent financial statement Contractor’s Current Ratio (Current Assets ÷ Current Liabilities) Contractor’s QuickClose full requirement
Date of Business’s most recent financial statement: ☐ Attached Date of Business’s most recent audited financial statement: ☐ Attached Financial indicators from the most recent financial statement Contractor’s Current Ratio (Current Assets ÷ Current Liabilities) Contractor’s Quick
View source 1
“Date of Business’s most recent financial statement: ☐ Attached Date of Business’s most recent audited financial statement: ☐ Attached Financial indicators from the most recent financial statement Contractor’s Current Ratio (Current Assets ÷ Current Liabilities) Contractor’s Quick Ratio ((Cash and Ca”
Joint ventures & teaming
10 findingsThe state of formation of the firm and the official address of the firm must be shown. 12.06 A Bid by an individual must show the Bidder’s name and official address. 12.07 A Bid by a joint venture must be executed by an authorized representative of each joint venturer in the mann
View source 1
“The state of formation of the firm and the official address of the firm must be shown. 12.06 A Bid by an individual must show the Bidder’s name and official address. 12.07 A Bid by a joint venture must be executed by an authorized representative of each joint venturer in the manner indicated on the ”
The joint venture must have been formally established prior to submittal of a Bid, and the official address of the joint venture must be shown. 12.08 All names must be printed in ink below the signatures. 12.09 The Bid must contain an acknowledgment of receipt of all Addenda, the
Applies when: prior to submittal of a Bid, and the official address of the joint venture must be shownMust be met by: prior to submittal of a Bid, and the official address of the joint venture must be shown
View source 1
“The joint venture must have been formally established prior to submittal of a Bid, and the official address of the joint venture must be shown. 12.08 All names must be printed in ink below the signatures. 12.09 The Bid must contain an acknowledgment of receipt of all Addenda, the numbers of which mu”
(typed or printed) If Bidder is a corporation, a partnership, or a joint venture, attach evidence of authority to sign.
Applies when: If Bidder is a corporation, a partnership, or a joint venture, attach evidence of authority to sign
View source 1
“(typed or printed) If Bidder is a corporation, a partnership, or a joint venture, attach evidence of authority to sign.”
(2) Provide execution by any additional parties, such as joint venturers, if necessary.
Applies when: if necessary
View source 1
“(2) Provide execution by any additional parties, such as joint venturers, if necessary.”
—
An uncompleted form does not establish an eligibility requirement.
View source 1
“Form of Business: ☐ Sole Proprietorship ☐ Partnership ☐ Corporation ☐ Limited Liability Company ☐ Joint Venture comprised of the following companies: 1. 2. 3. Provide a separate Qualification Statement for each Joint Venturer.”
As a joint venturer:
View source 1
“As a joint venturer:”
If Business is a Joint Venture, separate Qualifications Statements for each Joint Venturer, as required in Paragraph 1.02. B.
Applies when: If Business is a Joint Venture, separate Qualifications Statements for each Joint Venturer, as required in Paragraph 1
View source 1
“If Business is a Joint Venture, separate Qualifications Statements for each Joint Venturer, as required in Paragraph 1.02. B.”
(date signed) (If Business is a corporation, a partnership, or a joint venture, attach evidence of authority to sign.) Attest:
Applies when: If Business is a corporation, a partnership, or a joint venture, attach evidence of authority to sign
View source 1
“(date signed) (If Business is a corporation, a partnership, or a joint venture, attach evidence of authority to sign.) Attest:”
(typed or printed) (typed or printed) (If [Type of Entity] is a corporation, a partnership, or a joint venture, attach evidence of authority to sign.) Attest:
Applies when: If [Type of Entity] is a corporation, a partnership, or a joint venture, attach evidence of authority to sign
View source 1
“(typed or printed) (typed or printed) (If [Type of Entity] is a corporation, a partnership, or a joint venture, attach evidence of authority to sign.) Attest:”
(1) Provide supplemental execution by any additional parties, such as joint venturers.
View source 2
“(1) Provide supplemental execution by any additional parties, such as joint venturers.”
“(1) Provide supplemental execution by any additional parties, such as joint venturers.”
Exclusions & responsibility
2 findings2. Completed Bid Documents from Vendors debarred from doing business with the State of
View source 1
“2. Completed Bid Documents from Vendors debarred from doing business with the State of”
part 1986 Comp., p. 189) and 12689 (3 CFR part 1989 Comp., p. 235), “Debarment and Suspension.” SAM Exclusions contains the names of parties debarred, suspended, or
View source 1
“part 1986 Comp., p. 189) and 12689 (3 CFR part 1989 Comp., p. 235), “Debarment and Suspension.” SAM Exclusions contains the names of parties debarred, suspended, or”
Conflicts of interest
2 findingsAgency concurrence is required on both the Bid and the Contract before the Contract is effective. 19.03 Conflict of Interest A.
Applies when: before the Contract is effectiveMust be met by: before the Contract is effective
View source 1
“Agency concurrence is required on both the Bid and the Contract before the Contract is effective. 19.03 Conflict of Interest A.”
Owner’s officers, employees, or agents shall not engage in the award or administration of this Contract if a conflict of interest, real or apparent, would be involved.
Applies when: if a conflict of interest, real or apparent, would be involved
View source 1
“Owner’s officers, employees, or agents shall not engage in the award or administration of this Contract if a conflict of interest, real or apparent, would be involved.”
Missing information2 checks · expand to review
A missing value is not a waiver. Check the source or ask the agency before relying on it.
Set-aside
—
Not reviewed — requirement not confirmed
Small business size
—
Not reviewed — requirement not confirmed
1 additional field have no reviewed finding.
Deadlines & submission
When and how to submit, and whether you are still in time.
Site visit / pre-bid meeting
2 findingsMandatory Site Visit
View source 1
“Bidder is required to visit the Site and conduct a thorough visual examination of the Site and adjacent areas.”
Source page 37
Page markings may include other requirements. The quotation above identifies this requirement.

required
View source 1
“ARTICLE 4—PRE-BID CONFERENCE 4.01 A non-mandatory pre-bid conference will be held at the time and location indicated in the Advertisement or invitation to bid.”
How to submit
4 findingsThe last date/time for questions will be noon on August 19, 2026. Sealed Bid Documents are due no later than August 27, 2026, at 3:30 p.m. and will be opened and read aloud in the Office of the County Commissioners, Worcester County Government Center – Room 1103, One West Market Close full requirement
The last date/time for questions will be noon on August 19, 2026. Sealed Bid Documents are due no later than August 27, 2026, at 3:30 p.m. and will be opened and read aloud in the Office of the County Commissioners, Worcester County Government Center – Room 1103, One West Market
Applies when: no later than August 27, 2026, at 3:30 pMust be met by: no later than August 27, 2026, at 3:30 p
View source 1
“The last date/time for questions will be noon on August 19, 2026. Sealed Bid Documents are due no later than August 27, 2026, at 3:30 p.m. and will be opened and read aloud in the Office of the County Commissioners, Worcester County Government Center – Room 1103, One West Market Street, Snow Hill, M”
If the Bid Documents are sent by mail, the sealed envelope will be enclosed in a separate mailing envelope with the notation “SEALED BID DOCUMENTS ENCLOSED” on the face thereof. 2. Bids must be mailed or hand carried to the Worcester County Administration Office, 1 West Market St
View source 1
“If the Bid Documents are sent by mail, the sealed envelope will be enclosed in a separate mailing envelope with the notation “SEALED BID DOCUMENTS ENCLOSED” on the face thereof. 2. Bids must be mailed or hand carried to the Worcester County Administration Office, 1 West Market Street, Room 1103, Sno”
10. Electronically mailed bids are not considered sealed bids and will not be accepted.
View source 1
“10. Electronically mailed bids are not considered sealed bids and will not be accepted.”
security and the other documents required to be submitted under the terms of Article 2 of the Bid Form. 14.02 A Bid must be received no later than the date and time prescribed and at the place indicated in the Advertisement or invitation to bid and must be enclosed in a plainly m
Applies when: no later than the date and time prescribed and at the place indicated in the Advertisement orMust be met by: no later than the date and time prescribed and at the place indicated in the Advertisement or
View source 1
“security and the other documents required to be submitted under the terms of Article 2 of the Bid Form. 14.02 A Bid must be received no later than the date and time prescribed and at the place indicated in the Advertisement or invitation to bid and must be enclosed in a plainly marked package with t”
Required submission files
5 findingsEvidence of Insurance......................................... 7 2.02 Copies of Documents .................................................................................................................... 7 2.03 Before Starting Construction .....................................Close full requirement
Evidence of Insurance......................................... 7 2.02 Copies of Documents .................................................................................................................... 7 2.03 Before Starting Construction .....................................
Applies when: Before Starting ConstructionMust be met by: Before Starting Construction
View source 1
“Evidence of Insurance......................................... 7 2.02 Copies of Documents .................................................................................................................... 7 2.03 Before Starting Construction .........................................................”
2.02 Copies of Documents
View source 1
“2.02 Copies of Documents”
Owner may block out (redact) any confidential premium or pricing information contained in any policy or endorsement furnished under this provision. 2.02 Copies of Documents SC-2.02 Amend the first sentence of Paragraph 2.02.A. to read as follows:Close full requirement
Owner may block out (redact) any confidential premium or pricing information contained in any policy or endorsement furnished under this provision. 2.02 Copies of Documents SC-2.02 Amend the first sentence of Paragraph 2.02.A. to read as follows:
View source 1
“Owner may block out (redact) any confidential premium or pricing information contained in any policy or endorsement furnished under this provision. 2.02 Copies of Documents SC-2.02 Amend the first sentence of Paragraph 2.02.A. to read as follows:”
Installer’s Examination 1. Door installer shall examine conditions under which construction activities of this section are to be performed and submit a written report to general contractor if conditions are unacceptable. 2. General Contractor shall submit two copies of the instal
Applies when: within 24Must be met by: within 24
View source 1
“Installer’s Examination 1. Door installer shall examine conditions under which construction activities of this section are to be performed and submit a written report to general contractor if conditions are unacceptable. 2. General Contractor shall submit two copies of the installer’s report to the ”
The manufacturer shall furnish five copies of shop drawings in three ring binders to the engineer.
View source 1
“The manufacturer shall furnish five copies of shop drawings in three ring binders to the engineer.”
Acknowledge amendments
The joint venture must have been formally established prior to submittal of a Bid, and the official address of the joint venture must be shown. 12.08 All names must be printed in ink below the signatures. 12.09 The Bid must contain an acknowledgment of receipt of all Addenda, the
Applies when: prior to submittal of a Bid, and the official address of the joint venture must be shownMust be met by: prior to submittal of a Bid, and the official address of the joint venture must be shown
View source 1
“The joint venture must have been formally established prior to submittal of a Bid, and the official address of the joint venture must be shown. 12.08 All names must be printed in ink below the signatures. 12.09 The Bid must contain an acknowledgment of receipt of all Addenda, the numbers of which mu”
Procurement contact
12 findingsBid Documents for the above referenced project may be obtained from the Worcester County Commissioner’s Office by either e-mailing the Procurement Officer at purchasing@worcestermd.gov, by calling 410-632-1194 during normal business hours, or via the County’s Bids page on the CouClose full requirement
Bid Documents for the above referenced project may be obtained from the Worcester County Commissioner’s Office by either e-mailing the Procurement Officer at purchasing@worcestermd.gov, by calling 410-632-1194 during normal business hours, or via the County’s Bids page on the Cou
View source 1
“Bid Documents for the above referenced project may be obtained from the Worcester County Commissioner’s Office by either e-mailing the Procurement Officer at purchasing@worcestermd.gov, by calling 410-632-1194 during normal business hours, or via the County’s Bids page on the County’s website.”
QUESTIONS AND INQUIRES 1. Questions must be addressed in writing to the Worcester County Procurement Officer at nrice@co.worcester.md.us. 2. The last date to submit questions for clarification will be noon on August 19, 2026. 3Close full requirement
QUESTIONS AND INQUIRES 1. Questions must be addressed in writing to the Worcester County Procurement Officer at nrice@co.worcester.md.us. 2. The last date to submit questions for clarification will be noon on August 19, 2026. 3
View source 1
“QUESTIONS AND INQUIRES 1. Questions must be addressed in writing to the Worcester County Procurement Officer at nrice@co.worcester.md.us. 2. The last date to submit questions for clarification will be noon on August 19, 2026. 3”
No written agreements or changes to the scope of the Contract made by anyone other than the Procurement Officer (with the Chief Administrative Officer and/or County Commissioners approval, if required) will be honored or valid.Close full requirement
No written agreements or changes to the scope of the Contract made by anyone other than the Procurement Officer (with the Chief Administrative Officer and/or County Commissioners approval, if required) will be honored or valid.
View source 1
“No written agreements or changes to the scope of the Contract made by anyone other than the Procurement Officer (with the Chief Administrative Officer and/or County Commissioners approval, if required) will be honored or valid.”
All modifications and every request for any interpretation must be addressed to Worcester County’s Procurement Officer and to be given consideration, must be received no later than the last day for questions listed in Section I, Subsection C.2. 2. Any and all interpretations, corClose full requirement
All modifications and every request for any interpretation must be addressed to Worcester County’s Procurement Officer and to be given consideration, must be received no later than the last day for questions listed in Section I, Subsection C.2. 2. Any and all interpretations, cor
Applies when: no later than the last day for questions listed in Section I, Subsection CMust be met by: no later than the last day for questions listed in Section I, Subsection C
View source 1
“All modifications and every request for any interpretation must be addressed to Worcester County’s Procurement Officer and to be given consideration, must be received no later than the last day for questions listed in Section I, Subsection C.2. 2. Any and all interpretations, corrections, revisions,”
2. Any and all interpretations, corrections, revisions, and amendments will be issued by the Procurement Officer to all holders of Bid Documents in the form of written addenda. Vendors
View source 1
“2. Any and all interpretations, corrections, revisions, and amendments will be issued by the Procurement Officer to all holders of Bid Documents in the form of written addenda. Vendors”
To find out whether the County intends to issue an amendment reflecting an oral statement made by any employee, contact Worcester County’s Procurement Officer during normal business hours. 5. The Worcester County Procurement Officer reserves the right to postpone the Bid DocumentClose full requirement
To find out whether the County intends to issue an amendment reflecting an oral statement made by any employee, contact Worcester County’s Procurement Officer during normal business hours. 5. The Worcester County Procurement Officer reserves the right to postpone the Bid Document
View source 1
“To find out whether the County intends to issue an amendment reflecting an oral statement made by any employee, contact Worcester County’s Procurement Officer during normal business hours. 5. The Worcester County Procurement Officer reserves the right to postpone the Bid Document opening for any maj”
Code: Contact Person:
View source 1
“Code: Contact Person:”
Source page 21
Page markings may include other requirements. The quotation above identifies this requirement.

Contact Person: Contact Person:
View source 1
“Contact Person: Contact Person:”
Source page 21
Page markings may include other requirements. The quotation above identifies this requirement.

Town, State, Zip Code: Contact Person:
View source 1
“Town, State, Zip Code: Contact Person:”
Source page 21
Page markings may include other requirements. The quotation above identifies this requirement.

Edward Welch Title: Procurement Officer Date:
View source 1
“Edward Welch Title: Procurement Officer Date:”
Edward Welch, Procurement Officer Worcester County Administration One West Market Street, Room 1103 Snow Hill, Maryland 21863 nrice@co.worcester.md.us 7.03 Interpretations or clarifications considered necessary by Engineer in response to such questions will be issued by Addenda dClose full requirement
Edward Welch, Procurement Officer Worcester County Administration One West Market Street, Room 1103 Snow Hill, Maryland 21863 nrice@co.worcester.md.us 7.03 Interpretations or clarifications considered necessary by Engineer in response to such questions will be issued by Addenda d
View source 1
“Edward Welch, Procurement Officer Worcester County Administration One West Market Street, Room 1103 Snow Hill, Maryland 21863 nrice@co.worcester.md.us 7.03 Interpretations or clarifications considered necessary by Engineer in response to such questions will be issued by Addenda delivered to all regi”
Source page 38
Page markings may include other requirements. The quotation above identifies this requirement.

Set exterior door thresholds with full-width bead of elastomeric sealant at each point of contact with floor providing a continuous weather seal; anchor thresholds with stainless steel countersunk screws. 3.3 FIELD QUALITY CONTROL A.Close full requirement
Set exterior door thresholds with full-width bead of elastomeric sealant at each point of contact with floor providing a continuous weather seal; anchor thresholds with stainless steel countersunk screws. 3.3 FIELD QUALITY CONTROL A.
View source 1
“Set exterior door thresholds with full-width bead of elastomeric sealant at each point of contact with floor providing a continuous weather seal; anchor thresholds with stainless steel countersunk screws. 3.3 FIELD QUALITY CONTROL A.”
Bid opening
12 findings—
Needs confirmation
View source 1
“SUBMISSION OF BID DOCUMENTS ....................................................................................................... 4 F. OPENING OF BIDS ...................................................................................................................................... 5 G.”
—
Needs confirmation
View source 1
“Bids received after said time or delivered to the wrong location will be returned to the Vendor unopened. 3. Bids are due and will be opened at the time listed on the front of this Bid Document. 4. If you are delivering a bid in person please keep in mind to allow time to get through security and in”
—
Needs confirmation
View source 1
“F. OPENING OF BIDS 1. Bid Documents received on time will be opened publicly and Vendor’s names and total costs will be read aloud for the record.”
—
Needs confirmation
View source 1
“Article 15— Modification and Withdrawal of Bid ....................................................................................... 11 Article 16— Opening of Bids ....................................................................................................................... 12”
—
Needs confirmation
Applies when: prior to the date for opening of Bids may not be answeredMust be met by: prior to the date for opening of Bids may not be answered
View source 1
“Questions received less than seven days prior to the date for opening of Bids may not be answered. 7.04 Only responses set forth in an Addendum will be binding.”
Source page 38
Page markings may include other requirements. The quotation above identifies this requirement.

—
Needs confirmation
View source 1
“14.03 Bids received after the date and time prescribed for the opening of bids, or not submitted at the”
—
Needs confirmation
Applies when: prior to the date and time for the opening of BidsMust be met by: prior to the date and time for the opening of Bids
View source 1
“ARTICLE 15—MODIFICATION AND WITHDRAWAL OF BID 15.01 An unopened Bid may be withdrawn by an appropriate document duly executed in the same manner that a Bid must be executed and delivered to the place where Bids are to be submitted prior to the date and time for the opening of Bids.”
—
Needs confirmation
Applies when: Upon receipt of such notice, the unopened Bid will be returned to the BidderMust be met by: Upon receipt of such notice, the unopened Bid will be returned to the Bidder
View source 1
“Upon receipt of such notice, the unopened Bid will be returned to the Bidder. 15.02 If a Bidder wishes to modify its Bid prior to Bid opening, Bidder must withdraw its initial Bid in the manner specified in Paragraph 15.01 and submit a new Bid prior to the date and time for the opening of Bids. 15.0”
—
Needs confirmation
View source 1
“ARTICLE 16—OPENING OF BIDS 16.01 Bids will be opened at the time and place indicated in the advertisement or invitation to bid and, unless obviously non-responsive, read aloud publicly.”
—
Needs confirmation
View source 1
“An abstract of the amounts of the base Bids and major alternates, if any, will be made available to Bidders after the opening of Bids.”
—
Needs confirmation
Applies when: prior to the opening of Bids which clarify, correct, or change thMust be met by: prior to the opening of Bids which clarify, correct, or change th
View source 1
“In addition to terms specifically defined, terms with initial capital letters in the Contract Documents include references to identified articles and paragraphs, and the titles of other documents or forms. 1. Addenda—Written or graphic instruments issued prior to the opening of Bids which clarify, c”
—
Needs confirmation
Applies when: at the time of opening of Bids (or on the Effective Date of the Contract if there were no BidsMust be met by: at the time of opening of Bids (or on the Effective Date of the Contract if there were no Bids
View source 1
“specification, manual, reference standard, code, or Laws or Regulations in effect at the time of opening of Bids (or on the Effective Date of the Contract if there were no Bids),”
Formatting & signatures
2 findingsAll blanks on the Bid Form must be completed in ink and the Bid Form signed in ink.
View source 1
“All blanks on the Bid Form must be completed in ink and the Bid Form signed in ink.”
Each certificate shall be signed by an authorized officer of the manufacturing company and shall contain the name and address of the Contractor, the PROJECT name and location, the quantity and date or dates of shipment or delivery to which the certificates apply.
View source 1
“Each certificate shall be signed by an authorized officer of the manufacturing company and shall contain the name and address of the Contractor, the PROJECT name and location, the quantity and date or dates of shipment or delivery to which the certificates apply.”
Source page 231
Page markings may include other requirements. The quotation above identifies this requirement.

Mandatory forms
2 findingsAll blanks on the Bid Form must be completed in ink and the Bid Form signed in ink.
View source 1
“All blanks on the Bid Form must be completed in ink and the Bid Form signed in ink.”
Required Bidder Qualification Statement with supporting data; and G.
View source 1
“Required Bidder Qualification Statement with supporting data; and G.”
Offer acceptance period
3 findings—
Needs confirmation
View source 1
“APPLY THE FIBER BINDER AT A NET DRY WEIGHT OF 750 POUNDS PER 9. THE APPROVED PLANS REMAIN VALID FOR 3 YEARS FROM THE DATE OF APPROVAL B.”
—
Needs confirmation
View source 1
“ARTICLE 7—BIDDER’S ACKNOWLEDGEMENTS: ACCEPTANCE PERIOD, INSTRUCTIONS, AND RECEIPT OF ADDENDA 7.01 Bid Acceptance Period A.”
—
Needs confirmation
View source 1
“ACCEPTANCE PERIOD, INSTRUCTIONS, AND RECEIPT OF ADDENDA 7.01 Bid Acceptance Period A.”
Alternate proposals
4 findingsARTICLE 8—BID SECURITY 8.01 A Bid must be accompanied by Bid security made payable to Owner in an amount of 5% percent of Bidder’s maximum Bid price (determined by adding the base bid and all alternates) and in the form of a Bid bond issued by a surety meeting the requirements of
Applies to: surety
View source 1
“ARTICLE 8—BID SECURITY 8.01 A Bid must be accompanied by Bid security made payable to Owner in an amount of 5% percent of Bidder’s maximum Bid price (determined by adding the base bid and all alternates) and in the form of a Bid bond issued by a surety meeting the requirements of Paragraph 6.01 of t”
Source page 38
Page markings may include other requirements. The quotation above identifies this requirement.

Bidders must submit a Bid on a lump sum basis for the base Bid and include a separate price for each alternate described in the Bidding Documents and as provided for in the Bid Form.
View source 1
“Bidders must submit a Bid on a lump sum basis for the base Bid and include a separate price for each alternate described in the Bidding Documents and as provided for in the Bid Form.”
Source page 42
Page markings may include other requirements. The quotation above identifies this requirement.

To determine the Bid prices for purposes of comparison, Owner will announce to all bidders a “Base Bid plus alternates” budget after receiving all Bids, but prior to opening them.
Applies when: prior to opening themMust be met by: prior to opening them
View source 1
“To determine the Bid prices for purposes of comparison, Owner will announce to all bidders a “Base Bid plus alternates” budget after receiving all Bids, but prior to opening them.”
After determination of the Successful Bidder based on this comparative process and on the responsiveness, responsibility, and other factors set forth in these Instructions, the award may be made to said Successful Bidder on its base Bid and any combination of its additive alternaClose full requirement
After determination of the Successful Bidder based on this comparative process and on the responsiveness, responsibility, and other factors set forth in these Instructions, the award may be made to said Successful Bidder on its base Bid and any combination of its additive alterna
View source 1
“After determination of the Successful Bidder based on this comparative process and on the responsiveness, responsibility, and other factors set forth in these Instructions, the award may be made to said Successful Bidder on its base Bid and any combination of its additive alternate Bids for which Ow”
Grounds for rejection
7 findingsThe County reserves the right to waive any irregularities that may be in its best interest to do so. 5. The County will have the right to reject any and all Bid Documents, where applicable to accept in whole or in part, to add or delete quantities, to waive any informalities or iClose full requirement
The County reserves the right to waive any irregularities that may be in its best interest to do so. 5. The County will have the right to reject any and all Bid Documents, where applicable to accept in whole or in part, to add or delete quantities, to waive any informalities or i
View source 1
“The County reserves the right to waive any irregularities that may be in its best interest to do so. 5. The County will have the right to reject any and all Bid Documents, where applicable to accept in whole or in part, to add or delete quantities, to waive any informalities or irregularities in the”
Document received, to reject a Bid Document not accompanied by required Bid security or other data required by the Bid Documents, and to accept or reject any Bid Document which deviates from specifications when in the best interest of the County.Close full requirement
Document received, to reject a Bid Document not accompanied by required Bid security or other data required by the Bid Documents, and to accept or reject any Bid Document which deviates from specifications when in the best interest of the County.
View source 1
“Document received, to reject a Bid Document not accompanied by required Bid security or other data required by the Bid Documents, and to accept or reject any Bid Document which deviates from specifications when in the best interest of the County.”
Source page 11
Page markings may include other requirements. The quotation above identifies this requirement.

Failure to do so may be cause for rejection of the bid. 2. Any items, systems or devices supplied in this bid that are proprietary in nature relative to maintenance, repair, servicing or updating must be disclosed on the bid form.
View source 1
“Failure to do so may be cause for rejection of the bid. 2. Any items, systems or devices supplied in this bid that are proprietary in nature relative to maintenance, repair, servicing or updating must be disclosed on the bid form.”
Source page 11
Page markings may include other requirements. The quotation above identifies this requirement.

3. County personal property taxes (“Taxes”) must be on a current basis; if any such Taxes are delinquent, they must be paid before award of Contract. Failure to pay will result in the award of
Applies when: before award of ContractMust be met by: before award of Contract
View source 1
“3. County personal property taxes (“Taxes”) must be on a current basis; if any such Taxes are delinquent, they must be paid before award of Contract. Failure to pay will result in the award of”
ARTICLE 16—OPENING OF BIDS 16.01 Bids will be opened at the time and place indicated in the advertisement or invitation to bid and, unless obviously non-responsive, read aloud publicly.
View source 1
“ARTICLE 16—OPENING OF BIDS 16.01 Bids will be opened at the time and place indicated in the advertisement or invitation to bid and, unless obviously non-responsive, read aloud publicly.”
Thin or non-coated areas of the interior coating will be cause for rejection.
View source 1
“Thin or non-coated areas of the interior coating will be cause for rejection.”
Thin or non-coated areas in the interior will be cause for rejection.
View source 1
“Thin or non-coated areas in the interior will be cause for rejection.”
Missing information2 checks · expand to review
A missing value is not a waiver. Check the source or ask the agency before relying on it.
Response deadline
—
Not reviewed — requirement not confirmed
Questions due
—
Not reviewed — requirement not confirmed
1 additional field have no reviewed finding.
6 more sections are available once you sign in
Pricing & payment · Bonds & insurance · Evaluation & award · Scope & delivery · Labor, sourcing & compliance · Contract terms & risk
Sign in — freeExtracted from the public documents linked above. This is an information aid, not a determination of bid eligibility or legal advice. Verify the original wording and any addenda before submitting a bid.