Kitsap County · Port Orchard, WA

2026-030 IFB Courthouse Roof-Phase 2

12 source documentsSource checked Sep 5Content updated
Open notice
Response deadline
Not confirmed
Confirm the deadline with the buyer.
Published project value
Not confirmed
Check the pricing and payment terms below.
Solicitation number
Not confirmed
View official posting ↗Review requirements ↓Original posting details are available below.

Dates to plan around

Times follow the original source.

  1. Questions due
    Source wording
    WRITTEN QUESTIONS DUE: Sept. 1, 2026 by 5:00 p.m. to Purchasing Agent below
    Page 1
  2. Site visit / pre-bid meeting
    Source wording
    OPTIONAL SITE VISIT August 26, 2026 @ 10:00 a.m.
    Page 1
  3. Bid opening
    Source wording
    BID OPENING TIME & LOCATION September 10, 2026, at 2:00 p.m.
    Page 1
From the posting2 agency details · contact information and original wording
Title
2026-030 IFB Courthouse Roof-Phase 2
Status
Open
Worth confirming on the posting
View the official posting →Always the authority. An addendum can change any of this after we read it.
Document coverage
8 / 12documents readReview incomplete

12 documents found4 queued56% of weighted requirement checks reviewed

Newer source changes have not been verified. Confirm the latest notice and addenda before submitting.

Before you bid

Review first

Start with these requirements and unresolved points.
01

Eligibility & participation

Whether you can bid at all, and what you must already hold.

7 verified6 to confirm

Required licenses

Verified

Washington

Applies to: surety

View source 1
01page 67View official source ↗
“The Principal, and [SURETY NAME] (Surety), a corporation organized under the laws of the State of [STATE] and licensed to do business in the State of Washington as surety and named in the current list of “Surety Companies Acceptable in Federal Bonds” as published in the Federal Register by the Audit Staff Bureau of Acc”

Experience & references

4 findings
Requirement 1Conflicting sources

—

Conflicting sources

View source 1
01page 54View official source ↗
“If the Contractor’s liability coverage is written as a claims-made policy, the Contractor shall purchase an extended-reporting period or “tail” coverage for a minimum of three (3) years following completion of the performance or attempted performance of the provisions of this Contract. 13. WARRANTY The Contractor shall”
Requirement 2Conflicting sources

—

Conflicting sources

View source 1
01page 213View official source ↗
“Wall system manufacturer shall have a minimum of 10 years experience in manufacturing wall products in the United States and be ISO 9001 certified.”
Requirement 3Needs confirmation

—

Needs confirmation

Applies to: subcontractor

View source 1
01page 116View official source ↗
“The wage, payroll, and cost records of Contractor, and its Subcontractors, and all records subject to audit in accordance with Section 8.03, shall be retained for a period of not less than 6 years after the date of Final Acceptance. 10.08 THIRD-PARTY AGREEMENTS A.”
Requirement 4Needs confirmation

—

Needs confirmation

View source 1
01page 3View official source ↗
“Project References”
Source page 3

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 3

Key personnel

3 findings
Requirement 1Verified

The superintendent must be satisfactory to the County and shall not be changed without the prior written consent of County.

Applies to: person

View source 1
01page 86View official source ↗
“The superintendent must be satisfactory to the County and shall not be changed without the prior written consent of County.”
Requirement 2Verified

This Superintendent shall be authorized to act as general coordinator of interfaces between units of work.

Applies to: person

View source 1
01page 126View official source ↗
“This Superintendent shall be authorized to act as general coordinator of interfaces between units of work.”
Requirement 3Verified

This Superintendent shall be on site during the construction period as needed to coordinate and supervise the work.

Applies to: person

View source 1
01page 126View official source ↗
“This Superintendent shall be on site during the construction period as needed to coordinate and supervise the work.”

Financial capacity

Verified

The County has the right to request and review the self-insurance retention limits and deductibles, and the Contractor’s most recent annual financial reports and audited financial statements, as conditions of approval.

View source 1
01page 53View official source ↗
“The County has the right to request and review the self-insurance retention limits and deductibles, and the Contractor’s most recent annual financial reports and audited financial statements, as conditions of approval.”

Joint ventures & teaming

2 findings
Requirement 1Needs confirmation

—

An uncompleted form does not establish an eligibility requirement.

View source 1
01page 33View official source ↗
“Sole Proprietorship Partnership Joint Venture Corporation ☐ ☐ ☐ ☐ State of Incorporation, or if not a corporation, State where business entity was formed:”
Requirement 2Needs confirmation

—

An uncompleted form does not establish an eligibility requirement.

View source 1
01page 45View official source ↗
“Legal Name of Bidder By (Signature) Sole Proprietorship Partnership Joint Venture Corporation Other ☐ ☐ ☐ ☐ ☐ Street Address City State Zip Telephone State of Washington Contractor’s Number STATE OF WASHINGTON) ( ) SS.”

Exclusions & responsibility

Verified

Contractor certifies it is not a debarred entity or a "substantially identical" successor under RCW 39.12.010. Contractor pays all filing fees. 2. WAGE DETERMINATION.

View source 1
01page 59View official source ↗
“Contractor certifies it is not a debarred entity or a "substantially identical" successor under RCW 39.12.010. Contractor pays all filing fees. 2. WAGE DETERMINATION.”

Conflicts of interest

Verified

Acceptance of an offer does not bind the County until the offer is approved by the appropriate County level of authority and a contract is executed by both parties. CONFLICT OF INTEREST.

View source 2
01page 4View official source ↗
“Acceptance of an offer does not bind the County until the offer is approved by the appropriate County level of authority and a contract is executed by both parties. CONFLICT OF INTEREST.”
02page 12View official source ↗
“Acceptance of an offer does not bind the County until the offer is approved by the appropriate County level of authority and a contract is executed by both parties. CONFLICT OF INTEREST.”
Missing information3 checks · expand to review

A missing value is not a waiver. Check the source or ask the agency before relying on it.

Registrations

Not found

—

Not found in reviewed sources

Set-aside

Not found

—

Not found in reviewed sources

Small business size

Not found

—

Not found in reviewed sources

1 additional field have no reviewed finding.

02

Deadlines & submission

When and how to submit, and whether you are still in time.

48 verified12 to confirm

Response deadline

Needs confirmation

—

Needs confirmation

Applies when: prior to the opening time will be kept unopened and secured until the time of the bid opMust be met by: prior to the opening time will be kept unopened and secured until the time of the bid op

View source 1
01page 5View official source ↗
“Bids received prior to the opening time will be kept unopened and secured until the time of the bid opening as specified in the Advertisement for Bids.”

Questions due

Verified

2026-09-01T17:00:00

View source 2
01page 1View official source ↗
“WRITTEN QUESTIONS DUE: Sept. 1, 2026 by 5:00 p.m. to Purchasing Agent below”
02page 9View official source ↗
“WRITTEN QUESTIONS DUE: Sept. 1, 2026 by 5:00 p.m. to Purchasing Agent below”

Site visit / pre-bid meeting

Verified

2026-08-26T10:00:00

View source 2
01page 1View official source ↗
“OPTIONAL SITE VISIT August 26, 2026 @ 10:00 a.m.”
02page 9View official source ↗
“OPTIONAL SITE VISIT August 26, 2026 @ 10:00 a.m.”

How to submit

4 findings
Requirement 1Conflicting sources

—

Conflicting sources

View source 2
01page 2View official source ↗
“The Kitsap County Board of Commissioners will receive sealed bids for the COURTHOUSE ROOF - PHASE 2 project until the time and date indicated above.”
02page 10View official source ↗
“The Kitsap County Board of Commissioners will receive sealed bids for the COURTHOUSE ROOF - PHASE 2 project until the time and date indicated above.”
Requirement 2Conflicting sources

—

Conflicting sources

View source 1
01page 18View official source ↗
“If the bid is submitted electronically, Kitsap County will not guarantee the availability of Internet connectivity or related telecommunication and hosting services.”
Requirement 3Verified

Contractor must bond for contract amount plus the WSST. 1.09 SUBMISSION OF BIDS A. Bids must be submitted on or before the time as specified in the Advertisement for Bids.

Applies when: before the time as specified in the Advertisement for BidsMust be met by: before the time as specified in the Advertisement for Bids

View source 1
01page 17View official source ↗
“Contractor must bond for contract amount plus the WSST. 1.09 SUBMISSION OF BIDS A. Bids must be submitted on or before the time as specified in the Advertisement for Bids.”
Requirement 4Verified

The Bid shall be submitted to the location as indicated on the advertisement for bids.

View source 1
01page 17View official source ↗
“The Bid shall be submitted to the location as indicated on the advertisement for bids.”

Required submission files

4 findings
Requirement 1Verified

The proposal shall include: a price for each item (omitting digits more than four places to the right of the decimal point) and the total contract price (the sum of all extensions).

View source 2
01page 25View official source ↗
“The proposal shall include: a price for each item (omitting digits more than four places to the right of the decimal point) and the total contract price (the sum of all extensions).”
02page 3View official source ↗
“The proposal shall include: a price for each item (omitting digits more than four places to the right of the decimal point) and the total contract price (the sum of all extensions).”
Requirement 2Verified

The apparent low Bidder, for purpose of award, shall be the responsive and responsible Bidder offering the low aggregate amount for the base bid plus selected additive or deductive bid alternates and meeting all other bid submittal requirements.

View source 1
01page 21View official source ↗
“The apparent low Bidder, for purpose of award, shall be the responsive and responsible Bidder offering the low aggregate amount for the base bid plus selected additive or deductive bid alternates and meeting all other bid submittal requirements.”
Requirement 3Verified

Furnish three copies of manufacturers’ product data, specifications, installation instructions, and maintenance instructions for products incorporated in the work; information specified herein shall be for products in addition to equipment items requiring operating and maintenanc

View source 1
01page 155View official source ↗
“Furnish three copies of manufacturers’ product data, specifications, installation instructions, and maintenance instructions for products incorporated in the work; information specified herein shall be for products in addition to equipment items requiring operating and maintenance data specified els”
Requirement 4Verified

(five copies) 2. Complete data substantiating compliance of proposed substitution with Contract Documents. 3. For products: a.

View source 1
01page 216View official source ↗
“(five copies) 2. Complete data substantiating compliance of proposed substitution with Contract Documents. 3. For products: a.”

Acknowledge amendments

4 findings
Requirement 1Conflicting sources

—

Conflicting sources

View source 2
01page 2View official source ↗
“Bidders shall acknowledge receipt of all addenda and complete and submit all solicitation appendices with the offer.”
02page 10View official source ↗
“Bidders shall acknowledge receipt of all addenda and complete and submit all solicitation appendices with the offer.”
Requirement 2Conflicting sources

—

Conflicting sources

View source 1
01page 16View official source ↗
“Bidders shall acknowledge receipt of all addenda to this solicitation by identifying the addenda numbers on the bid form.”
Requirement 3Verified
• Fully completed and signed bid form • Signed acknowledgment of receipt of all addenda • Bid Bond security in an approved form, certified check, or cashier’s check payable to Kitsap County in an amount not less than five percent (5%) of the Bid Proposal • Subcontractor’s List • Read full requirement Close full requirement

• Fully completed and signed bid form • Signed acknowledgment of receipt of all addenda • Bid Bond security in an approved form, certified check, or cashier’s check payable to Kitsap County in an amount not less than five percent (5%) of the Bid Proposal • Subcontractor’s List •

Applies to: subcontractor

View source 2
01page 3View official source ↗
“• Fully completed and signed bid form • Signed acknowledgment of receipt of all addenda • Bid Bond security in an approved form, certified check, or cashier’s check payable to Kitsap County in an amount not less than five percent (5%) of the Bid Proposal • Subcontractor’s List • Bidder Information B”
Source page 3

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 3
02page 11View official source ↗
“• Fully completed and signed bid form • Signed acknowledgment of receipt of all addenda • Bid Bond security in an approved form, certified check, or cashier’s check payable to Kitsap County in an amount not less than five percent (5%) of the Bid Proposal • Subcontractor’s List • Bidder Information B”
Requirement 4Verified

All bids shall be accompanied by (but not necessarily limited to): 1. Completed Bid Form – as published in Invitation to Bid 2. Signed acknowledgment of receipt of all addenda 3. Surety company Bid Bond on an approved form, certified check, or cashier’s check payable to Kitsap Co

Applies to: surety

View source 1
01page 18View official source ↗
“All bids shall be accompanied by (but not necessarily limited to): 1. Completed Bid Form – as published in Invitation to Bid 2. Signed acknowledgment of receipt of all addenda 3. Surety company Bid Bond on an approved form, certified check, or cashier’s check payable to Kitsap County in an amount no”

Procurement contact

2 findings
Requirement 1Verified
Project Name: _______________________________________________________________ Project Manager: _____________________ Project Superintendent: ___________________ Public Agency Name: __________________________________________________________ Contact Person: ______________________ PRead full requirement Close full requirement

Project Name: _______________________________________________________________ Project Manager: _____________________ Project Superintendent: ___________________ Public Agency Name: __________________________________________________________ Contact Person: ______________________ P

Applies to: person

View source 1
01page 43View official source ↗
“Project Name: _______________________________________________________________ Project Manager: _____________________ Project Superintendent: ___________________ Public Agency Name: __________________________________________________________ Contact Person: ______________________ Phone No: ___________”
Requirement 2Verified
Payment and performance bonds for this project have been issued by [SURETY COMPANY NAME], Street address: [ADDRESS], City: [CITY], Telephone: [PHONE NUMBER], Contact Person: [CONTACT PERSON], in the amount of [BOND AMOUNT]. 11. HOLD HARMLESS AND INDEMNIFICATION To the fullest extRead full requirement Close full requirement

Payment and performance bonds for this project have been issued by [SURETY COMPANY NAME], Street address: [ADDRESS], City: [CITY], Telephone: [PHONE NUMBER], Contact Person: [CONTACT PERSON], in the amount of [BOND AMOUNT]. 11. HOLD HARMLESS AND INDEMNIFICATION To the fullest ext

Applies to: surety

View source 1
01page 51View official source ↗
“Payment and performance bonds for this project have been issued by [SURETY COMPANY NAME], Street address: [ADDRESS], City: [CITY], Telephone: [PHONE NUMBER], Contact Person: [CONTACT PERSON], in the amount of [BOND AMOUNT]. 11. HOLD HARMLESS AND INDEMNIFICATION To the fullest extent permitted by law”

Bid opening

8 findings
Requirement 1Verified

2026-09-10T14:00:00

View source 2
01page 1View official source ↗
“BID OPENING TIME & LOCATION September 10, 2026, at 2:00 p.m.”
02page 9View official source ↗
“BID OPENING TIME & LOCATION September 10, 2026, at 2:00 p.m.”
Requirement 2Needs confirmation

—

Needs confirmation

Applies when: before the deadline will be publicly opened and read aloud at the location described aMust be met by: before the deadline will be publicly opened and read aloud at the location described a

View source 2
01page 2View official source ↗
“Bids received before the deadline will be publicly opened and read aloud at the location described above.”
02page 10View official source ↗
“Bids received before the deadline will be publicly opened and read aloud at the location described above.”
Requirement 3Needs confirmation

—

Needs confirmation

View source 1
01page 5View official source ↗
“OPENING OF BIDS:”
Requirement 4Needs confirmation

—

Needs confirmation

Applies when: prior to the date and time established in the Invitation to BidMust be met by: prior to the date and time established in the Invitation to Bid

View source 2
01page 5View official source ↗
“The County reserves the right to postpone the date and time for receiving and/or opening of bids at any time prior to the date and time established in the Invitation to Bid.”
02page 27View official source ↗
“The County reserves the right to postpone the date and time for receiving and/or opening of bids at any time prior to the date and time established in the Invitation to Bid.”
Requirement 5Needs confirmation

—

Needs confirmation

Applies when: within sixty (60) days of the time set for opening of bids, the undersigned agrees toMust be met by: within sixty (60) days of the time set for opening of bids, the undersigned agrees to

View source 2
01page 5View official source ↗
“If notified of the acceptance of this bid within sixty (60) days of the time set for opening of bids, the undersigned agrees to execute a contract for the above work, for a compensation computed from the above-stated sums, on the Contract provided herein and to furnish the performance and payment bo”
02page 27View official source ↗
“If notified of the acceptance of this bid within sixty (60) days of the time set for opening of bids, the undersigned agrees to execute a contract for the above work, for a compensation computed from the above-stated sums, on the Contract provided herein and to furnish the performance and payment bo”
Requirement 6Needs confirmation

—

Needs confirmation

Applies when: within sixty (60) days after the time set for the opening of bids, or if the undersignMust be met by: within sixty (60) days after the time set for the opening of bids, or if the undersign

View source 2
01page 5View official source ↗
“If this bid is not accepted within sixty (60) days after the time set for the opening of bids, or if the undersigned delivers said Contract and bonds in a timely manner, then the check or cash shall be returned, or the Bid Bond shall become void.”
02page 27View official source ↗
“If this bid is not accepted within sixty (60) days after the time set for the opening of bids, or if the undersigned delivers said Contract and bonds in a timely manner, then the check or cash shall be returned, or the Bid Bond shall become void.”
Requirement 7Needs confirmation

—

Needs confirmation

View source 1
01page 18View official source ↗
“Bids will be publicly opened at the date, time, and location as indicated on the Advertisement for Bids.”
Requirement 8Needs confirmation

—

Needs confirmation

View source 1
01page 27View official source ↗
“27 OPENING OF BIDS:”

Formatting & signatures

4 findings
Requirement 1Verified

A request to modify or withdraw must be in writing, signed by an authorized representative of the bidder, and submitted to the Purchasing Agent.

View source 2
01page 3View official source ↗
“A request to modify or withdraw must be in writing, signed by an authorized representative of the bidder, and submitted to the Purchasing Agent.”
Source page 3

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 3
02page 11View official source ↗
“A request to modify or withdraw must be in writing, signed by an authorized representative of the bidder, and submitted to the Purchasing Agent.”
Requirement 2Verified

A request to modify or withdraw a bid must be in writing, signed by an authorized representative of the bidder, and submitted by email to the SECTION 00 21 13 PAGE 3 OF 8 INSTRUCTION TO BIDDERS

View source 1
01page 17View official source ↗
“A request to modify or withdraw a bid must be in writing, signed by an authorized representative of the bidder, and submitted by email to the SECTION 00 21 13 PAGE 3 OF 8 INSTRUCTION TO BIDDERS”
Requirement 3Verified

The Contract will only become effective when signed by an authorized agent of the County.

View source 1
01page 21View official source ↗
“The Contract will only become effective when signed by an authorized agent of the County.”
Requirement 4Verified

Upon request of the Engineer or Owner, submit Manufacturer's written approval of secondary components in list form, signed by an authorized agent of the Manufacturer. 1.7 PRE-INSTALLATION MEETING A.

Applies when: Upon request of the Engineer or Owner, submit Manufacturer's written approval of secMust be met by: Upon request of the Engineer or Owner, submit Manufacturer's written approval of sec

View source 1
01page 193View official source ↗
“Upon request of the Engineer or Owner, submit Manufacturer's written approval of secondary components in list form, signed by an authorized agent of the Manufacturer. 1.7 PRE-INSTALLATION MEETING A.”

Mandatory forms

15 findings
Requirement 1Verified
It is mandatory that each bidder complete and submit with its bid the documentation required by the contract documents, including but not limited to the following: 1. Bid Proposal 2. Bid Bond 3. Subcontractor's List 4. Bidder Information Form 5. Bidder Responsibility Checklist 6.Read full requirement Close full requirement

It is mandatory that each bidder complete and submit with its bid the documentation required by the contract documents, including but not limited to the following: 1. Bid Proposal 2. Bid Bond 3. Subcontractor's List 4. Bidder Information Form 5. Bidder Responsibility Checklist 6.

Applies to: subcontractor

View source 2
01page 24View official source ↗
“It is mandatory that each bidder complete and submit with its bid the documentation required by the contract documents, including but not limited to the following: 1. Bid Proposal 2. Bid Bond 3. Subcontractor's List 4. Bidder Information Form 5. Bidder Responsibility Checklist 6. Subcontractor Respo”
02page 2View official source ↗
“It is mandatory that each bidder complete and submit with its bid the documentation required by the contract documents, including but not limited to the following: 1. Bid Proposal 2. Bid Bond 3. Subcontractor's List 4. Bidder Information Form 5. Bidder Responsibility Checklist 6. Subcontractor Respo”
Requirement 2Verified

6. Subcontractor Responsibility Checklist 7. Non-Collusion Affidavit Certificate

Applies to: subcontractor

View source 2
01page 24View official source ↗
“6. Subcontractor Responsibility Checklist 7. Non-Collusion Affidavit Certificate”
02page 2View official source ↗
“6. Subcontractor Responsibility Checklist 7. Non-Collusion Affidavit Certificate”
Requirement 3Verified

o • Non-Collusion Affidavit

View source 2
01page 3View official source ↗
“o • Non-Collusion Affidavit”
Source page 3

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 3
02page 11View official source ↗
“o • Non-Collusion Affidavit”
Requirement 4Verified
00 45 13 Project References .............................................................................................................. 43 00 45 19 Non-Collusion Affidavit ........................................................................................................ Read full requirement Close full requirement

00 45 13 Project References .............................................................................................................. 43 00 45 19 Non-Collusion Affidavit ........................................................................................................

View source 1
01page 5View official source ↗
“00 45 13 Project References .............................................................................................................. 43 00 45 19 Non-Collusion Affidavit ........................................................................................................ 45”
Requirement 5Verified

8. Project References 9. Non-Collusion Affidavit

View source 1
01page 18View official source ↗
“8. Project References 9. Non-Collusion Affidavit”
Requirement 6Verified

Subcontractor Name: [THIS FORM SHALL BE COMPLETED IN FULL AND SUBMITTED WITH THE BID PROPOSAL] END OF SECTION Section 00 43 36 Page 1 of 2 Subcontractor Disclosure List

Applies to: subcontractor

View source 1
01page 31View official source ↗
“Subcontractor Name: [THIS FORM SHALL BE COMPLETED IN FULL AND SUBMITTED WITH THE BID PROPOSAL] END OF SECTION Section 00 43 36 Page 1 of 2 Subcontractor Disclosure List”
Requirement 7Verified

If a co- partnership, proposal must be executed by a partner. [THIS FORM SHALL BE COMPLETED IN FULL AND SUBMITTED WITH THE BID PROPOSAL] END OF CERTIFICATION OF COMPLIANCE WITH WAGE PAYMENT STATUTES Section 00 43 43 Page 1 of 2 Wage Rate Compliance Certification

View source 1
01page 33View official source ↗
“If a co- partnership, proposal must be executed by a partner. [THIS FORM SHALL BE COMPLETED IN FULL AND SUBMITTED WITH THE BID PROPOSAL] END OF CERTIFICATION OF COMPLIANCE WITH WAGE PAYMENT STATUTES Section 00 43 43 Page 1 of 2 Wage Rate Compliance Certification”
Requirement 8Verified

Project References e. Non-Collusion Affidavit Certificate f.

View source 1
01page 35View official source ↗
“Project References e. Non-Collusion Affidavit Certificate f.”
Requirement 9Verified

Yes/No Signature [THIS FORM SHALL BE COMPLETED IN FULL AND SUBMITTED WITH THE BID PROPOSAL]

View source 1
01page 39View official source ↗
“Yes/No Signature [THIS FORM SHALL BE COMPLETED IN FULL AND SUBMITTED WITH THE BID PROPOSAL]”
Requirement 10Verified

Date: [THIS FORM SHALL BE COMPLETED IN FULL FOR EACH SUBCONTRACTOR AND SUBMITTED WITH THE BID PROPOSAL] Section 00 45 02 Page 1 of 2 Subcontractor Responsibility Checklist

Applies to: subcontractor

View source 1
01page 41View official source ↗
“Date: [THIS FORM SHALL BE COMPLETED IN FULL FOR EACH SUBCONTRACTOR AND SUBMITTED WITH THE BID PROPOSAL] Section 00 45 02 Page 1 of 2 Subcontractor Responsibility Checklist”
Requirement 11Verified

____________________________________________________________________________ [THIS FORM SHALL BE COMPLETED IN FULL AND SUBMITTED WITH THE BID PROPOSAL]

View source 1
01page 43View official source ↗
“____________________________________________________________________________ [THIS FORM SHALL BE COMPLETED IN FULL AND SUBMITTED WITH THE BID PROPOSAL]”
Requirement 12Verified
45 SECTION 00 45 19 NON-COLLUSION AFFIDAVIT The undersigned, being duly sworn, deposes and says that the person, firm, association, co- partnership or corporation herein named, has not, either directly or indirectly, entered into any agreement, participated in any collusion, or oRead full requirement Close full requirement

45 SECTION 00 45 19 NON-COLLUSION AFFIDAVIT The undersigned, being duly sworn, deposes and says that the person, firm, association, co- partnership or corporation herein named, has not, either directly or indirectly, entered into any agreement, participated in any collusion, or o

View source 1
01page 45View official source ↗
“45 SECTION 00 45 19 NON-COLLUSION AFFIDAVIT The undersigned, being duly sworn, deposes and says that the person, firm, association, co- partnership or corporation herein named, has not, either directly or indirectly, entered into any agreement, participated in any collusion, or otherwise taken any a”
Requirement 13Verified

GIVEN under my hand and official seal this ___________ day of _____________________, 202_ _________________________ Notary Public in and for the State of Washington, residing at _________________________ My Commission Expires: _________________________ [THIS FORM SHALL BE COMPLET

View source 1
01page 45View official source ↗
“GIVEN under my hand and official seal this ___________ day of _____________________, 202_ _________________________ Notary Public in and for the State of Washington, residing at _________________________ My Commission Expires: _________________________ [THIS FORM SHALL BE COMPLETED IN FULL AND SUBMI”
Requirement 14Verified

Section 00 45 19 Page 1 of 2 Non-Collusion Affidavit

View source 1
01page 45View official source ↗
“Section 00 45 19 Page 1 of 2 Non-Collusion Affidavit”
Requirement 15Verified

46 THIS PAGE INTENTIONALLY LEFT BLANK Section 00 45 19 Page 2 of 2 Non-Collusion Affidavit

View source 1
01page 46View official source ↗
“46 THIS PAGE INTENTIONALLY LEFT BLANK Section 00 45 19 Page 2 of 2 Non-Collusion Affidavit”

Alternate proposals

6 findings
Requirement 1Verified

If the solicitation includes alternate bid items, failure to bid on the alternates may disqualify the bid.

View source 1
01page 15View official source ↗
“If the solicitation includes alternate bid items, failure to bid on the alternates may disqualify the bid.”
Requirement 2Verified

When the sum of the base bid plus all additive bid alternates is $25,000 or less, bid security is not required.

View source 1
01page 15View official source ↗
“When the sum of the base bid plus all additive bid alternates is $25,000 or less, bid security is not required.”
Requirement 3Verified

When the sum of the base bid plus all additive alternates is greater than $25,000, a bid guarantee in the amount of 5% of the base bid amount is required.

View source 1
01page 15View official source ↗
“When the sum of the base bid plus all additive alternates is greater than $25,000, a bid guarantee in the amount of 5% of the base bid amount is required.”
Requirement 4Verified

The Bidder agrees to hold all bid alternate prices for sixty (60) days from date of bid opening. 1.05 ACKNOWLEDGEMENT OF ADDENDA A.

View source 1
01page 16View official source ↗
“The Bidder agrees to hold all bid alternate prices for sixty (60) days from date of bid opening. 1.05 ACKNOWLEDGEMENT OF ADDENDA A.”
Requirement 5Verified

The apparent low Bidder, for purpose of award, shall be the responsive and responsible Bidder offering the low aggregate amount for the base bid plus selected additive or deductive bid alternates and meeting all other bid submittal requirements.

View source 1
01page 21View official source ↗
“The apparent low Bidder, for purpose of award, shall be the responsive and responsible Bidder offering the low aggregate amount for the base bid plus selected additive or deductive bid alternates and meeting all other bid submittal requirements.”
Requirement 6Verified
E. “Claim” means Contractor’s exclusive remedy for resolving disputes with County regarding the terms of a Change Order or a request for equitable adjustment, as more fully set forth in Part 8. F. “Contract Award Amount” is the sum of the Base Bid and any accepted Alternates.Read full requirement Close full requirement

E. “Claim” means Contractor’s exclusive remedy for resolving disputes with County regarding the terms of a Change Order or a request for equitable adjustment, as more fully set forth in Part 8. F. “Contract Award Amount” is the sum of the Base Bid and any accepted Alternates.

View source 1
01page 74View official source ↗
“E. “Claim” means Contractor’s exclusive remedy for resolving disputes with County regarding the terms of a Change Order or a request for equitable adjustment, as more fully set forth in Part 8. F. “Contract Award Amount” is the sum of the Base Bid and any accepted Alternates.”

Grounds for rejection

10 findings
Requirement 1Verified

Bidders that do not comply with this section may be rejected as non-responsive.

View source 2
01page 2View official source ↗
“Bidders that do not comply with this section may be rejected as non-responsive.”
02page 10View official source ↗
“Bidders that do not comply with this section may be rejected as non-responsive.”
Requirement 2Verified

Kitsap County reserves the right to reject any and all bids and to waive informalities or irregularities.

View source 2
01page 3View official source ↗
“Kitsap County reserves the right to reject any and all bids and to waive informalities or irregularities.”
Source page 3

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 3
02page 11View official source ↗
“Kitsap County reserves the right to reject any and all bids and to waive informalities or irregularities.”
Requirement 3Verified
The County may at any time reject all or part of any offer as non-responsive for any of the following reasons: 1) late or incomplete offer; 2) noncompliance with any part of the solicitation; 3) inaccurate, misleading, exaggerated, or false information; or 4) failure to respond tRead full requirement Close full requirement

The County may at any time reject all or part of any offer as non-responsive for any of the following reasons: 1) late or incomplete offer; 2) noncompliance with any part of the solicitation; 3) inaccurate, misleading, exaggerated, or false information; or 4) failure to respond t

View source 2
01page 3View official source ↗
“The County may at any time reject all or part of any offer as non-responsive for any of the following reasons: 1) late or incomplete offer; 2) noncompliance with any part of the solicitation; 3) inaccurate, misleading, exaggerated, or false information; or 4) failure to respond to every solicitation”
Source page 3

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 3
02page 11View official source ↗
“The County may at any time reject all or part of any offer as non-responsive for any of the following reasons: 1) late or incomplete offer; 2) noncompliance with any part of the solicitation; 3) inaccurate, misleading, exaggerated, or false information; or 4) failure to respond to every solicitation”
Requirement 4Verified

Reference checks indicating poor or failed performance may be cause for rejection.

View source 2
01page 4View official source ↗
“Reference checks indicating poor or failed performance may be cause for rejection.”
02page 12View official source ↗
“Reference checks indicating poor or failed performance may be cause for rejection.”
Requirement 5Verified

required as a condition for receiving an award, and bids will not be rejected or considered non-responsive on that basis. Any affirmative action

View source 1
01page 15View official source ↗
“required as a condition for receiving an award, and bids will not be rejected or considered non-responsive on that basis. Any affirmative action”
Requirement 6Verified

Failure of the Bidder to provide bid guarantee when required shall render the bid non-responsive.

View source 1
01page 15View official source ↗
“Failure of the Bidder to provide bid guarantee when required shall render the bid non-responsive.”
Requirement 7Verified

Bidders shall acknowledge receipt of all addenda to this solicitation by identifying the addenda numbers on the bid form. Failure to do so shall result in the bid being declared non-responsive. 1.06 SITE INVESTIGATION AND CONDITIONS AFFECTING THE WORK A.

View source 1
01page 16View official source ↗
“Bidders shall acknowledge receipt of all addenda to this solicitation by identifying the addenda numbers on the bid form. Failure to do so shall result in the bid being declared non-responsive. 1.06 SITE INVESTIGATION AND CONDITIONS AFFECTING THE WORK A.”
Requirement 8Verified

Failure to do so shall result in the bid being declared non-responsive. 1.06 SITE INVESTIGATION AND CONDITIONS AFFECTING THE WORK A.

View source 1
01page 16View official source ↗
“Failure to do so shall result in the bid being declared non-responsive. 1.06 SITE INVESTIGATION AND CONDITIONS AFFECTING THE WORK A.”
Requirement 9Verified

Failure of the Bidder to submit the names of such subcontractors or to name itself to perform such work or the naming of two or more subcontractors to perform the same work shall render the Bidder’s bid non-responsive and, therefore, void.

Applies to: subcontractor

View source 1
01page 31View official source ↗
“Failure of the Bidder to submit the names of such subcontractors or to name itself to perform such work or the naming of two or more subcontractors to perform the same work shall render the Bidder’s bid non-responsive and, therefore, void.”
Requirement 10Verified

No demand for arbitration of any such Claim shall be made later than 30 Days after the date of County’s decision on such Claim; failure to demand arbitration within said 30 Day period shall result in County’s decision being final and binding upon Contractor and its Subcontractors

Applies when: within said 30 Day period shall result in County’s decision being final and binding upMust be met by: within said 30 Day period shall result in County’s decision being final and binding up

Applies to: subcontractor

View source 1
01page 111View official source ↗
“No demand for arbitration of any such Claim shall be made later than 30 Days after the date of County’s decision on such Claim; failure to demand arbitration within said 30 Day period shall result in County’s decision being final and binding upon Contractor and its Subcontractors.”

2 additional fields have no reviewed finding.

Continue your review

6 more sections are available once you sign in

Pricing & payment · Bonds & insurance · Evaluation & award · Scope & delivery · Labor, sourcing & compliance · Contract terms & risk

Sign in — free

Extracted from the public documents linked above. This is an information aid, not a determination of bid eligibility or legal advice. Verify the original wording and any addenda before submitting a bid.

Bid review
Closing date not confirmed
See all 6