Kitsap County · Port Orchard, WA
2026-025 FB Phase 0, Courthouse Parking: Building Demolition
- Response deadline
- Not confirmedConfirm the deadline with the buyer.
- Published project value
- Not confirmedCheck the pricing and payment terms below.
- Solicitation number
- Not confirmed
Dates to plan around
Times follow the original source.
- Questions due
Source wording
WRITTEN QUESTIONS DUE: June 26, 2026 by 5:00 p.m. to Purchasing Agent below
Page 9 - Site visit / pre-bid meeting
Source wording
OPTIONAL SITE VISIT June 25, 2026 @ 10:00 a.m.
Page 9 - Bid opening
Source wording
BID OPENING TIME & LOCATION July 2, 2026, at 2:00 p.m.
Page 9
From the posting1 agency details · contact information and original wording
10 documents found8 restricted54% of weighted requirement checks reviewed
Newer source changes have not been verified. Confirm the latest notice and addenda before submitting.
Review first
Start with these requirements and unresolved points.- Must doExperience & references
Submit project references that meet similar size and scope criteria
- Must doRequired licenses
City Business License
- ConflictHow to submit
View 2 flagged requirements
- Requirement 1 ↗
Sources disagree — check both before relying on this
- Requirement 2 ↗
Sources disagree — check both before relying on this
- Requirement 1 ↗
Eligibility & participation
Whether you can bid at all, and what you must already hold.
Registrations
2 findingsI certify that the contractor(s) (general or specialty) who will perform any of the services for which this permit is issued, is registered with the State of Washington, Department of Labor & Industries, in compliance with chapter 18.27 RCW (law of 1963) under certificate number.Close full requirement
I certify that the contractor(s) (general or specialty) who will perform any of the services for which this permit is issued, is registered with the State of Washington, Department of Labor & Industries, in compliance with chapter 18.27 RCW (law of 1963) under certificate number.
View source 1
“I certify that the contractor(s) (general or specialty) who will perform any of the services for which this permit is issued, is registered with the State of Washington, Department of Labor & Industries, in compliance with chapter 18.27 RCW (law of 1963) under certificate number.”
Source page 35
Page markings may include other requirements. The quotation above identifies this requirement.

The Bidder shall not be listed as having an “active exclusion” on the U.S. government’s “System for Award Management” database (www.sam.gov).
View source 1
“The Bidder shall not be listed as having an “active exclusion” on the U.S. government’s “System for Award Management” database (www.sam.gov).”
Required licenses
5 findingsCity Business License
View source 1
“A City Business License (CBL) is required.”
Source page 35
Page markings may include other requirements. The quotation above identifies this requirement.

Washington Department of Labor & Industries contractor registration
View source 1
“ACKNOWLEGEMENT: I certify that the contractor(s) (general or specialty) who will perform any of the services for which this permit is issued, is registered with the State of Washington, Department of Labor & Industries, in compliance with chapter 18.27 RCW (law of 1963) under certificate number.”
Source page 35
Page markings may include other requirements. The quotation above identifies this requirement.

Washington
Applies to: surety
View source 1
“The Principal, and [SURETY NAME] (Surety), a corporation organized under the laws of the State of [STATE] and licensed to do business in the State of Washington as surety and named in the current list of “Surety Companies Acceptable in Federal Bonds” as published in the Federal Register by the Audit Staff Bureau of Acc”
Must meet minimum qualifications of RCW 39.04.350(1)
Applies when: Before award of a public works contract, a Bidder must meet at least the minimum qualiMust be met by: Before award of a public works contract, a Bidder must meet at least the minimum quali
View source 1
“Before award of a public works contract, a Bidder must meet at least the minimum qualifications of RCW 39.04.350(1) to be considered a responsible bidder and qualified to be awarded a public works project.”
Source page 79
Page markings may include other requirements. The quotation above identifies this requirement.

—
Needs confirmation
Applies when: prior to execution; If the Prime Contractor lists themselves as performing electrical, HVAC, or plumbing they are required to submit proof of licensure prior to executionMust be met by: prior to execution
View source 1
“If the Prime Contractor lists themselves as performing electrical, HVAC, or plumbing they are required to submit proof of licensure prior to execution.”
Source page 90
Page markings may include other requirements. The quotation above identifies this requirement.

Experience & references
5 findingsSubmit project references that meet similar size and scope criteria
View source 1
“Using the following form (use additional forms as needed), the Bidder shall describe projects that meet the similar size and scope criteria of the Plans and Specifications.”
Source page 33
Page markings may include other requirements. The quotation above identifies this requirement.

Provide list of more important construction projects completed in last 5 years
View source 1
“2. List of more important construction projects completed by your company in the last 5 years,”
Source page 88
Page markings may include other requirements. The quotation above identifies this requirement.

—
Needs confirmation
Applies when: If the Contractor’s liability coverage is written as a claims-made policy, the A Contractor shall purchase an extended-reporting period or “tail” coverage for a minimum of three (3)
View source 1
“If the Contractor’s liability coverage is written as a claims-made policy, the A Contractor shall purchase an extended-reporting period or “tail” coverage for a minimum of three (3) years following completion of the performance or attempted performance of the provisions of this Contract. 13. WARRANTY The Contractor sha”
—
Needs confirmation
View source 1
“7. Recordkeeping of this report and any other worker exposure related to GWB systems at this facility for a minimum of 30 years.”
—
Needs confirmation
Applies when: at least three years following Substantial Completion of the Work
View source 1
“Contractor shall maintain Commercial General Liability Insurance arising out of the Contractor’s completed operations for at least three years following Substantial Completion of the Work.”
Source page 107
Page markings may include other requirements. The quotation above identifies this requirement.

Financial capacity
2 findingsThe County has the right to request and review the self-insurance retention limits and deductibles, and the Contractor’s D most recent annual financial reports and audited financial statements, as conditions of approval.
View source 1
“The County has the right to request and review the self-insurance retention limits and deductibles, and the Contractor’s D most recent annual financial reports and audited financial statements, as conditions of approval.”
If renewal of the claims made form of coverage becomes unavailable, or economically prohibitive, the Contractor shall purchase an extended reporting period (“tail”) or execute another form of guarantee acceptable to the Contracting Agency to assure financial responsibility for li
Applies when: If renewal of the claims made form of coverage becomes unavailable, or economically prohibitive, the Contractor shall purchase an extended reporting period (“tail”) or execute anothe
View source 1
“If renewal of the claims made form of coverage becomes unavailable, or economically prohibitive, the Contractor shall purchase an extended reporting period (“tail”) or execute another form of guarantee acceptable to the Contracting Agency to assure financial responsibility for liability for services”
Source page 104
Page markings may include other requirements. The quotation above identifies this requirement.

Joint ventures & teaming
4 findings—
An uncompleted form does not establish an eligibility requirement.
View source 1
“Legal Name of Bidder By (Signature) Sole Proprietorship Partnership Joint Venture Corporation Other ☐ ☐ ☐ ☐ ☐ Street Address City State Zip Telephone State of Washington Contractor’s Number STATE OF WASHINGTON) ( ) SS.”
—
An uncompleted form does not establish an eligibility requirement.
View source 1
“Sole Proprietorship Partnership Joint Venture Corporation ☐ ☐ ☐ ☐ State of Incorporation, or if not a corporation, State where business entity was formed:”
SPECIAL PROVISIONS TO WSDOT STANDARD SPECIFICATIONS A bid by a joint venture shall be executed in the joint venture name and signed by a member of the joint venture.
Applies when: in the joint venture
View source 1
“SPECIAL PROVISIONS TO WSDOT STANDARD SPECIFICATIONS A bid by a joint venture shall be executed in the joint venture name and signed by a member of the joint venture.”
A member of a joint venture or partnership and the joint venture or partnership submit Proposals for the same project (in such an instance, both Bids may be rejected); or g.
View source 1
“A member of a joint venture or partnership and the joint venture or partnership submit Proposals for the same project (in such an instance, both Bids may be rejected); or g.”
Exclusions & responsibility
2 findingsContractor certifies it is not a debarred entity or a "substantially identical" successor under RCW 39.12.010. Contractor pays all filing fees. 2. WAGE DETERMINATION.
View source 1
“Contractor certifies it is not a debarred entity or a "substantially identical" successor under RCW 39.12.010. Contractor pays all filing fees. 2. WAGE DETERMINATION.”
The Bidder shall not currently be debarred or suspended by the Federal government.
View source 1
“The Bidder shall not currently be debarred or suspended by the Federal government.”
Conflicts of interest
Failure to include this information may result in the bid being rejected. CONFLICT OF INTEREST.
View source 1
“Failure to include this information may result in the bid being rejected. CONFLICT OF INTEREST.”
Prequalification
2 findingsTraffic Both vehicular and non-vehicular traffic, such as pedestrians, bicyclists, wheelchairs, and equestrian traffic. 1-02 BID PROCEDURES AND CONDITIONS 1-02.1 Prequalification of Bidders Delete this section and replace it with the following: 1-02.1 Qualifications of Bidder (FeClose full requirement
Traffic Both vehicular and non-vehicular traffic, such as pedestrians, bicyclists, wheelchairs, and equestrian traffic. 1-02 BID PROCEDURES AND CONDITIONS 1-02.1 Prequalification of Bidders Delete this section and replace it with the following: 1-02.1 Qualifications of Bidder (Fe
View source 1
“Traffic Both vehicular and non-vehicular traffic, such as pedestrians, bicyclists, wheelchairs, and equestrian traffic. 1-02 BID PROCEDURES AND CONDITIONS 1-02.1 Prequalification of Bidders Delete this section and replace it with the following: 1-02.1 Qualifications of Bidder (February 17, 2026 APWA”
Source page 79
Page markings may include other requirements. The quotation above identifies this requirement.

The Bidder is not prequalified when so required; b.
Applies when: when so required
View source 1
“The Bidder is not prequalified when so required; b.”
Missing information2 checks · expand to review
A missing value is not a waiver. Check the source or ask the agency before relying on it.
Set-aside
—
Not reviewed — requirement not confirmed
Small business size
—
Not reviewed — requirement not confirmed
1 additional field have no reviewed finding.
Deadlines & submission
When and how to submit, and whether you are still in time.
Questions due
2026-06-26T17:00:00
View source 1
“WRITTEN QUESTIONS DUE: June 26, 2026 by 5:00 p.m. to Purchasing Agent below”
Site visit / pre-bid meeting
2026-06-25T10:00:00
View source 1
“OPTIONAL SITE VISIT June 25, 2026 @ 10:00 a.m.”
How to submit
6 findings—
Conflicting sources
View source 1
“Thursday, June 25, 2026 @10:00 AM The Kitsap County Board of Commissioners will receive sealed bids for the PHASE 0, COURTHOUSE PARKING:”
—
Conflicting sources
View source 1
“The Kitsap County Board of Commissioners will receive sealed bids for the PHASE 0, COURTHOUSE PARKING:”
• Working Drawings • Product Data • Samples • Reports • Material Submittals (Ref. 1-06) • Progress Schedules (Ref. 1-08.3) Physical samples shall be delivered with a hardcopy of the transmittal submitted through the Contracting Agency’s project management software.
View source 1
“• Working Drawings • Product Data • Samples • Reports • Material Submittals (Ref. 1-06) • Progress Schedules (Ref. 1-08.3) Physical samples shall be delivered with a hardcopy of the transmittal submitted through the Contracting Agency’s project management software.”
When the submittal is marked “REVIEWED WITH COMMENTS” the Contractor shall comply with any comments on the return submittal. 1-05.3(5) Resubmittals When a submittal is marked “REVISE AND RESUBMIT” or “REJECTED,” the Contractor shall make the corrections as noted and instructed by
View source 1
“When the submittal is marked “REVIEWED WITH COMMENTS” the Contractor shall comply with any comments on the return submittal. 1-05.3(5) Resubmittals When a submittal is marked “REVISE AND RESUBMIT” or “REJECTED,” the Contractor shall make the corrections as noted and instructed by the Engineer and re”
The Contractor shall verify that all exceptions previously noted by the Engineer have been accounted for. 1-05.3(6) Clarifications Clarifications of the Contract intent shall be submitted via a Request for Information (RFI) using the Contracting Agency’s project management softwa
View source 1
“The Contractor shall verify that all exceptions previously noted by the Engineer have been accounted for. 1-05.3(6) Clarifications Clarifications of the Contract intent shall be submitted via a Request for Information (RFI) using the Contracting Agency’s project management software as described in S”
All correspondence from the Contractor constituting any notification, notice of protest, notice of dispute, or other correspondence constituting notification required to be furnished under the Contract, must be written in paper format, hand delivered or sent via certified mail de
View source 1
“All correspondence from the Contractor constituting any notification, notice of protest, notice of dispute, or other correspondence constituting notification required to be furnished under the Contract, must be written in paper format, hand delivered or sent via certified mail delivery service with ”
Required submission files
The proposal shall include: a price for each item (omitting digits more than four places to the right of the decimal point) and the total contract price (the sum of all extensions).
View source 1
“The proposal shall include: a price for each item (omitting digits more than four places to the right of the decimal point) and the total contract price (the sum of all extensions).”
Acknowledge amendments
3 findingsBidders shall acknowledge receipt of all addenda and complete and submit all solicitation appendices with the offer.
View source 1
“Bidders shall acknowledge receipt of all addenda and complete and submit all solicitation appendices with the offer.”
Source page 11
Page markings may include other requirements. The quotation above identifies this requirement.

• County Bid Proposal – as published in Invitation to Bid • Signed acknowledgment of receipt of all addenda • Surety company Bid Bond on an approved form, certified check, or cashier’s check payable to Kitsap County in an amount not less than five percent (5%) of the Bid ProposalClose full requirement
• County Bid Proposal – as published in Invitation to Bid • Signed acknowledgment of receipt of all addenda • Surety company Bid Bond on an approved form, certified check, or cashier’s check payable to Kitsap County in an amount not less than five percent (5%) of the Bid Proposal
Applies to: subcontractor
View source 1
“• County Bid Proposal – as published in Invitation to Bid • Signed acknowledgment of receipt of all addenda • Surety company Bid Bond on an approved form, certified check, or cashier’s check payable to Kitsap County in an amount not less than five percent (5%) of the Bid Proposal • Subcontractor’s L”
Source page 11
Page markings may include other requirements. The quotation above identifies this requirement.

SPECIAL PROVISIONS TO WSDOT STANDARD SPECIFICATIONS applicable, retail sales taxes and acknowledgment of addenda; the bidder’s name, address, telephone number, and signature; the bidder’s DBE commitment, if applicable; a State of Washington Contractor’s Registration Number; and aClose full requirement
SPECIAL PROVISIONS TO WSDOT STANDARD SPECIFICATIONS applicable, retail sales taxes and acknowledgment of addenda; the bidder’s name, address, telephone number, and signature; the bidder’s DBE commitment, if applicable; a State of Washington Contractor’s Registration Number; and a
View source 1
“SPECIAL PROVISIONS TO WSDOT STANDARD SPECIFICATIONS applicable, retail sales taxes and acknowledgment of addenda; the bidder’s name, address, telephone number, and signature; the bidder’s DBE commitment, if applicable; a State of Washington Contractor’s Registration Number; and a Business License Nu”
Procurement contact
2 findingsProject Name: _______________________________________________________________ Project Manager: _____________________ Project Superintendent: ___________________ Public Agency Name: __________________________________________________________ Contact Person: ______________________ PClose full requirement
Project Name: _______________________________________________________________ Project Manager: _____________________ Project Superintendent: ___________________ Public Agency Name: __________________________________________________________ Contact Person: ______________________ P
Applies to: person
View source 1
“Project Name: _______________________________________________________________ Project Manager: _____________________ Project Superintendent: ___________________ Public Agency Name: __________________________________________________________ Contact Person: ______________________ Phone No: ___________”
Source page 33
Page markings may include other requirements. The quotation above identifies this requirement.

Payment and performance bonds for this project have been issued by [SURETY COMPANY NAME], Street address: [ADDRESS], City: [CITY], Telephone: [PHONE NUMBER], Contact Person: [CONTACT PERSON], in the amount of [BOND AMOUNT]. 11. HOLD HARMLESS AND INDEMNIFICATION T To the fullest eClose full requirement
Payment and performance bonds for this project have been issued by [SURETY COMPANY NAME], Street address: [ADDRESS], City: [CITY], Telephone: [PHONE NUMBER], Contact Person: [CONTACT PERSON], in the amount of [BOND AMOUNT]. 11. HOLD HARMLESS AND INDEMNIFICATION T To the fullest e
Applies to: surety
View source 1
“Payment and performance bonds for this project have been issued by [SURETY COMPANY NAME], Street address: [ADDRESS], City: [CITY], Telephone: [PHONE NUMBER], Contact Person: [CONTACT PERSON], in the amount of [BOND AMOUNT]. 11. HOLD HARMLESS AND INDEMNIFICATION T To the fullest extent permitted by l”
Bid opening
7 findings2026-07-02T14:00:00
View source 1
“BID OPENING TIME & LOCATION July 2, 2026, at 2:00 p.m.”
—
Needs confirmation
Applies when: before the deadline will be publicly opened and read aloud at the location described aMust be met by: before the deadline will be publicly opened and read aloud at the location described a
View source 2
“Bids received before the deadline will be publicly opened and read aloud at the location described above.”
“Bids received before the deadline will be publicly opened and read aloud at the location described above.”
—
Needs confirmation
View source 1
“OPENING OF BIDS:”
—
Needs confirmation
Applies when: within appropriate time will be opened and publicly read aloudMust be met by: within appropriate time will be opened and publicly read aloud
View source 1
“At the time and place fixed for the opening of bids, every bid received within appropriate time will be opened and publicly read aloud.”
—
Needs confirmation
Applies when: prior to the date and time established in the Invitation to BidMust be met by: prior to the date and time established in the Invitation to Bid
View source 1
“The County reserves the right to postpone the date and time for receiving and/or opening of bids at any time prior to the date and time established in the Invitation to Bid.”
—
Needs confirmation
Applies when: within sixty (60) days of the time set for opening of bids, the undersigned agrees toMust be met by: within sixty (60) days of the time set for opening of bids, the undersigned agrees to
View source 1
“If notified of the acceptance of this bid within sixty (60) days of the time set for opening of bids, the undersigned agrees to execute a contract for the above work, for a compensation computed from the above-stated sums, on the Contract provided herein and to furnish the performance and payment bo”
—
Needs confirmation
Applies when: within sixty (60) days after the time set for the opening of bids, or if the undersignMust be met by: within sixty (60) days after the time set for the opening of bids, or if the undersign
View source 1
“If this bid is not accepted within sixty (60) days after the time set for the opening of bids, or if the undersigned delivers said Contract and bonds in a timely manner, then the check or cash shall be returned, or the Bid Bond shall become void.”
Formatting & signatures
2 findingsA request to modify or withdraw must be in writing, signed by an authorized representative of the bidder, and submitted to the Purchasing Agent.
View source 1
“A request to modify or withdraw must be in writing, signed by an authorized representative of the bidder, and submitted to the Purchasing Agent.”
Source page 11
Page markings may include other requirements. The quotation above identifies this requirement.

SPECIAL PROVISIONS TO WSDOT STANDARD SPECIFICATIONS 1. The Bidder submits a written request signed by an authorized person and physically delivers it to the place designated for receipt of Bid Proposals, and 2. The Contracting Agency receives the request before the time set for rClose full requirement
SPECIAL PROVISIONS TO WSDOT STANDARD SPECIFICATIONS 1. The Bidder submits a written request signed by an authorized person and physically delivers it to the place designated for receipt of Bid Proposals, and 2. The Contracting Agency receives the request before the time set for r
Applies when: before the time set for receipt of Bid Proposals, and 3Must be met by: before the time set for receipt of Bid Proposals, and 3
View source 1
“SPECIAL PROVISIONS TO WSDOT STANDARD SPECIFICATIONS 1. The Bidder submits a written request signed by an authorized person and physically delivers it to the place designated for receipt of Bid Proposals, and 2. The Contracting Agency receives the request before the time set for receipt of Bid Propos”
Mandatory forms
13 findingsProject References ....................................................................................................................... 33 Non-Collusion Affidavit ..................................................................................................................Close full requirement
Project References ....................................................................................................................... 33 Non-Collusion Affidavit ..................................................................................................................
View source 1
“Project References ....................................................................................................................... 33 Non-Collusion Affidavit ....................................................................................................................... 35”
o • Non-Collusion Affidavit
View source 1
“o • Non-Collusion Affidavit”
Source page 11
Page markings may include other requirements. The quotation above identifies this requirement.

Project References 5. Non-Collusion Affidavit Certificate 6. Certification of Compliance with Wage Payment Statutes 7. Exceptions & Assumptions Form BASIC BID:
View source 1
“Project References 5. Non-Collusion Affidavit Certificate 6. Certification of Compliance with Wage Payment Statutes 7. Exceptions & Assumptions Form BASIC BID:”
Subcontractor Name: [THIS FORM SHALL BE COMPLETED IN FULL AND SUBMITTED WITH THE BID PROPOSAL] END OF Subcontractors list Phase 0A, Courthouse Parking:
Applies to: subcontractor
View source 1
“Subcontractor Name: [THIS FORM SHALL BE COMPLETED IN FULL AND SUBMITTED WITH THE BID PROPOSAL] END OF Subcontractors list Phase 0A, Courthouse Parking:”
Yes/No Signature [THIS FORM SHALL BE COMPLETED IN FULL AND SUBMITTED WITH THE BID PROPOSAL]
View source 1
“Yes/No Signature [THIS FORM SHALL BE COMPLETED IN FULL AND SUBMITTED WITH THE BID PROPOSAL]”
Date: [THIS FORM SHALL BE COMPLETED IN FULL AND SUBMITTED WITH THE BID PROPOSAL] Phase 0A, Courthouse Parking:
View source 1
“Date: [THIS FORM SHALL BE COMPLETED IN FULL AND SUBMITTED WITH THE BID PROPOSAL] Phase 0A, Courthouse Parking:”
Date: [THIS FORM SHALL BE COMPLETED IN FULL FOR EACH SUBCONTRACTOR AND SUBMITTED WITH THE BID PROPOSAL] Phase 0A, Courthouse Parking:
Applies to: subcontractor
View source 1
“Date: [THIS FORM SHALL BE COMPLETED IN FULL FOR EACH SUBCONTRACTOR AND SUBMITTED WITH THE BID PROPOSAL] Phase 0A, Courthouse Parking:”
____________________________________________________________________________ [THIS FORM SHALL BE COMPLETED IN FULL AND SUBMITTED WITH THE BID PROPOSAL]
View source 1
“____________________________________________________________________________ [THIS FORM SHALL BE COMPLETED IN FULL AND SUBMITTED WITH THE BID PROPOSAL]”
Source page 33
Page markings may include other requirements. The quotation above identifies this requirement.

NON-COLLUSION AFFIDAVIT The undersigned, being duly sworn, deposes and says that the person, firm, association, co- partnership or corporation herein named, has not, either directly or indirectly, entered into any agreement, participated in any collusion, or otherwise taken any aClose full requirement
NON-COLLUSION AFFIDAVIT The undersigned, being duly sworn, deposes and says that the person, firm, association, co- partnership or corporation herein named, has not, either directly or indirectly, entered into any agreement, participated in any collusion, or otherwise taken any a
View source 1
“NON-COLLUSION AFFIDAVIT The undersigned, being duly sworn, deposes and says that the person, firm, association, co- partnership or corporation herein named, has not, either directly or indirectly, entered into any agreement, participated in any collusion, or otherwise taken any action in restraint o”
GIVEN under my hand and official seal this ___________ day of _____________________, 202_ _________________________ Notary Public in and for the State of Washington, residing at _________________________ My Commission Expires: _________________________ [THIS FORM SHALL BE COMPLET
View source 1
“GIVEN under my hand and official seal this ___________ day of _____________________, 202_ _________________________ Notary Public in and for the State of Washington, residing at _________________________ My Commission Expires: _________________________ [THIS FORM SHALL BE COMPLETED IN FULL AND SUBMI”
[THIS FORM SHALL BE COMPLETED IN FULL AND SUBMITTED WITH THE BID PROPOSAL] END OF NON-COLLUSION AFFIDAVIT
View source 1
“[THIS FORM SHALL BE COMPLETED IN FULL AND SUBMITTED WITH THE BID PROPOSAL] END OF NON-COLLUSION AFFIDAVIT”
If a co- partnership, proposal must be executed by a partner. [THIS FORM SHALL BE COMPLETED IN FULL AND SUBMITTED WITH THE BID PROPOSAL] END OF CERTIFICATION OF COMPLIANCE WITH WAGE PAYMENT STATUTES Phase 0A, Courthouse Parking:
View source 1
“If a co- partnership, proposal must be executed by a partner. [THIS FORM SHALL BE COMPLETED IN FULL AND SUBMITTED WITH THE BID PROPOSAL] END OF CERTIFICATION OF COMPLIANCE WITH WAGE PAYMENT STATUTES Phase 0A, Courthouse Parking:”
Project References e. Non-Collusion Affidavit Certificate f.
View source 1
“Project References e. Non-Collusion Affidavit Certificate f.”
Alternate proposals
The completed Proposal form contains unauthorized additions, deletions, alternate Bids, or conditions; e.
View source 1
“The completed Proposal form contains unauthorized additions, deletions, alternate Bids, or conditions; e.”
Grounds for rejection
6 findingsBidders that do not comply with this section may be rejected as non-responsive.
View source 1
“Bidders that do not comply with this section may be rejected as non-responsive.”
Source page 11
Page markings may include other requirements. The quotation above identifies this requirement.

Kitsap County reserves the right to reject any and all bids and to waive informalities or irregularities.
View source 1
“Kitsap County reserves the right to reject any and all bids and to waive informalities or irregularities.”
Source page 11
Page markings may include other requirements. The quotation above identifies this requirement.

The County may at any time reject all or part of any offer as non-responsive for any of the following reasons: 1) late or incomplete offer; 2) noncompliance with any part of the solicitation; 3) inaccurate, misleading, exaggerated, or false information; or 4) failure to respond tClose full requirement
The County may at any time reject all or part of any offer as non-responsive for any of the following reasons: 1) late or incomplete offer; 2) noncompliance with any part of the solicitation; 3) inaccurate, misleading, exaggerated, or false information; or 4) failure to respond t
View source 1
“The County may at any time reject all or part of any offer as non-responsive for any of the following reasons: 1) late or incomplete offer; 2) noncompliance with any part of the solicitation; 3) inaccurate, misleading, exaggerated, or false information; or 4) failure to respond to every solicitation”
Source page 11
Page markings may include other requirements. The quotation above identifies this requirement.

Reference checks indicating poor or failed performance may be cause for rejection.
View source 1
“Reference checks indicating poor or failed performance may be cause for rejection.”
Failure of the Bidder to submit the names of such subcontractors or to name itself to perform such work or the naming of two or more subcontractors to perform the same work shall render the Bidder’s bid non-responsive and, therefore, void.
Applies to: subcontractor
View source 1
“Failure of the Bidder to submit the names of such subcontractors or to name itself to perform such work or the naming of two or more subcontractors to perform the same work shall render the Bidder’s bid non-responsive and, therefore, void.”
Unallowable or questionable Exceptions and/or Assumptions may cause a proposal to be non-responsive.
View source 1
“Unallowable or questionable Exceptions and/or Assumptions may cause a proposal to be non-responsive.”
Missing information1 checks · expand to review
A missing value is not a waiver. Check the source or ask the agency before relying on it.
Response deadline
—
Not reviewed — requirement not confirmed
2 additional fields have no reviewed finding.
6 more sections are available once you sign in