City of Providence · Providence, RI
Item Description: PROVIDENCE CITY HALL ENVELOPE RESTORATION – PHASE 1 Procurement/MinuteTraq #: 54386 Date to be opened: 10/19/2026
- Response deadline
- Not confirmedConfirm the deadline with the buyer.
- Published project value
- Not confirmedCheck the pricing and payment terms below.
- Solicitation number
- Not confirmed
4 documents found62% of weighted requirement checks reviewed
Review first
Start with these requirements and unresolved points.- ConflictExperience & references
View 2 flagged requirements
- Requirement 1 ↗
Sources disagree — check both before relying on this
- Requirement 2 ↗
Sources disagree — check both before relying on this
- Requirement 1 ↗
- ConflictHow to submit
View 2 flagged requirements
- Requirement 1 ↗
Sources disagree — check both before relying on this
- Requirement 2 ↗
Sources disagree — check both before relying on this
- Requirement 1 ↗
Eligibility & participation
Whether you can bid at all, and what you must already hold.
Set-aside
MBE,WBE
Applies when: at the time of bidMust be met by: at the time of bid
Applies to: subcontractor
View source 1
“Please note that all MBE/WBE subcontractors/suppliers must be certified by the Office of Diversity, Equity and Opportunity at the time of bid.”
Experience & references
6 findings—
Conflicting sources
View source 1
“Photographer Qualifications: An individual who has been regularly engaged as a professional photographer of construction projects for not less than three (3) years. 1.5 FORMATS AND MEDIA A.”
—
Conflicting sources
View source 1
“Historic Treatment Specialist Qualifications: Engage an experienced stone restoration and cleaning firm with a minimum of five (5) years of experience to perform work of this Section.”
—
Needs confirmation
Applies to: person
View source 1
“Owner’s approval is required for all key personnel. 1. Project Superintendent shall have a minimum of ten (10) years of construction experience. 2. Assistant Project Superintendent shall have a minimum of five (5) years of construction experience.”
—
Needs confirmation
Applies when: when necessary in the application of the products and site review of the assembly
View source 1
“Manufacturer Qualifications: Minimum of 20 years of experience in the production and sales of waterproofing. 1. Waterproofing manufacturer shall have available an in-house technical staff to assist the contractor when necessary in the application of the products and site review of the assembly.”
—
Needs confirmation
Applies when: prior to the date of the Contractor’s Bid ProposalMust be met by: prior to the date of the Contractor’s Bid Proposal
View source 1
“Installer Certificates: Signed by roofing system manufacturer certifying that Installer is approved, authorized, or licensed by manufacturer to install specified roofing system. 1. Certification shall have been issued by the manufacturer no less than one (1) year prior to the date of the Contractor’s Bid Proposal.”
—
Needs confirmation
Applies when: if required by law
View source 1
“Records shall be retained for not less than five years after Final Completion or longer if required by law. 17. Default, Remedies, and Termination 17.1. Default.”
Key personnel
6 findings1.1.2. If unresolved, the Business Representative and the Contractor’s project manager shall
Applies when: If unresolved, the Business Representative and the Contractor’s project manager shall
Applies to: person
View source 1
“1.1.2. If unresolved, the Business Representative and the Contractor’s project manager shall”
Providence City Hall Exterior Restoration, Phase I Project No. 2417 Providence, Rhode Island Issued for Bid March 11, 2026 1.5 KEY PERSONNEL A.
Applies to: person
View source 1
“Providence City Hall Exterior Restoration, Phase I Project No. 2417 Providence, Rhode Island Issued for Bid March 11, 2026 1.5 KEY PERSONNEL A.”
Owner’s approval is required for all key personnel. 1. Project Superintendent shall have a minimum of ten (10) years of construction experience. 2. Assistant Project Superintendent shall have a minimum of five (5) years of construction experience.
Applies to: person
View source 1
“Owner’s approval is required for all key personnel. 1. Project Superintendent shall have a minimum of ten (10) years of construction experience. 2. Assistant Project Superintendent shall have a minimum of five (5) years of construction experience.”
C. Key Personnel Names: Within seven (7) calendar days of starting construction operations, submit a list of key personnel assignments, including superintendent and other personnel in attendance at Project site.
Applies when: Within seven (7) calendar days of starting construction operations, submit a list of kMust be met by: Within seven (7) calendar days of starting construction operations, submit a list of k
Applies to: person
View source 1
“C. Key Personnel Names: Within seven (7) calendar days of starting construction operations, submit a list of key personnel assignments, including superintendent and other personnel in attendance at Project site.”
Key Personnel Names: Within seven (7) calendar days of starting construction operations, submit a list of key personnel assignments, including superintendent and other personnel in attendance at Project site.
Applies when: Within seven (7) calendar days of starting construction operations, submit a list of kMust be met by: Within seven (7) calendar days of starting construction operations, submit a list of k
Applies to: person
View source 1
“Key Personnel Names: Within seven (7) calendar days of starting construction operations, submit a list of key personnel assignments, including superintendent and other personnel in attendance at Project site.”
Designation of key personnel and their duties. g.
Applies to: person
View source 1
“Designation of key personnel and their duties. g.”
Missing information3 checks · expand to review
A missing value is not a waiver. Check the source or ask the agency before relying on it.
Registrations
—
Not found in reviewed sources
Small business size
—
Not found in reviewed sources
Required licenses
—
Not found in reviewed sources
5 additional fields have no reviewed finding.
Deadlines & submission
When and how to submit, and whether you are still in time.
Site visit / pre-bid meeting
required
View source 1
“This first addendum is to provide the sign in sheet for prospective bidders who attended the mandatory pre-bid conference on 9/14/26.”
How to submit
3 findings—
Conflicting sources
View source 1
“QUESTIONS • Please direct questions related to the bidding process, how to fill out forms, and how to submit a bid”
—
Conflicting sources
View source 1
“Change Order Proposal Form: Use AIA Document G709, or similar document. 1. Submit proposals, including attachments, electronically as a PDF.”
Questions regarding this bid package shall be submitted via e-mail to The Providence Purchasing Department at purchasing@providenceri.gov and Dan Kittridge, Capital Improvement Project Manager at dkittridge@providenceri.gov.
Applies to: person
View source 1
“Questions regarding this bid package shall be submitted via e-mail to The Providence Purchasing Department at purchasing@providenceri.gov and Dan Kittridge, Capital Improvement Project Manager at dkittridge@providenceri.gov.”
Required submission files
2 findings• Bidders must submit 2 copies of their bid in sealed envelopes or packages labeled with the captioned Item Description and the City Department to which the solicitation and bid are related and must include the company name and address on the envelope as well.
View source 1
“• Bidders must submit 2 copies of their bid in sealed envelopes or packages labeled with the captioned Item Description and the City Department to which the solicitation and bid are related and must include the company name and address on the envelope as well.”
• Financial Assurance, if requested (as indicated on page 5 of this document under “Bid Terms”) • Addenda (If Any) - Must Be Acknowledged on Bid Form • Product Information for Items Submitted as ‘Or Equal’ to Specified Materials • City of Providence CDBG Program Federal Construct
Applies when: if requested (as indicated on page 5 of this document under “Bid Terms”) • Addenda (If Any) - Must Be Acknowledged on Bid Form • Product Information for Items Submitted as ‘Or Equal’A waiver may be available
View source 1
“• Financial Assurance, if requested (as indicated on page 5 of this document under “Bid Terms”) • Addenda (If Any) - Must Be Acknowledged on Bid Form • Product Information for Items Submitted as ‘Or Equal’ to Specified Materials • City of Providence CDBG Program Federal Construction Contract Provisi”
Procurement contact
4 findingsContact Person: Daniel Kittridge Email: dkittridge@providenceri.gov
View source 1
“Contact Person: Daniel Kittridge Email: dkittridge@providenceri.gov”
Contact Person: Benjamin Lueck Email: blueck@dbvw.com
View source 1
“Contact Person: Benjamin Lueck Email: blueck@dbvw.com”
Contact Person: Jennifer McClain Email: jennifer.mcclain@rseassociates.com
View source 1
“Contact Person: Jennifer McClain Email: jennifer.mcclain@rseassociates.com”
—
Needs confirmation
View source 1
“Point of Contact: Telephone: Email:”
Bid opening
—
Needs confirmation
View source 1
“At 2:15 P.M. all bids will be publicly opened and read at the Board of Contract Meeting in Conference Room 305, on the 3rd floor of City Hall.”
Formatting & signatures
Awards may be made on the basis of total bid or by individual items. 5. All bids MUST BE SIGNED IN INK.
View source 1
“Awards may be made on the basis of total bid or by individual items. 5. All bids MUST BE SIGNED IN INK.”
Mandatory forms
2 findingsSee forms and instructions enclosed (pages 11-12) or on: https://www.providenceri.gov/purchasing/minority-women-owned-business-mbewbe-procurement- program/ *Please note: MBE/WBE forms must be completed for EVERY bid submitted and must be inclusive of ALL required signatures.
View source 1
“See forms and instructions enclosed (pages 11-12) or on: https://www.providenceri.gov/purchasing/minority-women-owned-business-mbewbe-procurement- program/ *Please note: MBE/WBE forms must be completed for EVERY bid submitted and must be inclusive of ALL required signatures.”
Contractor will request information regarding the Work, on form acceptable to the Architect. 1. RFI forms shall be submitted in a typewritten, standardized format, including title and description, and sequentially numbered. 2. Submit RFI, including attachments, electronically as
View source 1
“Contractor will request information regarding the Work, on form acceptable to the Architect. 1. RFI forms shall be submitted in a typewritten, standardized format, including title and description, and sequentially numbered. 2. Submit RFI, including attachments, electronically as a “portable document”
Alternate proposals
5 findingsProvidence City Hall Exterior Restoration, Phase I Project No. 2417 Providence, Rhode Island Issued for Bid March 11, 2026 PART 2 - PRODUCTS (Not Used) PART 3 - EXECUTION 3.1 SCHEDULE OF ALTERNATES A. Alternate No. 1: Northeast Pavilion. 1. Base Bid: a.Close full requirement
Providence City Hall Exterior Restoration, Phase I Project No. 2417 Providence, Rhode Island Issued for Bid March 11, 2026 PART 2 - PRODUCTS (Not Used) PART 3 - EXECUTION 3.1 SCHEDULE OF ALTERNATES A. Alternate No. 1: Northeast Pavilion. 1. Base Bid: a.
View source 1
“Providence City Hall Exterior Restoration, Phase I Project No. 2417 Providence, Rhode Island Issued for Bid March 11, 2026 PART 2 - PRODUCTS (Not Used) PART 3 - EXECUTION 3.1 SCHEDULE OF ALTERNATES A. Alternate No. 1: Northeast Pavilion. 1. Base Bid: a.”
Refer to the Drawings for extents of area included in Alternate No. 1. B.
View source 1
“Refer to the Drawings for extents of area included in Alternate No. 1. B.”
Refer to the Drawings for extents of area included in Alternate No. 1. B. Alternate No. 2: Southeast Pavilion. 1. Base Bid: a.
View source 1
“Refer to the Drawings for extents of area included in Alternate No. 1. B. Alternate No. 2: Southeast Pavilion. 1. Base Bid: a.”
In addition to Base Bid and Alternate No. 1, include all scope, as indicated in the Drawings and Project Manual, at the southeast pavilion.
View source 1
“In addition to Base Bid and Alternate No. 1, include all scope, as indicated in the Drawings and Project Manual, at the southeast pavilion.”
Refer to the Drawings for extents of area included in Alternate No. 2. END OF SECTION 012300 ALTERNATES 012300 - 1
View source 1
“Refer to the Drawings for extents of area included in Alternate No. 2. END OF SECTION 012300 ALTERNATES 012300 - 1”
Grounds for rejection
8 findings7. The Board of Contract and Supply reserves the right to reject any and all bids.
View source 1
“7. The Board of Contract and Supply reserves the right to reject any and all bids.”
7. Failure on the part of a Contractor to provide complete Qualifications Data required herein within the required time may result in the Contractor being found non-responsive and may
Applies when: within the required time may result in the Contractor being found non-responsive and mMust be met by: within the required time may result in the Contractor being found non-responsive and m
View source 2
“7. Failure on the part of a Contractor to provide complete Qualifications Data required herein within the required time may result in the Contractor being found non-responsive and may”
“7. Failure on the part of a Contractor to provide complete Qualifications Data required herein within the required time may result in the Contractor being found non-responsive and may”
within the required time may result in the Contractor being found non-responsive and may be grounds for rejection of its bid.
Applies when: within the required time may result in the Contractor being found non-responsive and mMust be met by: within the required time may result in the Contractor being found non-responsive and m
View source 2
“within the required time may result in the Contractor being found non-responsive and may be grounds for rejection of its bid.”
“within the required time may result in the Contractor being found non-responsive and may be grounds for rejection of its bid.”
7. Failure on the part of a Contractor to provide complete Qualifications Data required herein within the required time may result in the Contractor being found non-responsive
Applies when: within the required time may result in the Contractor being found non-responsiveMust be met by: within the required time may result in the Contractor being found non-responsive
View source 1
“7. Failure on the part of a Contractor to provide complete Qualifications Data required herein within the required time may result in the Contractor being found non-responsive”
herein within the required time may result in the Contractor being found non-responsive and may be grounds for rejection of its bid.
Applies when: within the required time may result in the Contractor being found non-responsive and mMust be met by: within the required time may result in the Contractor being found non-responsive and m
View source 1
“herein within the required time may result in the Contractor being found non-responsive and may be grounds for rejection of its bid.”
Broken corners on the unexposed ends may be considered cause for rejection when either the base or leg of the right triangular piece broken off is greater than 1 1/2 inches. 3. The curvature of shingles shall not exceed 1/8 inch in 12 inches.Close full requirement
Broken corners on the unexposed ends may be considered cause for rejection when either the base or leg of the right triangular piece broken off is greater than 1 1/2 inches. 3. The curvature of shingles shall not exceed 1/8 inch in 12 inches.
Applies when: when either the base or leg of the right triangular piece broken off is greater than 1 1/2 inches
View source 1
“Broken corners on the unexposed ends may be considered cause for rejection when either the base or leg of the right triangular piece broken off is greater than 1 1/2 inches. 3. The curvature of shingles shall not exceed 1/8 inch in 12 inches.”
Slates with a protuberance of more than 1/16 inch beyond the split surface shall be cause for rejection. 5. Slates shall be free from ribbons and cracks. 6. Face dimensions shall not differ from those specified by more than 1/8 inch. 7. Slates shall not have quartz veins running Close full requirement
Slates with a protuberance of more than 1/16 inch beyond the split surface shall be cause for rejection. 5. Slates shall be free from ribbons and cracks. 6. Face dimensions shall not differ from those specified by more than 1/8 inch. 7. Slates shall not have quartz veins running
View source 1
“Slates with a protuberance of more than 1/16 inch beyond the split surface shall be cause for rejection. 5. Slates shall be free from ribbons and cracks. 6. Face dimensions shall not differ from those specified by more than 1/8 inch. 7. Slates shall not have quartz veins running through them. 8. Lar”
8. Large iron pyrites within the slates shall be cause for rejection.
Applies when: within the slates shall be cause for rejectionMust be met by: within the slates shall be cause for rejection
View source 1
“8. Large iron pyrites within the slates shall be cause for rejection.”
Missing information3 checks · expand to review
A missing value is not a waiver. Check the source or ask the agency before relying on it.
Response deadline
—
Not found in reviewed sources
Questions due
—
Not found in reviewed sources
Acknowledge amendments
—
Not found in reviewed sources
2 additional fields have no reviewed finding.
6 more sections are available once you sign in
Pricing & payment · Bonds & insurance · Evaluation & award · Scope & delivery · Labor, sourcing & compliance · Contract terms & risk
Sign in — freeExtracted from the public documents linked above. This is an information aid, not a determination of bid eligibility or legal advice. Verify the original wording and any addenda before submitting a bid.