TRANSPORTATION, DEPARTMENT OF · Moab, UT
UT NP ARCH 100(2) Bridges on Delicate Arch Road
- Response deadline
- 18 days left
- Published project value
- $10M – $20MAs stated in the source documents
- Solicitation number
- UT NP ARCH 100(2)
Dates to plan around
Times follow the original source.
- Response deadline
Source wording
2026-11-10T14:00:00-07:00
From the posting5 agency details · contact information and original wording
11 documents found3 could not be read24% of weighted requirement checks reviewed
Newer source changes have not been verified. Confirm the latest notice and addenda before submitting.
Eligibility & participation
Whether you can bid at all, and what you must already hold.
Registrations
3 findingsNotice of SAM Registration – Offerors or quoters are required to have an active Federal Government contracts registration in the System for Award Management (SAM) when they submit an offer or quotation, and at the time of award.
Applies when: when they submit an offer or quotation, and at the time of award; at the time of awardMust be met by: at the time of award
View source 1
“Notice of SAM Registration – Offerors or quoters are required to have an active Federal Government contracts registration in the System for Award Management (SAM) when they submit an offer or quotation, and at the time of award.”
Source page 5
Page markings may include other requirements. The quotation above identifies this requirement.

(Include area code) 16. REMITTANCE ADDRESS (Include only if different than Item 14) UEI. 17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government in writClose full requirement
(Include area code) 16. REMITTANCE ADDRESS (Include only if different than Item 14) UEI. 17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government in writ
Applies when: if different than Item 14) UEI
View source 1
“(Include area code) 16. REMITTANCE ADDRESS (Include only if different than Item 14) UEI. 17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government in writing with 60 calendar”
Source page 11
Page markings may include other requirements. The quotation above identifies this requirement.

Missing information · 1 check
—
Not reviewed — requirement not confirmed
Set-aside
3 findingsNo set-aside specified
View source 1
“NONE”
Missing information · 2 checks
—
Not found in reviewed sources
—
Not reviewed — requirement not confirmed
Small business size
3 findings$45,000,000
View source 1
“Entities are not required to, nor are they able to, update their entity registration to remove these representations in SAM.” Representations and Certifications – This solicitation is issued under NAICS 237310 – Highway, Street & Bridge Construction with a small business size standard of $45 million”
Source page 6
Page markings may include other requirements. The quotation above identifies this requirement.

—
Needs confirmation
Applies to: subcontractor
View source 1
“HUBZone, SDB, WOSB)5 5 List all applicable size standards for each proposed subcontractor.”
Source page 168
Page markings may include other requirements. The quotation above identifies this requirement.

Missing information · 1 check
—
Not reviewed — requirement not confirmed
Experience & references
2 findings—
Needs confirmation
Applies when: at least 3 years’ experience in areas of material testing, inspection, management, super
View source 1
“Provide a QCM with at least 3 years’ experience in areas of material testing, inspection, management, supervision, and QC on highway construction projects of similar type and scope; 153.03 Quality Control Plan (QCP).”
Source page 102
Page markings may include other requirements. The quotation above identifies this requirement.

Missing information · 1 check
—
Not reviewed — requirement not confirmed
Key personnel
Attach resumes of these key personnel as well as the on-site project manager(s) and superintendent(s), and specifically identify the following: - Present position, responsibility, and length of employment. - Amount and type of construction experience. - Amount and type of highwayClose full requirement
Attach resumes of these key personnel as well as the on-site project manager(s) and superintendent(s), and specifically identify the following: - Present position, responsibility, and length of employment. - Amount and type of construction experience. - Amount and type of highway
Applies to: person
View source 1
“Attach resumes of these key personnel as well as the on-site project manager(s) and superintendent(s), and specifically identify the following: - Present position, responsibility, and length of employment. - Amount and type of construction experience. - Amount and type of highway construction experi”
Source page 39
Page markings may include other requirements. The quotation above identifies this requirement.

Financial capacity
2 findingsThe Government may require the surety to furnish additional substantiating information concerning its financial capability. 5. Corporations executing the bond shall affix their corporate seals.
Applies to: surety
View source 1
“The Government may require the surety to furnish additional substantiating information concerning its financial capability. 5. Corporations executing the bond shall affix their corporate seals.”
Source page 37
Page markings may include other requirements. The quotation above identifies this requirement.

(b) The bidder shall furnish a bid guarantee in the form of a firm commitment, e.g., bid bond supported by good and sufficient surety or sureties acceptable to the Government, postal money order, certified check, cashier's check, irrevocable letter of credit, or, under Treasury D
Applies to: surety
View source 1
“(b) The bidder shall furnish a bid guarantee in the form of a firm commitment, e.g., bid bond supported by good and sufficient surety or sureties acceptable to the Government, postal money order, certified check, cashier's check, irrevocable letter of credit, or, under Treasury Department regulation”
Source page 45
Page markings may include other requirements. The quotation above identifies this requirement.

Joint ventures & teaming
13 findingsmay be ineligible for award of the contract. (Prime and subcontracting | U.S. Small Business
View source 1
“may be ineligible for award of the contract. (Prime and subcontracting | U.S. Small Business”
Source page 7
Page markings may include other requirements. The quotation above identifies this requirement.

INSTRUCTIONS: When the offeror/principal is a joint venture, include this certification
Applies when: When the offeror/principal is a joint venture, include this certification
View source 1
“INSTRUCTIONS: When the offeror/principal is a joint venture, include this certification”
Source page 30
Page markings may include other requirements. The quotation above identifies this requirement.

Authority to Bind Joint Venture This certifies that the person signing the proposal has the authority to actually bind the joint venture pursuant to its joint venture agreement, and that each of the named persons listed below individually has full authority to enter into and execClose full requirement
Authority to Bind Joint Venture This certifies that the person signing the proposal has the authority to actually bind the joint venture pursuant to its joint venture agreement, and that each of the named persons listed below individually has full authority to enter into and exec
View source 1
“Authority to Bind Joint Venture This certifies that the person signing the proposal has the authority to actually bind the joint venture pursuant to its joint venture agreement, and that each of the named persons listed below individually has full authority to enter into and execute contractual inst”
Source page 30
Page markings may include other requirements. The quotation above identifies this requirement.

individually has full authority to enter into and execute contractual instruments on behalf of said joint venture, except as follows:
View source 1
“individually has full authority to enter into and execute contractual instruments on behalf of said joint venture, except as follows:”
Source page 30
Page markings may include other requirements. The quotation above identifies this requirement.

B-1 Bid Bond Date Bond Executed (Must Not Be Later OMB Control Number: 9000-0001 (See Instructions on Page 3) Than Bid Opening Date) Expiration Date: 1/31/2027 Principal (Legal Name And Business Address) Type Of Organization ("X" One) Individual Partnership Joint Venture CorporatClose full requirement
B-1 Bid Bond Date Bond Executed (Must Not Be Later OMB Control Number: 9000-0001 (See Instructions on Page 3) Than Bid Opening Date) Expiration Date: 1/31/2027 Principal (Legal Name And Business Address) Type Of Organization ("X" One) Individual Partnership Joint Venture Corporat
View source 1
“B-1 Bid Bond Date Bond Executed (Must Not Be Later OMB Control Number: 9000-0001 (See Instructions on Page 3) Than Bid Opening Date) Expiration Date: 1/31/2027 Principal (Legal Name And Business Address) Type Of Organization ("X" One) Individual Partnership Joint Venture Corporation Other (Specify) ”
Source page 34
Page markings may include other requirements. The quotation above identifies this requirement.

Any person signing in a representative capacity (e.g., an attorney-in-fact) must furnish evidence of authority if that representative is not a member of the firm, partnership, or joint venture, or an officer of the corporation involved. 3. The bond may express penal sum as a perc
Applies when: if that representative is not a member of the firm, partnership, or joint venture, or an officer of the corporation involved
View source 1
“Any person signing in a representative capacity (e.g., an attorney-in-fact) must furnish evidence of authority if that representative is not a member of the firm, partnership, or joint venture, or an officer of the corporation involved. 3. The bond may express penal sum as a percentage of the bid pr”
Source page 36
Page markings may include other requirements. The quotation above identifies this requirement.

If the prospective bidder is a joint venture or general partnership, a separate Bidder's Qualifications form shall be provided individually for each joint venture participant or partner. 1. Name and address of business: Name Unique Entity ID and DUNS Street Employer ID Number (EI
Applies when: If the prospective bidder is a joint venture or general partnership, a separate Bidder's Qualifications form shall be provided individually for each joint venture participant or part
View source 1
“If the prospective bidder is a joint venture or general partnership, a separate Bidder's Qualifications form shall be provided individually for each joint venture participant or partner. 1. Name and address of business: Name Unique Entity ID and DUNS Street Employer ID Number (EIN)* City State Zip C”
Source page 38
Page markings may include other requirements. The quotation above identifies this requirement.

Type of organization (check appropriate box): Individual Non-profit organization Corporation Partnership Joint Venture Incorporated in: If a Foreign entity: Individual Non-profit organization Corporation Partnership Joint Venture Registered in: b.Close full requirement
Type of organization (check appropriate box): Individual Non-profit organization Corporation Partnership Joint Venture Incorporated in: If a Foreign entity: Individual Non-profit organization Corporation Partnership Joint Venture Registered in: b.
Applies when: If a Foreign entity: Individual Non-profit organization Corporation Partnership Joint Venture Registered in: b
View source 1
“Type of organization (check appropriate box): Individual Non-profit organization Corporation Partnership Joint Venture Incorporated in: If a Foreign entity: Individual Non-profit organization Corporation Partnership Joint Venture Registered in: b.”
Source page 38
Page markings may include other requirements. The quotation above identifies this requirement.

Provide the name and home office addresses of each of the joint venture partners; indicate which partner is the sponsoring partner.
View source 1
“Provide the name and home office addresses of each of the joint venture partners; indicate which partner is the sponsoring partner.”
Source page 39
Page markings may include other requirements. The quotation above identifies this requirement.

B-6 3. If a joint venture or general partnership: a.
Applies when: If a joint venture or general partnership: a
View source 1
“B-6 3. If a joint venture or general partnership: a.”
Source page 39
Page markings may include other requirements. The quotation above identifies this requirement.

(c)Joint venture.
View source 1
“(c)Joint venture.”
Source page 44
Page markings may include other requirements. The quotation above identifies this requirement.

A HUBZone joint venture agrees that, in the performance of the contract, at least 40 percent of the aggregate work performed by the joint venture shall be completed by the HUBZone small business parties to the joint venture.
Applies when: work performed by the joint venture shall be completed by the HUBZone small business parties to the joint venture; at least 40 percent of the aggregate work performed by the joint venture shall be comple
View source 1
“A HUBZone joint venture agrees that, in the performance of the contract, at least 40 percent of the aggregate work performed by the joint venture shall be completed by the HUBZone small business parties to the joint venture.”
Source page 44
Page markings may include other requirements. The quotation above identifies this requirement.

Work performed by the HUBZone small business parties to the joint venture must be more than administrative functions.
Applies when: Work performed by the HUBZone small business parties to the joint venture
View source 1
“Work performed by the HUBZone small business parties to the joint venture must be more than administrative functions.”
Source page 44
Page markings may include other requirements. The quotation above identifies this requirement.

Exclusions & responsibility
(DEC 2014)(DEVIATION NOV 2025) 52.204-91 Contractor Identification (DEVIATION NOV 2025) 52.209-6 Protecting the Government's Interest When Subcontracting with Contractors Debarred, Suspended, or Proposed for Debarment.
Applies when: When Subcontracting with Contractors Debarred, Suspended, or Proposed for Debarment
View source 1
“(DEC 2014)(DEVIATION NOV 2025) 52.204-91 Contractor Identification (DEVIATION NOV 2025) 52.209-6 Protecting the Government's Interest When Subcontracting with Contractors Debarred, Suspended, or Proposed for Debarment.”
Source page 49
Page markings may include other requirements. The quotation above identifies this requirement.

Missing information2 checks · expand to review
A missing value is not a waiver. Check the source or ask the agency before relying on it.
Required licenses
2 findings—
Not found in reviewed sources
—
Not reviewed — requirement not confirmed
2 additional fields have no reviewed finding.
Deadlines & submission
When and how to submit, and whether you are still in time.
Response deadline
3 findings2026-11-10T14:00:00-07:00
View source 1
“2026-11-10T14:00:00-07:00”
Missing information · 2 checks
—
Not found in reviewed sources
—
Not reviewed — requirement not confirmed
Site visit / pre-bid meeting
2 findingsrequired
Applies when: prior to the bid openingMust be met by: prior to the bid opening
View source 1
“A-vi NOTICE: NON-MANDATORY SITE VISIT This pre-bid meeting notice is being given to solicit contractor interest and to orient contractors with the project site prior to the bid opening.”
Source page 9
Page markings may include other requirements. The quotation above identifies this requirement.

Missing information · 1 check
—
Not reviewed — requirement not confirmed
How to submit
3 findingsSubmit a proposal for approval for other correction methods not listed above.
View source 1
“Submit a proposal for approval for other correction methods not listed above.”
Source page 133
Page markings may include other requirements. The quotation above identifies this requirement.

FHWA SUBCONTRACTING PLAN TEMPLATE 1. INSTRUCTIONS: • Where subcontracting opportunities will not exist for the solicitation, the bidder/offeror shall submit a response outlining the rationale for making this determination with its proposal/bid.
View source 1
“FHWA SUBCONTRACTING PLAN TEMPLATE 1. INSTRUCTIONS: • Where subcontracting opportunities will not exist for the solicitation, the bidder/offeror shall submit a response outlining the rationale for making this determination with its proposal/bid.”
Source page 167
Page markings may include other requirements. The quotation above identifies this requirement.

Missing information · 1 check
—
Not reviewed — requirement not confirmed
Acknowledge amendments
2 findingsItem 19: ACKNOWLEDGMENT OF AMENDMENTS: FAILURE TO
View source 1
“Item 19: ACKNOWLEDGMENT OF AMENDMENTS: FAILURE TO”
Source page 12
Page markings may include other requirements. The quotation above identifies this requirement.

Missing information · 1 check
—
Not reviewed — requirement not confirmed
Procurement contact
3 findingsLaura Slauter · cflcontracts@dot.gov
View source 1
“Laura Slauter · cflcontracts@dot.gov”
Ryan Phillips · cflcontracts@dot.gov
View source 1
“Ryan Phillips · cflcontracts@dot.gov”
—
Needs confirmation
Applies when: within 24-hMust be met by: within 24-h
View source 1
“At a minimum, the notice must include: 1.5.1 the UPDES Permit tracking number; 1.5.2 the name of a contact person for questions, SWPPP requests, or information about the project; a. a contact phone number (must be available during business hours); or b. an email address (you must check and respond t”
Source page 187
Page markings may include other requirements. The quotation above identifies this requirement.

Bid opening
3 findings—
Needs confirmation
Applies when: If this is a sealed bid solicitation, offers will be publicly opened at that time
View source 1
“If this is a sealed bid solicitation, offers will be publicly opened at that time.”
Source page 10
Page markings may include other requirements. The quotation above identifies this requirement.

—
Needs confirmation
View source 1
“(SEP 1996) (a) Failure to furnish a bid guarantee in the proper form and amount, by the time set for opening of bids, may be cause for rejection of the bid.”
Source page 45
Page markings may include other requirements. The quotation above identifies this requirement.

—
Needs confirmation
Applies when: upon execution of contractual documents and bonds (including any necessary coinsuranMust be met by: upon execution of contractual documents and bonds (including any necessary coinsuran
View source 1
“The Contracting Officer will return bid guarantees, other than bid bonds - (1) To unsuccessful bidders as soon as practicable after the opening of bids; and (2) To the successful bidder upon execution of contractual documents and bonds (including any necessary coinsurance or reinsurance agreements),”
Source page 45
Page markings may include other requirements. The quotation above identifies this requirement.

Formatting & signatures
satisfying the requirements of Part 9.9.2 must be submitted to the Director prior to or together with any reports, information, or applications to be signed by an authorized representative.
Applies when: prior to or together with any reports, information, or applications to be signed by an aMust be met by: prior to or together with any reports, information, or applications to be signed by an a
View source 1
“satisfying the requirements of Part 9.9.2 must be submitted to the Director prior to or together with any reports, information, or applications to be signed by an authorized representative.”
Source page 222
Page markings may include other requirements. The quotation above identifies this requirement.

Mandatory forms
3 findingsSubmit a printed copy of your bid to the address listed on the SF-1442 (Page A-1, Item 8).
View source 1
“Submit a printed copy of your bid to the address listed on the SF-1442 (Page A-1, Item 8).”
Source page 4
Page markings may include other requirements. The quotation above identifies this requirement.

Submit the following documents with your Bid Package– • SF-1442, Solicitation, Offer & Award, Pages A-1 and A-2 • Indication of interest in formal Partnering, Page A-6 • Bid Schedule Pages A-7 through A-17 • Completed an applicable Authority to Bind certificate, pages A-18 througClose full requirement
Submit the following documents with your Bid Package– • SF-1442, Solicitation, Offer & Award, Pages A-1 and A-2 • Indication of interest in formal Partnering, Page A-6 • Bid Schedule Pages A-7 through A-17 • Completed an applicable Authority to Bind certificate, pages A-18 throug
View source 1
“Submit the following documents with your Bid Package– • SF-1442, Solicitation, Offer & Award, Pages A-1 and A-2 • Indication of interest in formal Partnering, Page A-6 • Bid Schedule Pages A-7 through A-17 • Completed an applicable Authority to Bind certificate, pages A-18 through A22 • Buy American”
Source page 4
Page markings may include other requirements. The quotation above identifies this requirement.

Item 19: ACKNOWLEDGMENT OF AMENDMENTS: FAILURE TO ACKNOWLEDGE AMENDMENTS, IN ITEM 19 OF THE SF-1442, BY THE DESIGNATED DATE AND HOUR SPECIFIED IN THE SOLICITATION MAY RESULT IN REJECTION OF YOUR BID.
View source 1
“Item 19: ACKNOWLEDGMENT OF AMENDMENTS: FAILURE TO ACKNOWLEDGE AMENDMENTS, IN ITEM 19 OF THE SF-1442, BY THE DESIGNATED DATE AND HOUR SPECIFIED IN THE SOLICITATION MAY RESULT IN REJECTION OF YOUR BID.”
Source page 12
Page markings may include other requirements. The quotation above identifies this requirement.

Grounds for rejection
4 findingsPhotocopies and Faxed copies are NOT acceptable and will make your bid non-responsive.
View source 1
“Photocopies and Faxed copies are NOT acceptable and will make your bid non-responsive.”
Source page 4
Page markings may include other requirements. The quotation above identifies this requirement.

Photocopied and faxed copies of bonds will be rejected and cause your bid to be non-responsive.
View source 1
“Photocopied and faxed copies of bonds will be rejected and cause your bid to be non-responsive.”
Source page 6
Page markings may include other requirements. The quotation above identifies this requirement.

(SEP 1996) (a) Failure to furnish a bid guarantee in the proper form and amount, by the time set for opening of bids, may be cause for rejection of the bid.
View source 1
“(SEP 1996) (a) Failure to furnish a bid guarantee in the proper form and amount, by the time set for opening of bids, may be cause for rejection of the bid.”
Source page 45
Page markings may include other requirements. The quotation above identifies this requirement.

The presence of the following particularly noxious weed species are grounds for rejection of the source: species listed on the Utah listed noxious weeds Class 1A and 1B, yellow starthistle (Centaurea solstitialis), medusahead (Taeniatherum caput-medusea), Rush skeletonweed (ChondClose full requirement
The presence of the following particularly noxious weed species are grounds for rejection of the source: species listed on the Utah listed noxious weeds Class 1A and 1B, yellow starthistle (Centaurea solstitialis), medusahead (Taeniatherum caput-medusea), Rush skeletonweed (Chond
View source 1
“The presence of the following particularly noxious weed species are grounds for rejection of the source: species listed on the Utah listed noxious weeds Class 1A and 1B, yellow starthistle (Centaurea solstitialis), medusahead (Taeniatherum caput-medusea), Rush skeletonweed (Chondrilla juncea), and b”
Source page 79
Page markings may include other requirements. The quotation above identifies this requirement.

Missing information4 checks · expand to review
A missing value is not a waiver. Check the source or ask the agency before relying on it.
Questions due
2 findings—
Not found in reviewed sources
—
Not reviewed — requirement not confirmed
Required submission files
2 findings—
Not found in reviewed sources
—
Not reviewed — requirement not confirmed
3 additional fields have no reviewed finding.
6 more sections are available once you sign in
Pricing & payment · Bonds & insurance · Evaluation & award · Scope & delivery · Labor, sourcing & compliance · Contract terms & risk