BidEligible

TRANSPORTATION, DEPARTMENT OF · Hilo, HI

Replace Roof and Hatches, ITO ATCT, Hilo, Hawaii

6 source documentsSource checked Oct 17Content updated
Open notice
Response deadline
3 days left
Published project value
$100K – $250K
As stated in the source documents
Solicitation number
697DCK-26-R-00437
View official posting ↗Review requirements ↓Original posting details are available below.

Dates to plan around

Times follow the original source.

  1. Response deadline
    Source wording
    2026-10-26T17:00:00-10:00
From the posting1 agency details · contact information and original wording
View the official posting →Always the authority. An addendum can change any of this after we read it.
Document coverage
6 / 6documents readAll discovered documents read

6 documents found67% of weighted requirement checks reviewed

Before you bid

Review first

Start with these requirements and unresolved points.
  • Must do
    Exclusions & responsibility

    (c) Procedures: The offeror must review the list of excluded parties in the System for Award Management (SAM)

  • Must do
    Registrations
    View 4 flagged requirements
    1. Requirement 1 ↗

      (2) The offeror must enter, in Representations, Certifications and Other Statements of Offerors Section of the solicitation, the UEI or EFT indicator that identifies the offeror's name and address exactly as stated in the offer.

    2. Requirement 2 ↗

      To remain registered in the SAM database after the initial registration, the Contractor is required to review and update on an annual basis from the date of initial registration or subsequent updates its information in the SAM database to ensure it is current, accurate and comple

    3. Requirement 3 ↗

      Assignees must be separately registered in the SAM database.

    4. Requirement 4 ↗

      Therefore, the offeror must provide its UEI or EFT indicator below.

01

Eligibility & participation

Whether you can bid at all, and what you must already hold.

16 verified2 to confirm

Registrations

9 findings
Requirement 1Verified

(b)(1) By submission of an offer, the offeror acknowledges the requirement that a prospective awardee must be registered in the SAM database prior to award, during performance, and through final payment of any contract, basic agreement, basic ordering agreement, or blanket purcha

Applies when: prior to award, during performance, and through final payment of any contract, basic agrMust be met by: prior to award, during performance, and through final payment of any contract, basic agr

View source 1
01page 23View official source ↗
“(b)(1) By submission of an offer, the offeror acknowledges the requirement that a prospective awardee must be registered in the SAM database prior to award, during performance, and through final payment of any contract, basic agreement, basic ordering agreement, or blanket purchasing agreement resul”
Source page 23

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 23
Requirement 2Verified

(2) The offeror must enter, in Representations, Certifications and Other Statements of Offerors Section of the solicitation, the UEI or EFT indicator that identifies the offeror's name and address exactly as stated in the offer.

View source 1
01page 23View official source ↗
“(2) The offeror must enter, in Representations, Certifications and Other Statements of Offerors Section of the solicitation, the UEI or EFT indicator that identifies the offeror's name and address exactly as stated in the offer.”
Source page 23

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 23
Requirement 3Verified

To remain registered in the SAM database after the initial registration, the Contractor is required to review and update on an annual basis from the date of initial registration or subsequent updates its information in the SAM database to ensure it is current, accurate and comple

View source 1
01page 23View official source ↗
“To remain registered in the SAM database after the initial registration, the Contractor is required to review and update on an annual basis from the date of initial registration or subsequent updates its information in the SAM database to ensure it is current, accurate and complete.”
Source page 23

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 23
Requirement 4Verified

Assignees must be separately registered in the SAM database.

View source 1
01page 24View official source ↗
“Assignees must be separately registered in the SAM database.”
Source page 24

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 24
Requirement 5Verified

As part of its annual registration in SAM required per AMS Clause 3.3.1-33 System for Award Management, the Contractor must report the names and total compensation of each of the five most highly compensated executives for the Contractor's preceding completed fiscal year if: (i)

Applies when: if: (i) In the Contractor's preceding fiscal yea

View source 1
01page 47View official source ↗
“As part of its annual registration in SAM required per AMS Clause 3.3.1-33 System for Award Management, the Contractor must report the names and total compensation of each of the five most highly compensated executives for the Contractor's preceding completed fiscal year if: (i) In the Contractor's ”
Source page 47

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 47
Requirement 6Verified

If the Offeror has responded "does" to paragraph (d) (2) of this provision, the offeror must provide the following information as part of the offer- (3) For covered equipment (i) The entity that produced the covered telecommunications equipment (include entity name, unique entity

Applies when: If the Offeror has responded "does" to paragraph (d) (2) of this provision, the offeror must provide the following information as part of the offer- (3) For covered equipment (i) The

View source 1
01page 64View official source ↗
“If the Offeror has responded "does" to paragraph (d) (2) of this provision, the offeror must provide the following information as part of the offer- (3) For covered equipment (i) The entity that produced the covered telecommunications equipment (include entity name, unique entity identifier, CAGE co”
Source page 64

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 64
Requirement 7Verified

Therefore, the offeror must provide its UEI or EFT indicator below.

View source 1
01page 66View official source ↗
“Therefore, the offeror must provide its UEI or EFT indicator below.”
Source page 66

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 66
Missing information · 2 checks
Not reviewed

—

Not reviewed — requirement not confirmed

Not found

—

Not found in reviewed sources

Small business size

3 findings
Requirement 1Needs confirmation

—

The cited text does not establish a complete USD size standard.

View source 1
01page 71View official source ↗
“697DCK-26-R-00437 The small business size standard as defined by the Small Business Administration (SBA) is the following: For NAICS codes based on SBA's calculation of annual receipts, the annual average receipts cannot exceed $19. For NAICS codes based on the number of employees, the average numbe”
Source page 71

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 71
Missing information · 2 checks
Not reviewed

—

Not reviewed — requirement not confirmed

Not found

—

Not found in reviewed sources

Experience & references

3 findings
Requirement 1Needs confirmation

—

Needs confirmation

Applies when: at least three projects with the s

View source 1
01page 1View official source ↗
“Remove and Replace the Roof and Hatch at the Cab and Catwalk, Hilo Air Traffic Control Tower (ITO ATCT), Hilo, HI 697DCK-26-R-00417 Past Performance / Experience Information Offeror’s Information Name of Firm Contact Person Phone / Email RELEVANT WORK HISTORY / LIST OF REFERENCES List at least three projects with the s”
Source page 1

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 1
Missing information · 2 checks
Not reviewed

—

Not reviewed — requirement not confirmed

Not found

—

Not found in reviewed sources

Joint ventures & teaming

Verified

Relevant experience may include a mix of the Prime and subcontractors’ information.

Applies to: subcontractor

View source 1
01page 1View official source ↗
“Relevant experience may include a mix of the Prime and subcontractors’ information.”
Source page 1

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 1

Exclusions & responsibility

7 findings
Requirement 1Verified

If the Contractor is suspended or debarred as a result of the MOU termination, the contractor is not eligible to participate in E- Verify during the period of its suspension or debarment.

Applies when: If the Contractor is suspended or debarred as a result of the MOU termination, the contractor is not eligible to participate in E- Verify during the period of its suspension or debar

View source 1
01page 27View official source ↗
“If the Contractor is suspended or debarred as a result of the MOU termination, the contractor is not eligible to participate in E- Verify during the period of its suspension or debarment.”
Source page 27

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 27
Requirement 2Verified
(End of clause) 3.2.2.7-6 PROTECTING THE GOVERNMENT'S INTEREST WHEN SUBCONTRACTING WITH CONTRACTORS DEBARRED, SUSPENDED, OR PROPOSED FOR DEBARMENT (INTERIM JANUARY 2026) (a) The Government suspends or debars Contractors to protect the Government's interests.Read full requirement Close full requirement

(End of clause) 3.2.2.7-6 PROTECTING THE GOVERNMENT'S INTEREST WHEN SUBCONTRACTING WITH CONTRACTORS DEBARRED, SUSPENDED, OR PROPOSED FOR DEBARMENT (INTERIM JANUARY 2026) (a) The Government suspends or debars Contractors to protect the Government's interests.

Applies when: WHEN SUBCONTRACTING WITH CONTRACTORS DEBARRED, SUSPENDED, OR PROPOSED FOR DEBARMENT (INTERIM JANUARY 2026) (a) The Government suspends or debars Contractors to protect the Government's

View source 1
01page 48View official source ↗
“(End of clause) 3.2.2.7-6 PROTECTING THE GOVERNMENT'S INTEREST WHEN SUBCONTRACTING WITH CONTRACTORS DEBARRED, SUSPENDED, OR PROPOSED FOR DEBARMENT (INTERIM JANUARY 2026) (a) The Government suspends or debars Contractors to protect the Government's interests.”
Source page 48

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 48
Requirement 3Verified
Other than a subcontract for a commercial item (see Acquisition Management Policy Appendix C, Definitions), the Contractor must not enter into any subcontract, in excess of $45,000 with a Contractor that is debarred, suspended, or proposed for debarment unless there is a compelliRead full requirement Close full requirement

Other than a subcontract for a commercial item (see Acquisition Management Policy Appendix C, Definitions), the Contractor must not enter into any subcontract, in excess of $45,000 with a Contractor that is debarred, suspended, or proposed for debarment unless there is a compelli

Applies when: unless there is a compelling reason to do so

View source 1
01page 48View official source ↗
“Other than a subcontract for a commercial item (see Acquisition Management Policy Appendix C, Definitions), the Contractor must not enter into any subcontract, in excess of $45,000 with a Contractor that is debarred, suspended, or proposed for debarment unless there is a compelling reason to do so.”
Source page 48

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 48
Requirement 4Verified

(b) The Contractor must require each proposed first-tier subcontractor whose subcontract will exceed $45,000, other than a subcontractor providing a commercial item, to disclose to the Contractor, in writing, whether as of the time of award of the subcontract, the subcontractor,

Applies to: subcontractor

View source 1
01page 48View official source ↗
“(b) The Contractor must require each proposed first-tier subcontractor whose subcontract will exceed $45,000, other than a subcontractor providing a commercial item, to disclose to the Contractor, in writing, whether as of the time of award of the subcontract, the subcontractor, or its principals, i”
Source page 48

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 48
Requirement 5Verified

(c) A corporate officer or a designee of the Contractor must notify the Contracting Officer, in writing, before entering into a subcontract with a party (other than a subcontractor providing a commercial item) that is debarred, suspended, or proposed for debarment (see T3.2.2.7.A

Applies when: before entering into a subcontract with a party (other than a subcontractor providingMust be met by: before entering into a subcontract with a party (other than a subcontractor providing

Applies to: subcontractor

View source 1
01page 48View official source ↗
“(c) A corporate officer or a designee of the Contractor must notify the Contracting Officer, in writing, before entering into a subcontract with a party (other than a subcontractor providing a commercial item) that is debarred, suspended, or proposed for debarment (see T3.2.2.7.A.4).”
Source page 48

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 48
Requirement 6Verified

(c) Procedures: The offeror must review the list of excluded parties in the System for Award Management (SAM)

View source 1
01page 63View official source ↗
“(c) Procedures: The offeror must review the list of excluded parties in the System for Award Management (SAM)”
Source page 63

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 63
Requirement 7Verified

(ii)The Offeror and/or any of its Principals- (A) Are ____ are not ____ presently debarred, suspended, proposed for debarment, or declared ineligible for the award of contracts by any Federal agency;

View source 1
01page 67View official source ↗
“(ii)The Offeror and/or any of its Principals- (A) Are ____ are not ____ presently debarred, suspended, proposed for debarment, or declared ineligible for the award of contracts by any Federal agency;”
Source page 67

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 67

Conflicts of interest

Verified
(End of clause) 3.1.7-2 ORGANIZATIONAL CONFLICTS OF INTEREST (JAN 2023) 3.2.2.3-33 ORDER OF PRECEDENCE (APR 2024) 3.2.2.3-42 DIFFERING SITE CONDITIONS (APR 2024) 3.2.2.3-43 SITE INVESTIGATION AND CONDITIONS AFFECTING THE WORK (APR 2024) 3.2.2.3-45 MATERIAL AND WORKMANSHIP (JUL 20Read full requirement Close full requirement

(End of clause) 3.1.7-2 ORGANIZATIONAL CONFLICTS OF INTEREST (JAN 2023) 3.2.2.3-33 ORDER OF PRECEDENCE (APR 2024) 3.2.2.3-42 DIFFERING SITE CONDITIONS (APR 2024) 3.2.2.3-43 SITE INVESTIGATION AND CONDITIONS AFFECTING THE WORK (APR 2024) 3.2.2.3-45 MATERIAL AND WORKMANSHIP (JUL 20

View source 1
01page 16View official source ↗
“(End of clause) 3.1.7-2 ORGANIZATIONAL CONFLICTS OF INTEREST (JAN 2023) 3.2.2.3-33 ORDER OF PRECEDENCE (APR 2024) 3.2.2.3-42 DIFFERING SITE CONDITIONS (APR 2024) 3.2.2.3-43 SITE INVESTIGATION AND CONDITIONS AFFECTING THE WORK (APR 2024) 3.2.2.3-45 MATERIAL AND WORKMANSHIP (JUL 2024) 3.2.2.3-46 SUPER”
Source page 16

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 16
Missing information4 checks · expand to review

A missing value is not a waiver. Check the source or ask the agency before relying on it.

Set-aside

2 findings
Requirement 1Not reviewed

—

Not reviewed — requirement not confirmed

Requirement 2Not found

—

Not found in reviewed sources

Required licenses

2 findings
Requirement 1Not reviewed

—

Not reviewed — requirement not confirmed

Requirement 2Not found

—

Not found in reviewed sources

3 additional fields have no reviewed finding.

02

Deadlines & submission

When and how to submit, and whether you are still in time.

7 verified10 to confirm

Response deadline

3 findings
Requirement 1Verified

2026-10-26T17:00:00-10:00

View source 1
01https://sam.gov/api/prod/opps/v2/opportunities/bf9955c238904022ab52938793483064 /data2/solicitation/deadlines/responseView official source ↗
“2026-10-26T17:00:00-10:00”
Missing information · 2 checks
Not found

—

Not found in reviewed sources

Not reviewed

—

Not reviewed — requirement not confirmed

How to submit

4 findings
Requirement 1Verified

3.2.2.3-20 OFFERS (JAN 2018) (a) The offeror (you) must submit responses to this SIR by the following electronic means emailed attachments,

View source 1
01page 70View official source ↗
“3.2.2.3-20 OFFERS (JAN 2018) (a) The offeror (you) must submit responses to this SIR by the following electronic means emailed attachments,”
Source page 70

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 70
Requirement 2Verified

Unless otherwise provided in the SIR, the Offeror may submit offers for quantities less than those specified.

Applies when: Unless otherwise provided in the SIR, the Offeror may submit offers for quantities less than those specified

View source 1
01page 72View official source ↗
“Unless otherwise provided in the SIR, the Offeror may submit offers for quantities less than those specified.”
Source page 72

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 72
Missing information · 2 checks
Not found

—

Not found in reviewed sources

Not reviewed

—

Not reviewed — requirement not confirmed

Procurement contact

5 findings
Requirement 1Verified

Linda Hennequant · Linda.Hennequant@faa.gov

View source 1
01https://sam.gov/api/prod/opps/v2/opportunities/bf9955c238904022ab52938793483064 /data2/pointOfContact/0View official source ↗
“Linda Hennequant · Linda.Hennequant@faa.gov”
Requirement 2Verified

Chad.S.Sakumoto@faa.gov

View source 1
01from the postingView official source ↗
“required at least 2 days in advance. Please submit the information to Chad.S.Sakumoto@faa.gov , 808-937-1379; B.Decosta@faa.gov , 808-439-3786. *******************”
Requirement 3Verified

Contracting Officer: Linda.Hennequant@faa.gov

View source 2
01page 2View official source ↗
“Contracting Officer: Linda.Hennequant@faa.gov”
Source page 2

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 2
02page 3View official source ↗
“Contracting Officer: Linda.Hennequant@faa.gov”
Source page 3

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 3
Requirement 4Needs confirmation

—

Needs confirmation

Applies when: at least three projects with the s

View source 1
01page 1View official source ↗
“Remove and Replace the Roof and Hatch at the Cab and Catwalk, Hilo Air Traffic Control Tower (ITO ATCT), Hilo, HI 697DCK-26-R-00417 Past Performance / Experience Information Offeror’s Information Name of Firm Contact Person Phone / Email RELEVANT WORK HISTORY / LIST OF REFERENCES List at least three”
Source page 1

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 1
Requirement 5Needs confirmation

—

Needs confirmation

View source 1
01page 40View official source ↗
“4. For all contractor employees requiring access to FAA facilities, classified information, sensitive unclassified information, systems, or resources, the contractor must submit to its responsible AXP office and CO/COR a point of”
Source page 40

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 40

Bid opening

Needs confirmation

—

Needs confirmation

Applies when: If this is a sealed bid solicitation, offers will be publicly opened at that time

View source 1
01page 1View official source ↗
“If this is a sealed bid solicitation, offers will be publicly opened at that time.”
Source page 1

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 1

Offer acceptance period

7 findings
Requirement 1Needs confirmation

—

Needs confirmation

View source 1
01page 61View official source ↗
“(End of clause) 3.2.2.3-82 PROHIBITION ON CONDUCTING RESTRICTED BUSINESS OPERATIONS IN SUDAN - CERTIFICATION (JUL 2012) 3.6.3-4 RECOVERED MATERIAL PRODUCTS CERTIFICATION (OCT 2024) 3.2.2.3-2 MINIMUM OFFER ACCEPTANCE PERIOD (APR 2024) (a) 'Acceptance period,' as used in this provision, means the numb”
Source page 61

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 61
Requirement 2Needs confirmation

—

Needs confirmation

View source 1
01page 61View official source ↗
“(b) This provision supersedes any language about the acceptance period appearing elsewhere in this SIR.”
Source page 61

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 61
Requirement 3Needs confirmation

—

Needs confirmation

View source 1
01page 61View official source ↗
“(c) The FAA requires a minimum acceptance period of [the CO must insert the number of days] calendar days.”
Source page 61

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 61
Requirement 4Needs confirmation

—

Needs confirmation

View source 1
01page 61View official source ↗
“(d) The offeror may specify a longer acceptance period than the period shown in paragraph (c).”
Source page 61

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 61
Requirement 5Needs confirmation

—

Needs confirmation

View source 1
01page 61View official source ↗
“To specify a longer period, fill in the blank: The offeror allows the following acceptance period: _____ calendar days.”
Source page 61

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 61
Requirement 6Needs confirmation

—

Needs confirmation

View source 1
01page 61View official source ↗
“(e) The FAA may reject an offer allowing less than the FAA's minimum acceptance period.”
Source page 61

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 61
Requirement 7Needs confirmation

—

Needs confirmation

Applies when: if the FAA accepts the offer in writing within: (1) The acceptance period stated in paragraph (c) of this provision; within: (1) The acceptance period stated in paragraph (c) of this provisionMust be met by: within: (1) The acceptance period stated in paragraph (c) of this provision

View source 1
01page 61View official source ↗
“(f) The offeror agrees to fulfill the offer completely if the FAA accepts the offer in writing within: (1) The acceptance period stated in paragraph (c) of this provision; or (2) Any longer acceptance period stated in paragraph (d) of this provision.”
Source page 61

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 61

Grounds for rejection

Verified

In this event, the contractor must provide, or cause each of its employees to provide, such security information to AXP. Failure to cooperate with security processing will result in an unfavorable suitability determination. 13.The contractor must retrieve a current roster report

View source 1
01page 41View official source ↗
“In this event, the contractor must provide, or cause each of its employees to provide, such security information to AXP. Failure to cooperate with security processing will result in an unfavorable suitability determination. 13.The contractor must retrieve a current roster report through VAP on a qua”
Source page 41

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 41
Missing information8 checks · expand to review

A missing value is not a waiver. Check the source or ask the agency before relying on it.

Questions due

2 findings
Requirement 1Not found

—

Not found in reviewed sources

Requirement 2Not reviewed

—

Not reviewed — requirement not confirmed

Site visit / pre-bid meeting

2 findings
Requirement 1Not found

—

Not found in reviewed sources

Requirement 2Not reviewed

—

Not reviewed — requirement not confirmed

Required submission files

2 findings
Requirement 1Not found

—

Not found in reviewed sources

Requirement 2Not reviewed

—

Not reviewed — requirement not confirmed

Acknowledge amendments

2 findings
Requirement 1Not found

—

Not found in reviewed sources

Requirement 2Not reviewed

—

Not reviewed — requirement not confirmed

4 additional fields have no reviewed finding.

Continue your review

6 more sections are available once you sign in

Pricing & payment · Bonds & insurance · Evaluation & award · Scope & delivery · Labor, sourcing & compliance · Contract terms & risk

Sign in — free

Extracted from the public documents linked above. This is an information aid, not a determination of bid eligibility or legal advice. Verify the original wording and any addenda before submitting a bid.

$100K – $250K
3 days left
See all 6