Mike Monroney Aeronautical Center (MMAC) Industrial Waste Water Treatment Plant Upgrades

16 source documentsSource checked Oct 22Content updated
Open notice
Response deadline
27 days left
Published project value
$102K
As stated in the source documents
Solicitation number
6973GH-27-R-00005
View official posting ↗Review requirements ↓Original posting details are available below.

Dates to plan around

Times follow the original source.

  1. Response deadline
    Source wording
    2026-11-19T16:00:00-06:00
From the posting2 agency details · contact information and original wording
Solicitation number
solicitation number 6973GH-27-R-00005
Worth confirming on the posting
View the official posting →Always the authority. An addendum can change any of this after we read it.
Document coverage
13 / 16documents readReview incomplete

16 documents found1 partially read2 could not be read34% of weighted requirement checks reviewed

Newer source changes have not been verified. Confirm the latest notice and addenda before submitting.

Before you bid

Review first

Start with these requirements and unresolved points.
  • Must do
    Exclusions & responsibility

    (c) Procedures: The offeror must review the list of excluded parties in the System for Award Management (SAM)

  • Must do
    Financial capacity
    View 1 flagged requirement
    1. Requirement 1 ↗

      (End of Clause) 3.4.1-1 PROPOSAL GUARANTEE (JAN 2017) (a) Offerors must furnish a proposal guarantee in the form of a proposal bond, a postal money order, a certified or cashier's check, an irrevocable letter of credit, or United States bonds or notes with a maturity of less than

  • Must do
    Registrations
    View 4 flagged requirements
    1. Requirement 1 ↗

      (2) The offeror must enter, in Representations, Certifications and Other Statements of Offerors Section of the solicitation, the UEI or EFT indicator that identifies the offeror's name and address exactly as stated in the offer.

    2. Requirement 2 ↗

      To remain registered in the SAM database after the initial registration, the Contractor is required to review and update on an annual basis from the date of initial registration or subsequent updates its information in the SAM database to ensure it is current, accurate and comple

    3. Requirement 3 ↗

      Assignees must be separately registered in the SAM database.

    4. Requirement 4 ↗

      Therefore, the offeror must provide its UEI or EFT indicator below.

  • Must do
  • Must do
01

Eligibility & participation

Whether you can bid at all, and what you must already hold.

23 verified3 to confirm

Registrations

7 findings
Requirement 1Verified

(b)(1) By submission of an offer, the offeror acknowledges the requirement that a prospective awardee must be registered in the SAM database prior to award, during performance, and through final payment of any contract, basic agreement, basic ordering agreement, or blanket purcha

Applies when: prior to award, during performance, and through final payment of any contract, basic agrMust be met by: prior to award, during performance, and through final payment of any contract, basic agr

View source 1
01page 24View official source ↗
“(b)(1) By submission of an offer, the offeror acknowledges the requirement that a prospective awardee must be registered in the SAM database prior to award, during performance, and through final payment of any contract, basic agreement, basic ordering agreement, or blanket purchasing agreement resul”
Source page 24

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 24
Requirement 2Verified

(2) The offeror must enter, in Representations, Certifications and Other Statements of Offerors Section of the solicitation, the UEI or EFT indicator that identifies the offeror's name and address exactly as stated in the offer.

View source 1
01page 25View official source ↗
“(2) The offeror must enter, in Representations, Certifications and Other Statements of Offerors Section of the solicitation, the UEI or EFT indicator that identifies the offeror's name and address exactly as stated in the offer.”
Source page 25

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 25
Requirement 3Verified

To remain registered in the SAM database after the initial registration, the Contractor is required to review and update on an annual basis from the date of initial registration or subsequent updates its information in the SAM database to ensure it is current, accurate and comple

View source 1
01page 25View official source ↗
“To remain registered in the SAM database after the initial registration, the Contractor is required to review and update on an annual basis from the date of initial registration or subsequent updates its information in the SAM database to ensure it is current, accurate and complete.”
Source page 25

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 25
Requirement 4Verified

Assignees must be separately registered in the SAM database.

View source 1
01page 25View official source ↗
“Assignees must be separately registered in the SAM database.”
Source page 25

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 25
Requirement 5Verified

Therefore, the offeror must provide its UEI or EFT indicator below.

View source 1
01page 62View official source ↗
“Therefore, the offeror must provide its UEI or EFT indicator below.”
Source page 62

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 62
Missing information · 2 checks
Not reviewed

—

Not reviewed — requirement not confirmed

Not found

—

Not found in reviewed sources

Set-aside

3 findings
Requirement 1Verified

SBA

View source 1
01https://sam.gov/api/prod/opps/v2/opportunities/b5c4fee1baa64396b4584aa5e91d2487 /data2/solicitation/setAsideView official source ↗
“SBA”
Missing information · 2 checks
Not reviewed

—

Not reviewed — requirement not confirmed

Not found

—

Not found in reviewed sources

Small business size

3 findings
Requirement 1Needs confirmation

—

Needs confirmation

View source 1
01page 69View official source ↗
“(End of provision) 3.6.1-17 NORTH AMERICAN INDUSTRY CLASSIFICATION SYSTEM (NAICS) CODE (OCT 2022) The North American Industry Classification System (NAICS) code for this procurement is: 236220. The small business size standard as defined by the Small Business Administration (SBA) is the following: F”
Source page 69

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 69
Missing information · 2 checks
Not reviewed

—

Not reviewed — requirement not confirmed

Not found

—

Not found in reviewed sources

Experience & references

4 findings
Requirement 1Needs confirmation

—

Needs confirmation

Applies to: subcontractor

View source 1
01page 67View official source ↗
“This factor has a fifteen (15) Page Limit (5) Factor 5 - Site Infrastructure Subcontractor Experience: The Offeror's proposed Site Infrastructure subcontractor is required to provide a minimum of two (2) projects valued at or above $250,000.00 that are wastewater related and will need to provide “Past Performance Exper”
Source page 67

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 67
Requirement 2Needs confirmation

—

Needs confirmation

Applies to: person

View source 1
01page 74View official source ↗
“To receive an “ACCEPTABLE” rating under this subfactor, the offeror’s proposal documents the qualifications and experience for the Project Manager AND Superintendent that meet the requirements in the table below. -Evidence showing the Construction Project Manager has a minimum of seven (7) years of experience in servin”
Source page 74

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 74
Missing information · 2 checks
Not reviewed

—

Not reviewed — requirement not confirmed

Not found

—

Not found in reviewed sources

Key personnel

7 findings
Requirement 1Verified
(End of Clause) 3.8.2-17 KEY PERSONNEL AND FACILITIES (JUL 2019) (a) The personnel and/or facilities as specified below are considered essential to the work being performed hereunder and may, with the consent of the contracting parties, be changed from time to time during the couRead full requirement Close full requirement

(End of Clause) 3.8.2-17 KEY PERSONNEL AND FACILITIES (JUL 2019) (a) The personnel and/or facilities as specified below are considered essential to the work being performed hereunder and may, with the consent of the contracting parties, be changed from time to time during the cou

Applies to: person

View source 1
01page 14View official source ↗
“(End of Clause) 3.8.2-17 KEY PERSONNEL AND FACILITIES (JUL 2019) (a) The personnel and/or facilities as specified below are considered essential to the work being performed hereunder and may, with the consent of the contracting parties, be changed from time to time during the course of the contract.”
Source page 14

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 14
Requirement 2Verified

(d) The key personnel and/or facilities under this contract are: Project Manager Superintendent [ ] [ ] [ ] [ ] [ ] [ ] (List key personnel and/or facilities) (End of clause) AC0090 ENVIRONMENTAL, SAFETY AND HEALTH (JULY 2016) (a) The Contractor shall ensure that no person employ

Applies to: person

View source 1
01page 14View official source ↗
“(d) The key personnel and/or facilities under this contract are: Project Manager Superintendent [ ] [ ] [ ] [ ] [ ] [ ] (List key personnel and/or facilities) (End of clause) AC0090 ENVIRONMENTAL, SAFETY AND HEALTH (JULY 2016) (a) The Contractor shall ensure that no person employed on this contract ”
Source page 14

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 14
Requirement 3Verified
Proposal Documentation Section Title I Contract Documentation & Price Proposal to include price breakdown Factor 1 - Relevant Experience Factor 2 - Past Performance II Factor 3 - Key Personnel, (6-page limit for each resume) Factor 4 - Packaged Wastewater Treatment Equipment (15-Read full requirement Close full requirement

Proposal Documentation Section Title I Contract Documentation & Price Proposal to include price breakdown Factor 1 - Relevant Experience Factor 2 - Past Performance II Factor 3 - Key Personnel, (6-page limit for each resume) Factor 4 - Packaged Wastewater Treatment Equipment (15-

Applies to: person

View source 1
01page 65View official source ↗
“Proposal Documentation Section Title I Contract Documentation & Price Proposal to include price breakdown Factor 1 - Relevant Experience Factor 2 - Past Performance II Factor 3 - Key Personnel, (6-page limit for each resume) Factor 4 - Packaged Wastewater Treatment Equipment (15-page limit) Factor 5”
Source page 65

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 65
Requirement 4Verified
(f) Section II - Relevant Experience / Past Performance / Key Personnel / Packaged Wastewater Treatment Equipment / Site Infrastructure Subcontractor Experience: The five (5) evaluation factors under this section will each be assigned a rating of "ACCEPTABLE" or "UNACCEPTABLE" inRead full requirement Close full requirement

(f) Section II - Relevant Experience / Past Performance / Key Personnel / Packaged Wastewater Treatment Equipment / Site Infrastructure Subcontractor Experience: The five (5) evaluation factors under this section will each be assigned a rating of "ACCEPTABLE" or "UNACCEPTABLE" in

Applies to: subcontractor

View source 1
01page 65View official source ↗
“(f) Section II - Relevant Experience / Past Performance / Key Personnel / Packaged Wastewater Treatment Equipment / Site Infrastructure Subcontractor Experience: The five (5) evaluation factors under this section will each be assigned a rating of "ACCEPTABLE" or "UNACCEPTABLE" in accordance with Sec”
Source page 65

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 65
Requirement 5Verified

While the FAA may consider data from other sources, the burden of providing thorough and complete past performance data rests with the Offeror (3) Factor 3 - Key Personnel - Key Personnel Qualifications: Offerors must provide a Resume for the Project Manager AND Superintendent th

Applies to: person

View source 1
01page 67View official source ↗
“While the FAA may consider data from other sources, the burden of providing thorough and complete past performance data rests with the Offeror (3) Factor 3 - Key Personnel - Key Personnel Qualifications: Offerors must provide a Resume for the Project Manager AND Superintendent that will be employed ”
Source page 67

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 67
Requirement 6Verified

Factor 3 - Key Personnel: Key Personnel Qualifications - Evaluation Criteria The Government will review all documentation submitted under Factor 3 within the page limit identified.

Applies when: within the page limit identifiedMust be met by: within the page limit identified

Applies to: person

View source 1
01page 74View official source ↗
“Factor 3 - Key Personnel: Key Personnel Qualifications - Evaluation Criteria The Government will review all documentation submitted under Factor 3 within the page limit identified.”
Source page 74

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 74
Requirement 7Verified

Superintendent - Construction Superintendent must be employed by the offeror, however past project experience is not required to have been completed while employed by the offeror Failure to demonstrate the minimally acceptability standards under this factor will result in an "UNA

Applies to: person

View source 1
01page 74View official source ↗
“Superintendent - Construction Superintendent must be employed by the offeror, however past project experience is not required to have been completed while employed by the offeror Failure to demonstrate the minimally acceptability standards under this factor will result in an "UNACCEPTABLE" rating an”
Source page 74

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 74

Financial capacity

Verified

(End of Clause) 3.4.1-1 PROPOSAL GUARANTEE (JAN 2017) (a) Offerors must furnish a proposal guarantee in the form of a proposal bond, a postal money order, a certified or cashier's check, an irrevocable letter of credit, or United States bonds or notes with a maturity of less than

View source 1
01page 26View official source ↗
“(End of Clause) 3.4.1-1 PROPOSAL GUARANTEE (JAN 2017) (a) Offerors must furnish a proposal guarantee in the form of a proposal bond, a postal money order, a certified or cashier's check, an irrevocable letter of credit, or United States bonds or notes with a maturity of less than five years.”
Source page 26

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 26

Joint ventures & teaming

4 findings
Requirement 1Verified

(5) Bid Bond (6) Executed Teaming Agreement or Joint Venture agreements (if applicable)

Applies when: if applicable)

View source 1
01page 65View official source ↗
“(5) Bid Bond (6) Executed Teaming Agreement or Joint Venture agreements (if applicable)”
Source page 65

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 65
Requirement 2Verified

submitted project must be the amount of the offeror’s subcontract - If an offeror is proposing under Teaming Agreement, each Teaming Partner must have a minimum of one (1)

Applies when: If an offeror is proposing under Teaming Agreement, each Teaming Partner must have a minimum of one (1)

View source 1
01page 66View official source ↗
“submitted project must be the amount of the offeror’s subcontract - If an offeror is proposing under Teaming Agreement, each Teaming Partner must have a minimum of one (1)”
Source page 66

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 66
Requirement 3Verified

project must be the amount of the offeror’s subcontract - If an offeror is proposing under a Teaming Agreement, each Teaming Partner must have a minimum of one (1)

Applies when: If an offeror is proposing under a Teaming Agreement, each Teaming Partner must have a minimum of one (1)

View source 1
01page 66View official source ↗
“project must be the amount of the offeror’s subcontract - If an offeror is proposing under a Teaming Agreement, each Teaming Partner must have a minimum of one (1)”
Source page 66

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 66
Requirement 4Verified

(iii) The offeror must send out – and track the completion of - PPS(s) (See Section J, List of Attachments, Attachment 5 Past Performance Survey) to each of the offeror’s or if applicable joint venture member’s (i.e., each entity’s) clients.

Applies when: if applicable joint venture member’s (i

View source 1
01page 67View official source ↗
“(iii) The offeror must send out – and track the completion of - PPS(s) (See Section J, List of Attachments, Attachment 5 Past Performance Survey) to each of the offeror’s or if applicable joint venture member’s (i.e., each entity’s) clients.”
Source page 67

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 67

Exclusions & responsibility

4 findings
Requirement 1Verified

3.2.2.7-6 PROTECTING THE GOVERNMENT'S INTEREST WHEN SUBCONTRACTING WITH CONTRACTORS DEBARRED, SUSPENDED, OR PROPOSED FOR DEBARMENT (APR 2023)

Applies when: WHEN SUBCONTRACTING WITH CONTRACTORS DEBARRED, SUSPENDED, OR PROPOSED FOR DEBARMENT (APR 2023)

View source 1
01page 18View official source ↗
“3.2.2.7-6 PROTECTING THE GOVERNMENT'S INTEREST WHEN SUBCONTRACTING WITH CONTRACTORS DEBARRED, SUSPENDED, OR PROPOSED FOR DEBARMENT (APR 2023)”
Source page 18

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 18
Requirement 2Verified

If the Contractor is suspended or debarred as a result of the MOU termination, the contractor is not eligible to participate in E- Verify during the period of its suspension or debarment.

Applies when: If the Contractor is suspended or debarred as a result of the MOU termination, the contractor is not eligible to participate in E- Verify during the period of its suspension or debar

View source 1
01page 29View official source ↗
“If the Contractor is suspended or debarred as a result of the MOU termination, the contractor is not eligible to participate in E- Verify during the period of its suspension or debarment.”
Source page 29

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 29
Requirement 3Verified

(A) Are [ ] are not [ ] presently debarred, suspended, proposed for debarment, or declared ineligible for the award of contracts by any Federal agency;

View source 1
01page 55View official source ↗
“(A) Are [ ] are not [ ] presently debarred, suspended, proposed for debarment, or declared ineligible for the award of contracts by any Federal agency;”
Source page 55

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 55
Requirement 4Verified

(c) Procedures: The offeror must review the list of excluded parties in the System for Award Management (SAM)

View source 1
01page 59View official source ↗
“(c) Procedures: The offeror must review the list of excluded parties in the System for Award Management (SAM)”
Source page 59

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 59

Conflicts of interest

Verified
Section I - Contract Clauses Clause List 3.1.7-2 ORGANIZATIONAL CONFLICTS OF INTEREST (JAN 2023) 3.2.2.3-33 ORDER OF PRECEDENCE (APR 2024) 3.2.2.3-42 DIFFERING SITE CONDITIONS (APR 2024) 3.2.2.3-43 SITE INVESTIGATION AND CONDITIONS AFFECTING THE WORK (APR 2024) 3.2.2.3-45 MATERIARead full requirement Close full requirement

Section I - Contract Clauses Clause List 3.1.7-2 ORGANIZATIONAL CONFLICTS OF INTEREST (JAN 2023) 3.2.2.3-33 ORDER OF PRECEDENCE (APR 2024) 3.2.2.3-42 DIFFERING SITE CONDITIONS (APR 2024) 3.2.2.3-43 SITE INVESTIGATION AND CONDITIONS AFFECTING THE WORK (APR 2024) 3.2.2.3-45 MATERIA

View source 1
01page 18View official source ↗
“Section I - Contract Clauses Clause List 3.1.7-2 ORGANIZATIONAL CONFLICTS OF INTEREST (JAN 2023) 3.2.2.3-33 ORDER OF PRECEDENCE (APR 2024) 3.2.2.3-42 DIFFERING SITE CONDITIONS (APR 2024) 3.2.2.3-43 SITE INVESTIGATION AND CONDITIONS AFFECTING THE WORK (APR 2024) 3.2.2.3-45 MATERIAL AND WORKMANSHIP (J”
Source page 18

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 18
Missing information2 checks · expand to review

A missing value is not a waiver. Check the source or ask the agency before relying on it.

Required licenses

2 findings
Requirement 1Not reviewed

—

Not reviewed — requirement not confirmed

Requirement 2Not found

—

Not found in reviewed sources

1 additional field have no reviewed finding.

02

Deadlines & submission

When and how to submit, and whether you are still in time.

27 verified8 to confirm

Response deadline

2 findings
Requirement 1Verified

2026-11-19T16:00:00-06:00

View source 1
01https://sam.gov/api/prod/opps/v2/opportunities/b5c4fee1baa64396b4584aa5e91d2487 /data2/solicitation/deadlines/responseView official source ↗
“2026-11-19T16:00:00-06:00”
Missing information · 1 check
Not found

—

Not found in reviewed sources

Site visit / pre-bid meeting

3 findings
Requirement 1Verified

required

View source 1
01notice bodyView official source ↗
“Please include the solicitation number 6973GH-27-R-00005 in the subject line of all email correspondence as indicated in Section L of the SIR ***ATTENTION: REVIEW SECTION L.1 OF THE SIR FOR THE MANDATORY SITE VISIT INSTRUCTIONS*** Prospective offerors are REQUIRED to attend a MANDATORY pre-proposal conference/site visi”
Requirement 2Verified

required

Applies when: Prior to Proposal Prospective offerors are REQUIRED to attend a MANDATORY pre-proposal cMust be met by: Prior to Proposal Prospective offerors are REQUIRED to attend a MANDATORY pre-proposal c

View source 1
01page 63View official source ↗
“Section L - Instructions,Conditions, and Notices to Bidders Clause List L.1 Mandatory Site Visit/Submission of Questions Prior to Proposal Prospective offerors are REQUIRED to attend a MANDATORY pre-proposal conference/site visit to be held at 10:00 a.m.”
Source page 63

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 63
Missing information · 1 check
Not found

—

Not found in reviewed sources

How to submit

6 findings
Requirement 1Verified

(f) Documentation shall be submitted electronically in accordance with Section L, Clause 3.2.2.3-20, Electronic Offers.

View source 1
01page 64View official source ↗
“(f) Documentation shall be submitted electronically in accordance with Section L, Clause 3.2.2.3-20, Electronic Offers.”
Source page 64

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 64
Requirement 2Verified

Proposals must be emailed to andre.casiano@us.af.mil (g) VERY IMPORTANT NOTICE: Offerors are further advised that due to the size of the proposal documents as well as email security requirements, Offerors should not wait until the last minute to email proposal submission as any e

View source 1
01page 64View official source ↗
“Proposals must be emailed to andre.casiano@us.af.mil (g) VERY IMPORTANT NOTICE: Offerors are further advised that due to the size of the proposal documents as well as email security requirements, Offerors should not wait until the last minute to email proposal submission as any email received after ”
Source page 64

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 64
Requirement 3Verified
NOTE: Due to FAA email size limitations, it is highly recommended that offerors submit their email proposal for each Section as separate emails and in the email subject line state 6973GH-27-R-00005, Section/Factor “**” Submitted on Behalf of “<Insert Offeror Company>”.Read full requirement Close full requirement

NOTE: Due to FAA email size limitations, it is highly recommended that offerors submit their email proposal for each Section as separate emails and in the email subject line state 6973GH-27-R-00005, Section/Factor “**” Submitted on Behalf of “<Insert Offeror Company>”.

View source 1
01page 64View official source ↗
“NOTE: Due to FAA email size limitations, it is highly recommended that offerors submit their email proposal for each Section as separate emails and in the email subject line state 6973GH-27-R-00005, Section/Factor “**” Submitted on Behalf of “<Insert Offeror Company>”.”
Source page 64

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 64
Requirement 4Verified

(b) Documentation shall be submitted electronically in accordance with Section L, Provision 3.2.2.3-20, Electronic Offers.

View source 1
01page 65View official source ↗
“(b) Documentation shall be submitted electronically in accordance with Section L, Provision 3.2.2.3-20, Electronic Offers.”
Source page 65

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 65
Requirement 5Verified

(End of provision) 3.2.2.3-20 OFFERS (JAN 2018) (a) The offeror (you) must submit responses to this SIR by the following electronic means : Email.

View source 1
01page 69View official source ↗
“(End of provision) 3.2.2.3-20 OFFERS (JAN 2018) (a) The offeror (you) must submit responses to this SIR by the following electronic means : Email.”
Source page 69

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 69
Missing information · 1 check
Not found

—

Not found in reviewed sources

Required submission files

2 findings
Requirement 1Verified

Offerors must complete and submit a minimum of three (3) "Past Performance Experience Information" (PPIE) forms, attached to the SIR , (Attachment 6 Past Performance Experience Form) in response to this factor.

View source 1
01page 65View official source ↗
“Offerors must complete and submit a minimum of three (3) "Past Performance Experience Information" (PPIE) forms, attached to the SIR , (Attachment 6 Past Performance Experience Form) in response to this factor.”
Source page 65

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 65
Missing information · 1 check
Not found

—

Not found in reviewed sources

Procurement contact

3 findings
Requirement 1Verified

Andre Casiano · andre.casiano@faa.gov · 4059547850

View source 1
01https://sam.gov/api/prod/opps/v2/opportunities/b5c4fee1baa64396b4584aa5e91d2487 /data2/pointOfContact/0View official source ↗
“Andre Casiano · andre.casiano@faa.gov · 4059547850”
Requirement 2Verified

andre.casiano@faa.gov

View source 1
01from the postingView official source ↗
“applicable). Please advise the Contracting Officer, Andre Casiano, at andre.casiano@faa.gov in writing of your intent to attend by 12:00 p.m. Central Time, Frida”
Requirement 3Needs confirmation

—

Needs confirmation

View source 1
01page 74View official source ↗
“Offeror’s must ensure that current and accurate point of contact information is provided with their submission for all clients contacted to complete and submit a PPS.”
Source page 74

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 74

Bid opening

Needs confirmation

—

Needs confirmation

Applies when: If this is a sealed bid solicitation, offers will be publicly opened at that time

View source 1
01page 1View official source ↗
“If this is a sealed bid solicitation, offers will be publicly opened at that time.”
Source page 1

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 1

Formatting & signatures

5 findings
Requirement 1Verified
Proposal Documentation Section Title I Contract Documentation & Price Proposal to include price breakdown Factor 1 - Relevant Experience Factor 2 - Past Performance II Factor 3 - Key Personnel, (6-page limit for each resume) Factor 4 - Packaged Wastewater Treatment Equipment (15-Read full requirement Close full requirement

Proposal Documentation Section Title I Contract Documentation & Price Proposal to include price breakdown Factor 1 - Relevant Experience Factor 2 - Past Performance II Factor 3 - Key Personnel, (6-page limit for each resume) Factor 4 - Packaged Wastewater Treatment Equipment (15-

Applies to: person

View source 1
01page 65View official source ↗
“Proposal Documentation Section Title I Contract Documentation & Price Proposal to include price breakdown Factor 1 - Relevant Experience Factor 2 - Past Performance II Factor 3 - Key Personnel, (6-page limit for each resume) Factor 4 - Packaged Wastewater Treatment Equipment (15-page limit) Factor 5”
Source page 65

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 65
Requirement 2Verified

experience to perform under the contract - Each Resume has a Six (6) Page Limit

View source 1
01page 67View official source ↗
“experience to perform under the contract - Each Resume has a Six (6) Page Limit”
Source page 67

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 67
Requirement 3Verified

This factor has a fifteen (15) Page Limit (5) Factor 5 - Site Infrastructure Subcontractor Experience: The Offeror's proposed Site Infrastructure subcontractor is required to provide a minimum of two (2) projects valued at or above $250,000.00 that are wastewater related and will

Applies to: subcontractor

View source 1
01page 67View official source ↗
“This factor has a fifteen (15) Page Limit (5) Factor 5 - Site Infrastructure Subcontractor Experience: The Offeror's proposed Site Infrastructure subcontractor is required to provide a minimum of two (2) projects valued at or above $250,000.00 that are wastewater related and will need to provide “Pa”
Source page 67

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 67
Requirement 4Verified

Factor 3 - Key Personnel: Key Personnel Qualifications - Evaluation Criteria The Government will review all documentation submitted under Factor 3 within the page limit identified.

Applies when: within the page limit identifiedMust be met by: within the page limit identified

Applies to: person

View source 1
01page 74View official source ↗
“Factor 3 - Key Personnel: Key Personnel Qualifications - Evaluation Criteria The Government will review all documentation submitted under Factor 3 within the page limit identified.”
Source page 74

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 74
Requirement 5Verified

Factor 4 – Packaged Wastewater Treatment Equipment - Evaluation Criteria The Government will review all documentation submitted under Factor 4 within the page limit identified.

Applies when: within the page limit identifiedMust be met by: within the page limit identified

View source 1
01page 74View official source ↗
“Factor 4 – Packaged Wastewater Treatment Equipment - Evaluation Criteria The Government will review all documentation submitted under Factor 4 within the page limit identified.”
Source page 74

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 74

Mandatory forms

3 findings
Requirement 1Verified

1d Attachment 1d 13289-007_MMAC IWTP Drawings 06/10/2026 139 2 Attachment 2 SF25 Performance Bond 08/01/2016 3

View source 1
01page 53View official source ↗
“1d Attachment 1d 13289-007_MMAC IWTP Drawings 06/10/2026 139 2 Attachment 2 SF25 Performance Bond 08/01/2016 3”
Source page 53

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 53
Requirement 2Verified

3 Attachment 3 SF25A Payment Bond 08/01/2016 2 4 Attachment 4 SF24 Bid Bond 08/01/2016 2

View source 1
01page 53View official source ↗
“3 Attachment 3 SF25A Payment Bond 08/01/2016 2 4 Attachment 4 SF24 Bid Bond 08/01/2016 2”
Source page 53

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 53
Requirement 3Verified

Offerors must complete and submit: (1) Section A, Solicitation, Offer and Award, FAA Form 4400-82 (SF1442), Blocks 20a, 20b, and 20c (2) Section K, Representations and Certifications (3) Section B, Supplies or Services and Prices/Costs: Government format (4) Price Breakdown: Cont

View source 1
01page 65View official source ↗
“Offerors must complete and submit: (1) Section A, Solicitation, Offer and Award, FAA Form 4400-82 (SF1442), Blocks 20a, 20b, and 20c (2) Section K, Representations and Certifications (3) Section B, Supplies or Services and Prices/Costs: Government format (4) Price Breakdown: Contractor Format, Ident”
Source page 65

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 65

Offer acceptance period

7 findings
Requirement 1Verified

90 calendar days

View source 1
01page 54View official source ↗
“(c) The FAA requires a minimum acceptance period of 90 calendar days.”
Source page 54

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 54
Requirement 2Needs confirmation

—

Needs confirmation

View source 1
01page 54View official source ↗
“Section K - Representations, Certifications, and Other Statements of Bidders Clause List 3.2.2.3-82 PROHIBITION ON CONDUCTING RESTRICTED BUSINESS OPERATIONS IN SUDAN - CERTIFICATION (JUL 2012) 3.6.3-4 RECOVERED MATERIAL PRODUCTS CERTIFICATION (OCT 2024) 3.2.2.3-2 MINIMUM OFFER ACCEPTANCE PERIOD (APR”
Source page 54

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 54
Requirement 3Needs confirmation

—

Needs confirmation

View source 1
01page 54View official source ↗
“(b) This provision supersedes any language about the acceptance period appearing elsewhere in this SIR.”
Source page 54

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 54
Requirement 4Needs confirmation

—

Needs confirmation

View source 1
01page 54View official source ↗
“(d) The offeror may specify a longer acceptance period than the period shown in paragraph (c).”
Source page 54

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 54
Requirement 5Needs confirmation

—

Needs confirmation

View source 1
01page 54View official source ↗
“To specify a longer period, fill in the blank: The offeror allows the following acceptance period: _____ calendar days.”
Source page 54

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 54
Requirement 6Needs confirmation

—

Needs confirmation

View source 1
01page 54View official source ↗
“(e) The FAA may reject an offer allowing less than the FAA's minimum acceptance period.”
Source page 54

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 54
Requirement 7Needs confirmation

—

Needs confirmation

Applies when: if the FAA accepts the offer in writing within: (1) The acceptance period stated in paragraph (c) of this provision; within: (1) The acceptance period stated in paragraph (c) of this provisionMust be met by: within: (1) The acceptance period stated in paragraph (c) of this provision

View source 1
01page 54View official source ↗
“(f) The offeror agrees to fulfill the offer completely if the FAA accepts the offer in writing within: (1) The acceptance period stated in paragraph (c) of this provision; or (2) Any longer acceptance period stated in paragraph (d) of this provision.”
Source page 54

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 54

Alternate proposals

3 findings
Requirement 1Verified

The total evaluated price will be the sum of the base bid and the bid options the FAA elects to award.

View source 1
01page 5View official source ↗
“The total evaluated price will be the sum of the base bid and the bid options the FAA elects to award.”
Source page 5

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 5
Requirement 2Verified
The total evaluated price will be the sum of the base bid and the bid options the FAA elects to award. 3.1.9-1 ELECTRONIC COMMERCE AND SIGNATURE (JUL 2020) (a) The Electronic Signatures in Global and National Commerce Act (E-SIGN) establishes a legal equivalence between: Page 13Read full requirement Close full requirement

The total evaluated price will be the sum of the base bid and the bid options the FAA elects to award. 3.1.9-1 ELECTRONIC COMMERCE AND SIGNATURE (JUL 2020) (a) The Electronic Signatures in Global and National Commerce Act (E-SIGN) establishes a legal equivalence between: Page 13

View source 1
01page 13View official source ↗
“The total evaluated price will be the sum of the base bid and the bid options the FAA elects to award. 3.1.9-1 ELECTRONIC COMMERCE AND SIGNATURE (JUL 2020) (a) The Electronic Signatures in Global and National Commerce Act (E-SIGN) establishes a legal equivalence between: Page 13”
Source page 13

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 13
Requirement 3Verified

M.6 Cost/Price (a) The total evaluated price will be the sum of the base bid and the bid options the FAA elects to award.

View source 1
01page 75View official source ↗
“M.6 Cost/Price (a) The total evaluated price will be the sum of the base bid and the bid options the FAA elects to award.”
Source page 75

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 75

Grounds for rejection

4 findings
Requirement 1Verified

In this event, the contractor must provide, or cause each of its employees to provide, such security information to AXP. Failure to cooperate with security processing will result in an unfavorable suitability determination. 13. The contractor must retrieve a current roster report

View source 1
01page 45View official source ↗
“In this event, the contractor must provide, or cause each of its employees to provide, such security information to AXP. Failure to cooperate with security processing will result in an unfavorable suitability determination. 13. The contractor must retrieve a current roster report through VAP on a qu”
Source page 45

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 45
Requirement 2Verified

Any offer that fails to provide all of the requisite items identified at (1) through (6) above, or otherwise takes exception, may be deemed non-responsive and ineligible for award.

View source 1
01page 65View official source ↗
“Any offer that fails to provide all of the requisite items identified at (1) through (6) above, or otherwise takes exception, may be deemed non-responsive and ineligible for award.”
Source page 65

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 65
Requirement 3Verified

(2) Conformance – Proposals must conform to the format and content instructions identified at L.6. Non-adherence to proposal format and content instructions may be considered non-responsive.

View source 1
01page 72View official source ↗
“(2) Conformance – Proposals must conform to the format and content instructions identified at L.6. Non-adherence to proposal format and content instructions may be considered non-responsive.”
Source page 72

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 72
Requirement 4Verified

Proposals found by the CO to be non-responsive may not receive further consideration.

View source 1
01page 72View official source ↗
“Proposals found by the CO to be non-responsive may not receive further consideration.”
Source page 72

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 72
Missing information2 checks · expand to review

A missing value is not a waiver. Check the source or ask the agency before relying on it.

Questions due

Not found

—

Not found in reviewed sources

Acknowledge amendments

Not found

—

Not found in reviewed sources

1 additional field have no reviewed finding.

Continue your review

6 more sections are available once you sign in

Pricing & payment · Bonds & insurance · Evaluation & award · Scope & delivery · Labor, sourcing & compliance · Contract terms & risk

Sign in — free

Extracted from the public documents linked above. This is an information aid, not a determination of bid eligibility or legal advice. Verify the original wording and any addenda before submitting a bid.

$102K
27 days left
See all 13
Mike Monroney Aeronautical Center (MMAC) Industrial Waste Water Treatment Plant Upgrades