DEPT OF DEFENSE · Cascade Locks, OR
Bonneville Lock and Dam - Navigation Lock 1 Bridge Replacement
- Response deadline
- 6 days left
- Published project value
- Not confirmedCheck the pricing and payment terms below.
- Solicitation number
- W9127N26BA024
Dates to plan around
Times follow the original source.
- Response deadline
Source wording
2026-10-29T12:00:00-07:00
From the posting2 agency details · contact information and original wording
10 documents found2 could not be read32% of weighted requirement checks reviewed
Newer source changes have not been verified. Confirm the latest notice and addenda before submitting.
Review first
Start with these requirements and unresolved points.- Must doSet-aside
SBA
Eligibility & participation
Whether you can bid at all, and what you must already hold.
Set-aside
3 findingsSBA
View source 1
“SBA”
Missing information · 2 checks
—
Not found in reviewed sources
—
Not reviewed — requirement not confirmed
Required licenses
3 findingsBonneville Powerhouse I Navigation Lock Bridge Replacement 1.6.8.1 Quality Manager Qualifications The quality manager must hold a current license as a professional engineer in a U.S. state or territory with experience on at least five similar projects.
Applies when: at least five similar projects
View source 1
“Bonneville Powerhouse I Navigation Lock Bridge Replacement 1.6.8.1 Quality Manager Qualifications The quality manager must hold a current license as a professional engineer in a U.S. state or territory with experience on at least five similar projects.”
Source page 33
Page markings may include other requirements. The quotation above identifies this requirement.

Missing information · 2 checks
—
Not found in reviewed sources
—
Not reviewed — requirement not confirmed
Experience & references
5 findings—
Needs confirmation
Applies to: person
View source 1
“The Project Superintendent must be a Journeyman with a minimum of five years experience in a verifiable Project Superintendent role on jobs similar to this Contract.”
Source page 8
Page markings may include other requirements. The quotation above identifies this requirement.

—
Needs confirmation
View source 1
“The CQC System Manager must have a minimum of ten years of experience in a verifiable CQC role on jobs similar to this SECTION 01 45 00.00 25 Page 6 AMD #0006”
Source page 10
Page markings may include other requirements. The quotation above identifies this requirement.

—
Needs confirmation
Applies when: at least five similar projects
View source 1
“Bonneville Powerhouse I Navigation Lock Bridge Replacement 1.6.8.1 Quality Manager Qualifications The quality manager must hold a current license as a professional engineer in a U.S. state or territory with experience on at least five similar projects.”
Source page 33
Page markings may include other requirements. The quotation above identifies this requirement.

Missing information · 2 checks
—
Not found in reviewed sources
—
Not reviewed — requirement not confirmed
Key personnel
7 findingsThe Project Superintendent must be a Journeyman with a minimum of five years experience in a verifiable Project Superintendent role on jobs similar to this Contract.
Applies to: person
View source 1
“The Project Superintendent must be a Journeyman with a minimum of five years experience in a verifiable Project Superintendent role on jobs similar to this Contract.”
Source page 8
Page markings may include other requirements. The quotation above identifies this requirement.

The designated Project Superintendent must be acceptable to the Contracting Officer (CO).
Applies to: person
View source 1
“The designated Project Superintendent must be acceptable to the Contracting Officer (CO).”
Source page 8
Page markings may include other requirements. The quotation above identifies this requirement.

The Project Superintendent must be held responsible for the quality of work on the job and is subject to removal by the CO for non-compliance with the quality requirements specified in the Contract.
Applies to: person
View source 1
“The Project Superintendent must be held responsible for the quality of work on the job and is subject to removal by the CO for non-compliance with the quality requirements specified in the Contract.”
Source page 8
Page markings may include other requirements. The quotation above identifies this requirement.

The Project Superintendent must maintain a physical presence at the site at all times, except as otherwise acceptable to the CO, and must be responsible for all construction and construction related activities at the site.
Applies to: person
View source 1
“The Project Superintendent must maintain a physical presence at the site at all times, except as otherwise acceptable to the CO, and must be responsible for all construction and construction related activities at the site.”
Source page 8
Page markings may include other requirements. The quotation above identifies this requirement.

The Project Superintendent must have no other duties; they may not perform the duties of an equipment operator, flagger, laborer, or any other position.
Applies to: person
View source 1
“The Project Superintendent must have no other duties; they may not perform the duties of an equipment operator, flagger, laborer, or any other position.”
Source page 8
Page markings may include other requirements. The quotation above identifies this requirement.

Key Contractor staff will be required to attend in person. Key personnel include, but are not limited to, Project Manager, Site Superintendent, Project Engineer, Quality Control Manager, and Site Safety Health Officer.
Applies to: person
View source 1
“Key Contractor staff will be required to attend in person. Key personnel include, but are not limited to, Project Manager, Site Superintendent, Project Engineer, Quality Control Manager, and Site Safety Health Officer.”
Source page 8
Page markings may include other requirements. The quotation above identifies this requirement.

The name, qualifications (in resume format), duties, responsibilities, and authorities of each person assigned a CQC function; see Paragraph entitled QUALITY CONTROL ORGANIZATION. c.
View source 1
“The name, qualifications (in resume format), duties, responsibilities, and authorities of each person assigned a CQC function; see Paragraph entitled QUALITY CONTROL ORGANIZATION. c.”
Source page 9
Page markings may include other requirements. The quotation above identifies this requirement.

Joint ventures & teaming
Contractor entries generally include, but are not limited to, prime and subcontractor information, daily project data and associated information, quality control activities, submittals, requests for information (RFI), schedule updates, and payment requests. 1.6.1 Administration TClose full requirement
Contractor entries generally include, but are not limited to, prime and subcontractor information, daily project data and associated information, quality control activities, submittals, requests for information (RFI), schedule updates, and payment requests. 1.6.1 Administration T
Applies to: subcontractor
View source 1
“Contractor entries generally include, but are not limited to, prime and subcontractor information, daily project data and associated information, quality control activities, submittals, requests for information (RFI), schedule updates, and payment requests. 1.6.1 Administration The Contractor respon”
Source page 25
Page markings may include other requirements. The quotation above identifies this requirement.

Missing information4 checks · expand to review
A missing value is not a waiver. Check the source or ask the agency before relying on it.
Registrations
2 findings—
Not found in reviewed sources
—
Not reviewed — requirement not confirmed
Small business size
2 findings—
Not found in reviewed sources
—
Not reviewed — requirement not confirmed
4 additional fields have no reviewed finding.
Deadlines & submission
When and how to submit, and whether you are still in time.
Response deadline
2 findings2026-10-29T12:00:00-07:00
View source 1
“2026-10-29T12:00:00-07:00”
Missing information · 1 check
—
Not found in reviewed sources
Procurement contact
4 findingsChristopher Burroughs · christopher.d.burroughs@usace.army.mil
View source 1
“Christopher Burroughs · christopher.d.burroughs@usace.army.mil”
Justin Figueredo · Justin.F.Figueredo@usace.army.mil
View source 1
“Justin Figueredo · Justin.F.Figueredo@usace.army.mil”
—
Needs confirmation
View source 1
“(8) Point of Contact and 24 hour phone number.”
Source page 17
Page markings may include other requirements. The quotation above identifies this requirement.

—
Needs confirmation
Applies when: at least 2 inches beyond the point of contact with the bars
View source 1
“Supports for coated or galvanized bars must also be coated with electrically compatible material for a distance of at least 2 inches beyond the point of contact with the bars. 3.4.3 Epoxy Coated Reinforcing Epoxy Coated Reinforcing must meet the requirements of ASTM A934/A934M including Appendix X2,”
Source page 46
Page markings may include other requirements. The quotation above identifies this requirement.

Formatting & signatures
A copy of the letter to the CQC System Manager signed by an authorized official of the firm which describes the responsibilities and delegates sufficient authorities to adequately perform the functions of the CQC System Manager, including authority to stop work which is not in coClose full requirement
A copy of the letter to the CQC System Manager signed by an authorized official of the firm which describes the responsibilities and delegates sufficient authorities to adequately perform the functions of the CQC System Manager, including authority to stop work which is not in co
View source 1
“A copy of the letter to the CQC System Manager signed by an authorized official of the firm which describes the responsibilities and delegates sufficient authorities to adequately perform the functions of the CQC System Manager, including authority to stop work which is not in compliance with the Co”
Source page 9
Page markings may include other requirements. The quotation above identifies this requirement.

Offer acceptance period
—
Needs confirmation
View source 1
“US Passport Undamaged: Issued by the US Dept of State, without limitation, does not need to be current, is/was valid for 10 years for adults and 5 years for children under 16. US Passport Card Undamaged: Issued by the US Dept of State, without limitation, does not need to be current.”
Grounds for rejection
4 findingsPhotograph the existing condition of all staging areas prior to mobilization and submit all photographs in the Access Agreements submittal. Failure to properly document existing conditions will result in a Government determination of necessary repairs. 1.18.2 Work Areas a.Close full requirement
Photograph the existing condition of all staging areas prior to mobilization and submit all photographs in the Access Agreements submittal. Failure to properly document existing conditions will result in a Government determination of necessary repairs. 1.18.2 Work Areas a.
Applies when: prior to mobilization and submit all photographs in the Access Agreements submittalMust be met by: prior to mobilization and submit all photographs in the Access Agreements submittal
View source 1
“Photograph the existing condition of all staging areas prior to mobilization and submit all photographs in the Access Agreements submittal. Failure to properly document existing conditions will result in a Government determination of necessary repairs. 1.18.2 Work Areas a.”
Source page 12
Page markings may include other requirements. The quotation above identifies this requirement.

Fading of coating color will not be cause for rejection of epoxy-coated reinforcing bars. d.
View source 1
“Fading of coating color will not be cause for rejection of epoxy-coated reinforcing bars. d.”
Source page 43
Page markings may include other requirements. The quotation above identifies this requirement.

Fading of coating color must not be cause for rejection of epoxy-coated welded wire reinforcement. e.
View source 1
“Fading of coating color must not be cause for rejection of epoxy-coated welded wire reinforcement. e.”
Source page 44
Page markings may include other requirements. The quotation above identifies this requirement.

It is not expected that coated bars, when in final position ready for concrete placement, are completely free of damaged areas; however, excessive nicks and scrapes which expose steel is cause for rejection.
Applies when: when in final position ready for concrete placement, are completely free of damaged areas
View source 1
“It is not expected that coated bars, when in final position ready for concrete placement, are completely free of damaged areas; however, excessive nicks and scrapes which expose steel is cause for rejection.”
Source page 46
Page markings may include other requirements. The quotation above identifies this requirement.

Missing information5 checks · expand to review
A missing value is not a waiver. Check the source or ask the agency before relying on it.
Questions due
—
Not found in reviewed sources
Site visit / pre-bid meeting
—
Not found in reviewed sources
How to submit
—
Not found in reviewed sources
Required submission files
—
Not found in reviewed sources
Acknowledge amendments
—
Not found in reviewed sources
4 additional fields have no reviewed finding.
6 more sections are available once you sign in
Pricing & payment · Bonds & insurance · Evaluation & award · Scope & delivery · Labor, sourcing & compliance · Contract terms & risk
Sign in — freeExtracted from the public documents linked above. This is an information aid, not a determination of bid eligibility or legal advice. Verify the original wording and any addenda before submitting a bid.