Bonneville Lock and Dam - Navigation Lock 1 Bridge Replacement

10 source documentsSource checked Oct 19Content updated
Open notice
Response deadline
6 days left
Published project value
Not confirmed
Check the pricing and payment terms below.
Solicitation number
W9127N26BA024
View official posting ↗Review requirements ↓Original posting details are available below.

Dates to plan around

Times follow the original source.

  1. Response deadline
    Source wording
    2026-10-29T12:00:00-07:00
From the posting2 agency details · contact information and original wording
Issued by
Issued by the US Dept of State, without limitation, does not need to be current, is/was valid for 10 years for adults and 5 years for children under 16.
Status
open
Worth confirming on the posting
View the official posting →Always the authority. An addendum can change any of this after we read it.
Document coverage
8 / 10documents readReview incomplete

10 documents found2 could not be read32% of weighted requirement checks reviewed

Newer source changes have not been verified. Confirm the latest notice and addenda before submitting.

Before you bid

Review first

Start with these requirements and unresolved points.
01

Eligibility & participation

Whether you can bid at all, and what you must already hold.

10 verified3 to confirm

Set-aside

3 findings
Requirement 1Verified

SBA

View source 1
01https://sam.gov/api/prod/opps/v2/opportunities/e8d20fb3aaab46af86d58aac9f67c22e /data2/solicitation/setAsideView official source ↗
“SBA”
Missing information · 2 checks
Not found

—

Not found in reviewed sources

Not reviewed

—

Not reviewed — requirement not confirmed

Required licenses

3 findings
Requirement 1Verified

Bonneville Powerhouse I Navigation Lock Bridge Replacement 1.6.8.1 Quality Manager Qualifications The quality manager must hold a current license as a professional engineer in a U.S. state or territory with experience on at least five similar projects.

Applies when: at least five similar projects

View source 1
01page 33View official source ↗
“Bonneville Powerhouse I Navigation Lock Bridge Replacement 1.6.8.1 Quality Manager Qualifications The quality manager must hold a current license as a professional engineer in a U.S. state or territory with experience on at least five similar projects.”
Source page 33

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 33
Missing information · 2 checks
Not found

—

Not found in reviewed sources

Not reviewed

—

Not reviewed — requirement not confirmed

Experience & references

5 findings
Requirement 1Needs confirmation

—

Needs confirmation

Applies to: person

View source 1
01page 8View official source ↗
“The Project Superintendent must be a Journeyman with a minimum of five years experience in a verifiable Project Superintendent role on jobs similar to this Contract.”
Source page 8

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 8
Requirement 2Needs confirmation

—

Needs confirmation

View source 1
01page 10View official source ↗
“The CQC System Manager must have a minimum of ten years of experience in a verifiable CQC role on jobs similar to this SECTION 01 45 00.00 25 Page 6 AMD #0006”
Source page 10

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 10
Requirement 3Needs confirmation

—

Needs confirmation

Applies when: at least five similar projects

View source 1
01page 33View official source ↗
“Bonneville Powerhouse I Navigation Lock Bridge Replacement 1.6.8.1 Quality Manager Qualifications The quality manager must hold a current license as a professional engineer in a U.S. state or territory with experience on at least five similar projects.”
Source page 33

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 33
Missing information · 2 checks
Not found

—

Not found in reviewed sources

Not reviewed

—

Not reviewed — requirement not confirmed

Key personnel

7 findings
Requirement 1Verified

The Project Superintendent must be a Journeyman with a minimum of five years experience in a verifiable Project Superintendent role on jobs similar to this Contract.

Applies to: person

View source 1
01page 8View official source ↗
“The Project Superintendent must be a Journeyman with a minimum of five years experience in a verifiable Project Superintendent role on jobs similar to this Contract.”
Source page 8

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 8
Requirement 2Verified

The designated Project Superintendent must be acceptable to the Contracting Officer (CO).

Applies to: person

View source 1
01page 8View official source ↗
“The designated Project Superintendent must be acceptable to the Contracting Officer (CO).”
Source page 8

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 8
Requirement 3Verified

The Project Superintendent must be held responsible for the quality of work on the job and is subject to removal by the CO for non-compliance with the quality requirements specified in the Contract.

Applies to: person

View source 1
01page 8View official source ↗
“The Project Superintendent must be held responsible for the quality of work on the job and is subject to removal by the CO for non-compliance with the quality requirements specified in the Contract.”
Source page 8

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 8
Requirement 4Verified

The Project Superintendent must maintain a physical presence at the site at all times, except as otherwise acceptable to the CO, and must be responsible for all construction and construction related activities at the site.

Applies to: person

View source 1
01page 8View official source ↗
“The Project Superintendent must maintain a physical presence at the site at all times, except as otherwise acceptable to the CO, and must be responsible for all construction and construction related activities at the site.”
Source page 8

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 8
Requirement 5Verified

The Project Superintendent must have no other duties; they may not perform the duties of an equipment operator, flagger, laborer, or any other position.

Applies to: person

View source 1
01page 8View official source ↗
“The Project Superintendent must have no other duties; they may not perform the duties of an equipment operator, flagger, laborer, or any other position.”
Source page 8

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 8
Requirement 6Verified

Key Contractor staff will be required to attend in person. Key personnel include, but are not limited to, Project Manager, Site Superintendent, Project Engineer, Quality Control Manager, and Site Safety Health Officer.

Applies to: person

View source 1
01page 8View official source ↗
“Key Contractor staff will be required to attend in person. Key personnel include, but are not limited to, Project Manager, Site Superintendent, Project Engineer, Quality Control Manager, and Site Safety Health Officer.”
Source page 8

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 8
Requirement 7Verified

The name, qualifications (in resume format), duties, responsibilities, and authorities of each person assigned a CQC function; see Paragraph entitled QUALITY CONTROL ORGANIZATION. c.

View source 1
01page 9View official source ↗
“The name, qualifications (in resume format), duties, responsibilities, and authorities of each person assigned a CQC function; see Paragraph entitled QUALITY CONTROL ORGANIZATION. c.”
Source page 9

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 9

Joint ventures & teaming

Verified
Contractor entries generally include, but are not limited to, prime and subcontractor information, daily project data and associated information, quality control activities, submittals, requests for information (RFI), schedule updates, and payment requests. 1.6.1 Administration TRead full requirement Close full requirement

Contractor entries generally include, but are not limited to, prime and subcontractor information, daily project data and associated information, quality control activities, submittals, requests for information (RFI), schedule updates, and payment requests. 1.6.1 Administration T

Applies to: subcontractor

View source 1
01page 25View official source ↗
“Contractor entries generally include, but are not limited to, prime and subcontractor information, daily project data and associated information, quality control activities, submittals, requests for information (RFI), schedule updates, and payment requests. 1.6.1 Administration The Contractor respon”
Source page 25

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 25
Missing information4 checks · expand to review

A missing value is not a waiver. Check the source or ask the agency before relying on it.

Registrations

2 findings
Requirement 1Not found

—

Not found in reviewed sources

Requirement 2Not reviewed

—

Not reviewed — requirement not confirmed

Small business size

2 findings
Requirement 1Not found

—

Not found in reviewed sources

Requirement 2Not reviewed

—

Not reviewed — requirement not confirmed

4 additional fields have no reviewed finding.

02

Deadlines & submission

When and how to submit, and whether you are still in time.

8 verified3 to confirm

Response deadline

2 findings
Requirement 1Verified

2026-10-29T12:00:00-07:00

View source 1
01https://sam.gov/api/prod/opps/v2/opportunities/e8d20fb3aaab46af86d58aac9f67c22e /data2/solicitation/deadlines/responseView official source ↗
“2026-10-29T12:00:00-07:00”
Missing information · 1 check
Not found

—

Not found in reviewed sources

Procurement contact

4 findings
Requirement 1Verified

Christopher Burroughs · christopher.d.burroughs@usace.army.mil

View source 1
01https://sam.gov/api/prod/opps/v2/opportunities/e8d20fb3aaab46af86d58aac9f67c22e /data2/pointOfContact/0View official source ↗
“Christopher Burroughs · christopher.d.burroughs@usace.army.mil”
Requirement 2Verified

Justin Figueredo · Justin.F.Figueredo@usace.army.mil

View source 1
01https://sam.gov/api/prod/opps/v2/opportunities/e8d20fb3aaab46af86d58aac9f67c22e /data2/pointOfContact/1View official source ↗
“Justin Figueredo · Justin.F.Figueredo@usace.army.mil”
Requirement 3Needs confirmation

—

Needs confirmation

View source 1
01page 17View official source ↗
“(8) Point of Contact and 24 hour phone number.”
Source page 17

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 17
Requirement 4Needs confirmation

—

Needs confirmation

Applies when: at least 2 inches beyond the point of contact with the bars

View source 1
01page 46View official source ↗
“Supports for coated or galvanized bars must also be coated with electrically compatible material for a distance of at least 2 inches beyond the point of contact with the bars. 3.4.3 Epoxy Coated Reinforcing Epoxy Coated Reinforcing must meet the requirements of ASTM A934/A934M including Appendix X2,”
Source page 46

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 46

Formatting & signatures

Verified
A copy of the letter to the CQC System Manager signed by an authorized official of the firm which describes the responsibilities and delegates sufficient authorities to adequately perform the functions of the CQC System Manager, including authority to stop work which is not in coRead full requirement Close full requirement

A copy of the letter to the CQC System Manager signed by an authorized official of the firm which describes the responsibilities and delegates sufficient authorities to adequately perform the functions of the CQC System Manager, including authority to stop work which is not in co

View source 1
01page 9View official source ↗
“A copy of the letter to the CQC System Manager signed by an authorized official of the firm which describes the responsibilities and delegates sufficient authorities to adequately perform the functions of the CQC System Manager, including authority to stop work which is not in compliance with the Co”
Source page 9

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 9

Offer acceptance period

Needs confirmation

—

Needs confirmation

View source 1
01notice bodyView official source ↗
“US Passport Undamaged: Issued by the US Dept of State, without limitation, does not need to be current, is/was valid for 10 years for adults and 5 years for children under 16. US Passport Card Undamaged: Issued by the US Dept of State, without limitation, does not need to be current.”

Grounds for rejection

4 findings
Requirement 1Verified
Photograph the existing condition of all staging areas prior to mobilization and submit all photographs in the Access Agreements submittal. Failure to properly document existing conditions will result in a Government determination of necessary repairs. 1.18.2 Work Areas a.Read full requirement Close full requirement

Photograph the existing condition of all staging areas prior to mobilization and submit all photographs in the Access Agreements submittal. Failure to properly document existing conditions will result in a Government determination of necessary repairs. 1.18.2 Work Areas a.

Applies when: prior to mobilization and submit all photographs in the Access Agreements submittalMust be met by: prior to mobilization and submit all photographs in the Access Agreements submittal

View source 1
01page 12View official source ↗
“Photograph the existing condition of all staging areas prior to mobilization and submit all photographs in the Access Agreements submittal. Failure to properly document existing conditions will result in a Government determination of necessary repairs. 1.18.2 Work Areas a.”
Source page 12

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 12
Requirement 2Verified

Fading of coating color will not be cause for rejection of epoxy-coated reinforcing bars. d.

View source 1
01page 43View official source ↗
“Fading of coating color will not be cause for rejection of epoxy-coated reinforcing bars. d.”
Source page 43

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 43
Requirement 3Verified

Fading of coating color must not be cause for rejection of epoxy-coated welded wire reinforcement. e.

View source 1
01page 44View official source ↗
“Fading of coating color must not be cause for rejection of epoxy-coated welded wire reinforcement. e.”
Source page 44

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 44
Requirement 4Verified

It is not expected that coated bars, when in final position ready for concrete placement, are completely free of damaged areas; however, excessive nicks and scrapes which expose steel is cause for rejection.

Applies when: when in final position ready for concrete placement, are completely free of damaged areas

View source 1
01page 46View official source ↗
“It is not expected that coated bars, when in final position ready for concrete placement, are completely free of damaged areas; however, excessive nicks and scrapes which expose steel is cause for rejection.”
Source page 46

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 46
Missing information5 checks · expand to review

A missing value is not a waiver. Check the source or ask the agency before relying on it.

Questions due

Not found

—

Not found in reviewed sources

Site visit / pre-bid meeting

Not found

—

Not found in reviewed sources

How to submit

Not found

—

Not found in reviewed sources

Required submission files

Not found

—

Not found in reviewed sources

Acknowledge amendments

Not found

—

Not found in reviewed sources

4 additional fields have no reviewed finding.

Continue your review

6 more sections are available once you sign in

Pricing & payment · Bonds & insurance · Evaluation & award · Scope & delivery · Labor, sourcing & compliance · Contract terms & risk

Sign in — free

Extracted from the public documents linked above. This is an information aid, not a determination of bid eligibility or legal advice. Verify the original wording and any addenda before submitting a bid.