BidEligible

DEPT OF DEFENSE · GA

EAGLE Fort Stewart, GA W519TC-26-R-A056

25 source documentsSource checked Oct 19Content updated
Open notice
Response deadline
4 days left
Published project value
Not confirmed
Check the pricing and payment terms below.
Solicitation number
W519TC-26-R-A056

Dates to plan around

Times follow the original source.

  1. Response deadline
    Source wording
    2026-10-27T12:00:00-05:00
Document coverage
23 / 25documents readReview incomplete

25 documents found2 partially read8% of weighted requirement checks reviewed

Newer source changes have not been verified. Confirm the latest notice and addenda before submitting.

Before you bid

Review first

Start with these requirements and unresolved points.
  • Must do
    Joint ventures & teaming
    View 3 flagged requirements
    1. Requirement 1 ↗

      Due to the complexity and the wide range of capabilities required by this Task Order, Joint Ventures (JVs) may be utilized; however, a JV offeror must be an approved BOA holder from Step Two in order to propose as a Prime on this Task Order solicitation, and the JV must comply wi

    2. Requirement 2 ↗

      For Offerors that are Joint Ventures (JV), the budgetary data shall include both the JV entities' budgetary data as well as the budgetary data of each individual JV partner.

    3. Requirement 3 ↗

      The Offeror shall provide historical cost data for 2023, 2024, 2025, and 2026. For Offerors that are Joint Ventures (JV), the budgetary data shall include both the JV entities' budgetary data as well as the budgetary data of each individual JV partner.

  • Must do
    Registrations
    View 7 flagged requirements
    1. Requirement 1 ↗

      L.2.4 Offeror must be registered in the System for Award Management (SAM) and have a Marketing Partner Identification Number (MPIN) and Commercial and Government Entity (CAGE) Code.

    2. Requirement 2 ↗

      L.5.1.6.2(a) Naming Convention: Offeror's_Name_Vol_1_BusSys L.5.1.6.2(b) File Format: Adobe PDF or MS Word L.5.1.6.2(c) Page Limit: None L.5.1.7 Attachment 0005-Cost Price Matrix, Tab 2-Teaming Matrix: The Offeror shall provide the full company name, CAGE code, role of participan

    3. Requirement 3 ↗

      L.5.3.1.4(b)(9) Column D: Shall enter one corresponding CAGE Code (as identified in SAM) for the contractor who performed the requirements of the contract number listed in Column B.

    4. Requirement 4 ↗

      W519TC26RA0560002 Page 73 of 120 L.5.1.6.2(c) Page Limit: None L.5.1.7 Attachment 0005-Cost Price Matrix, Tab 2-Teaming Matrix: The Offeror shall provide the full company name, CAGE code, role of participant, functional area(s) to be performed, proposed labor/fee for each partici

    5. Requirement 5 ↗

      To access WAWF, the Contractor shall- (1) Have a designated electronic business point of contact in the System for Award Management at https://www.sam.gov; and (2) Be registered to use WAWF at https://wawf.eb.mil/ following the step-by-step procedures for self-registration availa

    6. Requirement 6 ↗

      (d) The offeror shall post the information in paragraphs (c)(1)(i) through (c)(1)(iv) of this provision in FAPIIS as required through maintaining an active registration in the System for Award Management, which can be accessed via https://www.sam.gov (see 52.204-7).

    7. Requirement 7 ↗

      W519TC26RA0560002 Page 90 of 134 L.2.4 Offeror must be registered in the System for Award Management (SAM) and have a Marketing Partner Identification Number (MPIN) and Commercial and Government Entity (CAGE) Code.

  • Must do
    Set-aside
    View 2 flagged requirements
    1. Requirement 1 ↗

      HUBZONE

    2. Requirement 2 ↗

      SBA

01

Eligibility & participation

Whether you can bid at all, and what you must already hold.

33 verified29 to confirm

Registrations

9 findings
Requirement 1Verified

To access WAWF, the Contractor shall- (1) Have a designated electronic business point of contact in the System for Award Management at https://www.sam.gov; and (2) Be registered to use WAWF at https://wawf.eb.mil/ following the step-by-step procedures for self-registration availa

View source 1
01page 34View official source ↗
“To access WAWF, the Contractor shall- (1) Have a designated electronic business point of contact in the System for Award Management at https://www.sam.gov; and (2) Be registered to use WAWF at https://wawf.eb.mil/ following the step-by-step procedures for self-registration available at this web site”
Source page 34

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 34
Requirement 2Verified

L.2.4 Offeror must be registered in the System for Award Management (SAM) and have a Marketing Partner Identification Number (MPIN) and Commercial and Government Entity (CAGE) Code.

View source 2
01page 36View official source ↗
“L.2.4 Offeror must be registered in the System for Award Management (SAM) and have a Marketing Partner Identification Number (MPIN) and Commercial and Government Entity (CAGE) Code.”
Source page 36

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 36
02page 68View official source ↗
“L.2.4 Offeror must be registered in the System for Award Management (SAM) and have a Marketing Partner Identification Number (MPIN) and Commercial and Government Entity (CAGE) Code.”
Source page 68

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 68
Requirement 3Verified

L.5.1.6.2(a) Naming Convention: Offeror's_Name_Vol_1_BusSys L.5.1.6.2(b) File Format: Adobe PDF or MS Word L.5.1.6.2(c) Page Limit: None L.5.1.7 Attachment 0005-Cost Price Matrix, Tab 2-Teaming Matrix: The Offeror shall provide the full company name, CAGE code, role of participan

View source 2
01page 41View official source ↗
“L.5.1.6.2(a) Naming Convention: Offeror's_Name_Vol_1_BusSys L.5.1.6.2(b) File Format: Adobe PDF or MS Word L.5.1.6.2(c) Page Limit: None L.5.1.7 Attachment 0005-Cost Price Matrix, Tab 2-Teaming Matrix: The Offeror shall provide the full company name, CAGE code, role of participant, functional area(s”
Source page 41

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 41
02page 94View official source ↗
“L.5.1.6.2(a) Naming Convention: Offeror's_Name_Vol_1_BusSys L.5.1.6.2(b) File Format: Adobe PDF or MS Word L.5.1.6.2(c) Page Limit: None L.5.1.7 Attachment 0005-Cost Price Matrix, Tab 2-Teaming Matrix: The Offeror shall provide the full company name, CAGE code, role of participant, functional area(s”
Source page 94

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 94
Requirement 4Verified

L.5.3.1.4(b)(9) Column D: Shall enter one corresponding CAGE Code (as identified in SAM) for the contractor who performed the requirements of the contract number listed in Column B.

View source 3
01page 51View official source ↗
“L.5.3.1.4(b)(9) Column D: Shall enter one corresponding CAGE Code (as identified in SAM) for the contractor who performed the requirements of the contract number listed in Column B.”
Source page 51

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 51
02page 82View official source ↗
“L.5.3.1.4(b)(9) Column D: Shall enter one corresponding CAGE Code (as identified in SAM) for the contractor who performed the requirements of the contract number listed in Column B.”
Source page 82

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 82
03page 103View official source ↗
“L.5.3.1.4(b)(9) Column D: Shall enter one corresponding CAGE Code (as identified in SAM) for the contractor who performed the requirements of the contract number listed in Column B.”
Source page 103

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 103
Requirement 5Verified

Attachment 0015 shall include the Subcontractor's company name, CAGE code, Task Order solicitation number, the Offeror's name for which it is submitting this particular proposal, and the Offeror's corresponding BOA number.

Applies to: subcontractor

View source 3
01page 60View official source ↗
“Attachment 0015 shall include the Subcontractor's company name, CAGE code, Task Order solicitation number, the Offeror's name for which it is submitting this particular proposal, and the Offeror's corresponding BOA number.”
Source page 60

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 60
02page 91View official source ↗
“Attachment 0015 shall include the Subcontractor's company name, CAGE code, Task Order solicitation number, the Offeror's name for which it is submitting this particular proposal, and the Offeror's corresponding BOA number.”
Source page 91

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 91
03page 112View official source ↗
“Attachment 0015 shall include the Subcontractor's company name, CAGE code, Task Order solicitation number, the Offeror's name for which it is submitting this particular proposal, and the Offeror's corresponding BOA number.”
Source page 112

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 112
Requirement 6Verified

W519TC26RA0560002 Page 73 of 120 L.5.1.6.2(c) Page Limit: None L.5.1.7 Attachment 0005-Cost Price Matrix, Tab 2-Teaming Matrix: The Offeror shall provide the full company name, CAGE code, role of participant, functional area(s) to be performed, proposed labor/fee for each partici

View source 1
01page 73View official source ↗
“W519TC26RA0560002 Page 73 of 120 L.5.1.6.2(c) Page Limit: None L.5.1.7 Attachment 0005-Cost Price Matrix, Tab 2-Teaming Matrix: The Offeror shall provide the full company name, CAGE code, role of participant, functional area(s) to be performed, proposed labor/fee for each participant for the entire ”
Source page 73

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 73
Requirement 7Verified

(d) The offeror shall post the information in paragraphs (c)(1)(i) through (c)(1)(iv) of this provision in FAPIIS as required through maintaining an active registration in the System for Award Management, which can be accessed via https://www.sam.gov (see 52.204-7).

View source 1
01page 80View official source ↗
“(d) The offeror shall post the information in paragraphs (c)(1)(i) through (c)(1)(iv) of this provision in FAPIIS as required through maintaining an active registration in the System for Award Management, which can be accessed via https://www.sam.gov (see 52.204-7).”
Source page 80

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 80
Requirement 8Verified

W519TC26RA0560002 Page 90 of 134 L.2.4 Offeror must be registered in the System for Award Management (SAM) and have a Marketing Partner Identification Number (MPIN) and Commercial and Government Entity (CAGE) Code.

View source 1
01page 90View official source ↗
“W519TC26RA0560002 Page 90 of 134 L.2.4 Offeror must be registered in the System for Award Management (SAM) and have a Marketing Partner Identification Number (MPIN) and Commercial and Government Entity (CAGE) Code.”
Source page 90

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 90
Missing information · 1 check
Not reviewed

—

Not reviewed — requirement not confirmed

Set-aside

5 findings
Requirement 1Verified

SBA

View source 1
01https://sam.gov/api/prod/opps/v2/opportunities/fec60a293d0f46e7bcd1760d21f57e84 /data2/solicitation/setAsideView official source ↗
“SBA”
Requirement 2Verified

SDVOSB,HUBZONE

Applies when: unless the Contractor waived the price evaluation preferenceA waiver may be available

View source 1
01page 62View official source ↗
“(2) Used the HUBZone price evaluation preference regardless of dollar value, unless the Contractor waived the price evaluation preference; or (3) Was an 8(a), HUBZone, service-disabled veteran-owned, economically disadvantaged women-owned, or women-owned small business set-aside or sole-source award regardless of dolla”
Source page 62

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 62
Requirement 3Verified

HUBZONE

View source 1
01page 64View official source ↗
“to the joint venture: .] Each HUBZone small business concern participating in the HUBZone joint venture must be certified as a HUBZone concern. [____Contractor to sign and date and insert”
Source page 64

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 64
Missing information · 2 checks
Not found

—

Not found in reviewed sources

Not reviewed

—

Not reviewed — requirement not confirmed

Small business size

14 findings
Requirement 1Needs confirmation

—

Needs confirmation

View source 3
01page 18View official source ↗
“RESERVED k. Size Standards.”
Source page 18

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 18
02page 24View official source ↗
“RESERVED k. Size Standards.”
Source page 24

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 24
03page 24View official source ↗
“RESERVED k. Size Standards.”
Source page 24

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 24
Requirement 2Needs confirmation

—

Needs confirmation

View source 3
01page 18View official source ↗
“Specifically, 13 CFR 121.103 may assist a prospective offeror in assessing whether affiliation rules could apply.”
Source page 18

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 18
02page 24View official source ↗
“Specifically, 13 CFR 121.103 may assist a prospective offeror in assessing whether affiliation rules could apply.”
Source page 24

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 24
03page 24View official source ↗
“Specifically, 13 CFR 121.103 may assist a prospective offeror in assessing whether affiliation rules could apply.”
Source page 24

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 24
Requirement 3Needs confirmation

—

Needs confirmation

Applies when: prior to submitting a proposalMust be met by: prior to submitting a proposal

View source 3
01page 18View official source ↗
“Entities proposing as a JV are encouraged to specifically review 13 CFR 121.103, "How Does SBA Determine Affiliation?" subparagraph (h) (Affiliation based on joint ventures) prior to submitting a proposal. 13 CFR 121.103 provides several examples that may assist a prospective offeror in assessing wh”
Source page 18

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 18
02page 24View official source ↗
“Entities proposing as a JV are encouraged to specifically review 13 CFR 121.103, "How Does SBA Determine Affiliation?" subparagraph (h) (Affiliation based on joint ventures) prior to submitting a proposal. 13 CFR 121.103 provides several examples that may assist a prospective offeror in assessing wh”
Source page 24

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 24
03page 24View official source ↗
“Entities proposing as a JV are encouraged to specifically review 13 CFR 121.103, "How Does SBA Determine Affiliation?" subparagraph (h) (Affiliation based on joint ventures) prior to submitting a proposal. 13 CFR 121.103 provides several examples that may assist a prospective offeror in assessing wh”
Source page 24

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 24
Requirement 4Needs confirmation

—

Needs confirmation

View source 2
01page 18View official source ↗
“Note: In accordance with 13 CFR 121.103, a JV of two (2) or more business concerns may submit an offer as a small business without regard to affiliation so long as each concern is small under the size standard for NAICS 561210. In order for this affiliation exception to apply, however, the following”
Source page 18

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 18
02page 24View official source ↗
“Note: In accordance with 13 CFR 121.103, a JV of two (2) or more business concerns may submit an offer as a small business without regard to affiliation so long as each concern is small under the size standard for NAICS 561210. In order for this affiliation exception to apply, however, the following”
Source page 24

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 24
Requirement 5Needs confirmation

—

Needs confirmation

Applies when: prior to submitting a proposalMust be met by: prior to submitting a proposal

View source 3
01page 18View official source ↗
“Offerors proposing subcontracting arrangements at this Task Order level (Step Three) are encouraged to specifically review 13 CFR 121.103, "How Does SBA Determine Affiliation?" (subparagraph (h)(3)) prior to submitting a proposal.”
Source page 18

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 18
02page 25View official source ↗
“Offerors proposing subcontracting arrangements at this Task Order level (Step Three) are encouraged to specifically review 13 CFR 121.103, "How Does SBA Determine Affiliation?" (subparagraph (h)(3)) prior to submitting a proposal.”
Source page 25

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 25
03page 25View official source ↗
“Offerors proposing subcontracting arrangements at this Task Order level (Step Three) are encouraged to specifically review 13 CFR 121.103, "How Does SBA Determine Affiliation?" (subparagraph (h)(3)) prior to submitting a proposal.”
Source page 25

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 25
Requirement 6Needs confirmation

—

Needs confirmation

View source 1
01page 24View official source ↗
“Note: In accordance with 13 CFR 121.103, a JV of two (2) or more business concerns may submit an offer”
Source page 24

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 24
Requirement 7Needs confirmation

—

Needs confirmation

View source 1
01page 25View official source ↗
“W519TC26RA0560002 Page 25 of 120 as a small business without regard to affiliation so long as each concern is small under the size standard for NAICS 561210. In order for this affiliation exception to apply, however, the following conditions must be met: there must be a written JV agreement, the JV ”
Source page 25

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 25
Requirement 8Needs confirmation

—

Needs confirmation

View source 1
01page 59View official source ↗
“regard to its socioeconomic status); and (2) Is considered small for the size standard under the North American Industry Classification”
Source page 59

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 59
Requirement 9Needs confirmation

—

Needs confirmation

View source 1
01page 61View official source ↗
“Small business concern- (1) Means a concern, including its affiliates, that is independently owned and operated, not dominant in its field of operation, and qualified as a small business under the criteria in 13 CFR part 121 and the size standard in paragraph (c) of this clause.”
Source page 61

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 61
Requirement 10Needs confirmation

—

Needs confirmation

Applies when: If the Contractor represented that it was a small business concern, a small disadvantaged business concern, or a joint venture that was any of the small business concerns identified; prior to award of this contract, the ContMust be met by: prior to award of this contract, the Cont

View source 1
01page 61View official source ↗
“SBA determines affiliation based on the factors set forth at 13 CFR 121.103. (b) If the Contractor represented that it was a small business concern, a small disadvantaged business concern, or a joint venture that was any of the small business concerns identified in 19.000(a)(3) prior to award of thi”
Source page 61

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 61
Requirement 11Needs confirmation

—

Needs confirmation

Applies when: at the time of this rerepresentation that corresponds to the North American Industry ClassificMust be met by: at the time of this rerepresentation that corresponds to the North American Industry Classific

View source 1
01page 62View official source ↗
“(c) The Contractor shall rerepresent its size status in accordance with the size standard in effect at the time of this rerepresentation that corresponds to the North American Industry Classification System (NAICS) code(s) assigned to this contract.”
Source page 62

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 62
Requirement 12Needs confirmation

—

Needs confirmation

View source 1
01page 62View official source ↗
“The small business size standard corresponding to this NAICS code(s) can be found at https://www.sba.gov/document /support--table-size-standards.”
Source page 62

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 62
Requirement 13Needs confirmation

—

Needs confirmation

Applies when: if the acquisit

View source 1
01page 62View official source ↗
“(d) The small business size standard for a Contractor providing an end item that it does not manufacture, process, or produce itself, for a contract other than a construction or service contract, is 500 employees, or 150 employees for information technology value-added resellers under NAICS code 541”
Source page 62

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 62
Missing information · 1 check
Not reviewed

—

Not reviewed — requirement not confirmed

Joint ventures & teaming

34 findings
Requirement 1Conflicting sources

—

Conflicting sources

Applies to: subcontractor

View source 3
01page 19View official source ↗
“determining whether the arrangement includes the use of any ostensible subcontractors and unduly reliant joint venture partners.”
Source page 19

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 19
02page 25View official source ↗
“determining whether the arrangement includes the use of any ostensible subcontractors and unduly reliant joint venture partners.”
Source page 25

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 25
03page 25View official source ↗
“determining whether the arrangement includes the use of any ostensible subcontractors and unduly reliant joint venture partners.”
Source page 25

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 25
Requirement 2Conflicting sources

—

Conflicting sources

View source 3
01page 35View official source ↗
“L.1.6 For the purposes of this Task Order RFP, a Joint Venture (JV) is defined as a team of two or more firms that have entered into a legally binding JV agreement.”
Source page 35

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 35
02page 67View official source ↗
“L.1.6 For the purposes of this Task Order RFP, a Joint Venture (JV) is defined as a team of two or more firms that have entered into a legally binding JV agreement.”
Source page 67

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 67
03page 88View official source ↗
“L.1.6 For the purposes of this Task Order RFP, a Joint Venture (JV) is defined as a team of two or more firms that have entered into a legally binding JV agreement.”
Source page 88

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 88
Requirement 3Conflicting sources

—

Conflicting sources

View source 3
01page 49View official source ↗
“L.5.3.1.1(b) Joint Venture (JV) Partner, as used in this factor, is one or more entities comprising the JV BOA Holder Offeror.”
Source page 49

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 49
02page 79View official source ↗
“L.5.3.1.1(b) Joint Venture (JV) Partner, as used in this factor, is one or more entities comprising the JV BOA Holder Offeror.”
Source page 79

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 79
03page 101View official source ↗
“L.5.3.1.1(b) Joint Venture (JV) Partner, as used in this factor, is one or more entities comprising the JV BOA Holder Offeror.”
Source page 101

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 101
Requirement 4Conflicting sources

—

Conflicting sources

Applies to: subcontractor

View source 3
01page 50View official source ↗
“L.5.3.1.3 The Offeror is afforded the opportunity to provide past performance contract references for itself, Joint Venture Partner(s) and for each proposed subcontractor but is not required to do so.”
Source page 50

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 50
02page 80View official source ↗
“L.5.3.1.3 The Offeror is afforded the opportunity to provide past performance contract references for itself, Joint Venture Partner(s) and for each proposed subcontractor but is not required to do so.”
Source page 80

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 80
03page 102View official source ↗
“L.5.3.1.3 The Offeror is afforded the opportunity to provide past performance contract references for itself, Joint Venture Partner(s) and for each proposed subcontractor but is not required to do so.”
Source page 102

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 102
Requirement 5Conflicting sources

—

Conflicting sources

Applies when: if the work performed by the contractor listed in Column C is a Joint Venture company to the contractor submitting this document

View source 2
01page 51View official source ↗
“L.5.3.1.4(b)(11) Column F: Shall select from the dropdown box if the work performed by the contractor listed in Column C is a Joint Venture company to the contractor submitting this document.”
Source page 51

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 51
02page 82View official source ↗
“L.5.3.1.4(b)(11) Column F: Shall select from the dropdown box if the work performed by the contractor listed in Column C is a Joint Venture company to the contractor submitting this document.”
Source page 82

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 82
Requirement 6Conflicting sources

—

Conflicting sources

View source 3
01page 52View official source ↗
“L.5.3.1.4(b)(13)(ii) Provide a description of the relationship between the Joint Venture or predecessor company listed in Column C to the contractor that is claiming the past performance in Column B.”
Source page 52

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 52
02page 82View official source ↗
“L.5.3.1.4(b)(13)(ii) Provide a description of the relationship between the Joint Venture or predecessor company listed in Column C to the contractor that is claiming the past performance in Column B.”
Source page 82

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 82
03page 104View official source ↗
“L.5.3.1.4(b)(13)(ii) Provide a description of the relationship between the Joint Venture or predecessor company listed in Column C to the contractor that is claiming the past performance in Column B.”
Source page 104

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 104
Requirement 7Conflicting sources

—

Conflicting sources

View source 3
01page 52View official source ↗
“workforce, management, facilities, or other resources) of the Joint Venture or predecessor”
Source page 52

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 52
02page 82View official source ↗
“workforce, management, facilities, or other resources) of the Joint Venture or predecessor”
Source page 82

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 82
03page 104View official source ↗
“workforce, management, facilities, or other resources) of the Joint Venture or predecessor”
Source page 104

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 104
Requirement 8Conflicting sources

—

Conflicting sources

Applies to: subcontractor

View source 1
01page 53View official source ↗
“Listing of subcontracts awarded to companies for which the contractor is the prime or upper-tier contractor (include prime and subcontract numbers; subcontract value and award type; amount claimed during the fiscal year; and the subcontractor name, address, and point of contact information).”
Source page 53

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 53
Requirement 9Conflicting sources

—

Conflicting sources

View source 1
01page 60View official source ↗
“(g) A joint venture agrees that, in the performance of the contract, the applicable percentage specified in paragraph (e) of this clause will be performed by the aggregate of the joint venture participants.”
Source page 60

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 60
Requirement 10Conflicting sources

—

Conflicting sources

View source 1
01page 63View official source ↗
“identifier of each party to the joint venture: __.]”
Source page 63

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 63
Requirement 11Conflicting sources

—

Conflicting sources

View source 1
01page 63View official source ↗
“identifier of each party to the joint venture: __ .]”
Source page 63

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 63
Requirement 12Conflicting sources

—

Conflicting sources

View source 1
01page 64View official source ↗
“to the joint venture: .] Each HUBZone small business concern participating in the HUBZone joint”
Source page 64

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 64
Requirement 13Conflicting sources

—

Conflicting sources

View source 3
01page 103View official source ↗
“For Offerors that are Joint Ventures (JV), the Government will evaluate both the past performance of the JV itself as well as the past performance of each individual JV partner.”
Source page 103

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 103
02page 115View official source ↗
“For Offerors that are Joint Ventures (JV), the Government will evaluate both the past performance of the JV itself as well as the past performance of each individual JV partner.”
Source page 115

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 115
03page 128View official source ↗
“For Offerors that are Joint Ventures (JV), the Government will evaluate both the past performance of the JV itself as well as the past performance of each individual JV partner.”
Source page 128

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 128
Requirement 14Conflicting sources

—

Conflicting sources

View source 3
01page 104View official source ↗
“For Offerors that are Joint Ventures (JV), the past performance confidence assessment will include both the JV entity's past performance as well as the past performance of each individual JV partner.”
Source page 104

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 104
02page 116View official source ↗
“For Offerors that are Joint Ventures (JV), the past performance confidence assessment will include both the JV entity's past performance as well as the past performance of each individual JV partner.”
Source page 116

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 116
03page 129View official source ↗
“For Offerors that are Joint Ventures (JV), the past performance confidence assessment will include both the JV entity's past performance as well as the past performance of each individual JV partner.”
Source page 129

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 129
Requirement 15Conflicting sources

—

Conflicting sources

Applies when: if the work performed by the contractor listed in Column C is a Joint Venture company to the contractor submitting this document

View source 1
01page 104View official source ↗
“W519TC26RA0560002 Page 104 of 134 L.5.3.1.4(b)(11) Column F: Shall select from the dropdown box if the work performed by the contractor listed in Column C is a Joint Venture company to the contractor submitting this document.”
Source page 104

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 104
Requirement 16Conflicting sources

—

Conflicting sources

View source 3
01page 106View official source ↗
“M.5.2.8(c)(3)(i) Please note that for Joint Ventures (JVs), Past Performance references need not be performed by the JV itself.”
Source page 106

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 106
02page 118View official source ↗
“M.5.2.8(c)(3)(i) Please note that for Joint Ventures (JVs), Past Performance references need not be performed by the JV itself.”
Source page 118

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 118
03page 131View official source ↗
“M.5.2.8(c)(3)(i) Please note that for Joint Ventures (JVs), Past Performance references need not be performed by the JV itself.”
Source page 131

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 131
Requirement 17Verified

Due to the complexity and the wide range of capabilities required by this Task Order, Joint Ventures (JVs) may be utilized; however, a JV offeror must be an approved BOA holder from Step Two in order to propose as a Prime on this Task Order solicitation, and the JV must comply wi

View source 3
01page 17View official source ↗
“Due to the complexity and the wide range of capabilities required by this Task Order, Joint Ventures (JVs) may be utilized; however, a JV offeror must be an approved BOA holder from Step Two in order to propose as a Prime on this Task Order solicitation, and the JV must comply with the applicable re”
Source page 17

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 17
02page 23View official source ↗
“Due to the complexity and the wide range of capabilities required by this Task Order, Joint Ventures (JVs) may be utilized; however, a JV offeror must be an approved BOA holder from Step Two in order to propose as a Prime on this Task Order solicitation, and the JV must comply with the applicable re”
Source page 23

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 23
03page 23View official source ↗
“Due to the complexity and the wide range of capabilities required by this Task Order, Joint Ventures (JVs) may be utilized; however, a JV offeror must be an approved BOA holder from Step Two in order to propose as a Prime on this Task Order solicitation, and the JV must comply with the applicable re”
Source page 23

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 23
Requirement 18Verified
This determination applies to all Task Orders issued under the Master Contract unless a specific triggering event at the Master Contract level (such as an option exercise, novation, merger, or acquisition) requires rerepresentation in accordance with RFO FAR 52.219-28, Post-AwardRead full requirement Close full requirement

This determination applies to all Task Orders issued under the Master Contract unless a specific triggering event at the Master Contract level (such as an option exercise, novation, merger, or acquisition) requires rerepresentation in accordance with RFO FAR 52.219-28, Post-Award

Applies when: unless a specific triggering event at the Master Contract level (such as an option exercise, novation, merger, or acquisition) requires rerepresentation in accordance with RFO FAR 52

View source 3
01page 18View official source ↗
“This determination applies to all Task Orders issued under the Master Contract unless a specific triggering event at the Master Contract level (such as an option exercise, novation, merger, or acquisition) requires rerepresentation in accordance with RFO FAR 52.219-28, Post-Award Small Business Prog”
Source page 18

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 18
02page 24View official source ↗
“This determination applies to all Task Orders issued under the Master Contract unless a specific triggering event at the Master Contract level (such as an option exercise, novation, merger, or acquisition) requires rerepresentation in accordance with RFO FAR 52.219-28, Post-Award Small Business Prog”
Source page 24

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 24
03page 24View official source ↗
“This determination applies to all Task Orders issued under the Master Contract unless a specific triggering event at the Master Contract level (such as an option exercise, novation, merger, or acquisition) requires rerepresentation in accordance with RFO FAR 52.219-28, Post-Award Small Business Prog”
Source page 24

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 24
Requirement 19Verified
Entities proposing as a JV are encouraged to specifically review 13 CFR 121.103, "How Does SBA Determine Affiliation?" subparagraph (h) (Affiliation based on joint ventures) prior to submitting a proposal. 13 CFR 121.103 provides several examples that may assist a prospective offRead full requirement Close full requirement

Entities proposing as a JV are encouraged to specifically review 13 CFR 121.103, "How Does SBA Determine Affiliation?" subparagraph (h) (Affiliation based on joint ventures) prior to submitting a proposal. 13 CFR 121.103 provides several examples that may assist a prospective off

Applies when: prior to submitting a proposalMust be met by: prior to submitting a proposal

View source 3
01page 18View official source ↗
“Entities proposing as a JV are encouraged to specifically review 13 CFR 121.103, "How Does SBA Determine Affiliation?" subparagraph (h) (Affiliation based on joint ventures) prior to submitting a proposal. 13 CFR 121.103 provides several examples that may assist a prospective offeror in assessing wh”
Source page 18

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 18
02page 24View official source ↗
“Entities proposing as a JV are encouraged to specifically review 13 CFR 121.103, "How Does SBA Determine Affiliation?" subparagraph (h) (Affiliation based on joint ventures) prior to submitting a proposal. 13 CFR 121.103 provides several examples that may assist a prospective offeror in assessing wh”
Source page 24

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 24
03page 24View official source ↗
“Entities proposing as a JV are encouraged to specifically review 13 CFR 121.103, "How Does SBA Determine Affiliation?" subparagraph (h) (Affiliation based on joint ventures) prior to submitting a proposal. 13 CFR 121.103 provides several examples that may assist a prospective offeror in assessing wh”
Source page 24

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 24
Requirement 20Verified

(note: a joint venture may be awarded one or more contracts within that two-year window, and may

Applies when: within that two-year window, and mayMust be met by: within that two-year window, and may

View source 3
01page 18View official source ↗
“(note: a joint venture may be awarded one or more contracts within that two-year window, and may”
Source page 18

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 18
02page 25View official source ↗
“(note: a joint venture may be awarded one or more contracts within that two-year window, and may”
Source page 25

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 25
03page 25View official source ↗
“(note: a joint venture may be awarded one or more contracts within that two-year window, and may”
Source page 25

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 25
Requirement 21Verified

Select YES if the work was performed by a Joint Venture company or NO if the work was not performed by a Joint Venture company.

Applies when: if the work was performed by a Joint Venture company or NO if the work was not performed by a Joint Venture company

View source 3
01page 51View official source ↗
“Select YES if the work was performed by a Joint Venture company or NO if the work was not performed by a Joint Venture company.”
Source page 51

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 51
02page 82View official source ↗
“Select YES if the work was performed by a Joint Venture company or NO if the work was not performed by a Joint Venture company.”
Source page 82

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 82
03page 104View official source ↗
“Select YES if the work was performed by a Joint Venture company or NO if the work was not performed by a Joint Venture company.”
Source page 104

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 104
Requirement 22Verified

Note: If work was performed by a Joint Venture company, the contractor submitting the document shall provide the justification in Column H as to why it can claim the experience of the Joint Venture Company.

Applies when: If work was performed by a Joint Venture company, the contractor submitting the document shall provide the justification in Column H as to why it can claim the experience of the Join

View source 3
01page 51View official source ↗
“Note: If work was performed by a Joint Venture company, the contractor submitting the document shall provide the justification in Column H as to why it can claim the experience of the Joint Venture Company.”
Source page 51

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 51
02page 82View official source ↗
“Note: If work was performed by a Joint Venture company, the contractor submitting the document shall provide the justification in Column H as to why it can claim the experience of the Joint Venture Company.”
Source page 82

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 82
03page 104View official source ↗
“Note: If work was performed by a Joint Venture company, the contractor submitting the document shall provide the justification in Column H as to why it can claim the experience of the Joint Venture Company.”
Source page 104

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 104
Requirement 23Verified

L.5.3.1.4(b)(13) Column H: If the contract number in Column B is for a Joint Venture or predecessor company of the contractor submitting the document, it shall:

Applies when: If the contract number in Column B is for a Joint Venture or predecessor company of the contractor submitting the document, it shall:

View source 1
01page 51View official source ↗
“L.5.3.1.4(b)(13) Column H: If the contract number in Column B is for a Joint Venture or predecessor company of the contractor submitting the document, it shall:”
Source page 51

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 51
Requirement 24Verified

L.5.3.1.4(b)(13)(iii) Provide a justification as to why the contractor can claim the past performance of work in Column B by explaining how the contractor will draw upon the past performance from the Joint Venture or predecessor company, and shall demonstrate that the resources (

Applies when: upon the past performance from the Joint Venture or predecessor company, and shall dMust be met by: upon the past performance from the Joint Venture or predecessor company, and shall d

View source 3
01page 52View official source ↗
“L.5.3.1.4(b)(13)(iii) Provide a justification as to why the contractor can claim the past performance of work in Column B by explaining how the contractor will draw upon the past performance from the Joint Venture or predecessor company, and shall demonstrate that the resources (e.g. workforce, mana”
Source page 52

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 52
02page 82View official source ↗
“L.5.3.1.4(b)(13)(iii) Provide a justification as to why the contractor can claim the past performance of work in Column B by explaining how the contractor will draw upon the past performance from the Joint Venture or predecessor company, and shall demonstrate that the resources (e.g. workforce, mana”
Source page 82

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 82
03page 104View official source ↗
“L.5.3.1.4(b)(13)(iii) Provide a justification as to why the contractor can claim the past performance of work in Column B by explaining how the contractor will draw upon the past performance from the Joint Venture or predecessor company, and shall demonstrate that the resources (e.g. workforce, mana”
Source page 104

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 104
Requirement 25Verified

company will be transferred to the contractor or provided or relied upon for contract performance, such that the Joint Venture or predecessor company will have meaningful involvement in contract

Applies when: upon for contract performance, such that the Joint Venture or predecessor company wiMust be met by: upon for contract performance, such that the Joint Venture or predecessor company wi

View source 3
01page 52View official source ↗
“company will be transferred to the contractor or provided or relied upon for contract performance, such that the Joint Venture or predecessor company will have meaningful involvement in contract”
Source page 52

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 52
02page 82View official source ↗
“company will be transferred to the contractor or provided or relied upon for contract performance, such that the Joint Venture or predecessor company will have meaningful involvement in contract”
Source page 82

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 82
03page 104View official source ↗
“company will be transferred to the contractor or provided or relied upon for contract performance, such that the Joint Venture or predecessor company will have meaningful involvement in contract”
Source page 104

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 104
Requirement 26Verified

Note: If the past performance provided in Column B was not performed by a Joint Venture or

Applies when: If the past performance provided in Column B was not performed by a Joint Venture or

View source 3
01page 52View official source ↗
“Note: If the past performance provided in Column B was not performed by a Joint Venture or”
Source page 52

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 52
02page 82View official source ↗
“Note: If the past performance provided in Column B was not performed by a Joint Venture or”
Source page 82

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 82
03page 104View official source ↗
“Note: If the past performance provided in Column B was not performed by a Joint Venture or”
Source page 104

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 104
Requirement 27Verified

(1) In a joint venture comprised of a small business protege and its mentor approved by the Small Business Administration, the small business protege shall perform at least 40 percent of the work performed by the joint venture.

Applies when: In a joint venture; at least 40 percent of the work performed by the joint venture

View source 1
01page 60View official source ↗
“(1) In a joint venture comprised of a small business protege and its mentor approved by the Small Business Administration, the small business protege shall perform at least 40 percent of the work performed by the joint venture.”
Source page 60

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 60
Requirement 28Verified

Work performed by the small business protege in the joint venture must be more than administrative functions.

Applies when: Work performed by the small business protege in the joint venture

View source 1
01page 60View official source ↗
“Work performed by the small business protege in the joint venture must be more than administrative functions.”
Source page 60

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 60
Requirement 29Verified

W519TC26RA0560002 Page 61 of 134 (2) In an 8(a) joint venture, the 8(a) participant(s) shall perform at least 40 percent of the work performed by the joint venture.

Applies when: In an 8(a) joint venture; at least 40 percent of the work performed by the joint venture

View source 1
01page 61View official source ↗
“W519TC26RA0560002 Page 61 of 134 (2) In an 8(a) joint venture, the 8(a) participant(s) shall perform at least 40 percent of the work performed by the joint venture.”
Source page 61

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 61
Requirement 30Verified

Work performed by the 8(a) participants in the joint venture must be more than administrative functions.

Applies when: Work performed by the 8(a) participants in the joint venture

View source 1
01page 61View official source ↗
“Work performed by the 8(a) participants in the joint venture must be more than administrative functions.”
Source page 61

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 61
Requirement 31Verified
SBA determines affiliation based on the factors set forth at 13 CFR 121.103. (b) If the Contractor represented that it was a small business concern, a small disadvantaged business concern, or a joint venture that was any of the small business concerns identified in 19.000(a)(3) pRead full requirement Close full requirement

SBA determines affiliation based on the factors set forth at 13 CFR 121.103. (b) If the Contractor represented that it was a small business concern, a small disadvantaged business concern, or a joint venture that was any of the small business concerns identified in 19.000(a)(3) p

Applies when: If the Contractor represented that it was a small business concern, a small disadvantaged business concern, or a joint venture that was any of the small business concerns identified; prior to award of this contract, the ContMust be met by: prior to award of this contract, the Cont

View source 1
01page 61View official source ↗
“SBA determines affiliation based on the factors set forth at 13 CFR 121.103. (b) If the Contractor represented that it was a small business concern, a small disadvantaged business concern, or a joint venture that was any of the small business concerns identified in 19.000(a)(3) prior to award of thi”
Source page 61

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 61
Requirement 32Verified

For Offerors that are Joint Ventures (JV), the budgetary data shall include both the JV entities' budgetary data as well as the budgetary data of each individual JV partner.

View source 3
01page 64View official source ↗
“For Offerors that are Joint Ventures (JV), the budgetary data shall include both the JV entities' budgetary data as well as the budgetary data of each individual JV partner.”
Source page 64

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 64
02page 94View official source ↗
“For Offerors that are Joint Ventures (JV), the budgetary data shall include both the JV entities' budgetary data as well as the budgetary data of each individual JV partner.”
Source page 94

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 94
03page 116View official source ↗
“For Offerors that are Joint Ventures (JV), the budgetary data shall include both the JV entities' budgetary data as well as the budgetary data of each individual JV partner.”
Source page 116

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 116
Requirement 33Verified

The Offeror shall provide historical cost data for 2023, 2024, 2025, and 2026. For Offerors that are Joint Ventures (JV), the budgetary data shall include both the JV entities' budgetary data as well as the budgetary data of each individual JV partner.

View source 3
01page 64View official source ↗
“The Offeror shall provide historical cost data for 2023, 2024, 2025, and 2026. For Offerors that are Joint Ventures (JV), the budgetary data shall include both the JV entities' budgetary data as well as the budgetary data of each individual JV partner.”
Source page 64

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 64
02page 94View official source ↗
“The Offeror shall provide historical cost data for 2023, 2024, 2025, and 2026. For Offerors that are Joint Ventures (JV), the budgetary data shall include both the JV entities' budgetary data as well as the budgetary data of each individual JV partner.”
Source page 94

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 94
03page 116View official source ↗
“The Offeror shall provide historical cost data for 2023, 2024, 2025, and 2026. For Offerors that are Joint Ventures (JV), the budgetary data shall include both the JV entities' budgetary data as well as the budgetary data of each individual JV partner.”
Source page 116

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 116
Requirement 34Verified

L.5.3.1.4(b)(13) Column H: If the contract number in Column B is for a Joint Venture or predecessor company of the contractor submitting the document, it shall: L.5.3.1.4(b)(13)(i) Provide the name of the contractor who is claiming the past performance in Column B.

Applies when: If the contract number in Column B is for a Joint Venture or predecessor company of the contractor submitting the document, it shall: L

View source 2
01page 82View official source ↗
“L.5.3.1.4(b)(13) Column H: If the contract number in Column B is for a Joint Venture or predecessor company of the contractor submitting the document, it shall: L.5.3.1.4(b)(13)(i) Provide the name of the contractor who is claiming the past performance in Column B.”
Source page 82

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 82
02page 104View official source ↗
“L.5.3.1.4(b)(13) Column H: If the contract number in Column B is for a Joint Venture or predecessor company of the contractor submitting the document, it shall: L.5.3.1.4(b)(13)(i) Provide the name of the contractor who is claiming the past performance in Column B.”
Source page 104

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 104

Exclusions & responsibility

2 findings
Requirement 1Verified
(Deviation 2026- O0038) 52.204-19 Incorporation by Reference of 2014-12 Representations and Certifications. 52.209-6 Protecting the Government's 2026-02 Interest When Subcontracting With Contractors Debarred, Suspended, Proposed for Debarment, or Voluntarily Excluded.Read full requirement Close full requirement

(Deviation 2026- O0038) 52.204-19 Incorporation by Reference of 2014-12 Representations and Certifications. 52.209-6 Protecting the Government's 2026-02 Interest When Subcontracting With Contractors Debarred, Suspended, Proposed for Debarment, or Voluntarily Excluded.

Applies when: When Subcontracting With Contractors Debarred, Suspended, Proposed for Debarment, or Voluntarily Excluded

View source 1
01page 42View official source ↗
“(Deviation 2026- O0038) 52.204-19 Incorporation by Reference of 2014-12 Representations and Certifications. 52.209-6 Protecting the Government's 2026-02 Interest When Subcontracting With Contractors Debarred, Suspended, Proposed for Debarment, or Voluntarily Excluded.”
Source page 42

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 42
Requirement 2Verified

The Offeror shall review the list of excluded parties in the System for Award Management (SAM) at https://www.sam.gov for entities that are excluded when providing any equipment, system, or service to carry out covered missions that uses covered defense telecommunications equipme

Applies when: when providing any equipment, system, or service to carry out covered missions that uses covered defense telecommunications equipment or services as a substantial or essen

View source 1
01page 86View official source ↗
“The Offeror shall review the list of excluded parties in the System for Award Management (SAM) at https://www.sam.gov for entities that are excluded when providing any equipment, system, or service to carry out covered missions that uses covered defense telecommunications equipment or services as a ”
Source page 86

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 86

Conflicts of interest

2 findings
Requirement 1Verified

A.21 Organizational conflict of interest (OCI) means a situation in which

View source 1
01page 4View official source ↗
“A.21 Organizational conflict of interest (OCI) means a situation in which”
Source page 4

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 4
Requirement 2Verified
A.21 Organizational conflict of interest (OCI) means a situation in which (1) A Government contract requires a contractor to exercise judgment to assist the Government in a matter (such as in drafting specifications or assessing another contractor's proposal or performance) and tRead full requirement Close full requirement

A.21 Organizational conflict of interest (OCI) means a situation in which (1) A Government contract requires a contractor to exercise judgment to assist the Government in a matter (such as in drafting specifications or assessing another contractor's proposal or performance) and t

View source 2
01page 5View official source ↗
“A.21 Organizational conflict of interest (OCI) means a situation in which (1) A Government contract requires a contractor to exercise judgment to assist the Government in a matter (such as in drafting specifications or assessing another contractor's proposal or performance) and the contractor or its”
Source page 5

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 5
02page 9View official source ↗
“A.21 Organizational conflict of interest (OCI) means a situation in which (1) A Government contract requires a contractor to exercise judgment to assist the Government in a matter (such as in drafting specifications or assessing another contractor's proposal or performance) and the contractor or its”
Source page 9

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 9
Missing information4 checks · expand to review

A missing value is not a waiver. Check the source or ask the agency before relying on it.

Required licenses

2 findings
Requirement 1Not found

—

Not found in reviewed sources

Requirement 2Not reviewed

—

Not reviewed — requirement not confirmed

Experience & references

2 findings
Requirement 1Not found

—

Not found in reviewed sources

Requirement 2Not reviewed

—

Not reviewed — requirement not confirmed

3 additional fields have no reviewed finding.

02

Deadlines & submission

When and how to submit, and whether you are still in time.

74 verified6 to confirm

Response deadline

3 findings
Requirement 1Verified

2026-10-27T12:00:00-05:00

View source 1
01https://sam.gov/api/prod/opps/v2/opportunities/fec60a293d0f46e7bcd1760d21f57e84 /data2/solicitation/deadlines/responseView official source ↗
“2026-10-27T12:00:00-05:00”
Missing information · 2 checks
Not found

—

Not found in reviewed sources

Not reviewed

—

Not reviewed — requirement not confirmed

How to submit

17 findings
Requirement 1Verified

A.16 Proposals shall be submitted electronically to Brett.W.Sutter.civ@army.mil and Michael.D.

View source 3
01page 4View official source ↗
“A.16 Proposals shall be submitted electronically to Brett.W.Sutter.civ@army.mil and Michael.D.”
Source page 4

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 4
02page 8View official source ↗
“A.16 Proposals shall be submitted electronically to Brett.W.Sutter.civ@army.mil and Michael.D.”
Source page 8

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 8
03page 4View official source ↗
“A.16 Proposals shall be submitted electronically to Brett.W.Sutter.civ@army.mil and Michael.D.”
Source page 4

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 4
Requirement 2Verified

Emailed proposals shall state the following in the subject line: Proposal for solicitation number [W519TC-26-R-A056] - Add company name.

View source 3
01page 4View official source ↗
“Emailed proposals shall state the following in the subject line: Proposal for solicitation number [W519TC-26-R-A056] - Add company name.”
Source page 4

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 4
02page 8View official source ↗
“Emailed proposals shall state the following in the subject line: Proposal for solicitation number [W519TC-26-R-A056] - Add company name.”
Source page 8

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 8
03page 4View official source ↗
“Emailed proposals shall state the following in the subject line: Proposal for solicitation number [W519TC-26-R-A056] - Add company name.”
Source page 4

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 4
Requirement 3Verified

Due to file size restrictions, Proposals may be submitted through Department of Defense (DOD) Secure Access File Exchange (SAFE), https://safe.apps.mil/.

View source 3
01page 4View official source ↗
“Due to file size restrictions, Proposals may be submitted through Department of Defense (DOD) Secure Access File Exchange (SAFE), https://safe.apps.mil/.”
Source page 4

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 4
02page 8View official source ↗
“Due to file size restrictions, Proposals may be submitted through Department of Defense (DOD) Secure Access File Exchange (SAFE), https://safe.apps.mil/.”
Source page 8

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 8
03page 4View official source ↗
“Due to file size restrictions, Proposals may be submitted through Department of Defense (DOD) Secure Access File Exchange (SAFE), https://safe.apps.mil/.”
Source page 4

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 4
Requirement 4Verified

The Contractor will receive briefings on the PMR slide deck and be allowed the opportunity to submit a response.

View source 3
01page 19View official source ↗
“The Contractor will receive briefings on the PMR slide deck and be allowed the opportunity to submit a response.”
Source page 19

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 19
02page 25View official source ↗
“The Contractor will receive briefings on the PMR slide deck and be allowed the opportunity to submit a response.”
Source page 25

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 25
03page 25View official source ↗
“The Contractor will receive briefings on the PMR slide deck and be allowed the opportunity to submit a response.”
Source page 25

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 25
Requirement 5Verified

L.1.3 Offerors shall submit proposals that will remain valid for not less than 180 days from the required submission date.

View source 2
01page 35View official source ↗
“L.1.3 Offerors shall submit proposals that will remain valid for not less than 180 days from the required submission date.”
Source page 35

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 35
02page 88View official source ↗
“L.1.3 Offerors shall submit proposals that will remain valid for not less than 180 days from the required submission date.”
Source page 88

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 88
Requirement 6Verified

L.3 PROPOSAL SUBMITTAL INSTRUCTIONS: L.3.1 Proposals shall be submitted electronically to Brett.W.Sutter.civ@army.mil and Michael.D.

View source 3
01page 37View official source ↗
“L.3 PROPOSAL SUBMITTAL INSTRUCTIONS: L.3.1 Proposals shall be submitted electronically to Brett.W.Sutter.civ@army.mil and Michael.D.”
Source page 37

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 37
02page 68View official source ↗
“L.3 PROPOSAL SUBMITTAL INSTRUCTIONS: L.3.1 Proposals shall be submitted electronically to Brett.W.Sutter.civ@army.mil and Michael.D.”
Source page 68

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 68
03page 90View official source ↗
“L.3 PROPOSAL SUBMITTAL INSTRUCTIONS: L.3.1 Proposals shall be submitted electronically to Brett.W.Sutter.civ@army.mil and Michael.D.”
Source page 90

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 90
Requirement 7Verified

Emailed proposals shall state the following in the subject line: Proposal for solicitation number (W519TC-26-R-A056) - Add company name.

View source 2
01page 37View official source ↗
“Emailed proposals shall state the following in the subject line: Proposal for solicitation number (W519TC-26-R-A056) - Add company name.”
Source page 37

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 37
02page 90View official source ↗
“Emailed proposals shall state the following in the subject line: Proposal for solicitation number (W519TC-26-R-A056) - Add company name.”
Source page 90

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 90
Requirement 8Verified

Due to file size restrictions, proposals may be submitted through Department of Defense (DOD) Secure Access File Exchange (SAFE), https://safe.apps.mil/ .

View source 3
01page 37View official source ↗
“Due to file size restrictions, proposals may be submitted through Department of Defense (DOD) Secure Access File Exchange (SAFE), https://safe.apps.mil/ .”
Source page 37

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 37
02page 68View official source ↗
“Due to file size restrictions, proposals may be submitted through Department of Defense (DOD) Secure Access File Exchange (SAFE), https://safe.apps.mil/ .”
Source page 68

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 68
03page 90View official source ↗
“Due to file size restrictions, proposals may be submitted through Department of Defense (DOD) Secure Access File Exchange (SAFE), https://safe.apps.mil/ .”
Source page 90

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 90
Requirement 9Verified

L.3.8 Submission Instructions for Subcontractor Cost proposal can be found in L.5.4.2.10. L.4 PROPOSAL STRUCTURE: L.4.1 The Offeror must submit a proposal IAW the guidelines below.

Applies to: subcontractor

View source 3
01page 38View official source ↗
“L.3.8 Submission Instructions for Subcontractor Cost proposal can be found in L.5.4.2.10. L.4 PROPOSAL STRUCTURE: L.4.1 The Offeror must submit a proposal IAW the guidelines below.”
Source page 38

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 38
02page 69View official source ↗
“L.3.8 Submission Instructions for Subcontractor Cost proposal can be found in L.5.4.2.10. L.4 PROPOSAL STRUCTURE: L.4.1 The Offeror must submit a proposal IAW the guidelines below.”
Source page 69

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 69
03page 91View official source ↗
“L.3.8 Submission Instructions for Subcontractor Cost proposal can be found in L.5.4.2.10. L.4 PROPOSAL STRUCTURE: L.4.1 The Offeror must submit a proposal IAW the guidelines below.”
Source page 91

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 91
Requirement 10Verified

L.5.4.2.9(b) The Offeror and its proposed Subcontractor(s) who will enter into Cost type subcontracts for the CPFF CLINs, shall provide a detailed cost element proposal by CLIN submitted electronically in Microsoft Excel format, with working formulas/algorithms - prepared IAW RFO

Applies to: subcontractor

View source 3
01page 59View official source ↗
“L.5.4.2.9(b) The Offeror and its proposed Subcontractor(s) who will enter into Cost type subcontracts for the CPFF CLINs, shall provide a detailed cost element proposal by CLIN submitted electronically in Microsoft Excel format, with working formulas/algorithms - prepared IAW RFO FAR 15.408-2, Table”
Source page 59

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 59
02page 90View official source ↗
“L.5.4.2.9(b) The Offeror and its proposed Subcontractor(s) who will enter into Cost type subcontracts for the CPFF CLINs, shall provide a detailed cost element proposal by CLIN submitted electronically in Microsoft Excel format, with working formulas/algorithms - prepared IAW RFO FAR 15.408-2, Table”
Source page 90

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 90
03page 112View official source ↗
“L.5.4.2.9(b) The Offeror and its proposed Subcontractor(s) who will enter into Cost type subcontracts for the CPFF CLINs, shall provide a detailed cost element proposal by CLIN submitted electronically in Microsoft Excel format, with working formulas/algorithms - prepared IAW RFO FAR 15.408-2, Table”
Source page 112

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 112
Requirement 11Verified

The Offeror shall provide the pool and base costs or Forward Pricing Rate Agreements (FPRAs) for all proposed indirect expense rates for itself and all Subcontractor(s) who do not submit a proposal directly to the Government.

Applies to: subcontractor

View source 3
01page 62View official source ↗
“The Offeror shall provide the pool and base costs or Forward Pricing Rate Agreements (FPRAs) for all proposed indirect expense rates for itself and all Subcontractor(s) who do not submit a proposal directly to the Government.”
Source page 62

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 62
02page 93View official source ↗
“The Offeror shall provide the pool and base costs or Forward Pricing Rate Agreements (FPRAs) for all proposed indirect expense rates for itself and all Subcontractor(s) who do not submit a proposal directly to the Government.”
Source page 93

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 93
03page 115View official source ↗
“The Offeror shall provide the pool and base costs or Forward Pricing Rate Agreements (FPRAs) for all proposed indirect expense rates for itself and all Subcontractor(s) who do not submit a proposal directly to the Government.”
Source page 115

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 115
Requirement 12Verified

details for each pool in both account/line-item name and dollar value, is required to be submitted in the Offeror's proposal for itself and all Subcontractor(s) who do not submit a proposal directly to

Applies to: subcontractor

View source 3
01page 63View official source ↗
“details for each pool in both account/line-item name and dollar value, is required to be submitted in the Offeror's proposal for itself and all Subcontractor(s) who do not submit a proposal directly to”
Source page 63

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 63
02page 93View official source ↗
“details for each pool in both account/line-item name and dollar value, is required to be submitted in the Offeror's proposal for itself and all Subcontractor(s) who do not submit a proposal directly to”
Source page 93

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 93
03page 115View official source ↗
“details for each pool in both account/line-item name and dollar value, is required to be submitted in the Offeror's proposal for itself and all Subcontractor(s) who do not submit a proposal directly to”
Source page 115

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 115
Requirement 13Verified

L.5.4.2.13(a)(5) Base: A descriptive summary of the costs proposed in each indirect cost allocation base, including the details for each base in both account/line-item name and dollar value, is required to be submitted in the Offeror's proposal for itself and all Subcontractor(s)

Applies to: subcontractor

View source 3
01page 63View official source ↗
“L.5.4.2.13(a)(5) Base: A descriptive summary of the costs proposed in each indirect cost allocation base, including the details for each base in both account/line-item name and dollar value, is required to be submitted in the Offeror's proposal for itself and all Subcontractor(s) who do not submit a”
Source page 63

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 63
02page 94View official source ↗
“L.5.4.2.13(a)(5) Base: A descriptive summary of the costs proposed in each indirect cost allocation base, including the details for each base in both account/line-item name and dollar value, is required to be submitted in the Offeror's proposal for itself and all Subcontractor(s) who do not submit a”
Source page 94

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 94
03page 115View official source ↗
“L.5.4.2.13(a)(5) Base: A descriptive summary of the costs proposed in each indirect cost allocation base, including the details for each base in both account/line-item name and dollar value, is required to be submitted in the Offeror's proposal for itself and all Subcontractor(s) who do not submit a”
Source page 115

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 115
Requirement 14Verified

L.5.4.2.13(b)(1)(i) The Offeror shall provide budgetary rate data for 2027 through 2032 depending upon availability for itself and all Subcontractor(s) who do not submit a proposal directly to the Government.

Applies when: upon availability for itself and all Subcontractor(s) who do not submit a proposal dMust be met by: upon availability for itself and all Subcontractor(s) who do not submit a proposal d

Applies to: subcontractor

View source 3
01page 63View official source ↗
“L.5.4.2.13(b)(1)(i) The Offeror shall provide budgetary rate data for 2027 through 2032 depending upon availability for itself and all Subcontractor(s) who do not submit a proposal directly to the Government.”
Source page 63

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 63
02page 94View official source ↗
“L.5.4.2.13(b)(1)(i) The Offeror shall provide budgetary rate data for 2027 through 2032 depending upon availability for itself and all Subcontractor(s) who do not submit a proposal directly to the Government.”
Source page 94

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 94
03page 116View official source ↗
“L.5.4.2.13(b)(1)(i) The Offeror shall provide budgetary rate data for 2027 through 2032 depending upon availability for itself and all Subcontractor(s) who do not submit a proposal directly to the Government.”
Source page 116

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 116
Requirement 15Verified

W519TC26RA0560002 Page 67 of 120 L.1.3 Offerors shall submit proposals that will remain valid for not less than 180 days from the required submission date.

View source 1
01page 67View official source ↗
“W519TC26RA0560002 Page 67 of 120 L.1.3 Offerors shall submit proposals that will remain valid for not less than 180 days from the required submission date.”
Source page 67

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 67
Requirement 16Verified

W519TC26RA0560002 Page 69 of 120 Emailed proposals shall state the following in the subject line: Proposal for solicitation number (W519TC-26-R-A056) - Add company name.

View source 1
01page 69View official source ↗
“W519TC26RA0560002 Page 69 of 120 Emailed proposals shall state the following in the subject line: Proposal for solicitation number (W519TC-26-R-A056) - Add company name.”
Source page 69

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 69
Missing information · 1 check
Not reviewed

—

Not reviewed — requirement not confirmed

Required submission files

7 findings
Requirement 1Verified

(iii) An adequate indirect cost rate proposal shall include the following data unless otherwise specified by the cognizant Federal agency official: (A) Summary of all claimed indirect expense rates, including pool, base, and calculated indirect rate.

Applies when: unless otherwise specified by the cognizant Federal agency official: (A) Summary of all claimed indirect expense rates, including pool, base, and calculated indirect rate

View source 1
01page 53View official source ↗
“(iii) An adequate indirect cost rate proposal shall include the following data unless otherwise specified by the cognizant Federal agency official: (A) Summary of all claimed indirect expense rates, including pool, base, and calculated indirect rate.”
Source page 53

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 53
Requirement 2Verified

L.5.4.2.7 The Offeror's firm-fixed-price Transition-in proposal shall include all cost/price elements for performance from notice to proceed until full operational capability within the time allotted in the PWS.

Applies when: within the time allotted in the PWSMust be met by: within the time allotted in the PWS

View source 3
01page 58View official source ↗
“L.5.4.2.7 The Offeror's firm-fixed-price Transition-in proposal shall include all cost/price elements for performance from notice to proceed until full operational capability within the time allotted in the PWS.”
Source page 58

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 58
02page 89View official source ↗
“L.5.4.2.7 The Offeror's firm-fixed-price Transition-in proposal shall include all cost/price elements for performance from notice to proceed until full operational capability within the time allotted in the PWS.”
Source page 89

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 89
03page 111View official source ↗
“L.5.4.2.7 The Offeror's firm-fixed-price Transition-in proposal shall include all cost/price elements for performance from notice to proceed until full operational capability within the time allotted in the PWS.”
Source page 111

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 111
Requirement 3Verified

The Offerors FFP PMO proposal shall include all cost/price elements required for performance.

View source 3
01page 59View official source ↗
“The Offerors FFP PMO proposal shall include all cost/price elements required for performance.”
Source page 59

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 59
02page 89View official source ↗
“The Offerors FFP PMO proposal shall include all cost/price elements required for performance.”
Source page 89

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 89
03page 111View official source ↗
“The Offerors FFP PMO proposal shall include all cost/price elements required for performance.”
Source page 111

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 111
Requirement 4Verified

L.5.4.2.10.1 The proposed Subcontractor(s) shall include Attachment 0015, titled Subcontractor Cost Information Submission with its proposal submission.

Applies to: subcontractor

View source 3
01page 60View official source ↗
“L.5.4.2.10.1 The proposed Subcontractor(s) shall include Attachment 0015, titled Subcontractor Cost Information Submission with its proposal submission.”
Source page 60

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 60
02page 91View official source ↗
“L.5.4.2.10.1 The proposed Subcontractor(s) shall include Attachment 0015, titled Subcontractor Cost Information Submission with its proposal submission.”
Source page 91

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 91
03page 112View official source ↗
“L.5.4.2.10.1 The proposed Subcontractor(s) shall include Attachment 0015, titled Subcontractor Cost Information Submission with its proposal submission.”
Source page 112

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 112
Requirement 5Verified

L.5.4.2.13(b) The Offeror's proposal shall include Budgetary and Historical Cost Data and Sales Volume Data.

View source 2
01page 63View official source ↗
“L.5.4.2.13(b) The Offeror's proposal shall include Budgetary and Historical Cost Data and Sales Volume Data.”
Source page 63

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 63
02page 94View official source ↗
“L.5.4.2.13(b) The Offeror's proposal shall include Budgetary and Historical Cost Data and Sales Volume Data.”
Source page 94

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 94
Requirement 6Verified

W519TC26RA0560002 Page 116 of 134 L.5.4.2.13(b) The Offeror's proposal shall include Budgetary and Historical Cost Data and Sales Volume Data.

View source 1
01page 116View official source ↗
“W519TC26RA0560002 Page 116 of 134 L.5.4.2.13(b) The Offeror's proposal shall include Budgetary and Historical Cost Data and Sales Volume Data.”
Source page 116

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 116
Missing information · 1 check
Not reviewed

—

Not reviewed — requirement not confirmed

Procurement contact

7 findings
Requirement 1Verified

Brett Sutter · brett.w.sutter.civ@army.mil

View source 1
01https://sam.gov/api/prod/opps/v2/opportunities/fec60a293d0f46e7bcd1760d21f57e84 /data2/pointOfContact/0View official source ↗
“Brett Sutter · brett.w.sutter.civ@army.mil”
Requirement 2Verified

Michael D. Thune · michael.d.thune2.civ@army.mil

View source 1
01https://sam.gov/api/prod/opps/v2/opportunities/fec60a293d0f46e7bcd1760d21f57e84 /data2/pointOfContact/1View official source ↗
“Michael D. Thune · michael.d.thune2.civ@army.mil”
Requirement 3Needs confirmation

—

Needs confirmation

View source 1
01page 34View official source ↗
“To access WAWF, the Contractor shall- (1) Have a designated electronic business point of contact in the System for Award Management at https://www.sam.gov; and (2) Be registered to use WAWF at https://wawf.eb.mil/ following the step-by-step procedures for self-registration available at this web site”
Source page 34

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 34
Requirement 4Needs confirmation

—

Needs confirmation

View source 1
01page 36View official source ↗
“(g) WAWF point of contact.”
Source page 36

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 36
Requirement 5Needs confirmation

—

Needs confirmation

View source 1
01page 37View official source ↗
“W519TC26RA0560002 Page 37 of 134 (1) The Contractor may obtain clarification regarding invoicing in WAWF from the following contracting activity's WAWF point of contact.”
Source page 37

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 37
Requirement 6Needs confirmation

—

Needs confirmation

Applies to: subcontractor

View source 1
01page 53View official source ↗
“Listing of subcontracts awarded to companies for which the contractor is the prime or upper-tier contractor (include prime and subcontract numbers; subcontract value and award type; amount claimed during the fiscal year; and the subcontractor name, address, and point of contact information).”
Source page 53

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 53
Requirement 7Needs confirmation

—

Needs confirmation

View source 3
01page 55View official source ↗
“The Offeror shall provide the contract number, type of termination, reason for the termination, and a Customer point of contact who can verify the information provided.”
Source page 55

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 55
02page 86View official source ↗
“The Offeror shall provide the contract number, type of termination, reason for the termination, and a Customer point of contact who can verify the information provided.”
Source page 86

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 86
03page 108View official source ↗
“The Offeror shall provide the contract number, type of termination, reason for the termination, and a Customer point of contact who can verify the information provided.”
Source page 108

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 108

Formatting & signatures

45 findings
Requirement 1Verified
L.5.1.12.1(a) Naming Convention: Offeror's_Name_Vol_1_e2Builds L.5.1.12.1(b) File Format: MS EXCEL L.5.1.12.1(c) Page Limit: None L.5.1.12.1(d) Naming Convention: Offeror's_Name_Vol_1_e2Rates L.5.1.12.1(e) File Format: MS EXCEL L.5.1.12.1(f) Page Limit: None TO: DELETED e.Read full requirement Close full requirement

L.5.1.12.1(a) Naming Convention: Offeror's_Name_Vol_1_e2Builds L.5.1.12.1(b) File Format: MS EXCEL L.5.1.12.1(c) Page Limit: None L.5.1.12.1(d) Naming Convention: Offeror's_Name_Vol_1_e2Rates L.5.1.12.1(e) File Format: MS EXCEL L.5.1.12.1(f) Page Limit: None TO: DELETED e.

View source 2
01page 14View official source ↗
“L.5.1.12.1(a) Naming Convention: Offeror's_Name_Vol_1_e2Builds L.5.1.12.1(b) File Format: MS EXCEL L.5.1.12.1(c) Page Limit: None L.5.1.12.1(d) Naming Convention: Offeror's_Name_Vol_1_e2Rates L.5.1.12.1(e) File Format: MS EXCEL L.5.1.12.1(f) Page Limit: None TO: DELETED e.”
Source page 14

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 14
02page 10View official source ↗
“L.5.1.12.1(a) Naming Convention: Offeror's_Name_Vol_1_e2Builds L.5.1.12.1(b) File Format: MS EXCEL L.5.1.12.1(c) Page Limit: None L.5.1.12.1(d) Naming Convention: Offeror's_Name_Vol_1_e2Rates L.5.1.12.1(e) File Format: MS EXCEL L.5.1.12.1(f) Page Limit: None TO: DELETED e.”
Source page 10

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 10
Requirement 2Verified
L.5.1.1(a) Naming Convention: Offeror's_Name_Vol_1_SF33 L.5.1.1(b) File Format: Adobe PDF or MS Word L.5.1.1(c) Page Limit: None L.5.1.1(d) STRICT COMPLIANCE REQUIREMENT: FAILURE TO PROVIDE THE SIGNED SF 33 WILL RENDER THE OFFEROR'S PROPOSAL NON-COMPLIANT.Read full requirement Close full requirement

L.5.1.1(a) Naming Convention: Offeror's_Name_Vol_1_SF33 L.5.1.1(b) File Format: Adobe PDF or MS Word L.5.1.1(c) Page Limit: None L.5.1.1(d) STRICT COMPLIANCE REQUIREMENT: FAILURE TO PROVIDE THE SIGNED SF 33 WILL RENDER THE OFFEROR'S PROPOSAL NON-COMPLIANT.

View source 2
01page 39View official source ↗
“L.5.1.1(a) Naming Convention: Offeror's_Name_Vol_1_SF33 L.5.1.1(b) File Format: Adobe PDF or MS Word L.5.1.1(c) Page Limit: None L.5.1.1(d) STRICT COMPLIANCE REQUIREMENT: FAILURE TO PROVIDE THE SIGNED SF 33 WILL RENDER THE OFFEROR'S PROPOSAL NON-COMPLIANT.”
Source page 39

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 39
02page 92View official source ↗
“L.5.1.1(a) Naming Convention: Offeror's_Name_Vol_1_SF33 L.5.1.1(b) File Format: Adobe PDF or MS Word L.5.1.1(c) Page Limit: None L.5.1.1(d) STRICT COMPLIANCE REQUIREMENT: FAILURE TO PROVIDE THE SIGNED SF 33 WILL RENDER THE OFFEROR'S PROPOSAL NON-COMPLIANT.”
Source page 92

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 92
Requirement 3Verified

L.5.1.2(a) Naming Convention: Offeror's_Name_Vol_1_SF30(Amends) L.5.1.2(b) File Format: Adobe PDF or MS Word L.5.1.2(c) Page Limit: None L.5.1.3 Section I clauses that require Offeror completion.

View source 2
01page 39View official source ↗
“L.5.1.2(a) Naming Convention: Offeror's_Name_Vol_1_SF30(Amends) L.5.1.2(b) File Format: Adobe PDF or MS Word L.5.1.2(c) Page Limit: None L.5.1.3 Section I clauses that require Offeror completion.”
Source page 39

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 39
02page 71View official source ↗
“L.5.1.2(a) Naming Convention: Offeror's_Name_Vol_1_SF30(Amends) L.5.1.2(b) File Format: Adobe PDF or MS Word L.5.1.2(c) Page Limit: None L.5.1.3 Section I clauses that require Offeror completion.”
Source page 71

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 71
Requirement 4Verified

W519TC26RA0560002 Page 40 of 120 L.5.1.3(c) Page Limit: None L.5.1.4 Section K clauses that require Offeror certification.

View source 1
01page 40View official source ↗
“W519TC26RA0560002 Page 40 of 120 L.5.1.3(c) Page Limit: None L.5.1.4 Section K clauses that require Offeror certification.”
Source page 40

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 40
Requirement 5Verified
L.5.1.4(a) Naming Convention: Offeror's_Name_Vol_1_Kclauses L.5.1.4(b) File Format: Adobe PDF or MS Word L.5.1.4(c) Page Limit: None L.5.1.5 Offeror Points of Contact (POC): The Government does not intend to conduct negotiations prior to awarding this Task Order.Read full requirement Close full requirement

L.5.1.4(a) Naming Convention: Offeror's_Name_Vol_1_Kclauses L.5.1.4(b) File Format: Adobe PDF or MS Word L.5.1.4(c) Page Limit: None L.5.1.5 Offeror Points of Contact (POC): The Government does not intend to conduct negotiations prior to awarding this Task Order.

Applies when: prior to awarding this Task OrderMust be met by: prior to awarding this Task Order

View source 3
01page 40View official source ↗
“L.5.1.4(a) Naming Convention: Offeror's_Name_Vol_1_Kclauses L.5.1.4(b) File Format: Adobe PDF or MS Word L.5.1.4(c) Page Limit: None L.5.1.5 Offeror Points of Contact (POC): The Government does not intend to conduct negotiations prior to awarding this Task Order.”
Source page 40

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 40
02page 71View official source ↗
“L.5.1.4(a) Naming Convention: Offeror's_Name_Vol_1_Kclauses L.5.1.4(b) File Format: Adobe PDF or MS Word L.5.1.4(c) Page Limit: None L.5.1.5 Offeror Points of Contact (POC): The Government does not intend to conduct negotiations prior to awarding this Task Order.”
Source page 71

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 71
03page 93View official source ↗
“L.5.1.4(a) Naming Convention: Offeror's_Name_Vol_1_Kclauses L.5.1.4(b) File Format: Adobe PDF or MS Word L.5.1.4(c) Page Limit: None L.5.1.5 Offeror Points of Contact (POC): The Government does not intend to conduct negotiations prior to awarding this Task Order.”
Source page 93

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 93
Requirement 6Verified
A Title Page is allowable to provide for the restriction or disclosure and use of data as specified in RFO FAR Clause 52.215-1. L.5.1.5(a) Naming Convention: Offeror's_Name_Vol_1_POCs L.5.1.5(b) File Format: Adobe PDF or MS Word L.5.1.5(c) Page Limit: None L.5.1.6 Business SystemRead full requirement Close full requirement

A Title Page is allowable to provide for the restriction or disclosure and use of data as specified in RFO FAR Clause 52.215-1. L.5.1.5(a) Naming Convention: Offeror's_Name_Vol_1_POCs L.5.1.5(b) File Format: Adobe PDF or MS Word L.5.1.5(c) Page Limit: None L.5.1.6 Business System

View source 2
01page 40View official source ↗
“A Title Page is allowable to provide for the restriction or disclosure and use of data as specified in RFO FAR Clause 52.215-1. L.5.1.5(a) Naming Convention: Offeror's_Name_Vol_1_POCs L.5.1.5(b) File Format: Adobe PDF or MS Word L.5.1.5(c) Page Limit: None L.5.1.6 Business Systems Information: L.5.1”
Source page 40

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 40
02page 93View official source ↗
“A Title Page is allowable to provide for the restriction or disclosure and use of data as specified in RFO FAR Clause 52.215-1. L.5.1.5(a) Naming Convention: Offeror's_Name_Vol_1_POCs L.5.1.5(b) File Format: Adobe PDF or MS Word L.5.1.5(c) Page Limit: None L.5.1.6 Business Systems Information: L.5.1”
Source page 93

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 93
Requirement 7Verified

L.5.1.6.1(a) Naming Convention: Offeror's_Name_Vol_1_AcctSys L.5.1.6.1.(b) File Format: Adobe PDF or MS Word L.5.1.6.1(c) Page Limit: None L.5.1.6.2 The Offeror shall provide its current Government approval status of the following business systems: billing (internal controls), es

View source 3
01page 41View official source ↗
“L.5.1.6.1(a) Naming Convention: Offeror's_Name_Vol_1_AcctSys L.5.1.6.1.(b) File Format: Adobe PDF or MS Word L.5.1.6.1(c) Page Limit: None L.5.1.6.2 The Offeror shall provide its current Government approval status of the following business systems: billing (internal controls), estimating, budget and”
Source page 41

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 41
02page 72View official source ↗
“L.5.1.6.1(a) Naming Convention: Offeror's_Name_Vol_1_AcctSys L.5.1.6.1.(b) File Format: Adobe PDF or MS Word L.5.1.6.1(c) Page Limit: None L.5.1.6.2 The Offeror shall provide its current Government approval status of the following business systems: billing (internal controls), estimating, budget and”
Source page 72

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 72
03page 94View official source ↗
“L.5.1.6.1(a) Naming Convention: Offeror's_Name_Vol_1_AcctSys L.5.1.6.1.(b) File Format: Adobe PDF or MS Word L.5.1.6.1(c) Page Limit: None L.5.1.6.2 The Offeror shall provide its current Government approval status of the following business systems: billing (internal controls), estimating, budget and”
Source page 94

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 94
Requirement 8Verified

L.5.1.6.2(a) Naming Convention: Offeror's_Name_Vol_1_BusSys L.5.1.6.2(b) File Format: Adobe PDF or MS Word L.5.1.6.2(c) Page Limit: None L.5.1.7 Attachment 0005-Cost Price Matrix, Tab 2-Teaming Matrix: The Offeror shall provide the full company name, CAGE code, role of participan

View source 2
01page 41View official source ↗
“L.5.1.6.2(a) Naming Convention: Offeror's_Name_Vol_1_BusSys L.5.1.6.2(b) File Format: Adobe PDF or MS Word L.5.1.6.2(c) Page Limit: None L.5.1.7 Attachment 0005-Cost Price Matrix, Tab 2-Teaming Matrix: The Offeror shall provide the full company name, CAGE code, role of participant, functional area(s”
Source page 41

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 41
02page 94View official source ↗
“L.5.1.6.2(a) Naming Convention: Offeror's_Name_Vol_1_BusSys L.5.1.6.2(b) File Format: Adobe PDF or MS Word L.5.1.6.2(c) Page Limit: None L.5.1.7 Attachment 0005-Cost Price Matrix, Tab 2-Teaming Matrix: The Offeror shall provide the full company name, CAGE code, role of participant, functional area(s”
Source page 94

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 94
Requirement 9Verified
W519TC26RA0560002 Page 42 of 120 L.5.1.7(c) File Format: MS Excel L.5.1.7(d) Page Limit: None L.5.1.7(e) STRICT COMPLIANCE REQUIREMENT: IF AN OFFEROR IS PROPOSING SUBCONTRACTORS, FAILURE OF THE OFFEROR TO POPULATE ALL BLUE HIGHLIGHTED CELLS FOR ITSELF AND EACH OF ITS PROPOSED SUBRead full requirement Close full requirement

W519TC26RA0560002 Page 42 of 120 L.5.1.7(c) File Format: MS Excel L.5.1.7(d) Page Limit: None L.5.1.7(e) STRICT COMPLIANCE REQUIREMENT: IF AN OFFEROR IS PROPOSING SUBCONTRACTORS, FAILURE OF THE OFFEROR TO POPULATE ALL BLUE HIGHLIGHTED CELLS FOR ITSELF AND EACH OF ITS PROPOSED SUB

Applies when: IF AN OFFEROR IS PROPOSING SUBCONTRACTORS, FAILURE OF THE OFFEROR TO POPULATE ALL BLUE HIGHLIGHTED CELLS FOR ITSELF AND EACH OF ITS PROPOSED SUBCONTRACTOR(S) ON THE COST PRICE MATRIX

Applies to: subcontractor

View source 1
01page 42View official source ↗
“W519TC26RA0560002 Page 42 of 120 L.5.1.7(c) File Format: MS Excel L.5.1.7(d) Page Limit: None L.5.1.7(e) STRICT COMPLIANCE REQUIREMENT: IF AN OFFEROR IS PROPOSING SUBCONTRACTORS, FAILURE OF THE OFFEROR TO POPULATE ALL BLUE HIGHLIGHTED CELLS FOR ITSELF AND EACH OF ITS PROPOSED SUBCONTRACTOR(S) ON THE”
Source page 42

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 42
Requirement 10Verified
W519TC26RA0560002 Page 43 of 120 L.5.1.12.1(a) Naming Convention: Offeror's_Name_Vol_1_e2Builds L.5.1.12.1(b) File Format: MS EXCEL L.5.1.12.1(c) Page Limit: None L.5.1.12.1(d) Naming Convention: Offeror's_Name_Vol_1_e2Rates L.5.1.12.1(e) File Format: MS EXCEL L.5.1.12.1(f) Page Read full requirement Close full requirement

W519TC26RA0560002 Page 43 of 120 L.5.1.12.1(a) Naming Convention: Offeror's_Name_Vol_1_e2Builds L.5.1.12.1(b) File Format: MS EXCEL L.5.1.12.1(c) Page Limit: None L.5.1.12.1(d) Naming Convention: Offeror's_Name_Vol_1_e2Rates L.5.1.12.1(e) File Format: MS EXCEL L.5.1.12.1(f) Page

View source 1
01page 43View official source ↗
“W519TC26RA0560002 Page 43 of 120 L.5.1.12.1(a) Naming Convention: Offeror's_Name_Vol_1_e2Builds L.5.1.12.1(b) File Format: MS EXCEL L.5.1.12.1(c) Page Limit: None L.5.1.12.1(d) Naming Convention: Offeror's_Name_Vol_1_e2Rates L.5.1.12.1(e) File Format: MS EXCEL L.5.1.12.1(f) Page Limit: None L.5.2 Te”
Source page 43

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 43
Requirement 11Verified

L.5.2.1.1 Staffing and Management Plan (SMP): L.5.2.1.1(a) The Offeror's SMP proposal must adhere to the following: L.5.2.1.1(a)(1) Naming Convention: Offeror's_Name_Vol_2_SMP L.5.2.1.1(a)(2) File Format: Text Searchable Adobe PDF L.5.2.1.1(a)(3) Page Limit: 15 Pages L.5.2.1.1(a)

View source 1
01page 43View official source ↗
“L.5.2.1.1 Staffing and Management Plan (SMP): L.5.2.1.1(a) The Offeror's SMP proposal must adhere to the following: L.5.2.1.1(a)(1) Naming Convention: Offeror's_Name_Vol_2_SMP L.5.2.1.1(a)(2) File Format: Text Searchable Adobe PDF L.5.2.1.1(a)(3) Page Limit: 15 Pages L.5.2.1.1(a)(3)(i) Page limit ex”
Source page 43

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 43
Requirement 12Verified

L.5.2.1.1(a)(3)(ii) Pages larger than 8.5 inches x 11 inches will be counted as two pages L.5.2.1.1(a)(3)(iii) The font size must be no less than 10-point font for all documents, to include

View source 2
01page 43View official source ↗
“L.5.2.1.1(a)(3)(ii) Pages larger than 8.5 inches x 11 inches will be counted as two pages L.5.2.1.1(a)(3)(iii) The font size must be no less than 10-point font for all documents, to include”
Source page 43

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 43
02page 74View official source ↗
“L.5.2.1.1(a)(3)(ii) Pages larger than 8.5 inches x 11 inches will be counted as two pages L.5.2.1.1(a)(3)(iii) The font size must be no less than 10-point font for all documents, to include”
Source page 74

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 74
Requirement 13Verified

A new Letter of Consent is required and shall adhere to the following: L.5.3.1.2(a) Naming Convention: Offeror's_Name_Vol_3_Att0004 L.5.3.1.2(b) File Format: MS Word or Adobe PDF L.5.3.1.2(c) Page Limit: None

View source 1
01page 49View official source ↗
“A new Letter of Consent is required and shall adhere to the following: L.5.3.1.2(a) Naming Convention: Offeror's_Name_Vol_3_Att0004 L.5.3.1.2(b) File Format: MS Word or Adobe PDF L.5.3.1.2(c) Page Limit: None”
Source page 49

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 49
Requirement 14Verified

L.5.3.1.4(a)(2) File Format: MS Excel L.5.3.1.4(a)(3) Page Limit: None

View source 2
01page 50View official source ↗
“L.5.3.1.4(a)(2) File Format: MS Excel L.5.3.1.4(a)(3) Page Limit: None”
Source page 50

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 50
02page 102View official source ↗
“L.5.3.1.4(a)(2) File Format: MS Excel L.5.3.1.4(a)(3) Page Limit: None”
Source page 102

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 102
Requirement 15Verified

The Offeror's proposal shall adhere to the following: L.5.3.1.4(b)(21)(ii) Naming Convention of Offeror: Offeror_Name_Vol_3_SR_ContractReference#; or, Naming Convention of Subcontractors: Offeror_Name_Sub_Name_Vol_3_SR_ContractReference# L.5.3.1.4(b)(21)(iii) File Format: MS Word

Applies to: subcontractor

View source 2
01page 54View official source ↗
“The Offeror's proposal shall adhere to the following: L.5.3.1.4(b)(21)(ii) Naming Convention of Offeror: Offeror_Name_Vol_3_SR_ContractReference#; or, Naming Convention of Subcontractors: Offeror_Name_Sub_Name_Vol_3_SR_ContractReference# L.5.3.1.4(b)(21)(iii) File Format: MS Word or Adobe PDF L.5.3.”
Source page 54

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 54
02page 106View official source ↗
“The Offeror's proposal shall adhere to the following: L.5.3.1.4(b)(21)(ii) Naming Convention of Offeror: Offeror_Name_Vol_3_SR_ContractReference#; or, Naming Convention of Subcontractors: Offeror_Name_Sub_Name_Vol_3_SR_ContractReference# L.5.3.1.4(b)(21)(iii) File Format: MS Word or Adobe PDF L.5.3.”
Source page 106

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 106
Requirement 16Verified

L.5.3.5(c) The Offeror's proposal shall adhere to the following: L.5.3.5(c)(1) Naming Convention: Offeror's_Name_Vol_3_Att0003 L.5.3.5(c)(2) File Format: MS Word or Adobe PDF L.5.3.5(c)(3) Page Limit: None L.5.3.5(c)(4) STRICT COMPLIANCE REQUIREMENT: FAILURE TO PROVIDE A COMPLETE

View source 3
01page 55View official source ↗
“L.5.3.5(c) The Offeror's proposal shall adhere to the following: L.5.3.5(c)(1) Naming Convention: Offeror's_Name_Vol_3_Att0003 L.5.3.5(c)(2) File Format: MS Word or Adobe PDF L.5.3.5(c)(3) Page Limit: None L.5.3.5(c)(4) STRICT COMPLIANCE REQUIREMENT: FAILURE TO PROVIDE A COMPLETED ATTACHMENT 0003 - ”
Source page 55

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 55
02page 85View official source ↗
“L.5.3.5(c) The Offeror's proposal shall adhere to the following: L.5.3.5(c)(1) Naming Convention: Offeror's_Name_Vol_3_Att0003 L.5.3.5(c)(2) File Format: MS Word or Adobe PDF L.5.3.5(c)(3) Page Limit: None L.5.3.5(c)(4) STRICT COMPLIANCE REQUIREMENT: FAILURE TO PROVIDE A COMPLETED ATTACHMENT 0003 - ”
Source page 85

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 85
03page 107View official source ↗
“L.5.3.5(c) The Offeror's proposal shall adhere to the following: L.5.3.5(c)(1) Naming Convention: Offeror's_Name_Vol_3_Att0003 L.5.3.5(c)(2) File Format: MS Word or Adobe PDF L.5.3.5(c)(3) Page Limit: None L.5.3.5(c)(4) STRICT COMPLIANCE REQUIREMENT: FAILURE TO PROVIDE A COMPLETED ATTACHMENT 0003 - ”
Source page 107

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 107
Requirement 17Verified

W519TC26RA0560002 Page 57 of 120 L.5.4.2.1(b) File Format: MS Word or Adobe PDF L.5.4.2.1(c) Page Limit: None L.5.4.2.2 MS Excel documents provided in response to the Cost/Price Factor may contain macros.

View source 1
01page 57View official source ↗
“W519TC26RA0560002 Page 57 of 120 L.5.4.2.1(b) File Format: MS Word or Adobe PDF L.5.4.2.1(c) Page Limit: None L.5.4.2.2 MS Excel documents provided in response to the Cost/Price Factor may contain macros.”
Source page 57

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 57
Requirement 18Verified

L.5.4.2.2(b)(2) File Format: MS Word or Adobe PDF L.5.4.2.2(b)(3) Page Limit: None

View source 2
01page 57View official source ↗
“L.5.4.2.2(b)(2) File Format: MS Word or Adobe PDF L.5.4.2.2(b)(3) Page Limit: None”
Source page 57

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 57
02page 109View official source ↗
“L.5.4.2.2(b)(2) File Format: MS Word or Adobe PDF L.5.4.2.2(b)(3) Page Limit: None”
Source page 109

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 109
Requirement 19Verified

L.5.4.2.3.1(c) Page Limit: None

View source 1
01page 57View official source ↗
“L.5.4.2.3.1(c) Page Limit: None”
Source page 57

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 57
Requirement 20Verified

Offerors (and Subcontractor(s)) shall adhere to the following: L.5.4.2.4(a) Naming Convention of Offeror: Offeror's_Name_Vol_4_Assumptions; or, Naming Convention of Subcontractors: Offeror's_Name_Sub_Name_Vol_4_Assumptions L.5.4.2.4(b) File Format: MS Word or Adobe PDF L.5.4.2.4(

Applies to: subcontractor

View source 2
01page 58View official source ↗
“Offerors (and Subcontractor(s)) shall adhere to the following: L.5.4.2.4(a) Naming Convention of Offeror: Offeror's_Name_Vol_4_Assumptions; or, Naming Convention of Subcontractors: Offeror's_Name_Sub_Name_Vol_4_Assumptions L.5.4.2.4(b) File Format: MS Word or Adobe PDF L.5.4.2.4(c) Page Limit: none ”
Source page 58

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 58
02page 110View official source ↗
“Offerors (and Subcontractor(s)) shall adhere to the following: L.5.4.2.4(a) Naming Convention of Offeror: Offeror's_Name_Vol_4_Assumptions; or, Naming Convention of Subcontractors: Offeror's_Name_Sub_Name_Vol_4_Assumptions L.5.4.2.4(b) File Format: MS Word or Adobe PDF L.5.4.2.4(c) Page Limit: none ”
Source page 110

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 110
Requirement 21Verified
L.5.4.2.5(a) Naming Convention: Offeror's_Name_Vol_4_DCAA_DCMA L.5.4.2.5(b) File Format: MS Word or Adobe PDF L.5.4.2.5(c) Page Limit: None L.5.4.2.6 The CLINs for ODCs are Government provided surrogate numbers, which are inclusive for any Offeror's applicable indirect rate adderRead full requirement Close full requirement

L.5.4.2.5(a) Naming Convention: Offeror's_Name_Vol_4_DCAA_DCMA L.5.4.2.5(b) File Format: MS Word or Adobe PDF L.5.4.2.5(c) Page Limit: None L.5.4.2.6 The CLINs for ODCs are Government provided surrogate numbers, which are inclusive for any Offeror's applicable indirect rate adder

View source 2
01page 58View official source ↗
“L.5.4.2.5(a) Naming Convention: Offeror's_Name_Vol_4_DCAA_DCMA L.5.4.2.5(b) File Format: MS Word or Adobe PDF L.5.4.2.5(c) Page Limit: None L.5.4.2.6 The CLINs for ODCs are Government provided surrogate numbers, which are inclusive for any Offeror's applicable indirect rate adders.”
Source page 58

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 58
02page 89View official source ↗
“L.5.4.2.5(a) Naming Convention: Offeror's_Name_Vol_4_DCAA_DCMA L.5.4.2.5(b) File Format: MS Word or Adobe PDF L.5.4.2.5(c) Page Limit: None L.5.4.2.6 The CLINs for ODCs are Government provided surrogate numbers, which are inclusive for any Offeror's applicable indirect rate adders.”
Source page 89

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 89
Requirement 22Verified

Supporting Documentation in MS Excel, MS Word, Adobe PDF L.5.4.2.9(c)(3) Page Limit: None L.5.4.2.9(c)(4) STRICT COMPLIANCE REQUIREMENT: FAILURE OF THE OFFEROR OR ITS PROPOSED SUBCONTRACTOR(S) TO PROVIDE ITS COST/PRICE PROPOSAL IN COMPLIANCE WITH L.5.4.2.9 THROUGH L.5.4.2.9(c)(2)

Applies to: subcontractor

View source 3
01page 60View official source ↗
“Supporting Documentation in MS Excel, MS Word, Adobe PDF L.5.4.2.9(c)(3) Page Limit: None L.5.4.2.9(c)(4) STRICT COMPLIANCE REQUIREMENT: FAILURE OF THE OFFEROR OR ITS PROPOSED SUBCONTRACTOR(S) TO PROVIDE ITS COST/PRICE PROPOSAL IN COMPLIANCE WITH L.5.4.2.9 THROUGH L.5.4.2.9(c)(2), EXCLUDING L.5.4.2.”
Source page 60

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 60
02page 90View official source ↗
“Supporting Documentation in MS Excel, MS Word, Adobe PDF L.5.4.2.9(c)(3) Page Limit: None L.5.4.2.9(c)(4) STRICT COMPLIANCE REQUIREMENT: FAILURE OF THE OFFEROR OR ITS PROPOSED SUBCONTRACTOR(S) TO PROVIDE ITS COST/PRICE PROPOSAL IN COMPLIANCE WITH L.5.4.2.9 THROUGH L.5.4.2.9(c)(2), EXCLUDING L.5.4.2.”
Source page 90

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 90
03page 112View official source ↗
“Supporting Documentation in MS Excel, MS Word, Adobe PDF L.5.4.2.9(c)(3) Page Limit: None L.5.4.2.9(c)(4) STRICT COMPLIANCE REQUIREMENT: FAILURE OF THE OFFEROR OR ITS PROPOSED SUBCONTRACTOR(S) TO PROVIDE ITS COST/PRICE PROPOSAL IN COMPLIANCE WITH L.5.4.2.9 THROUGH L.5.4.2.9(c)(2), EXCLUDING L.5.4.2.”
Source page 112

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 112
Requirement 23Verified
L.5.4.2.10.1(a) Naming Convention of Subcontractors: Offeror's_Name_Sub_Name_Vol_4_Att0015 L.5.4.2.10.1(b) File Format: MS Word or Adobe PDF L.5.4.2.10.1(c) Page Limit: None L.5.4.2.10.1(d) STRICT COMPLIANCE REQUIREMENT: FAILURE OF ANY SUBCONTRACTORS SUBMITTING COST/PRICE PROPOSARead full requirement Close full requirement

L.5.4.2.10.1(a) Naming Convention of Subcontractors: Offeror's_Name_Sub_Name_Vol_4_Att0015 L.5.4.2.10.1(b) File Format: MS Word or Adobe PDF L.5.4.2.10.1(c) Page Limit: None L.5.4.2.10.1(d) STRICT COMPLIANCE REQUIREMENT: FAILURE OF ANY SUBCONTRACTORS SUBMITTING COST/PRICE PROPOSA

Applies to: subcontractor

View source 2
01page 60View official source ↗
“L.5.4.2.10.1(a) Naming Convention of Subcontractors: Offeror's_Name_Sub_Name_Vol_4_Att0015 L.5.4.2.10.1(b) File Format: MS Word or Adobe PDF L.5.4.2.10.1(c) Page Limit: None L.5.4.2.10.1(d) STRICT COMPLIANCE REQUIREMENT: FAILURE OF ANY SUBCONTRACTORS SUBMITTING COST/PRICE PROPOSALS DIRECTLY TO THE G”
Source page 60

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 60
02page 91View official source ↗
“L.5.4.2.10.1(a) Naming Convention of Subcontractors: Offeror's_Name_Sub_Name_Vol_4_Att0015 L.5.4.2.10.1(b) File Format: MS Word or Adobe PDF L.5.4.2.10.1(c) Page Limit: None L.5.4.2.10.1(d) STRICT COMPLIANCE REQUIREMENT: FAILURE OF ANY SUBCONTRACTORS SUBMITTING COST/PRICE PROPOSALS DIRECTLY TO THE G”
Source page 91

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 91
Requirement 24Verified

L.5.4.2.12(c) File Format: MS Word, MS Excel, or Adobe PDF L.5.4.2.12(d) Page Limit: None L.5.4.2.12(e) STRICT COMPLIANCE REQUIREMENT: FAILURE OF THE OFFEROR, OR ITS PROPOSED SUBCONTRACTORS TO PROVIDE ITS DIRECT LABOR RATE DATA SHALL RENDER THE OFFEROR'S PROPOSAL NON-COMPLIANT.

Applies to: subcontractor

View source 3
01page 62View official source ↗
“L.5.4.2.12(c) File Format: MS Word, MS Excel, or Adobe PDF L.5.4.2.12(d) Page Limit: None L.5.4.2.12(e) STRICT COMPLIANCE REQUIREMENT: FAILURE OF THE OFFEROR, OR ITS PROPOSED SUBCONTRACTORS TO PROVIDE ITS DIRECT LABOR RATE DATA SHALL RENDER THE OFFEROR'S PROPOSAL NON-COMPLIANT.”
Source page 62

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 62
02page 93View official source ↗
“L.5.4.2.12(c) File Format: MS Word, MS Excel, or Adobe PDF L.5.4.2.12(d) Page Limit: None L.5.4.2.12(e) STRICT COMPLIANCE REQUIREMENT: FAILURE OF THE OFFEROR, OR ITS PROPOSED SUBCONTRACTORS TO PROVIDE ITS DIRECT LABOR RATE DATA SHALL RENDER THE OFFEROR'S PROPOSAL NON-COMPLIANT.”
Source page 93

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 93
03page 114View official source ↗
“L.5.4.2.12(c) File Format: MS Word, MS Excel, or Adobe PDF L.5.4.2.12(d) Page Limit: None L.5.4.2.12(e) STRICT COMPLIANCE REQUIREMENT: FAILURE OF THE OFFEROR, OR ITS PROPOSED SUBCONTRACTORS TO PROVIDE ITS DIRECT LABOR RATE DATA SHALL RENDER THE OFFEROR'S PROPOSAL NON-COMPLIANT.”
Source page 114

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 114
Requirement 25Verified
L.5.4.2.13(f)(1) Naming Convention of Offeror Narrative: "Offeror's_Name_Vol_4_IERD_NAR"; or Naming Convention of Subcontractor: "Offeror's_Name_Sub_Name_Vol_4_IERD_NAR" L.5.4.2.13(g) Page Limit: None L.5.4.2.13(h) STRICT COMPLIANCE REQUIREMENT: FAILURE OF THE OFFEROR, OR ITS PRORead full requirement Close full requirement

L.5.4.2.13(f)(1) Naming Convention of Offeror Narrative: "Offeror's_Name_Vol_4_IERD_NAR"; or Naming Convention of Subcontractor: "Offeror's_Name_Sub_Name_Vol_4_IERD_NAR" L.5.4.2.13(g) Page Limit: None L.5.4.2.13(h) STRICT COMPLIANCE REQUIREMENT: FAILURE OF THE OFFEROR, OR ITS PRO

Applies to: subcontractor

View source 2
01page 65View official source ↗
“L.5.4.2.13(f)(1) Naming Convention of Offeror Narrative: "Offeror's_Name_Vol_4_IERD_NAR"; or Naming Convention of Subcontractor: "Offeror's_Name_Sub_Name_Vol_4_IERD_NAR" L.5.4.2.13(g) Page Limit: None L.5.4.2.13(h) STRICT COMPLIANCE REQUIREMENT: FAILURE OF THE OFFEROR, OR ITS PROPOSED SUBCONTRACTORS”
Source page 65

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 65
02page 117View official source ↗
“L.5.4.2.13(f)(1) Naming Convention of Offeror Narrative: "Offeror's_Name_Vol_4_IERD_NAR"; or Naming Convention of Subcontractor: "Offeror's_Name_Sub_Name_Vol_4_IERD_NAR" L.5.4.2.13(g) Page Limit: None L.5.4.2.13(h) STRICT COMPLIANCE REQUIREMENT: FAILURE OF THE OFFEROR, OR ITS PROPOSED SUBCONTRACTORS”
Source page 117

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 117
Requirement 26Verified
L.5.4.2.14(a) Naming Convention of Offeror: Offeror's_Name_Vol_4_CW; or Naming Convention of Subcontractors: Offeror's_Name_Sub_Name_Vol_4_CW L.5.4.2.14(b) File Format: MS Word or Excel L.5.4.2.14(c) Page Limit: None L.5.4.2.14(d) STRICT COMPLIANCE REQUIREMENT: FAILURE OF THE OFFRead full requirement Close full requirement

L.5.4.2.14(a) Naming Convention of Offeror: Offeror's_Name_Vol_4_CW; or Naming Convention of Subcontractors: Offeror's_Name_Sub_Name_Vol_4_CW L.5.4.2.14(b) File Format: MS Word or Excel L.5.4.2.14(c) Page Limit: None L.5.4.2.14(d) STRICT COMPLIANCE REQUIREMENT: FAILURE OF THE OFF

Applies to: subcontractor

View source 3
01page 65View official source ↗
“L.5.4.2.14(a) Naming Convention of Offeror: Offeror's_Name_Vol_4_CW; or Naming Convention of Subcontractors: Offeror's_Name_Sub_Name_Vol_4_CW L.5.4.2.14(b) File Format: MS Word or Excel L.5.4.2.14(c) Page Limit: None L.5.4.2.14(d) STRICT COMPLIANCE REQUIREMENT: FAILURE OF THE OFFEROR OR ITS PROPOSED”
Source page 65

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 65
02page 96View official source ↗
“L.5.4.2.14(a) Naming Convention of Offeror: Offeror's_Name_Vol_4_CW; or Naming Convention of Subcontractors: Offeror's_Name_Sub_Name_Vol_4_CW L.5.4.2.14(b) File Format: MS Word or Excel L.5.4.2.14(c) Page Limit: None L.5.4.2.14(d) STRICT COMPLIANCE REQUIREMENT: FAILURE OF THE OFFEROR OR ITS PROPOSED”
Source page 96

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 96
03page 118View official source ↗
“L.5.4.2.14(a) Naming Convention of Offeror: Offeror's_Name_Vol_4_CW; or Naming Convention of Subcontractors: Offeror's_Name_Sub_Name_Vol_4_CW L.5.4.2.14(b) File Format: MS Word or Excel L.5.4.2.14(c) Page Limit: None L.5.4.2.14(d) STRICT COMPLIANCE REQUIREMENT: FAILURE OF THE OFFEROR OR ITS PROPOSED”
Source page 118

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 118
Requirement 27Verified

L.5.1.1(a) Naming Convention: Offeror's_Name_Vol_1_SF33 L.5.1.1(b) File Format: Adobe PDF or MS Word L.5.1.1(c) Page Limit: None

View source 1
01page 70View official source ↗
“L.5.1.1(a) Naming Convention: Offeror's_Name_Vol_1_SF33 L.5.1.1(b) File Format: Adobe PDF or MS Word L.5.1.1(c) Page Limit: None”
Source page 70

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 70
Requirement 28Verified

L.5.1.3(a) Naming Convention: Offeror's_Name_Vol_1_Iclauses L.5.1.3(b) File Format: Adobe PDF or MS Word L.5.1.3(c) Page Limit: None L.5.1.4 Section K clauses that require Offeror certification.

View source 2
01page 71View official source ↗
“L.5.1.3(a) Naming Convention: Offeror's_Name_Vol_1_Iclauses L.5.1.3(b) File Format: Adobe PDF or MS Word L.5.1.3(c) Page Limit: None L.5.1.4 Section K clauses that require Offeror certification.”
Source page 71

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 71
02page 93View official source ↗
“L.5.1.3(a) Naming Convention: Offeror's_Name_Vol_1_Iclauses L.5.1.3(b) File Format: Adobe PDF or MS Word L.5.1.3(c) Page Limit: None L.5.1.4 Section K clauses that require Offeror certification.”
Source page 93

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 93
Requirement 29Verified
W519TC26RA0560002 Page 72 of 120 L.5.1.5(c) Page Limit: None L.5.1.6 Business Systems Information: L.5.1.6.1 The Contracting Officer will review the Offeror's accounting system status for determining contractor responsibility IAW RFO FAR 16.301-3; a cost-reimbursement type contraRead full requirement Close full requirement

W519TC26RA0560002 Page 72 of 120 L.5.1.5(c) Page Limit: None L.5.1.6 Business Systems Information: L.5.1.6.1 The Contracting Officer will review the Offeror's accounting system status for determining contractor responsibility IAW RFO FAR 16.301-3; a cost-reimbursement type contra

Applies when: when the contractor'

View source 1
01page 72View official source ↗
“W519TC26RA0560002 Page 72 of 120 L.5.1.5(c) Page Limit: None L.5.1.6 Business Systems Information: L.5.1.6.1 The Contracting Officer will review the Offeror's accounting system status for determining contractor responsibility IAW RFO FAR 16.301-3; a cost-reimbursement type contract may be used only ”
Source page 72

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 72
Requirement 30Verified

W519TC26RA0560002 Page 73 of 120 L.5.1.6.2(c) Page Limit: None L.5.1.7 Attachment 0005-Cost Price Matrix, Tab 2-Teaming Matrix: The Offeror shall provide the full company name, CAGE code, role of participant, functional area(s) to be performed, proposed labor/fee for each partici

View source 1
01page 73View official source ↗
“W519TC26RA0560002 Page 73 of 120 L.5.1.6.2(c) Page Limit: None L.5.1.7 Attachment 0005-Cost Price Matrix, Tab 2-Teaming Matrix: The Offeror shall provide the full company name, CAGE code, role of participant, functional area(s) to be performed, proposed labor/fee for each participant for the entire ”
Source page 73

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 73
Requirement 31Verified
L.5.1.7(b) Naming Convention: Offeror's_Name_Vol_4_Att0005 L.5.1.7(c) File Format: MS Excel L.5.1.7(d) Page Limit: None L.5.1.7(e) STRICT COMPLIANCE REQUIREMENT: IF AN OFFEROR IS PROPOSING SUBCONTRACTORS, FAILURE OF THE OFFEROR TO POPULATE ALL BLUE HIGHLIGHTED CELLS FOR ITSELF ANRead full requirement Close full requirement

L.5.1.7(b) Naming Convention: Offeror's_Name_Vol_4_Att0005 L.5.1.7(c) File Format: MS Excel L.5.1.7(d) Page Limit: None L.5.1.7(e) STRICT COMPLIANCE REQUIREMENT: IF AN OFFEROR IS PROPOSING SUBCONTRACTORS, FAILURE OF THE OFFEROR TO POPULATE ALL BLUE HIGHLIGHTED CELLS FOR ITSELF AN

Applies when: IF AN OFFEROR IS PROPOSING SUBCONTRACTORS, FAILURE OF THE OFFEROR TO POPULATE ALL BLUE HIGHLIGHTED CELLS FOR ITSELF AND EACH OF ITS PROPOSED SUBCONTRACTOR(S)

Applies to: subcontractor

View source 2
01page 73View official source ↗
“L.5.1.7(b) Naming Convention: Offeror's_Name_Vol_4_Att0005 L.5.1.7(c) File Format: MS Excel L.5.1.7(d) Page Limit: None L.5.1.7(e) STRICT COMPLIANCE REQUIREMENT: IF AN OFFEROR IS PROPOSING SUBCONTRACTORS, FAILURE OF THE OFFEROR TO POPULATE ALL BLUE HIGHLIGHTED CELLS FOR ITSELF AND EACH OF ITS PROPOS”
Source page 73

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 73
02page 95View official source ↗
“L.5.1.7(b) Naming Convention: Offeror's_Name_Vol_4_Att0005 L.5.1.7(c) File Format: MS Excel L.5.1.7(d) Page Limit: None L.5.1.7(e) STRICT COMPLIANCE REQUIREMENT: IF AN OFFEROR IS PROPOSING SUBCONTRACTORS, FAILURE OF THE OFFEROR TO POPULATE ALL BLUE HIGHLIGHTED CELLS FOR ITSELF AND EACH OF ITS PROPOS”
Source page 95

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 95
Requirement 32Verified

W519TC26RA0560002 Page 74 of 120 L.5.2.1.1 Staffing and Management Plan (SMP): L.5.2.1.1(a) The Offeror's SMP proposal must adhere to the following: L.5.2.1.1(a)(1) Naming Convention: Offeror's_Name_Vol_2_SMP L.5.2.1.1(a)(2) File Format: Text Searchable Adobe PDF L.5.2.1.1(a)(3)

View source 1
01page 74View official source ↗
“W519TC26RA0560002 Page 74 of 120 L.5.2.1.1 Staffing and Management Plan (SMP): L.5.2.1.1(a) The Offeror's SMP proposal must adhere to the following: L.5.2.1.1(a)(1) Naming Convention: Offeror's_Name_Vol_2_SMP L.5.2.1.1(a)(2) File Format: Text Searchable Adobe PDF L.5.2.1.1(a)(3) Page Limit: 15 Pages”
Source page 74

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 74
Requirement 33Verified

A new Letter of Consent is required and shall adhere to the following: L.5.3.1.2(a) Naming Convention: Offeror's_Name_Vol_3_Att0004 L.5.3.1.2(b) File Format: MS Word or Adobe PDF L.5.3.1.2(c) Page Limit: None L.5.3.1.2(d) STRICT COMPLIANCE REQUIREMENT: FAILURE TO PROVIDE A COMPLE

View source 2
01page 80View official source ↗
“A new Letter of Consent is required and shall adhere to the following: L.5.3.1.2(a) Naming Convention: Offeror's_Name_Vol_3_Att0004 L.5.3.1.2(b) File Format: MS Word or Adobe PDF L.5.3.1.2(c) Page Limit: None L.5.3.1.2(d) STRICT COMPLIANCE REQUIREMENT: FAILURE TO PROVIDE A COMPLETED LETTER OF CONSEN”
Source page 80

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 80
02page 102View official source ↗
“A new Letter of Consent is required and shall adhere to the following: L.5.3.1.2(a) Naming Convention: Offeror's_Name_Vol_3_Att0004 L.5.3.1.2(b) File Format: MS Word or Adobe PDF L.5.3.1.2(c) Page Limit: None L.5.3.1.2(d) STRICT COMPLIANCE REQUIREMENT: FAILURE TO PROVIDE A COMPLETED LETTER OF CONSEN”
Source page 102

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 102
Requirement 34Verified

W519TC26RA0560002 Page 81 of 120 L.5.3.1.4(a)(2) File Format: MS Excel L.5.3.1.4(a)(3) Page Limit: None L.5.3.1.4(b) Attachment 0011 Information: L.5.3.1.4(b)(1) Line 1: The BOA Holder Offeror Name.

View source 1
01page 81View official source ↗
“W519TC26RA0560002 Page 81 of 120 L.5.3.1.4(a)(2) File Format: MS Excel L.5.3.1.4(a)(3) Page Limit: None L.5.3.1.4(b) Attachment 0011 Information: L.5.3.1.4(b)(1) Line 1: The BOA Holder Offeror Name.”
Source page 81

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 81
Requirement 35Verified
W519TC26RA0560002 Page 85 of 120 L.5.3.1.4(b)(21)(ii) Naming Convention of Offeror: Offeror_Name_Vol_3_SR_ContractReference#; or, Naming Convention of Subcontractors: Offeror_Name_Sub_Name_Vol_3_SR_ContractReference# L.5.3.1.4(b)(21)(iii) File Format: MS Word or Adobe PDF L.5.3.1Read full requirement Close full requirement

W519TC26RA0560002 Page 85 of 120 L.5.3.1.4(b)(21)(ii) Naming Convention of Offeror: Offeror_Name_Vol_3_SR_ContractReference#; or, Naming Convention of Subcontractors: Offeror_Name_Sub_Name_Vol_3_SR_ContractReference# L.5.3.1.4(b)(21)(iii) File Format: MS Word or Adobe PDF L.5.3.1

Applies to: subcontractor

View source 1
01page 85View official source ↗
“W519TC26RA0560002 Page 85 of 120 L.5.3.1.4(b)(21)(ii) Naming Convention of Offeror: Offeror_Name_Vol_3_SR_ContractReference#; or, Naming Convention of Subcontractors: Offeror_Name_Sub_Name_Vol_3_SR_ContractReference# L.5.3.1.4(b)(21)(iii) File Format: MS Word or Adobe PDF L.5.3.1.4(b)(21)(iv) Page L”
Source page 85

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 85
Requirement 36Verified

Offerors (and Subcontractor(s)) shall adhere to the following table of contents format: L.5.4.2.1(a) Naming Convention of Offeror: Offeror's_Name_Vol_4_TOC; or, Naming Convention of Subcontractors: Offeror's_Name_Sub_Name_Vol_4_TOC L.5.4.2.1(b) File Format: MS Word or Adobe PDF L

Applies to: subcontractor

View source 2
01page 87View official source ↗
“Offerors (and Subcontractor(s)) shall adhere to the following table of contents format: L.5.4.2.1(a) Naming Convention of Offeror: Offeror's_Name_Vol_4_TOC; or, Naming Convention of Subcontractors: Offeror's_Name_Sub_Name_Vol_4_TOC L.5.4.2.1(b) File Format: MS Word or Adobe PDF L.5.4.2.1(c) Page Lim”
Source page 87

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 87
02page 109View official source ↗
“Offerors (and Subcontractor(s)) shall adhere to the following table of contents format: L.5.4.2.1(a) Naming Convention of Offeror: Offeror's_Name_Vol_4_TOC; or, Naming Convention of Subcontractors: Offeror's_Name_Sub_Name_Vol_4_TOC L.5.4.2.1(b) File Format: MS Word or Adobe PDF L.5.4.2.1(c) Page Lim”
Source page 109

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 109
Requirement 37Verified

W519TC26RA0560002 Page 88 of 120 L.5.4.2.2(b)(1) Naming Convention of Offeror: Offeror's_Name_Vol_4_ MacroInst; or, Naming Convention of Subcontractors: Offeror's_Name_Sub_Name_Vol_4_MacroInst, L.5.4.2.2(b)(2) File Format: MS Word or Adobe PDF L.5.4.2.2(b)(3) Page Limit: None L.5

Applies to: subcontractor

View source 1
01page 88View official source ↗
“W519TC26RA0560002 Page 88 of 120 L.5.4.2.2(b)(1) Naming Convention of Offeror: Offeror's_Name_Vol_4_ MacroInst; or, Naming Convention of Subcontractors: Offeror's_Name_Sub_Name_Vol_4_MacroInst, L.5.4.2.2(b)(2) File Format: MS Word or Adobe PDF L.5.4.2.2(b)(3) Page Limit: None L.5.4.2.3 The Offeror s”
Source page 88

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 88
Requirement 38Verified

L.5.4.2.3.1(c) Page Limit: None L.5.4.2.3.1(d) STRICT COMPLIANCE REQUIREMENT: FAILURE TO PROVIDE A FULLY POPULATED ATTACHMENT 0005 - COST PRICE MATRIX TO INCLUDE ALL HIGHLIGHTED BLUE CELLS ON TAB 1B THE COST PRICE MATRIX ALLOCATION TAB OR ONE NOT OTHERWISE IN COMPLIANCE WITH L.5.

View source 2
01page 88View official source ↗
“L.5.4.2.3.1(c) Page Limit: None L.5.4.2.3.1(d) STRICT COMPLIANCE REQUIREMENT: FAILURE TO PROVIDE A FULLY POPULATED ATTACHMENT 0005 - COST PRICE MATRIX TO INCLUDE ALL HIGHLIGHTED BLUE CELLS ON TAB 1B THE COST PRICE MATRIX ALLOCATION TAB OR ONE NOT OTHERWISE IN COMPLIANCE WITH L.5.4.2.3.1(b), SHALL RE”
Source page 88

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 88
02page 110View official source ↗
“L.5.4.2.3.1(c) Page Limit: None L.5.4.2.3.1(d) STRICT COMPLIANCE REQUIREMENT: FAILURE TO PROVIDE A FULLY POPULATED ATTACHMENT 0005 - COST PRICE MATRIX TO INCLUDE ALL HIGHLIGHTED BLUE CELLS ON TAB 1B THE COST PRICE MATRIX ALLOCATION TAB OR ONE NOT OTHERWISE IN COMPLIANCE WITH L.5.4.2.3.1(b), SHALL RE”
Source page 110

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 110
Requirement 39Verified

W519TC26RA0560002 Page 89 of 120 L.5.4.2.4(c) Page Limit: none L.5.4.2.4(d) STRICT COMPLIANCE REQUIREMENT: FAILURE OF THE OFFEROR OR ITS PROPOSED SUBCONTRACTORS TO PROVIDE THE ASSUMPTIONS AND RATIONALE AND IN COMPLIANCE WITH L.5.4.2.4(b) SHALL RENDER THE OFFEROR'S PROPOSAL NON- C

Applies to: subcontractor

View source 1
01page 89View official source ↗
“W519TC26RA0560002 Page 89 of 120 L.5.4.2.4(c) Page Limit: none L.5.4.2.4(d) STRICT COMPLIANCE REQUIREMENT: FAILURE OF THE OFFEROR OR ITS PROPOSED SUBCONTRACTORS TO PROVIDE THE ASSUMPTIONS AND RATIONALE AND IN COMPLIANCE WITH L.5.4.2.4(b) SHALL RENDER THE OFFEROR'S PROPOSAL NON- COMPLIANT.”
Source page 89

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 89
Requirement 40Verified

W519TC26RA0560002 Page 93 of 134 L.5.1.2(b) File Format: Adobe PDF or MS Word L.5.1.2(c) Page Limit: None L.5.1.3 Section I clauses that require Offeror completion.

View source 1
01page 93View official source ↗
“W519TC26RA0560002 Page 93 of 134 L.5.1.2(b) File Format: Adobe PDF or MS Word L.5.1.2(c) Page Limit: None L.5.1.3 Section I clauses that require Offeror completion.”
Source page 93

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 93
Requirement 41Verified

L.5.4.2.13(f)(1) Naming Convention of Offeror Narrative: "Offeror's_Name_Vol_4_IERD_NAR"; or Naming Convention of Subcontractor: "Offeror's_Name_Sub_Name_Vol_4_IERD_NAR" L.5.4.2.13(g) Page Limit: None

Applies to: subcontractor

View source 1
01page 95View official source ↗
“L.5.4.2.13(f)(1) Naming Convention of Offeror Narrative: "Offeror's_Name_Vol_4_IERD_NAR"; or Naming Convention of Subcontractor: "Offeror's_Name_Sub_Name_Vol_4_IERD_NAR" L.5.4.2.13(g) Page Limit: None”
Source page 95

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 95
Requirement 42Verified

L.5.2.1.1 Staffing and Management Plan (SMP): L.5.2.1.1(a) The Offeror's SMP proposal must adhere to the following: L.5.2.1.1(a)(1) Naming Convention: Offeror's_Name_Vol_2_SMP L.5.2.1.1(a)(2) File Format: Text Searchable Adobe PDF L.5.2.1.1(a)(3) Page Limit: 15 Pages

View source 1
01page 95View official source ↗
“L.5.2.1.1 Staffing and Management Plan (SMP): L.5.2.1.1(a) The Offeror's SMP proposal must adhere to the following: L.5.2.1.1(a)(1) Naming Convention: Offeror's_Name_Vol_2_SMP L.5.2.1.1(a)(2) File Format: Text Searchable Adobe PDF L.5.2.1.1(a)(3) Page Limit: 15 Pages”
Source page 95

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 95
Requirement 43Verified

W519TC26RA0560002 Page 96 of 134 L.5.2.1.1(a)(3)(i) Page limit excludes cover page, table of contents, and glossary of abbreviations and acronyms L.5.2.1.1(a)(3)(ii) Pages larger than 8.5 inches x 11 inches will be counted as two pages L.5.2.1.1(a)(3)(iii) The font size must be n

View source 1
01page 96View official source ↗
“W519TC26RA0560002 Page 96 of 134 L.5.2.1.1(a)(3)(i) Page limit excludes cover page, table of contents, and glossary of abbreviations and acronyms L.5.2.1.1(a)(3)(ii) Pages larger than 8.5 inches x 11 inches will be counted as two pages L.5.2.1.1(a)(3)(iii) The font size must be no less than 10-point”
Source page 96

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 96
Requirement 44Verified
W519TC26RA0560002 Page 111 of 134 L.5.4.2.5(b) File Format: MS Word or Adobe PDF L.5.4.2.5(c) Page Limit: None L.5.4.2.6 The CLINs for ODCs are Government provided surrogate numbers, which are inclusive for any Offeror's applicable indirect rate adders.Read full requirement Close full requirement

W519TC26RA0560002 Page 111 of 134 L.5.4.2.5(b) File Format: MS Word or Adobe PDF L.5.4.2.5(c) Page Limit: None L.5.4.2.6 The CLINs for ODCs are Government provided surrogate numbers, which are inclusive for any Offeror's applicable indirect rate adders.

View source 1
01page 111View official source ↗
“W519TC26RA0560002 Page 111 of 134 L.5.4.2.5(b) File Format: MS Word or Adobe PDF L.5.4.2.5(c) Page Limit: None L.5.4.2.6 The CLINs for ODCs are Government provided surrogate numbers, which are inclusive for any Offeror's applicable indirect rate adders.”
Source page 111

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 111
Requirement 45Verified

W519TC26RA0560002 Page 113 of 134 L.5.4.2.10.1(c) Page Limit: None L.5.4.2.10.1(d) STRICT COMPLIANCE REQUIREMENT: FAILURE OF ANY SUBCONTRACTORS SUBMITTING COST/PRICE PROPOSALS DIRECTLY TO THE GOVERNMENT, TO PROVIDE ATTACHMENT 0015 - SUBCONTRACTOR COST INFORMATION SUBMISSION SHALL

Applies to: subcontractor

View source 1
01page 113View official source ↗
“W519TC26RA0560002 Page 113 of 134 L.5.4.2.10.1(c) Page Limit: None L.5.4.2.10.1(d) STRICT COMPLIANCE REQUIREMENT: FAILURE OF ANY SUBCONTRACTORS SUBMITTING COST/PRICE PROPOSALS DIRECTLY TO THE GOVERNMENT, TO PROVIDE ATTACHMENT 0015 - SUBCONTRACTOR COST INFORMATION SUBMISSION SHALL RENDER THE OFFEROR'”
Source page 113

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 113

Mandatory forms

3 findings
Requirement 1Verified

The following contract documents were modified: Exhibit A DD Form 1423-1 Contract Data Requirements List

View source 1
01page 31View official source ↗
“The following contract documents were modified: Exhibit A DD Form 1423-1 Contract Data Requirements List”
Source page 31

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 31
Requirement 2Verified

Each individual Attachment 0011 must be completed in the following format with the following information: L.5.3.1.4(a) Attachment 0011 Format: L.5.3.1.4(a)(1) Naming Convention: Offeror's_Name_Vol_3_Att0011; or, Naming Convention for Subcontractors: Offeror's_Name_Sub's_Name_Vol_

Applies to: subcontractor

View source 3
01page 50View official source ↗
“Each individual Attachment 0011 must be completed in the following format with the following information: L.5.3.1.4(a) Attachment 0011 Format: L.5.3.1.4(a)(1) Naming Convention: Offeror's_Name_Vol_3_Att0011; or, Naming Convention for Subcontractors: Offeror's_Name_Sub's_Name_Vol_3_Att0011 L.5.3.1.4(”
Source page 50

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 50
02page 80View official source ↗
“Each individual Attachment 0011 must be completed in the following format with the following information: L.5.3.1.4(a) Attachment 0011 Format: L.5.3.1.4(a)(1) Naming Convention: Offeror's_Name_Vol_3_Att0011; or, Naming Convention for Subcontractors: Offeror's_Name_Sub's_Name_Vol_3_Att0011”
Source page 80

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 80
03page 102View official source ↗
“Each individual Attachment 0011 must be completed in the following format with the following information: L.5.3.1.4(a) Attachment 0011 Format: L.5.3.1.4(a)(1) Naming Convention: Offeror's_Name_Vol_3_Att0011; or, Naming Convention for Subcontractors: Offeror's_Name_Sub's_Name_Vol_3_Att0011 L.5.3.1.4(”
Source page 102

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 102
Requirement 3Verified

4OCT26 A Exhibit A DD Exhibit A DD Form 18 0010 Exhibit No

View source 1
01page 76View official source ↗
“4OCT26 A Exhibit A DD Exhibit A DD Form 18 0010 Exhibit No”
Source page 76

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 76

Offer acceptance period

2 findings
Requirement 1Verified

180 days

View source 3
01page 3View official source ↗
“A.6 The Offeror's proposal shall be valid for 180 days from the closing date of the RFP.”
Source page 3

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 3
02page 8View official source ↗
“W519TC26RA0560002 Page 8 of 120 A.6 The Offeror's proposal shall be valid for 180 days from the closing date of the RFP.”
Source page 8

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 8
03page 3View official source ↗
“A.6 The Offeror's proposal shall be valid for 180 days from the closing date of the RFP.”
Source page 3

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 3
Requirement 2Needs confirmation

—

Needs confirmation

Applies when: if the solicitation includes the provisions at 52

View source 1
01page 1View official source ↗
“NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.”
Source page 1

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 1
Missing information6 checks · expand to review

A missing value is not a waiver. Check the source or ask the agency before relying on it.

Questions due

2 findings
Requirement 1Not found

—

Not found in reviewed sources

Requirement 2Not reviewed

—

Not reviewed — requirement not confirmed

Site visit / pre-bid meeting

2 findings
Requirement 1Not found

—

Not found in reviewed sources

Requirement 2Not reviewed

—

Not reviewed — requirement not confirmed

Acknowledge amendments

2 findings
Requirement 1Not found

—

Not found in reviewed sources

Requirement 2Not reviewed

—

Not reviewed — requirement not confirmed

4 additional fields have no reviewed finding.

Continue your review

6 more sections are available once you sign in

Pricing & payment · Bonds & insurance · Evaluation & award · Scope & delivery · Labor, sourcing & compliance · Contract terms & risk

Sign in — free

Extracted from the public documents linked above. This is an information aid, not a determination of bid eligibility or legal advice. Verify the original wording and any addenda before submitting a bid.

Bid review
4 days left
See all 7