DEPT OF DEFENSE · SC
JB Charleston Multiple Award Construction Contract
- Response deadline
- 4 days left
- Published project value
- Not confirmedCheck the pricing and payment terms below.
- Solicitation number
- FA441826R0009
Dates to plan around
Times follow the original source.
- Response deadline
Source wording
2026-10-28T12:00:00-04:00
49 documents found2 partially read4 need OCR2 could not be read9% of weighted requirement checks reviewed
Newer source changes have not been verified. Confirm the latest notice and addenda before submitting.
Review first
Start with these requirements and unresolved points.- Must doJoint ventures & teaming
View 2 flagged requirements
- Requirement 1 ↗
unique entity identifier of each party to the joint venture: .] Each HUBZone small business concern participating in the HUBZone joint venture must be certified as a
- Requirement 2 ↗
The offeror should provide a list of any relevant and recent past/present performance information on previous teaming arrangements or joint ventures with the same teaming or joint venture partner. Joint ventures must align with the current guidance provided by the Small Business
- Requirement 1 ↗
- Must doRegistrations
View 2 flagged requirements
- Requirement 1 ↗
To access WAWF, the Contractor shall- (1) Have a designated electronic business point of contact in the System for Award Management at https://www.sam.gov; and (2) Be registered to use WAWF at https://wawf.eb.mil/ following the step-by-step procedures for self-registration availa
- Requirement 2 ↗
(d) The offeror shall post the information in paragraphs (c)(1)(i) through (c)(1)(iv) of this provision in FAPIIS as required through maintaining an active registration in the System for Award Management, which can be accessed via https://www.sam.gov (see 52.204-7).
- Requirement 1 ↗
Eligibility & participation
Whether you can bid at all, and what you must already hold.
Registrations
3 findingsTo access WAWF, the Contractor shall- (1) Have a designated electronic business point of contact in the System for Award Management at https://www.sam.gov; and (2) Be registered to use WAWF at https://wawf.eb.mil/ following the step-by-step procedures for self-registration availa
View source 1
“To access WAWF, the Contractor shall- (1) Have a designated electronic business point of contact in the System for Award Management at https://www.sam.gov; and (2) Be registered to use WAWF at https://wawf.eb.mil/ following the step-by-step procedures for self-registration available at this web site”
Source page 11
Page markings may include other requirements. The quotation above identifies this requirement.

(d) The offeror shall post the information in paragraphs (c)(1)(i) through (c)(1)(iv) of this provision in FAPIIS as required through maintaining an active registration in the System for Award Management, which can be accessed via https://www.sam.gov (see 52.204-7).
View source 1
“(d) The offeror shall post the information in paragraphs (c)(1)(i) through (c)(1)(iv) of this provision in FAPIIS as required through maintaining an active registration in the System for Award Management, which can be accessed via https://www.sam.gov (see 52.204-7).”
Source page 36
Page markings may include other requirements. The quotation above identifies this requirement.

Missing information · 1 check
—
Not reviewed — requirement not confirmed
Set-aside
2 findingsSDVOSB,HUBZONE
View source 1
“Project Location: Charleston, South Carolina THIS SOLICITATION IS ISSUED AS A COMPETITIVE HUBZone AND SDVOSB BUSINESS SET-ASIDE USING TRADE-OFF PROCEDURES AND THE PROVISIONS OF SECTIONS L &”
Source page 1
Page markings may include other requirements. The quotation above identifies this requirement.

Missing information · 1 check
—
Not reviewed — requirement not confirmed
Small business size
9 findings$45,000,000
View source 1
“NAICS Code: 236220 Size Standard: $45,000,000”
Source page 1
Page markings may include other requirements. The quotation above identifies this requirement.

—
Needs confirmation
View source 1
“Size Standard: USD 45,000,000.00 Annual receipts”
Source page 3
Page markings may include other requirements. The quotation above identifies this requirement.

—
Needs confirmation
View source 1
“concern, without regard to its socioeconomic status); and (2) Is considered small for the size standard under the North American Industry Classification System (NAICS) code the prime contractor assigned to the subcontract.”
Source page 23
Page markings may include other requirements. The quotation above identifies this requirement.

—
Needs confirmation
View source 1
“Small business concern- (1) Means a concern, including its affiliates, that is independently owned and operated, not dominant in its field of operation, and qualified as a small business under the criteria in 13 CFR part 121 and the size standard in paragraph (c) of this clause.”
Source page 24
Page markings may include other requirements. The quotation above identifies this requirement.

—
Needs confirmation
Applies when: If the Contractor represented that it was a small business concern, a small disadvantaged business concern, or a joint venture that was any of the small business concerns identified; prior to award of this contract, the ContMust be met by: prior to award of this contract, the Cont
View source 1
“SBA determines affiliation based on the factors set forth at 13 CFR 121.103. (b) If the Contractor represented that it was a small business concern, a small disadvantaged business concern, or a joint venture that was any of the small business concerns identified in 19.000(a)(3) prior to award of thi”
Source page 24
Page markings may include other requirements. The quotation above identifies this requirement.

—
Needs confirmation
Applies when: at the time of this rerepresentation that corresponds to the North AmericanMust be met by: at the time of this rerepresentation that corresponds to the North American
View source 1
“(c) The Contractor shall rerepresent its size status in accordance with the size standard in effect at the time of this rerepresentation that corresponds to the North American”
Source page 24
Page markings may include other requirements. The quotation above identifies this requirement.

—
Needs confirmation
View source 1
“The small business size standard corresponding to this NAICS code(s) can be found at https:// www.sba.gov/document/support--table-size-standards.”
Source page 25
Page markings may include other requirements. The quotation above identifies this requirement.

—
Needs confirmation
Applies when: if the acquisit
View source 1
“(d) The small business size standard for a Contractor providing an end item that it does not manufacture, process, or produce itself, for a contract other than a construction or service contract, is 500 employees, or 150 employees for information technology value-added resellers under NAICS code 541”
Source page 25
Page markings may include other requirements. The quotation above identifies this requirement.

Missing information · 1 check
—
Not reviewed — requirement not confirmed
Key personnel
3 findingsThe evaluation of Past Performance information will take into account performance of predecessor companies, major subcontractors, key personnel, consultant, or teaming contractor or partner whose effort, as demonstrated in the proposal, will significantly influence performance ofClose full requirement
The evaluation of Past Performance information will take into account performance of predecessor companies, major subcontractors, key personnel, consultant, or teaming contractor or partner whose effort, as demonstrated in the proposal, will significantly influence performance of
Applies to: subcontractor
View source 1
“The evaluation of Past Performance information will take into account performance of predecessor companies, major subcontractors, key personnel, consultant, or teaming contractor or partner whose effort, as demonstrated in the proposal, will significantly influence performance of the proposed constr”
Source page 41
Page markings may include other requirements. The quotation above identifies this requirement.

Furnish the following information for each contract referenced: Prime Contractor on Project (Company/Division): CAGE Code: Unique Entity ID: Role of Offeror in Effort (Prime Contractor, Sub Contractor, JV Partner, Teaming Partner, Predecessor Company, Consultant, Key Personnel) PClose full requirement
Furnish the following information for each contract referenced: Prime Contractor on Project (Company/Division): CAGE Code: Unique Entity ID: Role of Offeror in Effort (Prime Contractor, Sub Contractor, JV Partner, Teaming Partner, Predecessor Company, Consultant, Key Personnel) P
Applies to: person
View source 1
“Furnish the following information for each contract referenced: Prime Contractor on Project (Company/Division): CAGE Code: Unique Entity ID: Role of Offeror in Effort (Prime Contractor, Sub Contractor, JV Partner, Teaming Partner, Predecessor Company, Consultant, Key Personnel) Project Title: Contra”
Source page 41
Page markings may include other requirements. The quotation above identifies this requirement.

The evaluation will take into account performance of predecessor companies, major subcontractors, key personnel, consultant, or teaming contractor or partner whose effort, as demonstrated in the proposal, will significantly influence performance of the proposed construction and/oClose full requirement
The evaluation will take into account performance of predecessor companies, major subcontractors, key personnel, consultant, or teaming contractor or partner whose effort, as demonstrated in the proposal, will significantly influence performance of the proposed construction and/o
Applies to: subcontractor
View source 1
“The evaluation will take into account performance of predecessor companies, major subcontractors, key personnel, consultant, or teaming contractor or partner whose effort, as demonstrated in the proposal, will significantly influence performance of the proposed construction and/or design-build effor”
Source page 46
Page markings may include other requirements. The quotation above identifies this requirement.

Financial capacity
(b) The bidder shall furnish a bid guarantee in the form of a firm commitment, e.g., bid bond supported by good and sufficient surety or sureties acceptable to the Government, postal money order, certified check, cashier's check, irrevocable letter of credit, or, under Treasury D
Applies to: surety
View source 1
“(b) The bidder shall furnish a bid guarantee in the form of a firm commitment, e.g., bid bond supported by good and sufficient surety or sureties acceptable to the Government, postal money order, certified check, cashier's check, irrevocable letter of credit, or, under Treasury Department regulation”
Source page 43
Page markings may include other requirements. The quotation above identifies this requirement.

Joint ventures & teaming
14 findings(g) A joint venture agrees that, in the performance of the contract, the applicable percentage specified in paragraph (e) of this clause will be performed by the aggregate of the joint venture participants.
View source 1
“(g) A joint venture agrees that, in the performance of the contract, the applicable percentage specified in paragraph (e) of this clause will be performed by the aggregate of the joint venture participants.”
Source page 24
Page markings may include other requirements. The quotation above identifies this requirement.

(1) In a joint venture comprised of a small business protege and its mentor approved by the Small Business Administration, the small business protege shall perform at least 40 percent of the work performed by the joint venture.
Applies when: In a joint venture; at least 40 percent of the work performed by the joint venture
View source 1
“(1) In a joint venture comprised of a small business protege and its mentor approved by the Small Business Administration, the small business protege shall perform at least 40 percent of the work performed by the joint venture.”
Source page 24
Page markings may include other requirements. The quotation above identifies this requirement.

Work performed by the small business protege in the joint venture must be more than administrative functions.
Applies when: Work performed by the small business protege in the joint venture
View source 1
“Work performed by the small business protege in the joint venture must be more than administrative functions.”
Source page 24
Page markings may include other requirements. The quotation above identifies this requirement.

(2) In an 8(a) joint venture, the 8(a) participant(s) shall perform at least 40 percent of the work performed by the joint venture.
Applies when: In an 8(a) joint venture; at least 40 percent of the work performed by the joint venture
View source 1
“(2) In an 8(a) joint venture, the 8(a) participant(s) shall perform at least 40 percent of the work performed by the joint venture.”
Source page 24
Page markings may include other requirements. The quotation above identifies this requirement.

Work performed by the 8(a) participants in the joint venture must be more than administrative functions.
Applies when: Work performed by the 8(a) participants in the joint venture
View source 1
“Work performed by the 8(a) participants in the joint venture must be more than administrative functions.”
Source page 24
Page markings may include other requirements. The quotation above identifies this requirement.

SBA determines affiliation based on the factors set forth at 13 CFR 121.103. (b) If the Contractor represented that it was a small business concern, a small disadvantaged business concern, or a joint venture that was any of the small business concerns identified in 19.000(a)(3) pClose full requirement
SBA determines affiliation based on the factors set forth at 13 CFR 121.103. (b) If the Contractor represented that it was a small business concern, a small disadvantaged business concern, or a joint venture that was any of the small business concerns identified in 19.000(a)(3) p
Applies when: If the Contractor represented that it was a small business concern, a small disadvantaged business concern, or a joint venture that was any of the small business concerns identified; prior to award of this contract, the ContMust be met by: prior to award of this contract, the Cont
View source 1
“SBA determines affiliation based on the factors set forth at 13 CFR 121.103. (b) If the Contractor represented that it was a small business concern, a small disadvantaged business concern, or a joint venture that was any of the small business concerns identified in 19.000(a)(3) prior to award of thi”
Source page 24
Page markings may include other requirements. The quotation above identifies this requirement.

entity identifier of each party to the joint venture: __.]
View source 1
“entity identifier of each party to the joint venture: __.]”
Source page 25
Page markings may include other requirements. The quotation above identifies this requirement.

unique entity identifier of each party to the joint venture: .] Each HUBZone small business concern participating in the HUBZone joint venture must be certified as a
View source 1
“unique entity identifier of each party to the joint venture: .] Each HUBZone small business concern participating in the HUBZone joint venture must be certified as a”
Source page 25
Page markings may include other requirements. The quotation above identifies this requirement.

For all joint ventures and teaming arrangements offerors are reminded of the work performance requirements of 13 CFR 125.8, 13 CFR 126.616, 13 CFR 128.402 and RFO 52.219-14, Limitations On Subcontracting, as applicable.
View source 1
“For all joint ventures and teaming arrangements offerors are reminded of the work performance requirements of 13 CFR 125.8, 13 CFR 126.616, 13 CFR 128.402 and RFO 52.219-14, Limitations On Subcontracting, as applicable.”
Source page 39
Page markings may include other requirements. The quotation above identifies this requirement.

The offeror should provide a list of any relevant and recent past/present performance information on previous teaming arrangements or joint ventures with the same teaming or joint venture partner. Joint ventures must align with the current guidance provided by the Small Business
View source 1
“The offeror should provide a list of any relevant and recent past/present performance information on previous teaming arrangements or joint ventures with the same teaming or joint venture partner. Joint ventures must align with the current guidance provided by the Small Business Administration (SBA)”
Source page 39
Page markings may include other requirements. The quotation above identifies this requirement.

L-1.4 Teaming Arrangements/Joint Ventures: If the offeror intends to fulfill the requirements of this RFP in a teaming arrangement or joint venture, the offeror must provide complete information as to the arrangement, including identifying the responsibilities of each entity, and
Applies when: If the offeror intends to fulfill the requirements of this RFP in a teaming arrangement or joint venture, the offeror must provide complete information as to the arrangement, includi
View source 1
“L-1.4 Teaming Arrangements/Joint Ventures: If the offeror intends to fulfill the requirements of this RFP in a teaming arrangement or joint venture, the offeror must provide complete information as to the arrangement, including identifying the responsibilities of each entity, and the contractual rel”
Source page 39
Page markings may include other requirements. The quotation above identifies this requirement.

The offeror should provide a list of any relevant and recent past/present performance information on previous teaming arrangements or joint ventures with the same teaming or joint venture partner.
View source 1
“The offeror should provide a list of any relevant and recent past/present performance information on previous teaming arrangements or joint ventures with the same teaming or joint venture partner.”
Source page 39
Page markings may include other requirements. The quotation above identifies this requirement.

If the offeror performed as part of a teaming arrangement or joint venture, indicate the names of all team members and the work performed by each.
Applies when: If the offeror performed as part of a teaming arrangement or joint venture, indicate the names of all team members and the work performed by each
View source 1
“If the offeror performed as part of a teaming arrangement or joint venture, indicate the names of all team members and the work performed by each.”
Source page 42
Page markings may include other requirements. The quotation above identifies this requirement.

Small Business Teaming Arrangement Partner/Subcontractor Consent: The offeror shall submit a consent letter executed by each teaming partner and/or joint venture partner authorizing the release of adverse past performance information to the offeror.
Applies to: subcontractor
View source 1
“Small Business Teaming Arrangement Partner/Subcontractor Consent: The offeror shall submit a consent letter executed by each teaming partner and/or joint venture partner authorizing the release of adverse past performance information to the offeror.”
Source page 42
Page markings may include other requirements. The quotation above identifies this requirement.

Conflicts of interest
2 findingsFA441826R00090002 Page 17 of 47 ORGANIZATIONAL CONFLICT OF INTEREST (DAF Part 9) The following restrictions and definitions apply to prevent conflicting roles which may bias the Contractor's judgment or objectivity, or to preclude the Contractor from obtaining an unfair competitiClose full requirement
FA441826R00090002 Page 17 of 47 ORGANIZATIONAL CONFLICT OF INTEREST (DAF Part 9) The following restrictions and definitions apply to prevent conflicting roles which may bias the Contractor's judgment or objectivity, or to preclude the Contractor from obtaining an unfair competiti
View source 1
“FA441826R00090002 Page 17 of 47 ORGANIZATIONAL CONFLICT OF INTEREST (DAF Part 9) The following restrictions and definitions apply to prevent conflicting roles which may bias the Contractor's judgment or objectivity, or to preclude the Contractor from obtaining an unfair competitive advantage in conc”
Source page 17
Page markings may include other requirements. The quotation above identifies this requirement.

The Contractor agrees to accept and to complete all issued task orders, and not to contract with Government prime Contractors or first-tier subcontractors in such a way as to create an organizational conflict of interest.Close full requirement
The Contractor agrees to accept and to complete all issued task orders, and not to contract with Government prime Contractors or first-tier subcontractors in such a way as to create an organizational conflict of interest.
Applies to: subcontractor
View source 1
“The Contractor agrees to accept and to complete all issued task orders, and not to contract with Government prime Contractors or first-tier subcontractors in such a way as to create an organizational conflict of interest.”
Source page 17
Page markings may include other requirements. The quotation above identifies this requirement.

Missing information4 checks · expand to review
A missing value is not a waiver. Check the source or ask the agency before relying on it.
Required licenses
2 findings—
Not found in reviewed sources
—
Not reviewed — requirement not confirmed
Experience & references
2 findings—
Not found in reviewed sources
—
Not reviewed — requirement not confirmed
2 additional fields have no reviewed finding.
Deadlines & submission
When and how to submit, and whether you are still in time.
Response deadline
3 findings2026-10-28T12:00:00-04:00
View source 1
“2026-10-28T12:00:00-04:00”
Missing information · 2 checks
—
Not found in reviewed sources
—
Not reviewed — requirement not confirmed
How to submit
2 findingsPROPOSAL BOND: The offeror shall submit a Proposal Bond (Standard Form 24) with good and sufficient surety or sureties acceptable to the Government in the amount
Applies to: surety
View source 1
“PROPOSAL BOND: The offeror shall submit a Proposal Bond (Standard Form 24) with good and sufficient surety or sureties acceptable to the Government in the amount”
Source page 13
Page markings may include other requirements. The quotation above identifies this requirement.

Missing information · 1 check
—
Not reviewed — requirement not confirmed
Acknowledge amendments
2 findingsYOU ARE ENCOURAGED TO REGISTER ON THE WWW.SAM.GOV WEBSITE TO RECEIVE NOTIFICATION OF CHANGES TO THE SOLICITATION. FAILURE TO ACKNOWLEDGE AMENDMENTS MAY RENDER YOUR PROPOSAL NONRESPONSIVE.
View source 1
“YOU ARE ENCOURAGED TO REGISTER ON THE WWW.SAM.GOV WEBSITE TO RECEIVE NOTIFICATION OF CHANGES TO THE SOLICITATION. FAILURE TO ACKNOWLEDGE AMENDMENTS MAY RENDER YOUR PROPOSAL NONRESPONSIVE.”
Source page 13
Page markings may include other requirements. The quotation above identifies this requirement.

Missing information · 1 check
—
Not reviewed — requirement not confirmed
Procurement contact
10 findingsDaniel Teeter · daniel.teeter@us.af.mil · 8439637744
View source 1
“Daniel Teeter · daniel.teeter@us.af.mil · 8439637744”
Robert R. Melton · robert.melton.6@us.af.mil · 8439635173
View source 1
“Robert R. Melton · robert.melton.6@us.af.mil · 8439635173”
be submitted directly to the Government's Point of Contact, robert.melton.6@us.af.mil | daniel.teeter@us.af.mil.
View source 1
“be submitted directly to the Government's Point of Contact, robert.melton.6@us.af.mil | daniel.teeter@us.af.mil.”
Source page 42
Page markings may include other requirements. The quotation above identifies this requirement.

—
Needs confirmation
View source 1
“To access WAWF, the Contractor shall- (1) Have a designated electronic business point of contact in the System for Award Management at https://www.sam.gov; and (2) Be registered to use WAWF at https://wawf.eb.mil/ following the step-by-step procedures for self-registration available at this web site”
Source page 11
Page markings may include other requirements. The quotation above identifies this requirement.

—
Needs confirmation
View source 1
“(Contracting Officer: Insert applicable invoice and receiving report document type(s) for fixed price line items that require shipment of a deliverable.)”
Source page 11
Page markings may include other requirements. The quotation above identifies this requirement.

—
Needs confirmation
View source 1
“(Contracting Officer: Insert either "Invoice 2in1" or the applicable invoice and receiving report document type(s) for fixed price line items for services.)”
Source page 12
Page markings may include other requirements. The quotation above identifies this requirement.

—
Needs confirmation
Applies when: If multiple ship to/acceptance locations apply, insert "See Schedule" or "Not applicable
View source 1
“If multiple ship to/acceptance locations apply, insert "See Schedule" or "Not applicable.") (**Contracting Officer: If the contract provides for progress payments or performance-based payments, insert the DoDAAC for the contract administration office assigned the functions under FAR 42.302(a)(13).) ”
Source page 12
Page markings may include other requirements. The quotation above identifies this requirement.

—
Needs confirmation
View source 1
“(g) WAWF point of contact.”
Source page 12
Page markings may include other requirements. The quotation above identifies this requirement.

—
Needs confirmation
View source 1
“(1) The Contractor may obtain clarification regarding invoicing in WAWF from the following contracting activity's WAWF point of contact.”
Source page 12
Page markings may include other requirements. The quotation above identifies this requirement.

—
Needs confirmation
View source 1
“(Contracting Officer: Insert applicable information or "Not applicable.")”
Source page 12
Page markings may include other requirements. The quotation above identifies this requirement.

Bid opening
3 findings—
Needs confirmation
Applies when: If this is a sealed bid solicitation, offers will be publicly opened at that time
View source 1
“If this is a sealed bid solicitation, offers will be publicly opened at that time.”
Source page 1
Page markings may include other requirements. The quotation above identifies this requirement.

—
Needs confirmation
View source 1
“(Sep 1996) Bid Guarantee (Sept 1996) (a) Failure to furnish a bid guarantee in the proper form and amount, by the time set for opening of bids, may be cause for rejection of the bid.”
Source page 43
Page markings may include other requirements. The quotation above identifies this requirement.

—
Needs confirmation
Applies when: upon execution of contractual documents and bonds (including any necessary coinsuranMust be met by: upon execution of contractual documents and bonds (including any necessary coinsuran
View source 1
“The Contracting Officer will return bid guarantees, other than bid bonds- (1) To unsuccessful bidders as soon as practicable after the opening of bids; and (2) To the successful bidder upon execution of contractual documents and bonds (including any necessary coinsurance or reinsurance agreements), ”
Source page 43
Page markings may include other requirements. The quotation above identifies this requirement.

Formatting & signatures
4 findingsPlease note, Past Performance Customer Questionnaires are not included in the page limitation.
View source 1
“Please note, Past Performance Customer Questionnaires are not included in the page limitation.”
Source page 40
Page markings may include other requirements. The quotation above identifies this requirement.

Pages exceeding the page limitations set forth in this Section L will not be read nor evaluated.
View source 1
“Pages exceeding the page limitations set forth in this Section L will not be read nor evaluated.”
Source page 42
Page markings may include other requirements. The quotation above identifies this requirement.

The total PART II - FACTOR 2 - PAST PERFORMANCE INFORMATION portion of the proposal shall have a page limitation of fifty (50) pages.
View source 1
“The total PART II - FACTOR 2 - PAST PERFORMANCE INFORMATION portion of the proposal shall have a page limitation of fifty (50) pages.”
Source page 42
Page markings may include other requirements. The quotation above identifies this requirement.

Please note, Past Performance Customer Questionnaires are not included in the page limitation. e.
View source 1
“Please note, Past Performance Customer Questionnaires are not included in the page limitation. e.”
Source page 42
Page markings may include other requirements. The quotation above identifies this requirement.

Offer acceptance period
180 days
View source 2
“Requirements of the solicitation (Contract Line Items (CLINs) & Specifications/drawings) and government standards and regulations pertaining to the Seed Project. b. Proposals shall remain valid for 180 days after date of submission to ensure adequate time for evaluations. c.”
Source page 42
Page markings may include other requirements. The quotation above identifies this requirement.

“Proposals shall remain valid for 180 days after date of submission to ensure adequate time for evaluations. c.”
Source page 42
Page markings may include other requirements. The quotation above identifies this requirement.

Grounds for rejection
4 findingsIf a contractor chooses not to attend the site visit for a specific task order, that contractor's proposal for the task order will be considered non-responsive.
Applies when: If a contractor chooses not to attend the site visit for a specific task order, that contractor's proposal for the task order will be considered non-responsive
View source 1
“If a contractor chooses not to attend the site visit for a specific task order, that contractor's proposal for the task order will be considered non-responsive.”
Source page 42
Page markings may include other requirements. The quotation above identifies this requirement.

(Sep 1996) Bid Guarantee (Sept 1996) (a) Failure to furnish a bid guarantee in the proper form and amount, by the time set for opening of bids, may be cause for rejection of the bid.
View source 1
“(Sep 1996) Bid Guarantee (Sept 1996) (a) Failure to furnish a bid guarantee in the proper form and amount, by the time set for opening of bids, may be cause for rejection of the bid.”
Source page 43
Page markings may include other requirements. The quotation above identifies this requirement.

Failure to complete the requirements in Section L may result in an offer being determined non-responsive, incomplete and not evaluated.
View source 1
“Failure to complete the requirements in Section L may result in an offer being determined non-responsive, incomplete and not evaluated.”
Source page 45
Page markings may include other requirements. The quotation above identifies this requirement.

Past Performance submissions older than five (5) years from the solicitation due date; i.e. non- responsive as to recency, and Past Performance submissions which occurred outside the SE Region, i.e. non-responsive as to relevancy, shall not be evaluated.Close full requirement
Past Performance submissions older than five (5) years from the solicitation due date; i.e. non- responsive as to recency, and Past Performance submissions which occurred outside the SE Region, i.e. non-responsive as to relevancy, shall not be evaluated.
View source 1
“Past Performance submissions older than five (5) years from the solicitation due date; i.e. non- responsive as to recency, and Past Performance submissions which occurred outside the SE Region, i.e. non-responsive as to relevancy, shall not be evaluated.”
Source page 46
Page markings may include other requirements. The quotation above identifies this requirement.

Missing information6 checks · expand to review
A missing value is not a waiver. Check the source or ask the agency before relying on it.
Questions due
2 findings—
Not found in reviewed sources
—
Not reviewed — requirement not confirmed
Site visit / pre-bid meeting
2 findings—
Not found in reviewed sources
—
Not reviewed — requirement not confirmed
Required submission files
2 findings—
Not found in reviewed sources
—
Not reviewed — requirement not confirmed
3 additional fields have no reviewed finding.
6 more sections are available once you sign in
Pricing & payment · Bonds & insurance · Evaluation & award · Scope & delivery · Labor, sourcing & compliance · Contract terms & risk
Sign in — freeExtracted from the public documents linked above. This is an information aid, not a determination of bid eligibility or legal advice. Verify the original wording and any addenda before submitting a bid.