Published project value
$25K – $100K
As stated in the source documents
Solicitation number
W912WJ27QA003
View official posting ↗Review requirements ↓Original posting details are available below.

Dates to plan around

Times follow the original source.

  1. Response deadline
    Source wording
    2026-10-30T14:00:00-04:00
From the posting1 agency details · contact information and original wording
Status
awarded
Worth confirming on the posting
View the official posting →Always the authority. An addendum can change any of this after we read it.
Document coverage
3 / 3documents readAll discovered documents read

3 documents found70% of weighted requirement checks reviewed

Before you bid

Review first

Start with these requirements and unresolved points.
  • Must do
    Registrations
    View 2 flagged requirements
    1. Requirement 1 ↗

      The invoice must also include the company letterhead, and this must match the data that is registered in the System for Award Management (SAM) registry.

    2. Requirement 2 ↗

      To access WAWF, the Contractor shall- (1) Have a designated electronic business point of contact in the System for Award Management at https://www.sam.gov; and (2) Be registered to use WAWF at https://wawf.eb.mil/ following the step-by-step procedures for self-registration availa

  • Must do
    Set-aside
    View 2 flagged requirements
    1. Requirement 1 ↗

      HUBZONE

    2. Requirement 2 ↗

      SBA

01

Eligibility & participation

Whether you can bid at all, and what you must already hold.

19 verified6 to confirm

Registrations

5 findings
Requirement 1Verified

THE WORK CONSISTS OF: Furnish all equipment, materials, and labor for the provision and installation of approximately 250 linear feet of new pressure-treated guardrail at Mansfield Hollow Dam, Mansfield, CT in accordance with the following requirements and Statement of Work. The

Applies when: AT THE TIME OF SUBMISSION IN ORDER TO BE CONSIDEREDMust be met by: AT THE TIME OF SUBMISSION IN ORDER TO BE CONSIDERED

View source 1
01notice bodyView official source ↗
“THE WORK CONSISTS OF: Furnish all equipment, materials, and labor for the provision and installation of approximately 250 linear feet of new pressure-treated guardrail at Mansfield Hollow Dam, Mansfield, CT in accordance with the following requirements and Statement of Work. The magnitude of constru”
Requirement 2Verified

The invoice must also include the company letterhead, and this must match the data that is registered in the System for Award Management (SAM) registry.

View source 1
01page 8View official source ↗
“The invoice must also include the company letterhead, and this must match the data that is registered in the System for Award Management (SAM) registry.”
Source page 8

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 8
Requirement 3Verified

To access WAWF, the Contractor shall- (1) Have a designated electronic business point of contact in the System for Award Management at https://www.sam.gov; and (2) Be registered to use WAWF at https://wawf.eb.mil/ following the step-by-step procedures for self-registration availa

View source 1
01page 18View official source ↗
“To access WAWF, the Contractor shall- (1) Have a designated electronic business point of contact in the System for Award Management at https://www.sam.gov; and (2) Be registered to use WAWF at https://wawf.eb.mil/ following the step-by-step procedures for self-registration available at this web site”
Source page 18

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 18
Missing information · 2 checks
Not reviewed

—

Not reviewed — requirement not confirmed

Not found

—

Not found in reviewed sources

Set-aside

5 findings
Requirement 1Verified

SBA

View source 1
01https://sam.gov/api/prod/opps/v2/opportunities/c376b7d331cd43aab54e2ee00315c011 /data2/solicitation/setAsideView official source ↗
“SBA”
Requirement 2Verified

SDVOSB,HUBZONE

Applies when: unless the Contractor waived the price evaluation preferenceA waiver may be available

View source 1
01page 34View official source ↗
“(2) Used the HUBZone price evaluation preference regardless of dollar value, unless the Contractor waived the price evaluation preference; or (3) Was an 8(a), HUBZone, service-disabled veteran-owned, economically disadvantaged women-owned, or women-owned small business set-aside or sole-source award regardless of dolla”
Source page 34

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 34
Requirement 3Verified

HUBZONE

View source 1
01page 35View official source ↗
“venture: .] Each HUBZone small business concern participating in the HUBZone joint venture must be certified as a HUBZone concern. [____Contractor to sign and date and insert”
Source page 35

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 35
Missing information · 2 checks
Not reviewed

—

Not reviewed — requirement not confirmed

Not found

—

Not found in reviewed sources

Small business size

8 findings
Requirement 1Needs confirmation

—

The cited text does not establish a complete USD size standard.

Applies when: AT THE TIME OF SUBMISSION IN ORDER TO BE CONSIDEREDMust be met by: AT THE TIME OF SUBMISSION IN ORDER TO BE CONSIDERED

View source 1
01notice bodyView official source ↗
“THE WORK CONSISTS OF: Furnish all equipment, materials, and labor for the provision and installation of approximately 250 linear feet of new pressure-treated guardrail at Mansfield Hollow Dam, Mansfield, CT in accordance with the following requirements and Statement of Work. The magnitude of constru”
Requirement 2Needs confirmation

—

Needs confirmation

View source 1
01page 33View official source ↗
“Small business concern- (1) Means a concern, including its affiliates, that is independently owned and operated, not dominant in its field of operation, and qualified as a small business under the criteria in 13 CFR part 121 and the size standard in paragraph (c) of this clause.”
Source page 33

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 33
Requirement 3Needs confirmation

—

Needs confirmation

Applies when: If the Contractor represented that it was a small business concern, a small disadvantaged business concern, or a joint venture that was any of the small business concerns identified; prior to award of this contract, the ContMust be met by: prior to award of this contract, the Cont

View source 1
01page 33View official source ↗
“SBA determines affiliation based on the factors set forth at 13 CFR 121.103. (b) If the Contractor represented that it was a small business concern, a small disadvantaged business concern, or a joint venture that was any of the small business concerns identified in 19.000(a)(3) prior to award of thi”
Source page 33

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 33
Requirement 4Needs confirmation

—

Needs confirmation

Applies when: at the time of this rerepresentation that corresponds to the North American Industry ClassificMust be met by: at the time of this rerepresentation that corresponds to the North American Industry Classific

View source 1
01page 34View official source ↗
“(c) The Contractor shall rerepresent its size status in accordance with the size standard in effect at the time of this rerepresentation that corresponds to the North American Industry Classification System (NAICS) code(s) assigned to this contract.”
Source page 34

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 34
Requirement 5Needs confirmation

—

Needs confirmation

View source 1
01page 34View official source ↗
“The small business size standard corresponding to this NAICS code(s) can be found at https://www.sba.gov/document /support--table-size-standards.”
Source page 34

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 34
Requirement 6Needs confirmation

—

Needs confirmation

Applies when: if the acquisit

View source 1
01page 34View official source ↗
“(d) The small business size standard for a Contractor providing an end item that it does not manufacture, process, or produce itself, for a contract other than a construction or service contract, is 500 employees, or 150 employees for information technology value-added resellers under NAICS code 541”
Source page 34

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 34
Missing information · 2 checks
Not reviewed

—

Not reviewed — requirement not confirmed

Not found

—

Not found in reviewed sources

Key personnel

Verified

Government will review key personnel, subcontractor teaming arrangements, documents, and certifications as they relate to the solicitation.

Applies to: subcontractor

View source 1
01page 60View official source ↗
“Government will review key personnel, subcontractor teaming arrangements, documents, and certifications as they relate to the solicitation.”
Source page 60

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 60

Financial capacity

5 findings
Requirement 1Verified

Attach copy of response; if oral, attach summary.] [Include other applicable supporting information.] (End of clause) 52.228-13 Alternative Payment Protections. 2000-07 Alternative Payment Protections (July 2000) (a) The Contractor shall submit one of the following payment protec

Applies when: if oral, attach summary

View source 1
01page 41View official source ↗
“Attach copy of response; if oral, attach summary.] [Include other applicable supporting information.] (End of clause) 52.228-13 Alternative Payment Protections. 2000-07 Alternative Payment Protections (July 2000) (a) The Contractor shall submit one of the following payment protections: Payment Bond ”
Source page 41

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 41
Requirement 2Verified

(i) Payment Bond or (ii) Irrevocable Letter of Credit and

View source 1
01page 55View official source ↗
“(i) Payment Bond or (ii) Irrevocable Letter of Credit and”
Source page 55

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 55
Requirement 3Verified

(iii) Performance Bond A Payment Bond or Irrevocable Letter of Credit is the SELECTED payment protection for the

View source 1
01page 55View official source ↗
“(iii) Performance Bond A Payment Bond or Irrevocable Letter of Credit is the SELECTED payment protection for the”
Source page 55

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 55
Requirement 4Verified

(i) Payment bond or (ii) Irrevocable letter of credit

View source 1
01page 55View official source ↗
“(i) Payment bond or (ii) Irrevocable letter of credit”
Source page 55

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 55
Requirement 5Verified

(ii) Irrevocable letter of credit A Payment Bond or Irrevocable Letter of Credit is the SELECTED payment protection for the

View source 1
01page 55View official source ↗
“(ii) Irrevocable letter of credit A Payment Bond or Irrevocable Letter of Credit is the SELECTED payment protection for the”
Source page 55

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 55

Joint ventures & teaming

6 findings
Requirement 1Verified
SBA determines affiliation based on the factors set forth at 13 CFR 121.103. (b) If the Contractor represented that it was a small business concern, a small disadvantaged business concern, or a joint venture that was any of the small business concerns identified in 19.000(a)(3) pRead full requirement Close full requirement

SBA determines affiliation based on the factors set forth at 13 CFR 121.103. (b) If the Contractor represented that it was a small business concern, a small disadvantaged business concern, or a joint venture that was any of the small business concerns identified in 19.000(a)(3) p

Applies when: If the Contractor represented that it was a small business concern, a small disadvantaged business concern, or a joint venture that was any of the small business concerns identified; prior to award of this contract, the ContMust be met by: prior to award of this contract, the Cont

View source 1
01page 33View official source ↗
“SBA determines affiliation based on the factors set forth at 13 CFR 121.103. (b) If the Contractor represented that it was a small business concern, a small disadvantaged business concern, or a joint venture that was any of the small business concerns identified in 19.000(a)(3) prior to award of thi”
Source page 33

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 33
Requirement 2Verified
(2) [Complete only if the Contractor represented itself as a small business concern in paragraph (g)(1) of this clause.] The Contractor represents that it is, is not, a small disadvantaged business concern as defined in 13 CFR 124.1001. (3) Women-owned small business (WOSB) jointRead full requirement Close full requirement

(2) [Complete only if the Contractor represented itself as a small business concern in paragraph (g)(1) of this clause.] The Contractor represents that it is, is not, a small disadvantaged business concern as defined in 13 CFR 124.1001. (3) Women-owned small business (WOSB) joint

Applies when: if the Contractor represented itself as a small business concern in paragraph (g)(1) of this clause

View source 1
01page 35View official source ↗
“(2) [Complete only if the Contractor represented itself as a small business concern in paragraph (g)(1) of this clause.] The Contractor represents that it is, is not, a small disadvantaged business concern as defined in 13 CFR 124.1001. (3) Women-owned small business (WOSB) joint venture eligible un”
Source page 35

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 35
Requirement 3Verified

identifier of each party to the joint venture: __.]

View source 1
01page 35View official source ↗
“identifier of each party to the joint venture: __.]”
Source page 35

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 35
Requirement 4Verified

identifier of each party to the joint venture: __ .]

View source 1
01page 35View official source ↗
“identifier of each party to the joint venture: __ .]”
Source page 35

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 35
Requirement 5Verified

a HUBZone small business concern. ] The offeror represents, as part of its offer, that It is, is not a HUBZone joint venture that complies with the requirements of 13 CFR 126.616(a) through (c).

View source 1
01page 35View official source ↗
“a HUBZone small business concern. ] The offeror represents, as part of its offer, that It is, is not a HUBZone joint venture that complies with the requirements of 13 CFR 126.616(a) through (c).”
Source page 35

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 35
Requirement 6Verified

venture: .] Each HUBZone small business concern participating in the HUBZone joint venture

View source 1
01page 35View official source ↗
“venture: .] Each HUBZone small business concern participating in the HUBZone joint venture”
Source page 35

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 35

Exclusions & responsibility

Verified

The Offeror shall review the list of excluded parties in the System for Award Management (SAM) at https://www.sam.gov for entities that are excluded when providing any equipment, system, or service to carry out covered missions that uses covered defense telecommunications equipme

Applies when: when providing any equipment, system, or service to carry out covered missions that uses covered defense telecommunications equipment or services as a substantial or essen

View source 1
01page 51View official source ↗
“The Offeror shall review the list of excluded parties in the System for Award Management (SAM) at https://www.sam.gov for entities that are excluded when providing any equipment, system, or service to carry out covered missions that uses covered defense telecommunications equipment or services as a ”
Source page 51

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 51
Missing information4 checks · expand to review

A missing value is not a waiver. Check the source or ask the agency before relying on it.

Required licenses

2 findings
Requirement 1Not found

—

Not found in reviewed sources

Requirement 2Not reviewed

—

Not reviewed — requirement not confirmed

Experience & references

2 findings
Requirement 1Not found

—

Not found in reviewed sources

Requirement 2Not reviewed

—

Not reviewed — requirement not confirmed

2 additional fields have no reviewed finding.

02

Deadlines & submission

When and how to submit, and whether you are still in time.

21 verified10 to confirm

Response deadline

3 findings
Requirement 1Verified

2026-10-30T14:00:00-04:00

View source 1
01https://sam.gov/api/prod/opps/v2/opportunities/c376b7d331cd43aab54e2ee00315c011 /data2/solicitation/deadlines/responseView official source ↗
“2026-10-30T14:00:00-04:00”
Missing information · 2 checks
Not found

—

Not found in reviewed sources

Not reviewed

—

Not reviewed — requirement not confirmed

How to submit

5 findings
Requirement 1Verified

Failure to provide sufficient documentation for Government evaluation for these factors with quote submission shall result in a quote being deemed non-responsive. 4. This work is considered "new". 5. All responsible sources may submit a quote which, if timely received, must be co

Applies when: if timely received, must be considered by the Agency

View source 1
01page 53View official source ↗
“Failure to provide sufficient documentation for Government evaluation for these factors with quote submission shall result in a quote being deemed non-responsive. 4. This work is considered "new". 5. All responsible sources may submit a quote which, if timely received, must be considered by the Agen”
Source page 53

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 53
Requirement 2Verified

QUOTE SUBMISSION: 1. Quotes shall be submitted via email to the Contract Specialist listed above no later than the closing date and time identified in the solicitation or subsequent amendments. 2. The Government is under no obligation to consider any quote received after the soli

Applies when: no later than the closing date and time identified in the solicitation or subsequent amendmenMust be met by: no later than the closing date and time identified in the solicitation or subsequent amendmen

View source 1
01page 54View official source ↗
“QUOTE SUBMISSION: 1. Quotes shall be submitted via email to the Contract Specialist listed above no later than the closing date and time identified in the solicitation or subsequent amendments. 2. The Government is under no obligation to consider any quote received after the solicitation closing dat”
Source page 54

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 54
Requirement 3Verified

2. In accordance with FAR Part 52.204-7(b)(1) Contractors must be registered in the System for Award Management (SAM) database (www.SAM.gov) to submit a quote. Registered is considered

View source 1
01page 56View official source ↗
“2. In accordance with FAR Part 52.204-7(b)(1) Contractors must be registered in the System for Award Management (SAM) database (www.SAM.gov) to submit a quote. Registered is considered”
Source page 56

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 56
Missing information · 2 checks
Not reviewed

—

Not reviewed — requirement not confirmed

Not found

—

Not found in reviewed sources

Procurement contact

11 findings
Requirement 1Verified

Jennifer Samela · jennifer.m.samela@usace.army.mil · 9783188324

View source 1
01https://sam.gov/api/prod/opps/v2/opportunities/c376b7d331cd43aab54e2ee00315c011 /data2/pointOfContact/0View official source ↗
“Jennifer Samela · jennifer.m.samela@usace.army.mil · 9783188324”
Requirement 2Needs confirmation

—

Needs confirmation

View source 2
01page 3View official source ↗
“Point of Contact (POC) Name:”
Source page 3

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 3
02page 4View official source ↗
“Point of Contact (POC) Name:”
Source page 4

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 4
Requirement 3Needs confirmation

—

Needs confirmation

View source 1
01page 5View official source ↗
“W912WJ27QA003 Page 5 of 62 Product specification & SDS sheets 2. Location: The required services shall by performed at the following location: Mansfield Hollow Dam at 141 Mansfield Hollow Road, Mansfield Center, CT 06250. 3. Site Visit: Contact the Technical Point of Contact (TPOC), Park Ranger Mari”
Source page 5

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 5
Requirement 4Needs confirmation

—

Needs confirmation

View source 1
01page 8View official source ↗
“W912WJ27QA003 Page 8 of 62 Authority of the Technical Point of Contact Contractor's Safety Program (including sub-contractors) Accident Prevention Plan and Activity Hazard Analysis Weekly Safety Meetings (Documented on NED Form 251) Accident Reporting (ENG Form 3394) Correspondence, Communication an”
Source page 8

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 8
Requirement 5Needs confirmation

—

Needs confirmation

View source 1
01page 18View official source ↗
“To access WAWF, the Contractor shall- (1) Have a designated electronic business point of contact in the System for Award Management at https://www.sam.gov; and (2) Be registered to use WAWF at https://wawf.eb.mil/ following the step-by-step procedures for self-registration available at this web site”
Source page 18

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 18
Requirement 6Needs confirmation

—

Needs confirmation

View source 1
01page 19View official source ↗
“(Contracting Officer: Insert applicable invoice and receiving report document type(s) for fixed”
Source page 19

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 19
Requirement 7Needs confirmation

—

Needs confirmation

View source 1
01page 19View official source ↗
“(Contracting Officer: Insert either "Invoice 2in1" or the applicable invoice and receiving report”
Source page 19

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 19
Requirement 8Needs confirmation

—

Needs confirmation

Applies when: If multiple ship to/acceptance locations apply, insert "See Schedule" or "Not applicable

View source 1
01page 20View official source ↗
“If multiple ship to/acceptance locations apply, insert "See Schedule" or "Not applicable.") (**Contracting Officer: If the contract provides for progress payments or performance-based payments, insert the DoDAAC for the contract administration office assigned the functions under FAR 42.302(a)(13).) ”
Source page 20

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 20
Requirement 9Needs confirmation

—

Needs confirmation

View source 1
01page 20View official source ↗
“(g) WAWF point of contact.”
Source page 20

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 20
Requirement 10Needs confirmation

—

Needs confirmation

View source 1
01page 20View official source ↗
“(Contracting Officer: Insert applicable information or "Not applicable.")”
Source page 20

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 20
Requirement 11Needs confirmation

—

Needs confirmation

Applies when: If no dates/times for site visits are included in the solicitation, then interested vendors shall contact the Technical Point of Contact as identified in the solicitation to schedule

View source 1
01page 54View official source ↗
“No other dates/times will be permitted for site visits. 3. If no dates/times for site visits are included in the solicitation, then interested vendors shall contact the Technical Point of Contact as identified in the solicitation to schedule a site visit. 4. No site visits will be permitted AFTER a ”
Source page 54

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 54

Grounds for rejection

16 findings
Requirement 1Verified

THE WORK CONSISTS OF: Furnish all equipment, materials, and labor for the provision and installation of approximately 250 linear feet of new pressure-treated guardrail at Mansfield Hollow Dam, Mansfield, CT in accordance with the following requirements and Statement of Work. The

Applies when: AT THE TIME OF SUBMISSION IN ORDER TO BE CONSIDEREDMust be met by: AT THE TIME OF SUBMISSION IN ORDER TO BE CONSIDERED

View source 1
01notice bodyView official source ↗
“THE WORK CONSISTS OF: Furnish all equipment, materials, and labor for the provision and installation of approximately 250 linear feet of new pressure-treated guardrail at Mansfield Hollow Dam, Mansfield, CT in accordance with the following requirements and Statement of Work. The magnitude of constru”
Requirement 2Verified

SOLICITATION SURVEY Solicitation No.: W912WJ27QA003 **ALL INFORMATION MUST BE PROVIDED TO BE COMPLIANT WITH SOLICITATION. Failure to provide a completed solicitation survey will result in quote being deemed non-responsive and removed from consideration** Company Name: SAM CAGE Co

View source 1
01page 1View official source ↗
“SOLICITATION SURVEY Solicitation No.: W912WJ27QA003 **ALL INFORMATION MUST BE PROVIDED TO BE COMPLIANT WITH SOLICITATION. Failure to provide a completed solicitation survey will result in quote being deemed non-responsive and removed from consideration** Company Name: SAM CAGE Code: Address: POC Nam”
Source page 1

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 1
Requirement 3Verified

Failure to provide a completed solicitation survey will result in quote being deemed non-responsive and removed from consideration** Company Name: SAM CAGE Code: Address: POC Name/Phone/Email: Type of Business: Corporation LLC Sole Proprietor Other (describe): INFORMATION SUBMITT

View source 1
01page 1View official source ↗
“Failure to provide a completed solicitation survey will result in quote being deemed non-responsive and removed from consideration** Company Name: SAM CAGE Code: Address: POC Name/Phone/Email: Type of Business: Corporation LLC Sole Proprietor Other (describe): INFORMATION SUBMITTED BELOW SHALL BE TH”
Source page 1

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 1
Requirement 4Verified
6) If you are a prime contractor hiring a Subcontractor, provide the name, POC, and location of the subcontractor (vendors that state “to be determined” or “information provided upon request” will be deemed non-responsive and removed from consideration).Read full requirement Close full requirement

6) If you are a prime contractor hiring a Subcontractor, provide the name, POC, and location of the subcontractor (vendors that state “to be determined” or “information provided upon request” will be deemed non-responsive and removed from consideration).

Applies when: If you are a prime contractor hiring a Subcontractor, provide the name, POC, and location of the subcontractor (vendors that state “to be determined” or “information provided upon re; upon request” will be deemed non-responsive and removed from consideration)Must be met by: upon request” will be deemed non-responsive and removed from consideration)

Applies to: subcontractor

View source 1
01page 2View official source ↗
“6) If you are a prime contractor hiring a Subcontractor, provide the name, POC, and location of the subcontractor (vendors that state “to be determined” or “information provided upon request” will be deemed non-responsive and removed from consideration).”
Source page 2

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 2
Requirement 5Verified
If past performance is that of the subcontractor or you do not have any past performance, identify as such below with the drop downs. Failure to adhere to these requirements will result in quotes being deemed non-responsive.Read full requirement Close full requirement

If past performance is that of the subcontractor or you do not have any past performance, identify as such below with the drop downs. Failure to adhere to these requirements will result in quotes being deemed non-responsive.

Applies when: If past performance is that of the subcontractor or you do not have any past performance, identify as such below with the drop downs

Applies to: subcontractor

View source 1
01page 3View official source ↗
“If past performance is that of the subcontractor or you do not have any past performance, identify as such below with the drop downs. Failure to adhere to these requirements will result in quotes being deemed non-responsive.”
Source page 3

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 3
Requirement 6Verified

Failure to adhere to these requirements will result in quotes being deemed non-responsive.

View source 1
01page 3View official source ↗
“Failure to adhere to these requirements will result in quotes being deemed non-responsive.”
Source page 3

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 3
Requirement 7Verified

FAILURE TO DO SO MAY RESULT IN QUOTES BEING DEEMED NON-RESPONSIVE AND REMOVED FROM CONSIDERATION.

View source 2
01page 4View official source ↗
“FAILURE TO DO SO MAY RESULT IN QUOTES BEING DEEMED NON-RESPONSIVE AND REMOVED FROM CONSIDERATION.”
Source page 4

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 4
02page 53View official source ↗
“Failure to do so may result in quotes being deemed non-responsive and removed from consideration.”
Source page 53

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 53
Requirement 8Verified

USE OF A SOLICITATION SURVEY NOT ISSUED FOR THE RELEVANT SOLICITATION WILL RESULT IN QUOTES BEING DEEMED NON-RESPONSIVE AND REMOVED FROM CONSIDERATION.

View source 1
01page 4View official source ↗
“USE OF A SOLICITATION SURVEY NOT ISSUED FOR THE RELEVANT SOLICITATION WILL RESULT IN QUOTES BEING DEEMED NON-RESPONSIVE AND REMOVED FROM CONSIDERATION.”
Source page 4

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 4
Requirement 9Verified

Failure to provide sufficient documentation for Government evaluation for these factors with quote submission shall result in a quote being deemed non-responsive. 4. This work is considered "new". 5. All responsible sources may submit a quote which, if timely received, must be co

Applies when: if timely received, must be considered by the Agency

View source 1
01page 53View official source ↗
“Failure to provide sufficient documentation for Government evaluation for these factors with quote submission shall result in a quote being deemed non-responsive. 4. This work is considered "new". 5. All responsible sources may submit a quote which, if timely received, must be considered by the Agen”
Source page 53

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 53
Requirement 10Verified

3. Interested vendors shall submit signed copies of all material amendments (SF30) with their quotes. Failure to do so will result in quotes being deemed non-responsive and removed from

View source 1
01page 54View official source ↗
“3. Interested vendors shall submit signed copies of all material amendments (SF30) with their quotes. Failure to do so will result in quotes being deemed non-responsive and removed from”
Source page 54

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 54
Requirement 11Verified

Failure to do so will result in quotes being deemed non-responsive and removed from consideration.

View source 1
01page 54View official source ↗
“Failure to do so will result in quotes being deemed non-responsive and removed from consideration.”
Source page 54

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 54
Requirement 12Verified
Blank entries will not be considered and will result in quotes being deemed non-responsive 3. Failure to complete the Bid Schedule in its entirety and return same with a quote will result in quotes being deemed non-responsive. 4. When Bid Schedules or Contract Line Item Numbers (Read full requirement Close full requirement

Blank entries will not be considered and will result in quotes being deemed non-responsive 3. Failure to complete the Bid Schedule in its entirety and return same with a quote will result in quotes being deemed non-responsive. 4. When Bid Schedules or Contract Line Item Numbers (

Applies when: When Bid Schedules or Contract Line Item Numbers (CLINs) require unit pricing and total am

View source 1
01page 54View official source ↗
“Blank entries will not be considered and will result in quotes being deemed non-responsive 3. Failure to complete the Bid Schedule in its entirety and return same with a quote will result in quotes being deemed non-responsive. 4. When Bid Schedules or Contract Line Item Numbers (CLINs) require unit ”
Source page 54

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 54
Requirement 13Verified

W912WJ27QA003 Page 56 of 62 Failure to provide a Letter of Bond Ability as required will result in the Contractor's quote being deemed non-responsive.

View source 1
01page 56View official source ↗
“W912WJ27QA003 Page 56 of 62 Failure to provide a Letter of Bond Ability as required will result in the Contractor's quote being deemed non-responsive.”
Source page 56

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 56
Requirement 14Verified

W912WJ27QA003 Page 60 of 62 completed, and/or material amendments not signed and returned, the quote will be determined non-responsive, and quote will be eliminated from any further evaluation. ii.

View source 1
01page 60View official source ↗
“W912WJ27QA003 Page 60 of 62 completed, and/or material amendments not signed and returned, the quote will be determined non-responsive, and quote will be eliminated from any further evaluation. ii.”
Source page 60

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 60
Requirement 15Verified

If the quote schedule is not completed, the quote will be determined non-responsive, and quote will be eliminated from any further evaluation. iii.

Applies when: If the quote schedule is not completed, the quote will be determined non-responsive, and quote will be eliminated from any further evaluation

View source 1
01page 60View official source ↗
“If the quote schedule is not completed, the quote will be determined non-responsive, and quote will be eliminated from any further evaluation. iii.”
Source page 60

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 60
Requirement 16Verified

Per solicitation requirements, if the survey included with the solicitation documents is not completed, the quote will be determined non-responsive, and quote will be eliminated from any further evaluation. iv.

Applies when: if the survey included with the solicitation documents is not completed, the quote will be determined non-responsive, and quote will be eliminated from any further evaluation

View source 1
01page 60View official source ↗
“Per solicitation requirements, if the survey included with the solicitation documents is not completed, the quote will be determined non-responsive, and quote will be eliminated from any further evaluation. iv.”
Source page 60

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 60
Missing information8 checks · expand to review

A missing value is not a waiver. Check the source or ask the agency before relying on it.

Questions due

2 findings
Requirement 1Not found

—

Not found in reviewed sources

Requirement 2Not reviewed

—

Not reviewed — requirement not confirmed

Site visit / pre-bid meeting

2 findings
Requirement 1Not found

—

Not found in reviewed sources

Requirement 2Not reviewed

—

Not reviewed — requirement not confirmed

Required submission files

2 findings
Requirement 1Not found

—

Not found in reviewed sources

Requirement 2Not reviewed

—

Not reviewed — requirement not confirmed

Acknowledge amendments

2 findings
Requirement 1Not found

—

Not found in reviewed sources

Requirement 2Not reviewed

—

Not reviewed — requirement not confirmed

6 additional fields have no reviewed finding.

Continue your review

6 more sections are available once you sign in

Pricing & payment · Bonds & insurance · Evaluation & award · Scope & delivery · Labor, sourcing & compliance · Contract terms & risk

Sign in — free

Extracted from the public documents linked above. This is an information aid, not a determination of bid eligibility or legal advice. Verify the original wording and any addenda before submitting a bid.

$25K – $100K
7 days left
See all 5