TRANSPORTATION, DEPARTMENT OF · Medora, ND
ND NP THRO 204(1) Buck Hill Road
- Response deadline
- 11 days left
- Published project value
- $5.0M – $10MAs stated in the source documents
- Solicitation number
- ND NP THRO 204(1)
Dates to plan around
Times follow the original source.
- Response deadline
Source wording
2026-11-03T14:00:00-07:00
From the posting4 agency details · contact information and original wording
13 documents found1 need OCR3 could not be read24% of weighted requirement checks reviewed
Newer source changes have not been verified. Confirm the latest notice and addenda before submitting.
Review first
Start with these requirements and unresolved points.- ConflictJoint ventures & teaming
View 7 flagged requirements
- Requirement 1 ↗
Sources disagree — check both before relying on this
- Requirement 2 ↗
Sources disagree — check both before relying on this
- Requirement 3 ↗
Sources disagree — check both before relying on this
- Requirement 4 ↗
Sources disagree — check both before relying on this
- Requirement 5 ↗
Sources disagree — check both before relying on this
- Requirement 6 ↗
Sources disagree — check both before relying on this
- Requirement 7 ↗
Sources disagree — check both before relying on this
- Requirement 1 ↗
Eligibility & participation
Whether you can bid at all, and what you must already hold.
Registrations
4 findingsNotice of SAM Registration – Offerors or quoters are required to have an active Federal Government contracts registration in the System for Award Management (SAM) when they submit an offer or quotation, and at the time of award.
Applies when: when they submit an offer or quotation, and at the time of award; at the time of awardMust be met by: at the time of award
View source 1
“Notice of SAM Registration – Offerors or quoters are required to have an active Federal Government contracts registration in the System for Award Management (SAM) when they submit an offer or quotation, and at the time of award.”
Source page 5
Page markings may include other requirements. The quotation above identifies this requirement.

(Include area code) 16. REMITTANCE ADDRESS (Include only if different than Item 14) UEI. 17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government in writClose full requirement
(Include area code) 16. REMITTANCE ADDRESS (Include only if different than Item 14) UEI. 17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government in writ
Applies when: if different than Item 14) UEI
View source 1
“(Include area code) 16. REMITTANCE ADDRESS (Include only if different than Item 14) UEI. 17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government in writing with 60 calendar”
Source page 10
Page markings may include other requirements. The quotation above identifies this requirement.

Missing information · 2 checks
—
Not found in reviewed sources
—
Not reviewed — requirement not confirmed
Set-aside
3 findingsNo set-aside specified
View source 1
“NONE”
Missing information · 2 checks
—
Not found in reviewed sources
—
Not reviewed — requirement not confirmed
Small business size
4 findings$45,000,000
View source 1
“Entities are not required to, nor are they able to, update their entity registration to remove these representations in SAM.” Representations and Certifications – This solicitation is issued under NAICS 237310 – Highway, Street & Bridge Construction with a small business size standard of $45 million”
Source page 6
Page markings may include other requirements. The quotation above identifies this requirement.

—
Needs confirmation
Applies to: subcontractor
View source 1
“HUBZone, SDB, WOSB)4 4 List all applicable size standards for each proposed subcontractor.”
Source page 150
Page markings may include other requirements. The quotation above identifies this requirement.

Missing information · 2 checks
—
Not found in reviewed sources
—
Not reviewed — requirement not confirmed
Required licenses
3 findings(3) Copy of a valid blaster license accepted by the state where the project is located for the type of blasting required; and (4) Five references with knowledge of qualifications and reliability.
View source 1
“(3) Copy of a valid blaster license accepted by the state where the project is located for the type of blasting required; and (4) Five references with knowledge of qualifications and reliability.”
Source page 131
Page markings may include other requirements. The quotation above identifies this requirement.

Missing information · 2 checks
—
Not found in reviewed sources
—
Not reviewed — requirement not confirmed
Experience & references
6 findings—
Needs confirmation
Applies when: at least 2 years’ experience in highway construction, inspection, quality control, and m
View source 1
“Furnish a QCM who has at least 2 years’ experience in highway construction, inspection, quality control, and material testing.”
Source page 82
Page markings may include other requirements. The quotation above identifies this requirement.

—
Needs confirmation
Applies when: at least 5 years
View source 1
“(b) A résumé for each individual describing their knowledge and experience providing erosion and sediment control and pollution prevention on highway or road construction projects for at least 5 years.”
Source page 101
Page markings may include other requirements. The quotation above identifies this requirement.

—
Needs confirmation
Applies when: at least 3 years’ experience in wave equation analyses to perform the wave equation anal
View source 1
“Name of the engineer and a résumé describing at least 3 years’ experience in wave equation analyses to perform the wave equation analysis.”
Source page 398
Page markings may include other requirements. The quotation above identifies this requirement.

—
Needs confirmation
Applies when: at least five projects of similar complexity
View source 1
“Name and a résumé describing experience in shotcrete construction on at least five projects of similar complexity.”
Source page 518
Page markings may include other requirements. The quotation above identifies this requirement.

Missing information · 2 checks
—
Not found in reviewed sources
—
Not reviewed — requirement not confirmed
Key personnel
Attach resumes of key personnel as well as the on-site manager(s) and superintendent(s), and specifically identify the following - Present position, responsibility, and length of employment - Amount and type of construction - Amount and type of highway construction experience, inClose full requirement
Attach resumes of key personnel as well as the on-site manager(s) and superintendent(s), and specifically identify the following - Present position, responsibility, and length of employment - Amount and type of construction - Amount and type of highway construction experience, in
Applies to: person
View source 1
“Attach resumes of key personnel as well as the on-site manager(s) and superintendent(s), and specifically identify the following - Present position, responsibility, and length of employment - Amount and type of construction - Amount and type of highway construction experience, including position, re”
Source page 34
Page markings may include other requirements. The quotation above identifies this requirement.

Financial capacity
2 findingsThe Government may require the surety to furnish additional substantiating information concerning its financial capability. 4. Corporations executing the bond shall affix their corporate seals.
Applies to: surety
View source 1
“The Government may require the surety to furnish additional substantiating information concerning its financial capability. 4. Corporations executing the bond shall affix their corporate seals.”
Source page 32
Page markings may include other requirements. The quotation above identifies this requirement.

(b) The bidder shall furnish a bid guarantee in the form of a firm commitment, e.g., bid bond supported by good and sufficient surety or sureties acceptable to the Government, postal money order, certified check, cashier's check, irrevocable letter of credit, or, under Treasury D
Applies to: surety
View source 1
“(b) The bidder shall furnish a bid guarantee in the form of a firm commitment, e.g., bid bond supported by good and sufficient surety or sureties acceptable to the Government, postal money order, certified check, cashier's check, irrevocable letter of credit, or, under Treasury Department regulation”
Source page 40
Page markings may include other requirements. The quotation above identifies this requirement.

Joint ventures & teaming
15 findings—
Conflicting sources
View source 1
“Authority to Bind Joint Venture This certifies that the person signing the proposal has the authority to actually bind the joint venture pursuant to its joint venture agreement, and that each of the named persons listed below individually has full authority to enter into and execute contractual inst”
Source page 24
Page markings may include other requirements. The quotation above identifies this requirement.

—
Conflicting sources
View source 1
“individually has full authority to enter into and execute contractual instruments on behalf of said joint venture, except as follows:”
Source page 24
Page markings may include other requirements. The quotation above identifies this requirement.

—
Conflicting sources
View source 1
“(d) Joint ventures.”
Source page 27
Page markings may include other requirements. The quotation above identifies this requirement.

—
Conflicting sources
View source 1
“Submit a copy of the Joint Venture agreement.”
Source page 27
Page markings may include other requirements. The quotation above identifies this requirement.

—
Conflicting sources
View source 1
“Sign the SF 1442 according to the Joint Venture agreement.”
Source page 27
Page markings may include other requirements. The quotation above identifies this requirement.

—
Conflicting sources
View source 1
“Provide the name of the home office addresses of each of the joint venture partners; indicate which partner is the sponsoring partner.”
Source page 34
Page markings may include other requirements. The quotation above identifies this requirement.

—
Conflicting sources
View source 1
“(c) Joint venture.”
Source page 39
Page markings may include other requirements. The quotation above identifies this requirement.

may be ineligible for award of the contract. (Prime and subcontracting | U.S. Small Business
View source 1
“may be ineligible for award of the contract. (Prime and subcontracting | U.S. Small Business”
Source page 7
Page markings may include other requirements. The quotation above identifies this requirement.

INSTRUCTIONS: When the offeror/principal is a joint venture, include this certification
Applies when: When the offeror/principal is a joint venture, include this certification
View source 1
“INSTRUCTIONS: When the offeror/principal is a joint venture, include this certification”
Source page 24
Page markings may include other requirements. The quotation above identifies this requirement.

B-1 Bid Bond Date Bond Executed (Must Not Be Later OMB Control Number: 9000-0001 (See Instructions on Page 3) Than Bid Opening Date) Expiration Date: 1/31/2027 Principal (Legal Name And Business Address) Type Of Organization ("X" One) Individual Partnership Joint Venture CorporatClose full requirement
B-1 Bid Bond Date Bond Executed (Must Not Be Later OMB Control Number: 9000-0001 (See Instructions on Page 3) Than Bid Opening Date) Expiration Date: 1/31/2027 Principal (Legal Name And Business Address) Type Of Organization ("X" One) Individual Partnership Joint Venture Corporat
View source 1
“B-1 Bid Bond Date Bond Executed (Must Not Be Later OMB Control Number: 9000-0001 (See Instructions on Page 3) Than Bid Opening Date) Expiration Date: 1/31/2027 Principal (Legal Name And Business Address) Type Of Organization ("X" One) Individual Partnership Joint Venture Corporation Other (Specify) ”
Source page 29
Page markings may include other requirements. The quotation above identifies this requirement.

Any person signing in a representative capacity (e.g., an attorney-in-fact) must furnish evidence of authority if that representative is not a member of the firm, partnership, or joint venture, or an officer of the corporation involved. 3. The bond may express penal sum as a perc
Applies when: if that representative is not a member of the firm, partnership, or joint venture, or an officer of the corporation involved
View source 1
“Any person signing in a representative capacity (e.g., an attorney-in-fact) must furnish evidence of authority if that representative is not a member of the firm, partnership, or joint venture, or an officer of the corporation involved. 3. The bond may express penal sum as a percentage of the bid pr”
Source page 31
Page markings may include other requirements. The quotation above identifies this requirement.

If the prospective bidder is a joint venture or general partnership, a separate Bidder's Qualifications form shall be provided individually for each joint venture participant or partner. 1. Name and address of business Name Unique Entity ID (See RFO Provision 52.204-91 Street Emp
Applies when: If the prospective bidder is a joint venture or general partnership, a separate Bidder's Qualifications form shall be provided individually for each joint venture participant or part
View source 1
“If the prospective bidder is a joint venture or general partnership, a separate Bidder's Qualifications form shall be provided individually for each joint venture participant or partner. 1. Name and address of business Name Unique Entity ID (See RFO Provision 52.204-91 Street Employer ID Number (EIN”
Source page 33
Page markings may include other requirements. The quotation above identifies this requirement.

Concern Concern Concern 3. If a Joint Venture or General Partnership:
Applies when: If a Joint Venture or General Partnership:
View source 1
“Concern Concern Concern 3. If a Joint Venture or General Partnership:”
Source page 33
Page markings may include other requirements. The quotation above identifies this requirement.

A HUBZone joint venture agrees that, in the performance of the contract, at least 40 percent of the aggregate work performed by the joint venture shall be completed by the HUBZone small business parties to the joint venture.
Applies when: work performed by the joint venture shall be completed by the HUBZone small business parties to the joint venture; at least 40 percent of the aggregate work performed by the joint venture shall be comple
View source 1
“A HUBZone joint venture agrees that, in the performance of the contract, at least 40 percent of the aggregate work performed by the joint venture shall be completed by the HUBZone small business parties to the joint venture.”
Source page 39
Page markings may include other requirements. The quotation above identifies this requirement.

Work performed by the HUBZone small business parties to the joint venture must be more than administrative functions.
Applies when: Work performed by the HUBZone small business parties to the joint venture
View source 1
“Work performed by the HUBZone small business parties to the joint venture must be more than administrative functions.”
Source page 39
Page markings may include other requirements. The quotation above identifies this requirement.

Exclusions & responsibility
(DEC 2014)(DEVIATION NOV 2025) 52.204-91 Contractor Identification (DEVIATION NOV 2025) 52.209-6 Protecting the Government's Interest When Subcontracting with Contractors Debarred, Suspended, or Proposed for Debarment.
Applies when: When Subcontracting with Contractors Debarred, Suspended, or Proposed for Debarment
View source 1
“(DEC 2014)(DEVIATION NOV 2025) 52.204-91 Contractor Identification (DEVIATION NOV 2025) 52.209-6 Protecting the Government's Interest When Subcontracting with Contractors Debarred, Suspended, or Proposed for Debarment.”
Source page 43
Page markings may include other requirements. The quotation above identifies this requirement.

Prequalification
4 findingsWeld the entire pile cross-section using prequalified AWS groove weld butt joints.
View source 1
“Weld the entire pile cross-section using prequalified AWS groove weld butt joints.”
Source page 406
Page markings may include other requirements. The quotation above identifies this requirement.

Use a prequalified ASTM A775 patching/repair material to patch defects in the coating that are discernible to the unaided eye.
View source 1
“Use a prequalified ASTM A775 patching/repair material to patch defects in the coating that are discernible to the unaided eye.”
Source page 450
Page markings may include other requirements. The quotation above identifies this requirement.

Conform to AASHTO/AWS, Bridge Welding Code D1.5 (D1.5M) for welding, welder qualifications, prequalification of weld details, and inspection of welds.
View source 1
“Conform to AASHTO/AWS, Bridge Welding Code D1.5 (D1.5M) for welding, welder qualifications, prequalification of weld details, and inspection of welds.”
Source page 466
Page markings may include other requirements. The quotation above identifies this requirement.

The mean core grade must not be greater than the maximum permissible value shown in Table 566-1 with no individual core grade greater than 3. When a prequalification test panel is rejected by the CO, a second panel may be shot.Close full requirement
The mean core grade must not be greater than the maximum permissible value shown in Table 566-1 with no individual core grade greater than 3. When a prequalification test panel is rejected by the CO, a second panel may be shot.
Applies when: When a prequalification test panel is rejected by the CO, a second panel may be shot
View source 1
“The mean core grade must not be greater than the maximum permissible value shown in Table 566-1 with no individual core grade greater than 3. When a prequalification test panel is rejected by the CO, a second panel may be shot.”
Source page 522
Page markings may include other requirements. The quotation above identifies this requirement.

1 additional field have no reviewed finding.
Deadlines & submission
When and how to submit, and whether you are still in time.
Response deadline
3 findings2026-11-03T14:00:00-07:00
View source 1
“2026-11-03T14:00:00-07:00”
Missing information · 2 checks
—
Not found in reviewed sources
—
Not reviewed — requirement not confirmed
How to submit
4 findingsSubmit the bid guarantee on SF 24, Bid Bond.
View source 1
“Submit the bid guarantee on SF 24, Bid Bond.”
Source page 28
Page markings may include other requirements. The quotation above identifies this requirement.

ATTACHMENT 1 – FHWA SUBCONTRACTING PLAN 1. INSTRUCTIONS: • Where subcontracting opportunities will not exist for the solicitation, the bidder/offeror shall submit a response outlining the rationale for making this determination with its proposal/bid.
View source 1
“ATTACHMENT 1 – FHWA SUBCONTRACTING PLAN 1. INSTRUCTIONS: • Where subcontracting opportunities will not exist for the solicitation, the bidder/offeror shall submit a response outlining the rationale for making this determination with its proposal/bid.”
Source page 149
Page markings may include other requirements. The quotation above identifies this requirement.

Submit a proposal for approval for other correction methods not listed above. 282
View source 1
“Submit a proposal for approval for other correction methods not listed above. 282”
Source page 298
Page markings may include other requirements. The quotation above identifies this requirement.

Missing information · 1 check
—
Not reviewed — requirement not confirmed
Required submission files
3 findingsATTACHMENT 1 – FHWA SUBCONTRACTING PLAN 1. INSTRUCTIONS: • Where subcontracting opportunities will not exist for the solicitation, the bidder/offeror shall submit a response outlining the rationale for making this determination with its proposal/bid.
View source 1
“ATTACHMENT 1 – FHWA SUBCONTRACTING PLAN 1. INSTRUCTIONS: • Where subcontracting opportunities will not exist for the solicitation, the bidder/offeror shall submit a response outlining the rationale for making this determination with its proposal/bid.”
Source page 149
Page markings may include other requirements. The quotation above identifies this requirement.

Missing information · 2 checks
—
Not found in reviewed sources
—
Not reviewed — requirement not confirmed
Acknowledge amendments
3 findingsItem 19: ACKNOWLEDGMENT OF AMENDMENTS: FAILURE TO
View source 1
“Item 19: ACKNOWLEDGMENT OF AMENDMENTS: FAILURE TO”
Source page 11
Page markings may include other requirements. The quotation above identifies this requirement.

Missing information · 2 checks
—
Not found in reviewed sources
—
Not reviewed — requirement not confirmed
Procurement contact
Kelly Palmer · cflacquisitions@dot.gov
View source 1
“Kelly Palmer · cflacquisitions@dot.gov”
Bid opening
6 findings—
Needs confirmation
Applies when: If this is a sealed bid solicitation, offers will be publicly opened at that time
View source 1
“If this is a sealed bid solicitation, offers will be publicly opened at that time.”
Source page 9
Page markings may include other requirements. The quotation above identifies this requirement.

—
Needs confirmation
Applies when: within 14 days after the opening of bidsMust be met by: within 14 days after the opening of bids
Applies to: surety
View source 1
“Furnish documentary evidence as to the ownership and value of the assets pledged in support of the bond and details of the security interest in the assets by the individual sureties for the apparent low bidder within 14 days after the opening of bids.”
Source page 28
Page markings may include other requirements. The quotation above identifies this requirement.

—
Needs confirmation
View source 1
“Section 102 102.05 Public Opening of Bids.”
Source page 29
Page markings may include other requirements. The quotation above identifies this requirement.

—
Needs confirmation
View source 1
“Bids will be publicly opened at the time specified in the SF 1442, Solicitation, Offer, and Award.”
Source page 29
Page markings may include other requirements. The quotation above identifies this requirement.

—
Needs confirmation
View source 1
“(SEP 1996) (a) Failure to furnish a bid guarantee in the proper form and amount, by the time set for opening of bids, may be cause for rejection of the bid.”
Source page 40
Page markings may include other requirements. The quotation above identifies this requirement.

—
Needs confirmation
Applies when: upon execution of contractual documents and bonds (including any necessary coinsuranMust be met by: upon execution of contractual documents and bonds (including any necessary coinsuran
View source 1
“The Contracting Officer will return bid guarantees, other than bid bonds - (1) To unsuccessful bidders as soon as practicable after the opening of bids; and (2) To the successful bidder upon execution of contractual documents and bonds (including any necessary coinsurance or reinsurance agreements),”
Source page 40
Page markings may include other requirements. The quotation above identifies this requirement.

Mandatory forms
3 findingsSubmit a printed copy of your bid to the address listed on the SF-1442 (Page A-1, Item 8).
View source 1
“Submit a printed copy of your bid to the address listed on the SF-1442 (Page A-1, Item 8).”
Source page 4
Page markings may include other requirements. The quotation above identifies this requirement.

Submit the following documents with your Bid Package– • SF-1442, Solicitation, Offer & Award, Pages A-1 and A-2 • Indication of interest in formal Partnering, Page A-5 • Bid Schedule Pages A-6 through A-12 • Completed an applicable Authority to Bind certificate, pages A-13 througClose full requirement
Submit the following documents with your Bid Package– • SF-1442, Solicitation, Offer & Award, Pages A-1 and A-2 • Indication of interest in formal Partnering, Page A-5 • Bid Schedule Pages A-6 through A-12 • Completed an applicable Authority to Bind certificate, pages A-13 throug
View source 1
“Submit the following documents with your Bid Package– • SF-1442, Solicitation, Offer & Award, Pages A-1 and A-2 • Indication of interest in formal Partnering, Page A-5 • Bid Schedule Pages A-6 through A-12 • Completed an applicable Authority to Bind certificate, pages A-13 through A-17 • Buy America”
Source page 4
Page markings may include other requirements. The quotation above identifies this requirement.

Item 19: ACKNOWLEDGMENT OF AMENDMENTS: FAILURE TO ACKNOWLEDGE AMENDMENTS, IN ITEM 19 OF THE SF-1442, BY THE DESIGNATED DATE AND HOUR SPECIFIED IN THE SOLICITATION MAY RESULT IN REJECTION OF YOUR BID.
View source 1
“Item 19: ACKNOWLEDGMENT OF AMENDMENTS: FAILURE TO ACKNOWLEDGE AMENDMENTS, IN ITEM 19 OF THE SF-1442, BY THE DESIGNATED DATE AND HOUR SPECIFIED IN THE SOLICITATION MAY RESULT IN REJECTION OF YOUR BID.”
Source page 11
Page markings may include other requirements. The quotation above identifies this requirement.

Grounds for rejection
5 findingsPhotocopies and Faxed copies are NOT acceptable and will make your bid non-responsive.
View source 1
“Photocopies and Faxed copies are NOT acceptable and will make your bid non-responsive.”
Source page 4
Page markings may include other requirements. The quotation above identifies this requirement.

Failure of the surety to respond with the requested documentation within 7 days of receipt of the request is cause for rejection of the surety.
Applies when: within 7 days of receipt of the request is cause for rejection of the suretyMust be met by: within 7 days of receipt of the request is cause for rejection of the surety
Applies to: surety
View source 1
“Failure of the surety to respond with the requested documentation within 7 days of receipt of the request is cause for rejection of the surety.”
Source page 28
Page markings may include other requirements. The quotation above identifies this requirement.

Any material misstatement by the surety, overstatement of assets (either as to ownership or value), or understatement of liabilities is cause for rejection of the surety.
Applies to: surety
View source 1
“Any material misstatement by the surety, overstatement of assets (either as to ownership or value), or understatement of liabilities is cause for rejection of the surety.”
Source page 28
Page markings may include other requirements. The quotation above identifies this requirement.

Failure of the surety to accept such mail or failure of the surety to respond with the requested information or documents within 7 days of receipt of the request; will be cause for rejection of the surety.
Applies when: within 7 days of receipt of the requestMust be met by: within 7 days of receipt of the request
Applies to: surety
View source 1
“Failure of the surety to accept such mail or failure of the surety to respond with the requested information or documents within 7 days of receipt of the request; will be cause for rejection of the surety.”
Source page 28
Page markings may include other requirements. The quotation above identifies this requirement.

(SEP 1996) (a) Failure to furnish a bid guarantee in the proper form and amount, by the time set for opening of bids, may be cause for rejection of the bid.
View source 1
“(SEP 1996) (a) Failure to furnish a bid guarantee in the proper form and amount, by the time set for opening of bids, may be cause for rejection of the bid.”
Source page 40
Page markings may include other requirements. The quotation above identifies this requirement.

Missing information4 checks · expand to review
A missing value is not a waiver. Check the source or ask the agency before relying on it.
Questions due
2 findings—
Not found in reviewed sources
—
Not reviewed — requirement not confirmed
Site visit / pre-bid meeting
2 findings—
Not found in reviewed sources
—
Not reviewed — requirement not confirmed
4 additional fields have no reviewed finding.
6 more sections are available once you sign in
Pricing & payment · Bonds & insurance · Evaluation & award · Scope & delivery · Labor, sourcing & compliance · Contract terms & risk
Sign in — freeExtracted from the public documents linked above. This is an information aid, not a determination of bid eligibility or legal advice. Verify the original wording and any addenda before submitting a bid.