VETERANS AFFAIRS, DEPARTMENT OF · Spokane, WA
Z1DA--CON-NRM-668-22-106 Correct Domestic Water System
- Response deadline
- 31 days left
- Published project value
- Not confirmedCheck the pricing and payment terms below.
- Solicitation number
- 36C26027R0014
Dates to plan around
Times follow the original source.
- Response deadline
Source wording
2026-11-23T12:00:00-08:00
14 documents found4 partially read3 could not be read10% of weighted requirement checks reviewed
Newer source changes have not been verified. Confirm the latest notice and addenda before submitting.
Review first
Start with these requirements and unresolved points.- Must doJoint ventures & teaming
View 1 flagged requirement
- Requirement 1 ↗
1.12.7. Notice to SDVOSB Joint Venture: Joint Venture Certification - Any offeror submitting a proposal as a joint venture must provide a certification from each SDVOSB joint partner, signed by an authorized official of each partner to the joint venture, stating that the parties
- Requirement 1 ↗
- Must doRegistrations
View 1 flagged requirement
- Requirement 1 ↗
(d) The offeror shall post the information in paragraphs (c)(1)(i) through (c)(1)(iv) of this provision in FAPIIS as required through maintaining an active registration in the System for Award Management, which can be accessed via https://www.sam.gov (see 52.204-7).
- Requirement 1 ↗
- Must doSet-aside
SDVOSBC
Eligibility & participation
Whether you can bid at all, and what you must already hold.
Registrations
2 findings(d) The offeror shall post the information in paragraphs (c)(1)(i) through (c)(1)(iv) of this provision in FAPIIS as required through maintaining an active registration in the System for Award Management, which can be accessed via https://www.sam.gov (see 52.204-7).
View source 1
“(d) The offeror shall post the information in paragraphs (c)(1)(i) through (c)(1)(iv) of this provision in FAPIIS as required through maintaining an active registration in the System for Award Management, which can be accessed via https://www.sam.gov (see 52.204-7).”
Missing information · 1 check
—
Not reviewed — requirement not confirmed
Set-aside
5 findingsSDVOSBC
View source 1
“SDVOSBC”
SDVOSB
View source 1
“This acquisition is a 100% set-aside for Service-Disabled Veteran-Owned Small Business (SDVOSB) concerns.”
SDVOSB,HUBZONE
Applies when: unless the Contractor waived the price evaluation preferenceA waiver may be available
View source 1
“(2) Used the HUBZone price evaluation preference regardless of dollar value, unless the Contractor waived the price evaluation preference; or (3) Was an 8(a), HUBZone, service-disabled veteran-owned, economically disadvantaged women-owned, or women-owned small business set-aside or sole-source award regardless of dolla”
HUBZONE
Applies when: if the offeror is a HUBZone small business concern
View source 1
“(6) HUBZone joint venture eligible under the HUBZone Program.[ Complete only if the offeror is a HUBZone small business concern.] The offeror represents, as part of its offer, that it [ ] is, [ ] is not a HUBZone joint venture that complies with the requirements of 13 CFR 126.616(a) through (c). [ The Contractor shall”
Missing information · 1 check
—
Not reviewed — requirement not confirmed
Small business size
10 findings—
Needs confirmation
Applies when: within the clause, and the printed name of signee, date, and company name/address, atMust be met by: within the clause, and the printed name of signee, date, and company name/address, at
View source 1
“1.12.8. Limitations on Subcontracting Certificate of Compliance: VAAR 852.219-75, VA NOTICE OF LIMITATIONS ON SUBCONTRACTING—CERTIFICATE OF COMPLIANCE FOR SERVICES AND CONSTRUCTION (JAN 2023) (DEVIATION) is incorporated into this amendment. All offerors must return the entire clause, in full text, w”
—
Needs confirmation
View source 1
“Small business concern, as used in this clause— (1) Means a concern, including its affiliates, that is independently owned and operated, not dominant in the field of operation in which it is bidding on Government contracts, and qualified as a small business under the size standards in this solicitat”
—
Needs confirmation
View source 1
“SBA determines affiliation based on the factors set forth at 13 CFR 121.103. (b) Applicability.”
—
Needs confirmation
View source 1
“(2) Is considered small for the size standard under the North American Industry Classification System (NAICS) code the prime contractor assigned to the subcontract.”
—
Needs confirmation
View source 1
“Small business concern— (1) Means a concern, including its affiliates, that is independently owned and operated, not dominant in its field of operation, and qualified as a small business under the criteria in 13 CFR part 121 and the size standard in paragraph (d) of this clause.”
—
Needs confirmation
Applies when: If the Contractor represented that it was any of the small business concerns identified in 19; prior to award of this contract, the Contractor shall rerepresent its size and socioeconMust be met by: prior to award of this contract, the Contractor shall rerepresent its size and socioecon
View source 1
“SBA determines affiliation based on the factors set forth at 13 CFR 121.103. (b) If the Contractor represented that it was any of the small business concerns identified in 19.000(a)(3) prior to award of this contract, the Contractor shall rerepresent its size and socioeconomic status according to pa”
—
Needs confirmation
Applies when: at the time of this representation that corresponds to the North American Industry ClassificatMust be met by: at the time of this representation that corresponds to the North American Industry Classificat
View source 1
“(c) The Contractor shall represent its size status in accordance with the size standard in effect at the time of this representation that corresponds to the North American Industry Classification System (NAICS) code(s) assigned to this contract.”
—
Needs confirmation
View source 1
“The small business size standard corresponding to this NAICS code(s) can be found at https://www.sba.gov/document/support--table-size-standards.”
—
Needs confirmation
Applies when: if the acquisit
View source 1
“(d) The small business size standard for a Contractor providing an end item that it does not manufacture, process, or produce itself, for a contract other than a construction or service contract, is 500 employees, or 150 employees for information technology value-added resellers under NAICS code 541”
Missing information · 1 check
—
Not reviewed — requirement not confirmed
Financial capacity
(b) The bidder shall furnish a bid guarantee in the form of a firm commitment, e.g., bid bond supported by good and sufficient surety or sureties acceptable to the Government, postal money order, certified check, cashier's check, irrevocable letter of credit, or, under Treasury D
Applies to: surety
View source 1
“(b) The bidder shall furnish a bid guarantee in the form of a firm commitment, e.g., bid bond supported by good and sufficient surety or sureties acceptable to the Government, postal money order, certified check, cashier's check, irrevocable letter of credit, or, under Treasury Department regulation”
Joint ventures & teaming
10 findings1.12.7. Notice to SDVOSB Joint Venture:
View source 1
“1.12.7. Notice to SDVOSB Joint Venture:”
1) Have entered into a joint venture agreement that fully complies with paragraph (c) of 13 CFR § 128.402; and
View source 1
“1) Have entered into a joint venture agreement that fully complies with paragraph (c) of 13 CFR § 128.402; and”
2) Will perform the contract in compliance with the joint venture agreement.
View source 1
“2) Will perform the contract in compliance with the joint venture agreement.”
(g) A joint venture agrees that, in the performance of the contract, the applicable percentage specified in paragraph (e) of this clause will be performed by the aggregate of the joint venture participants.
View source 1
“(g) A joint venture agrees that, in the performance of the contract, the applicable percentage specified in paragraph (e) of this clause will be performed by the aggregate of the joint venture participants.”
1.12.7. Notice to SDVOSB Joint Venture: Joint Venture Certification - Any offeror submitting a proposal as a joint venture must provide a certification from each SDVOSB joint partner, signed by an authorized official of each partner to the joint venture, stating that the parties
View source 1
“1.12.7. Notice to SDVOSB Joint Venture: Joint Venture Certification - Any offeror submitting a proposal as a joint venture must provide a certification from each SDVOSB joint partner, signed by an authorized official of each partner to the joint venture, stating that the parties to the joint venture”
1.12.8. Limitations on Subcontracting Certificate of Compliance: VAAR 852.219-75, VA NOTICE OF LIMITATIONS ON SUBCONTRACTING—CERTIFICATE OF COMPLIANCE FOR SERVICES AND CONSTRUCTION (JAN 2023) (DEVIATION) is incorporated into this amendment. All offerors must return the entire cla
Applies when: within the clause, and the printed name of signee, date, and company name/address, atMust be met by: within the clause, and the printed name of signee, date, and company name/address, at
View source 1
“1.12.8. Limitations on Subcontracting Certificate of Compliance: VAAR 852.219-75, VA NOTICE OF LIMITATIONS ON SUBCONTRACTING—CERTIFICATE OF COMPLIANCE FOR SERVICES AND CONSTRUCTION (JAN 2023) (DEVIATION) is incorporated into this amendment. All offerors must return the entire clause, in full text, w”
(1) In a joint venture comprised of a small business protégé and its mentor approved by the Small Business Administration, the small business protégé shall perform at least 40 percent of the work performed by the joint venture.
Applies when: In a joint venture; at least 40 percent of the work performed by the joint venture
View source 1
“(1) In a joint venture comprised of a small business protégé and its mentor approved by the Small Business Administration, the small business protégé shall perform at least 40 percent of the work performed by the joint venture.”
Work performed by the small business protégé in the joint venture must be more than administrative functions.
Applies when: Work performed by the small business protégé in the joint venture
View source 1
“Work performed by the small business protégé in the joint venture must be more than administrative functions.”
(2) In an 8(a) joint venture, the 8(a) participant(s) shall perform at least 40 percent of the work performed by the joint venture.
Applies when: In an 8(a) joint venture; at least 40 percent of the work performed by the joint venture
View source 1
“(2) In an 8(a) joint venture, the 8(a) participant(s) shall perform at least 40 percent of the work performed by the joint venture.”
Work performed by the 8(a) participants in the joint venture must be more than administrative functions.
Applies when: Work performed by the 8(a) participants in the joint venture
View source 1
“Work performed by the 8(a) participants in the joint venture must be more than administrative functions.”
Missing information4 checks · expand to review
A missing value is not a waiver. Check the source or ask the agency before relying on it.
Required licenses
2 findings—
Not reviewed — requirement not confirmed
—
Not found in reviewed sources
Experience & references
2 findings—
Not reviewed — requirement not confirmed
—
Not found in reviewed sources
4 additional fields have no reviewed finding.
Deadlines & submission
When and how to submit, and whether you are still in time.
Response deadline
3 findings2026-11-23T12:00:00-08:00
View source 1
“2026-11-23T12:00:00-08:00”
Missing information · 2 checks
—
Not reviewed — requirement not confirmed
—
Not found in reviewed sources
How to submit
6 findingsMeet – Building 5, Engineering Conference Room *Assistance call 509-434-7466 GENERAL SUBMISSION REQUIREMENTS 1.1.1. Proposals must be submitted electronically via e-mail to the POCs noted in the Formal Communications paragraph no later than November 23, 2026, at 12 PM Pacific Tim
Applies when: no later than November 23, 2026, at 12 PM Pacific TimeMust be met by: no later than November 23, 2026, at 12 PM Pacific Time
View source 1
“Meet – Building 5, Engineering Conference Room *Assistance call 509-434-7466 GENERAL SUBMISSION REQUIREMENTS 1.1.1. Proposals must be submitted electronically via e-mail to the POCs noted in the Formal Communications paragraph no later than November 23, 2026, at 12 PM Pacific Time.”
No hard copies of proposals will be accepted (hand delivered or traditional mail).
View source 1
“No hard copies of proposals will be accepted (hand delivered or traditional mail).”
1.1.4. Proposal shall be submitted in three (3) separate Volumes with strict adherence to the format, data, and other requirements of this Solicitation:
View source 1
“1.1.4. Proposal shall be submitted in three (3) separate Volumes with strict adherence to the format, data, and other requirements of this Solicitation:”
A proposal that merely reiterates or promises to accomplish the requirements of the RFP may be considered unacceptable. 1.6. Offerors are reminded of their responsibility to submit a proposal that is orderly and sufficiently documented that will enable the Government to easily unClose full requirement
A proposal that merely reiterates or promises to accomplish the requirements of the RFP may be considered unacceptable. 1.6. Offerors are reminded of their responsibility to submit a proposal that is orderly and sufficiently documented that will enable the Government to easily un
View source 1
“A proposal that merely reiterates or promises to accomplish the requirements of the RFP may be considered unacceptable. 1.6. Offerors are reminded of their responsibility to submit a proposal that is orderly and sufficiently documented that will enable the Government to easily understand and perform”
1.8. All proposals must be submitted electronically. Hard copies or facsimile proposals will not be accepted.
View source 1
“1.8. All proposals must be submitted electronically. Hard copies or facsimile proposals will not be accepted.”
Missing information · 1 check
—
Not reviewed — requirement not confirmed
Required submission files
2 findingsOfferors who do not follow submission instructions may not be evaluated and considered ineligible for award. 1.1.4. Proposal shall be submitted in three (3) separate Volumes with strict adherence to the format, data, and other requirements of this Solicitation: Volume 1 – TechnicClose full requirement
Offerors who do not follow submission instructions may not be evaluated and considered ineligible for award. 1.1.4. Proposal shall be submitted in three (3) separate Volumes with strict adherence to the format, data, and other requirements of this Solicitation: Volume 1 – Technic
View source 1
“Offerors who do not follow submission instructions may not be evaluated and considered ineligible for award. 1.1.4. Proposal shall be submitted in three (3) separate Volumes with strict adherence to the format, data, and other requirements of this Solicitation: Volume 1 – Technical Proposal Volume 2”
Missing information · 1 check
—
Not reviewed — requirement not confirmed
Procurement contact
Brenda R Bigelow, Contractor · Brenda.Bigelow1@va.gov
View source 1
“Brenda R Bigelow, Contractor · Brenda.Bigelow1@va.gov”
Bid opening
3 findings—
Needs confirmation
Applies when: at least 20 percent of the bid price but shall not exceed $2 million
View source 1
“1.12.3. A Bid Guarantee, SF 24, is required. The amount shall be adequate to protect the RFO Government from loss should the successful bidder fail to execute further contractual documents and bonds as required. The bid guarantee amount shall be at least 20 percent of the bid price but shall not exc”
—
Needs confirmation
View source 1
“(End of Provision) 2.6 52.228-1 BID GUARANTEE (SEP 1996) (a) Failure to furnish a bid guarantee in the proper form and amount, by the time set for opening of bids, may be cause for rejection of the bid.”
—
Needs confirmation
View source 1
“The Contracting Officer will return bid guarantees, other than bid bonds— (1) To unsuccessful bidders as soon as practicable after the opening of bids; and”
Formatting & signatures
3 findingsOfferors may not submit any past performance information on projects not listed in Volume 1. Page limitation shall not exceed 25 pages.
View source 1
“Offerors may not submit any past performance information on projects not listed in Volume 1. Page limitation shall not exceed 25 pages.”
1.12.7. Notice to SDVOSB Joint Venture: Joint Venture Certification - Any offeror submitting a proposal as a joint venture must provide a certification from each SDVOSB joint partner, signed by an authorized official of each partner to the joint venture, stating that the parties
View source 1
“1.12.7. Notice to SDVOSB Joint Venture: Joint Venture Certification - Any offeror submitting a proposal as a joint venture must provide a certification from each SDVOSB joint partner, signed by an authorized official of each partner to the joint venture, stating that the parties to the joint venture”
1.12.8. Limitations on Subcontracting Certificate of Compliance: VAAR 852.219-75, VA NOTICE OF LIMITATIONS ON SUBCONTRACTING—CERTIFICATE OF COMPLIANCE FOR SERVICES AND CONSTRUCTION (JAN 2023) (DEVIATION) is incorporated into this amendment. All offerors must return the entire cla
Applies when: within the clause, and the printed name of signee, date, and company name/address, atMust be met by: within the clause, and the printed name of signee, date, and company name/address, at
View source 1
“1.12.8. Limitations on Subcontracting Certificate of Compliance: VAAR 852.219-75, VA NOTICE OF LIMITATIONS ON SUBCONTRACTING—CERTIFICATE OF COMPLIANCE FOR SERVICES AND CONSTRUCTION (JAN 2023) (DEVIATION) is incorporated into this amendment. All offerors must return the entire clause, in full text, w”
Mandatory forms
1.12.1. SF1442, completed and signed. Note: Contractor’s signature shall be in accordance with RFO Part 4.102 (e.g., proper signature and format of person who is able to bind an individual, partnership, corporation, etc.).
View source 1
“1.12.1. SF1442, completed and signed. Note: Contractor’s signature shall be in accordance with RFO Part 4.102 (e.g., proper signature and format of person who is able to bind an individual, partnership, corporation, etc.).”
Alternate proposals
2 findingsDEDUCT ALTERNATE NO.1: BASE Offer except omit work indicated in contract drawings identified as being included in bid alternate 1. This includes work related to the installation of pressure sensors in Building 1 Basement identified on separate bid deduct alternate schedule, instaClose full requirement
DEDUCT ALTERNATE NO.1: BASE Offer except omit work indicated in contract drawings identified as being included in bid alternate 1. This includes work related to the installation of pressure sensors in Building 1 Basement identified on separate bid deduct alternate schedule, insta
View source 1
“DEDUCT ALTERNATE NO.1: BASE Offer except omit work indicated in contract drawings identified as being included in bid alternate 1. This includes work related to the installation of pressure sensors in Building 1 Basement identified on separate bid deduct alternate schedule, installation of pressure ”
DEDUCT ALTERNATE NO.2: BASE Offer except omit work indicated to be part of bid deduct alternate 2 on drawings PD-118, PD-120, PL-117, and PL-119. This includes work related demolition in areas of Building 12 as identified on drawings PD-118 and PD-120 by the bid deduct alternate Close full requirement
DEDUCT ALTERNATE NO.2: BASE Offer except omit work indicated to be part of bid deduct alternate 2 on drawings PD-118, PD-120, PL-117, and PL-119. This includes work related demolition in areas of Building 12 as identified on drawings PD-118 and PD-120 by the bid deduct alternate
View source 1
“DEDUCT ALTERNATE NO.2: BASE Offer except omit work indicated to be part of bid deduct alternate 2 on drawings PD-118, PD-120, PL-117, and PL-119. This includes work related demolition in areas of Building 12 as identified on drawings PD-118 and PD-120 by the bid deduct alternate keyed note. This als”
Grounds for rejection
(End of Provision) 2.6 52.228-1 BID GUARANTEE (SEP 1996) (a) Failure to furnish a bid guarantee in the proper form and amount, by the time set for opening of bids, may be cause for rejection of the bid.
View source 1
“(End of Provision) 2.6 52.228-1 BID GUARANTEE (SEP 1996) (a) Failure to furnish a bid guarantee in the proper form and amount, by the time set for opening of bids, may be cause for rejection of the bid.”
Missing information6 checks · expand to review
A missing value is not a waiver. Check the source or ask the agency before relying on it.
Questions due
2 findings—
Not reviewed — requirement not confirmed
—
Not found in reviewed sources
Site visit / pre-bid meeting
2 findings—
Not reviewed — requirement not confirmed
—
Not found in reviewed sources
Acknowledge amendments
2 findings—
Not reviewed — requirement not confirmed
—
Not found in reviewed sources
2 additional fields have no reviewed finding.
6 more sections are available once you sign in
Pricing & payment · Bonds & insurance · Evaluation & award · Scope & delivery · Labor, sourcing & compliance · Contract terms & risk
Sign in — freeExtracted from the public documents linked above. This is an information aid, not a determination of bid eligibility or legal advice. Verify the original wording and any addenda before submitting a bid.