VETERANS AFFAIRS, DEPARTMENT OF · Saint Louis, MO

657-26-602 Create Observation Unit JC

10 source documentsSource checked Oct 18Content updated
Open notice
Response deadline
Not confirmed
Confirm the deadline with the buyer.
Published project value
$500K – $1.0M
As stated in the source documents
Solicitation number
36C25526R0162
View official posting ↗Review requirements ↓Original posting details are available below.

Dates to plan around

Times follow the original source.

  1. Response deadline — conflicting source time; verify with buyer
    Source wording
    PROPOSAL DUE DATE: August 25, 2026, at 2PM
    Page 10
  2. Response deadline — conflicting source time; verify with buyer
    Source wording
    2026-10-26T14:00:00-05:00
From the posting2 agency details · contact information and original wording
Job walk location
Saint Louis VAMC Building #16, Room #B201 on the 2nd Floor at 10:00AM CST. The building is located directly across from the
View the official posting →Always the authority. An addendum can change any of this after we read it.
Document coverage
10 / 10documents readAll discovered documents read

10 documents found62% of weighted requirement checks reviewed

Before you bid

Review first

Start with these requirements and unresolved points.
  • Must do
    Joint ventures & teaming
    View 1 flagged requirement
    1. Requirement 1 ↗

      All contractors and joint ventures must be registered in SAM and VetBiz by the proposal due date in order to be eligible for award.

  • Must do
    Registrations
    View 4 flagged requirements
    1. Requirement 1 ↗

      All contractors and joint ventures must be registered in SAM and VetBiz by the proposal due date in order to be eligible for award.

    2. Requirement 2 ↗

      The offeror will be required to provide consent for TIN validation to the Government as a part of the SAM registration process; and (4) The Government has marked the record “Active”.

    3. Requirement 3 ↗

      (2) The Offeror shall enter, in the block with its name and address on the cover page of its offer, the annotation ‘‘Unique Entity Identifier’’ followed by the unique entity identifier that identifies the Offeror’s name and address exactly as stated in the offer.

    4. Requirement 4 ↗

      (d) The offeror shall post the information in paragraphs (c)(1)(i) through (c)(1)(iv) of this provision in FAPIIS as required through maintaining an active registration in the System for Award Management, which can be accessed via https://www.sam.gov (see 52.204-7).

  • Must do
    Set-aside

    SDVOSBS

  • Conflict
    Experience & references
    View 2 flagged requirements
    1. Requirement 1 ↗

      Sources disagree — check both before relying on this

    2. Requirement 2 ↗

      Sources disagree — check both before relying on this

  • Conflict
    Response deadline
    View 2 flagged requirements
    1. Requirement 1 ↗

      Sources disagree — check both before relying on this

    2. Requirement 2 ↗

      Sources disagree — check both before relying on this

01

Eligibility & participation

Whether you can bid at all, and what you must already hold.

27 verified17 to confirm

Registrations

7 findings
Requirement 1Verified

All contractors and joint ventures must be registered in SAM and VetBiz by the proposal due date in order to be eligible for award.

View source 1
01page 1View official source ↗
“All contractors and joint ventures must be registered in SAM and VetBiz by the proposal due date in order to be eligible for award.”
Source page 1

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 1
Requirement 2Verified

The offeror will be required to provide consent for TIN validation to the Government as a part of the SAM registration process; and (4) The Government has marked the record “Active”.

View source 1
01page 40View official source ↗
“The offeror will be required to provide consent for TIN validation to the Government as a part of the SAM registration process; and (4) The Government has marked the record “Active”.”
Source page 40

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 40
Requirement 3Verified

(b)(1) An Offeror is required to be registered in SAM when submitting an offer or quotation and at time of award (see FAR clause 52.204–13, System for Award Management Maintenance, for the requirement to maintain SAM registration during performance and through final payment).

Applies when: when submitting an offer or quotation and at time of award (see FAR clause 52

View source 1
01page 40View official source ↗
“(b)(1) An Offeror is required to be registered in SAM when submitting an offer or quotation and at time of award (see FAR clause 52.204–13, System for Award Management Maintenance, for the requirement to maintain SAM registration during performance and through final payment).”
Source page 40

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 40
Requirement 4Verified

(2) The Offeror shall enter, in the block with its name and address on the cover page of its offer, the annotation ‘‘Unique Entity Identifier’’ followed by the unique entity identifier that identifies the Offeror’s name and address exactly as stated in the offer.

View source 1
01page 40View official source ↗
“(2) The Offeror shall enter, in the block with its name and address on the cover page of its offer, the annotation ‘‘Unique Entity Identifier’’ followed by the unique entity identifier that identifies the Offeror’s name and address exactly as stated in the offer.”
Source page 40

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 40
Requirement 5Verified

(d) The offeror shall post the information in paragraphs (c)(1)(i) through (c)(1)(iv) of this provision in FAPIIS as required through maintaining an active registration in the System for Award Management, which can be accessed via https://www.sam.gov (see 52.204-7).

View source 1
01page 42View official source ↗
“(d) The offeror shall post the information in paragraphs (c)(1)(i) through (c)(1)(iv) of this provision in FAPIIS as required through maintaining an active registration in the System for Award Management, which can be accessed via https://www.sam.gov (see 52.204-7).”
Source page 42

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 42
Missing information · 2 checks
Not found

—

Not found in reviewed sources

Not reviewed

—

Not reviewed — requirement not confirmed

Set-aside

6 findings
Requirement 1Verified

SDVOSBS

View source 1
01https://sam.gov/api/prod/opps/v2/opportunities/9e536d5dcc7d4970a6536e4230d42560 /data2/solicitation/setAsideView official source ↗
“SDVOSBS”
Requirement 2Verified

SDVOSB

View source 1
01page 1View official source ↗
“Create Observation Unit, located at the Saint Louis, Missouri VA Medical Center This project is being solicited as a Service Disabled Veteran Owned Small Business (SDVOSB) set-aside.”
Source page 1

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 1
Requirement 3Verified

HUBZONE

View source 1
01page 47View official source ↗
“(2) Issued under a multiple-award contract set aside for small businesses that is further set aside for a specific socioeconomic category that differs from the underlying multiple-award contract (e.g., an order set aside for a HUBZone small business concern under a multiple-award contract that is set aside for small bu”
Source page 47

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 47
Requirement 4Verified

SDVOSB,HUBZONE

Applies when: unless the Contractor waived the price evaluation preferenceA waiver may be available

View source 1
01page 48View official source ↗
“(2) Used the HUBZone price evaluation preference regardless of dollar value, unless the Contractor waived the price evaluation preference; or (3) Was an 8(a), HUBZone, service-disabled veteran-owned, economically disadvantaged women-owned, or women-owned small business set-aside or sole-source award regardless of dolla”
Source page 48

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 48
Missing information · 2 checks
Not found

—

Not found in reviewed sources

Not reviewed

—

Not reviewed — requirement not confirmed

Small business size

7 findings
Requirement 1Needs confirmation

—

Needs confirmation

View source 1
01page 46View official source ↗
“Small business concern— (1) Means a concern, including its affiliates, that is independently owned and operated, not dominant in its field of operation, and qualified as a small business under the criteria in 13 CFR part 121 and the size standard in paragraph (d) of this clause.”
Source page 46

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 46
Requirement 2Needs confirmation

—

Needs confirmation

Applies when: If the Contractor represented that it was any of the small business concerns identified in 19; prior to award of this contract, the Contractor shall rerepresent its size and socioeconMust be met by: prior to award of this contract, the Contractor shall rerepresent its size and socioecon

View source 1
01page 46View official source ↗
“SBA determines affiliation based on the factors set forth at 13 CFR 121.103. (b) If the Contractor represented that it was any of the small business concerns identified in 19.000(a)(3) prior to award of this contract, the Contractor shall rerepresent its size and socioeconomic status according to pa”
Source page 46

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 46
Requirement 3Needs confirmation

—

Needs confirmation

Applies when: at the time of this rerepresentation that corresponds to the North American Industry ClassificMust be met by: at the time of this rerepresentation that corresponds to the North American Industry Classific

View source 1
01page 47View official source ↗
“(d) The Contractor shall rerepresent its size status in accordance with the size standard in effect at the time of this rerepresentation that corresponds to the North American Industry Classification System (NAICS) code(s) assigned to this contract.”
Source page 47

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 47
Requirement 4Needs confirmation

—

Needs confirmation

View source 1
01page 47View official source ↗
“The small business size standard corresponding to this NAICS code(s) can be found at https://www.sba.gov/document/support--table-size-standards.”
Source page 47

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 47
Requirement 5Needs confirmation

—

Needs confirmation

Applies when: if the acquisit

View source 1
01page 47View official source ↗
“(e) The small business size standard for a Contractor providing an end item that it does not manufacture, process, or produce itself, for a contract other than a construction or service contract, is 500 employees, or 150 employees for information technology value-added resellers under NAICS code 541”
Source page 47

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 47
Missing information · 2 checks
Not found

—

Not found in reviewed sources

Not reviewed

—

Not reviewed — requirement not confirmed

Experience & references

14 findings
Requirement 1Conflicting sources

—

Conflicting sources

View source 2
01page 181View official source ↗
“Installer Qualifications: An experienced installer with a minimum of three (3) years’ experience and who has specialized in installing joint sealants similar in material, design, and extent to those indicated for this Project and whose work has resulted in joint-sealant installations with a record of successful in-serv”
Source page 181

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 181
02page 181View official source ↗
“Installer Qualifications: An experienced installer with a minimum of three (3) years’ experience and who has specialized in installing joint sealants similar in material, design, and extent to those indicated for this Project and whose work has resulted in joint-sealant installations with a record of successful in-serv”
Source page 181

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 181
Requirement 2Conflicting sources

—

Conflicting sources

View source 2
01page 176View official source ↗
“The inspector to meet the criteria contained in ASTM E699 for agencies involved in quality assurance and to have a minimum of two years’ experience in construction field inspections of firestopping systems, products, and assemblies.”
Source page 176

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 176
02page 176View official source ↗
“The inspector to meet the criteria contained in ASTM E699 for agencies involved in quality assurance and to have a minimum of two years’ experience in construction field inspections of firestopping systems, products, and assemblies.”
Source page 176

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 176
Requirement 3Needs confirmation

—

Needs confirmation

Applies to: person

View source 1
01page 15View official source ↗
“Must have a minimum of 5 years’ experience as a project manager and must provide a minimum of 3 projects with similar scope of this project, i.e. new build/add-on.”
Source page 15

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 15
Requirement 4Needs confirmation

—

Needs confirmation

View source 1
01page 183View official source ↗
“Manufacturer Warranty: Manufacturer shall warranty their sealant for a minimum of five (5) years from the date of installation and final acceptance by the Government.”
Source page 183

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 183
Requirement 5Needs confirmation

—

Needs confirmation

Applies when: within the past three (3) years

Applies to: person

View source 1
01page 202View official source ↗
“Submit evidence that key personnel have successfully performed surface preparation and application of coating on a minimum of three (3) similar projects within the past three (3) years.”
Source page 202

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 202
Requirement 6Needs confirmation

—

Needs confirmation

View source 1
01page 348View official source ↗
“This will show the least amount of restriction is being imposed on the system by the TAB firm. 5. All TAB technicians performing actual TAB work shall be experienced and shall have done satisfactory work on a minimum of three (3) projects comparable in size and complexity to this project.”
Source page 348

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 348
Requirement 7Needs confirmation

—

Needs confirmation

Applies when: at least five years of successful technical construction experience with either moderniz

Applies to: subcontractor

View source 1
01page 16View official source ↗
“Offeror must demonstrate that its intended subcontractor(s) each have at least five years of successful technical construction experience with either modernization of existing medical facilities or the demolition and installation of critical construction components similar to that required under this project.”
Source page 16

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 16
Requirement 8Needs confirmation

—

Needs confirmation

Applies when: upon the cMust be met by: upon the c

View source 1
01page 17View official source ↗
“The list shall include projects that have been in operation for a period of not less than two years preceding the date of these specifications; include the names and addresses of the Medical Center and the names of the Medical Center Administrators. 4. Approval of electronic key contractor will be contingent upon the c”
Source page 17

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 17
Requirement 9Needs confirmation

—

Needs confirmation

Applies when: at least five projects of equal or greater size and complexity

View source 1
01page 234View official source ↗
“Construction work will not start on any system until the layout drawings have been approved by VA. 4. Installer Qualifications: Installer will be licensed and will provide evidence of the successful completion of at least five projects of equal or greater size and complexity.”
Source page 234

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 234
Requirement 10Needs confirmation

—

Needs confirmation

Applies to: subcontractor

View source 1
01page 382View official source ↗
“Products shall be manufacturer’s latest standard design and have been tested and proven in actual use. 3. The controls subcontractor shall provide a list of no less than five similar projects which have building control systems as specified in this Section.”
Source page 382

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 382
Requirement 11Needs confirmation

—

Needs confirmation

Applies when: at least five years after completion of this contract

View source 1
01page 389View official source ↗
“Spare parts shall be available for at least five years after completion of this contract. 2.2 CONTROLS SYSTEM ARCHITECTURE General 1. The Controls Systems shall consist of multiple Nodes and associated equipment connected by industry standard digital and communication network arrangements. 2. The ECC, building controll”
Source page 389

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 389
Requirement 12Needs confirmation

—

Needs confirmation

Applies when: at least three years

View source 1
01page 433View official source ↗
“Manufacturer’s Qualifications: The manufacturer shall regularly and currently produce, as one of the manufacturer's principal products, the materials and equipment specified for this project, and shall have manufactured the materials and equipment for at least three years.”
Source page 433

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 433
Missing information · 2 checks
Not reviewed

—

Not reviewed — requirement not confirmed

Not found

—

Not found in reviewed sources

Key personnel

8 findings
Requirement 1Verified

The evaluation criteria request resumes for approximately 14 roles, with three to five completed projects from the past five years on each resume.

View source 1
01page 7View official source ↗
“The evaluation criteria request resumes for approximately 14 roles, with three to five completed projects from the past five years on each resume.”
Source page 7

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 7
Requirement 2Verified

submit relevant past performance information regarding: predecessor companies; key personnel

Applies to: person

View source 1
01page 13View official source ↗
“submit relevant past performance information regarding: predecessor companies; key personnel”
Source page 13

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 13
Requirement 3Verified

36C25526R0162 4. Special Contract Requirements SUBSTITUTIONS OF SUBCONTRACTORS AND / OR KEY PERSONNEL A.

Applies to: subcontractor

View source 1
01page 19View official source ↗
“36C25526R0162 4. Special Contract Requirements SUBSTITUTIONS OF SUBCONTRACTORS AND / OR KEY PERSONNEL A.”
Source page 19

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 19
Requirement 4Verified

When an offeror submits its proposal in response to this Request for Proposals, and key personnel who are proposed to work on the project are required to be submitted, those personnel who are offered must be the same personnel who will actually perform on the project.

Applies when: When an offeror submits its proposal in response to this Request for Proposals, and key personnel who are proposed to work on the project are required to be submitted, those personnel

Applies to: person

View source 1
01page 19View official source ↗
“When an offeror submits its proposal in response to this Request for Proposals, and key personnel who are proposed to work on the project are required to be submitted, those personnel who are offered must be the same personnel who will actually perform on the project.”
Source page 19

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 19
Requirement 5Verified
Include a CQC System Manager that reports to the project superintendent. 2. The name, qualifications (in resume format) duties, responsibilities, and authorities of each person assigned a CQC function. 3. A copy of the letter to the CQC System Manager signed by an authorized offiRead full requirement Close full requirement

Include a CQC System Manager that reports to the project superintendent. 2. The name, qualifications (in resume format) duties, responsibilities, and authorities of each person assigned a CQC function. 3. A copy of the letter to the CQC System Manager signed by an authorized offi

Applies to: person

View source 1
01page 103View official source ↗
“Include a CQC System Manager that reports to the project superintendent. 2. The name, qualifications (in resume format) duties, responsibilities, and authorities of each person assigned a CQC function. 3. A copy of the letter to the CQC System Manager signed by an authorized official of the firm whi”
Source page 103

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 103
Requirement 6Verified

Submit evidence that key personnel have successfully performed surface preparation and application of coating on a minimum of three (3) similar projects within the past three (3) years.

Applies when: within the past three (3) years

Applies to: person

View source 1
01page 202View official source ↗
“Submit evidence that key personnel have successfully performed surface preparation and application of coating on a minimum of three (3) similar projects within the past three (3) years.”
Source page 202

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 202
Requirement 7Verified

The Project Manager shall be supported as necessary by other Contractor employees in order to provide professional engineering, technical and management service for the work.

Applies to: person

View source 1
01page 383View official source ↗
“The Project Manager shall be supported as necessary by other Contractor employees in order to provide professional engineering, technical and management service for the work.”
Source page 383

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 383
Requirement 8Verified

The Project Manager shall attend scheduled Project Meetings as required and shall be empowered to make technical, scheduling and related decisions on behalf of the Controls Contractor.

Applies to: person

View source 1
01page 383View official source ↗
“The Project Manager shall attend scheduled Project Meetings as required and shall be empowered to make technical, scheduling and related decisions on behalf of the Controls Contractor.”
Source page 383

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 383

Financial capacity

Verified

(b) The bidder shall furnish a bid guarantee in the form of a firm commitment, e.g., bid bond supported by good and sufficient surety or sureties acceptable to the Government, postal money order, certified check, cashier's check, irrevocable letter of credit, or, under Treasury D

Applies to: surety

View source 1
01page 28View official source ↗
“(b) The bidder shall furnish a bid guarantee in the form of a firm commitment, e.g., bid bond supported by good and sufficient surety or sureties acceptable to the Government, postal money order, certified check, cashier's check, irrevocable letter of credit, or, under Treasury Department regulation”
Source page 28

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 28

Joint ventures & teaming

4 findings
Requirement 1Verified

All contractors and joint ventures must be registered in SAM and VetBiz by the proposal due date in order to be eligible for award.

View source 1
01page 1View official source ↗
“All contractors and joint ventures must be registered in SAM and VetBiz by the proposal due date in order to be eligible for award.”
Source page 1

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 1
Requirement 2Verified
36C25526R0162 firms are encouraged to assist protégé firms under VA's Mentor-Protégé Program in obtaining acceptable bid, payment, and performance bonds, when required, as a prime contractor under a solicitation or contract and in obtaining any required bonds under subcontracts.Read full requirement Close full requirement

36C25526R0162 firms are encouraged to assist protégé firms under VA's Mentor-Protégé Program in obtaining acceptable bid, payment, and performance bonds, when required, as a prime contractor under a solicitation or contract and in obtaining any required bonds under subcontracts.

Applies when: when required, as a prime contractor under a solicitation or contract and in obtaining any required bonds under subcontracts

View source 1
01page 37View official source ↗
“36C25526R0162 firms are encouraged to assist protégé firms under VA's Mentor-Protégé Program in obtaining acceptable bid, payment, and performance bonds, when required, as a prime contractor under a solicitation or contract and in obtaining any required bonds under subcontracts.”
Source page 37

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 37
Requirement 3Verified

(8) Service-disabled veteran-owned small business (SDVOSB) joint venture eligible under the SDVOSB Program.

View source 1
01page 49View official source ↗
“(8) Service-disabled veteran-owned small business (SDVOSB) joint venture eligible under the SDVOSB Program.”
Source page 49

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 49
Requirement 4Verified

part 126, and the representation in paragraph (h)(8)(i) of this clause is accurate for each HUBZone small business concern participating in the HUBZone joint venture. [The Contractor

View source 1
01page 49View official source ↗
“part 126, and the representation in paragraph (h)(8)(i) of this clause is accurate for each HUBZone small business concern participating in the HUBZone joint venture. [The Contractor”
Source page 49

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 49

Exclusions & responsibility

2 findings
Requirement 1Verified
36C25526R0162 52.204-10 REPORTING EXECUTIVE COMPENSATION AND FIRST- JUN 2020 TIER SUBCONTRACT AWARDS 52.204-13 SYSTEM FOR AWARD MANAGEMENT MAINTENANCE OCT 2018 52.204-14 SERVICE CONTRACT REPORTING REQUIREMENTS OCT 2016 52.209-6 PROTECTING THE GOVERNMENT'S INTEREST WHEN JAN 2025 SRead full requirement Close full requirement

36C25526R0162 52.204-10 REPORTING EXECUTIVE COMPENSATION AND FIRST- JUN 2020 TIER SUBCONTRACT AWARDS 52.204-13 SYSTEM FOR AWARD MANAGEMENT MAINTENANCE OCT 2018 52.204-14 SERVICE CONTRACT REPORTING REQUIREMENTS OCT 2016 52.209-6 PROTECTING THE GOVERNMENT'S INTEREST WHEN JAN 2025 S

Applies when: WHEN JAN 2025 SUBCONTRACTING WITH CONTRACTORS DEBARRED,

View source 1
01page 23View official source ↗
“36C25526R0162 52.204-10 REPORTING EXECUTIVE COMPENSATION AND FIRST- JUN 2020 TIER SUBCONTRACT AWARDS 52.204-13 SYSTEM FOR AWARD MANAGEMENT MAINTENANCE OCT 2018 52.204-14 SERVICE CONTRACT REPORTING REQUIREMENTS OCT 2016 52.209-6 PROTECTING THE GOVERNMENT'S INTEREST WHEN JAN 2025 SUBCONTRACTING WITH C”
Source page 23

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 23
Requirement 2Verified
36C25526R0162 (e) In the event that the Contractor does not comply with the requirements set forth in paragraphs (a) through (d) of this clause, this contract may be terminated or suspended in whole or in part, and the Contractor may be suspended or debarred in accordance with 29Read full requirement Close full requirement

36C25526R0162 (e) In the event that the Contractor does not comply with the requirements set forth in paragraphs (a) through (d) of this clause, this contract may be terminated or suspended in whole or in part, and the Contractor may be suspended or debarred in accordance with 29

View source 1
01page 51View official source ↗
“36C25526R0162 (e) In the event that the Contractor does not comply with the requirements set forth in paragraphs (a) through (d) of this clause, this contract may be terminated or suspended in whole or in part, and the Contractor may be suspended or debarred in accordance with 29 CFR 471.14 and subp”
Source page 51

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 51

Conflicts of interest

3 findings
Requirement 1Verified

the task is under the control of the firm performing the task or has other possibilities of financial conflicts of interest in the

View source 1
01page 134View official source ↗
“the task is under the control of the firm performing the task or has other possibilities of financial conflicts of interest in the”
Source page 134

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 134
Requirement 2Verified

Should the installing Contractor engage the testing company to provide as-built or any portion thereof, it will not be deemed a conflict of interest or breach of the ‘third party testing company’ requirement.

View source 1
01page 236View official source ↗
“Should the installing Contractor engage the testing company to provide as-built or any portion thereof, it will not be deemed a conflict of interest or breach of the ‘third party testing company’ requirement.”
Source page 236

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 236
Requirement 3Verified

Should the installing contractor engage the testing company to provide as-built or any portion thereof, it shall not be deemed a conflict of interest or breach of the ‘third party testing company’ requirement.

View source 3
01page 261View official source ↗
“Should the installing contractor engage the testing company to provide as-built or any portion thereof, it shall not be deemed a conflict of interest or breach of the ‘third party testing company’ requirement.”
Source page 261

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 261
02page 275View official source ↗
“Should the installing contractor engage the testing company to provide as-built or any portion thereof, it shall not be deemed a conflict of interest or breach of the ‘third party testing company’ requirement.”
Source page 275

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 275
03page 310View official source ↗
“Should the installing Contractor engage the testing company to provide as-built or any portion thereof, it shall not be deemed a conflict of interest or breach of the ‘third party testing company’ requirement.”
Source page 310

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 310
Missing information2 checks · expand to review

A missing value is not a waiver. Check the source or ask the agency before relying on it.

Required licenses

2 findings
Requirement 1Not found

—

Not found in reviewed sources

Requirement 2Not reviewed

—

Not reviewed — requirement not confirmed

1 additional field have no reviewed finding.

02

Deadlines & submission

When and how to submit, and whether you are still in time.

23 verified9 to confirm

Response deadline

4 findings
Requirement 1Conflicting sources

—

Conflicting response deadlines — confirm the exact time with the buyer before bidding

View source 1
01https://sam.gov/api/prod/opps/v2/opportunities/9e536d5dcc7d4970a6536e4230d42560 /data2/solicitation/deadlines/responseView official source ↗
“2026-10-26T14:00:00-05:00”
Requirement 2Conflicting sources

—

Conflicting response deadlines — confirm the exact time with the buyer before bidding

View source 2
01page 10View official source ↗
“PROPOSAL DUE DATE: August 25, 2026, at 2PM”
Source page 10

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 10
02page 10View official source ↗
“PROPOSAL DUE DATE: August 25, 2026”
Source page 10

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 10
Missing information · 2 checks
Not found

—

Not found in reviewed sources

Not reviewed

—

Not reviewed — requirement not confirmed

Site visit / pre-bid meeting

4 findings
Requirement 1Verified

A site visit will be conducted on 08-5-2026 at 10:00 AM CST .

View source 1
01from the postingView official source ↗
“SITE VISIT: A site visit will be conducted on 08-5-2026 at 10:00 AM CST .”
Requirement 2Verified

Saint Louis VAMC Building #16, Room #B201 on the 2nd Floor at 10:00AM CST. The building is located directly across from the

View source 1
01from the postingView official source ↗
“Location: Saint Louis VAMC Building #16, Room #B201 on the 2nd Floor at 10:00AM CST. The building is located directly across from the”
Missing information · 2 checks
Not found

—

Not found in reviewed sources

Not reviewed

—

Not reviewed — requirement not confirmed

How to submit

4 findings
Requirement 1Verified

Offerors shall submit proposals electronically by email to: Gislaine.Dorvil@va.gov .

View source 1
01page 11View official source ↗
“Offerors shall submit proposals electronically by email to: Gislaine.Dorvil@va.gov .”
Source page 11

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 11
Requirement 2Verified

(3) Proposals shall be submitted to the Contracting Officer or ACO and the resident engineer as expeditiously as possible, but not later than calendar days, after receipt of a written change order by the Contracting Officer.

View source 1
01page 70View official source ↗
“(3) Proposals shall be submitted to the Contracting Officer or ACO and the resident engineer as expeditiously as possible, but not later than calendar days, after receipt of a written change order by the Contracting Officer.”
Source page 70

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 70
Missing information · 2 checks
Not found

—

Not found in reviewed sources

Not reviewed

—

Not reviewed — requirement not confirmed

Required submission files

5 findings
Requirement 1Verified

The email(s) shall include the following as attachments: (a) Part 1 - Technical Proposal (Item 2.c. below) (b) Part 2 - Price Proposal (Item 2.a. and 2.b. below) The total size if any single email must be less than 10 megabytes.

Applies when: if any single email must be less than 10 megabytes

View source 1
01page 11View official source ↗
“The email(s) shall include the following as attachments: (a) Part 1 - Technical Proposal (Item 2.c. below) (b) Part 2 - Price Proposal (Item 2.a. and 2.b. below) The total size if any single email must be less than 10 megabytes.”
Source page 11

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 11
Requirement 2Verified

The qualification proposal shall include: 1. The name and address of the proposed consultant. 2. Information to show that the proposed consultant has the qualifications to meet the requirements specified in the preceding paragraph. 3. A representative sample of prior construction

View source 1
01page 39View official source ↗
“The qualification proposal shall include: 1. The name and address of the proposed consultant. 2. Information to show that the proposed consultant has the qualifications to meet the requirements specified in the preceding paragraph. 3. A representative sample of prior construction projects, which the”
Source page 39

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 39
Requirement 3Verified

Louis VA Health Care System 100% Bid Documents 12-01-25 review, the Contractor shall revise and shall submit three blue line copies of the revised Project Schedule, three copies of the revised computer-produced activity/event ID schedule and a revised electronic file as specified

View source 1
01page 42View official source ↗
“Louis VA Health Care System 100% Bid Documents 12-01-25 review, the Contractor shall revise and shall submit three blue line copies of the revised Project Schedule, three copies of the revised computer-produced activity/event ID schedule and a revised electronic file as specified by the Contracting ”
Source page 42

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 42
Missing information · 2 checks
Not reviewed

—

Not reviewed — requirement not confirmed

Not found

—

Not found in reviewed sources

Acknowledge amendments

3 findings
Requirement 1Verified

NOTE: Failure to acknowledge any and all Amendments issued pursuant to this solicitation may be cause for rejection of your offer. b.

View source 1
01page 11View official source ↗
“NOTE: Failure to acknowledge any and all Amendments issued pursuant to this solicitation may be cause for rejection of your offer. b.”
Source page 11

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 11
Missing information · 2 checks
Not found

—

Not found in reviewed sources

Not reviewed

—

Not reviewed — requirement not confirmed

Procurement contact

4 findings
Requirement 1Verified

Gislaine Dorvil · Gislaine.Dorvil@va.gov · 9139461139

View source 1
01https://sam.gov/api/prod/opps/v2/opportunities/9e536d5dcc7d4970a6536e4230d42560 /data2/pointOfContact/0View official source ↗
“Gislaine Dorvil · Gislaine.Dorvil@va.gov · 9139461139”
Requirement 2Verified

314-652-4100

View source 1
01from the postingView official source ↗
“ated directly across from the Emergency Room. POC: WALTER STAAS PHONE:314-652-4100 JCx58723 ____________________________________________________________”
Requirement 3Needs confirmation

—

Needs confirmation

View source 1
01page 146View official source ↗
“The Commissioning Manager shall be the single point of contact and communications for all commissioning related services by the Contractor.”
Source page 146

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 146
Requirement 4Needs confirmation

—

Needs confirmation

View source 2
01page 234View official source ↗
“Include contact persons who will serve as references, with current telephone numbers and e-mail addresses.”
Source page 234

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 234
02page 308View official source ↗
“Include contact persons who will serve as references, with current telephone numbers and e-mail addresses.”
Source page 308

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 308

Bid opening

4 findings
Requirement 1Needs confirmation

—

Needs confirmation

Applies when: If this is a sealed bid solicitation, offers must be publicly opened at that time

View source 1
01page 1View official source ↗
“If this is a sealed bid solicitation, offers must be publicly opened at that time.”
Source page 1

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 1
Requirement 2Needs confirmation

—

Needs confirmation

View source 1
01page 9View official source ↗
“BID GUARANTEE A bid guarantee is required in an amount not less than 20 percent of the bid price but shall not exceed $3,000,000. Failure to furnish a photocopy of the original bid guarantee in the proper form and amount, by the time set for opening of bids, will require rejection of the bid in all ”
Source page 9

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 9
Requirement 3Needs confirmation

—

Needs confirmation

View source 1
01page 28View official source ↗
“(End of Provision) 2.8 52.228-1 BID GUARANTEE (SEP 1996) (a) Failure to furnish a bid guarantee in the proper form and amount, by the time set for opening of bids, may be cause for rejection of the bid.”
Source page 28

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 28
Requirement 4Needs confirmation

—

Needs confirmation

Applies when: upon execution of contractual documents and bonds (including any necessary coinsuranMust be met by: upon execution of contractual documents and bonds (including any necessary coinsuran

View source 1
01page 28View official source ↗
“The Contracting Officer will return bid guarantees, other than bid bonds— (1) To unsuccessful bidders as soon as practicable after the opening of bids; and (2) To the successful bidder upon execution of contractual documents and bonds (including any necessary coinsurance or reinsurance agreements), ”
Source page 28

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 28

Formatting & signatures

2 findings
Requirement 1Verified

CLARIFICATION HAS BEEN PROVIDED IN THE REVISED DRAWINGS. 52. Could you please clarify what is included in the three-page limit? A.

View source 1
01page 7View official source ↗
“CLARIFICATION HAS BEEN PROVIDED IN THE REVISED DRAWINGS. 52. Could you please clarify what is included in the three-page limit? A.”
Source page 7

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 7
Requirement 2Verified
Include a CQC System Manager that reports to the project superintendent. 2. The name, qualifications (in resume format) duties, responsibilities, and authorities of each person assigned a CQC function. 3. A copy of the letter to the CQC System Manager signed by an authorized offiRead full requirement Close full requirement

Include a CQC System Manager that reports to the project superintendent. 2. The name, qualifications (in resume format) duties, responsibilities, and authorities of each person assigned a CQC function. 3. A copy of the letter to the CQC System Manager signed by an authorized offi

Applies to: person

View source 1
01page 103View official source ↗
“Include a CQC System Manager that reports to the project superintendent. 2. The name, qualifications (in resume format) duties, responsibilities, and authorities of each person assigned a CQC function. 3. A copy of the letter to the CQC System Manager signed by an authorized official of the firm whi”
Source page 103

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 103

Mandatory forms

Verified

CROSS-SECTION 'A-A' MOBILE CONTAINMENT CART CLASS IV TYPE A ICRA INFECTION CONTROL RISK ASSESSMENT: THE REQUIRED INFECTION CONTROL RISK ASSESSMENT FORMS MUST BE COMPLETED AND POSTED IN THE PROPER AREA.

View source 1
01page 2View official source ↗
“CROSS-SECTION 'A-A' MOBILE CONTAINMENT CART CLASS IV TYPE A ICRA INFECTION CONTROL RISK ASSESSMENT: THE REQUIRED INFECTION CONTROL RISK ASSESSMENT FORMS MUST BE COMPLETED AND POSTED IN THE PROPER AREA.”
Source page 2

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 2

Offer acceptance period

Needs confirmation

—

Needs confirmation

Applies when: Before starting work the General Contractor shall give one week’s notice to the COR soMust be met by: Before starting work the General Contractor shall give one week’s notice to the COR so

View source 1
01page 9View official source ↗
“This badge is valid for 15 site visits in a calendar year and provides no access to restricted areas, i.e. mag-locked doors. 2. Before starting work the General Contractor shall give one week’s notice to the COR so that security arrangements can be provided for the employees.”
Source page 9

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 9

Grounds for rejection

10 findings
Requirement 1Verified

Those offerors not providing the documentation outlined in the "Proposal Instructions to Offeror" will be deemed non-responsive to the terms of the solicitation.

View source 1
01page 1View official source ↗
“Those offerors not providing the documentation outlined in the "Proposal Instructions to Offeror" will be deemed non-responsive to the terms of the solicitation.”
Source page 1

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 1
Requirement 2Verified

form and amount, by the time set for opening of bids, will require rejection of the bid in all cases except those listed in FAR 28.101-4, and may be cause for rejection even then. Bidders shall

View source 1
01page 9View official source ↗
“form and amount, by the time set for opening of bids, will require rejection of the bid in all cases except those listed in FAR 28.101-4, and may be cause for rejection even then. Bidders shall”
Source page 9

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 9
Requirement 3Verified

NOTE: Failure to acknowledge any and all Amendments issued pursuant to this solicitation may be cause for rejection of your offer. b.

View source 1
01page 11View official source ↗
“NOTE: Failure to acknowledge any and all Amendments issued pursuant to this solicitation may be cause for rejection of your offer. b.”
Source page 11

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 11
Requirement 4Verified
In accordance with solicitation provision 52.228-1, Bid Guarantee, failure to furnish a bid guarantee, in the proper form and amount, by the deadline established for submitting offers, may be cause for rejection of the offer.Read full requirement Close full requirement

In accordance with solicitation provision 52.228-1, Bid Guarantee, failure to furnish a bid guarantee, in the proper form and amount, by the deadline established for submitting offers, may be cause for rejection of the offer.

View source 1
01page 11View official source ↗
“In accordance with solicitation provision 52.228-1, Bid Guarantee, failure to furnish a bid guarantee, in the proper form and amount, by the deadline established for submitting offers, may be cause for rejection of the offer.”
Source page 11

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 11
Requirement 5Verified

Written verification will follow oral instructions. Failure to respond will be cause for the Contracting Officer to proceed against the Contractor.

View source 1
01page 22View official source ↗
“Written verification will follow oral instructions. Failure to respond will be cause for the Contracting Officer to proceed against the Contractor.”
Source page 22

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 22
Requirement 6Verified

(End of Provision) 2.8 52.228-1 BID GUARANTEE (SEP 1996) (a) Failure to furnish a bid guarantee in the proper form and amount, by the time set for opening of bids, may be cause for rejection of the bid.

View source 1
01page 28View official source ↗
“(End of Provision) 2.8 52.228-1 BID GUARANTEE (SEP 1996) (a) Failure to furnish a bid guarantee in the proper form and amount, by the time set for opening of bids, may be cause for rejection of the bid.”
Source page 28

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 28
Requirement 7Verified

All deviations submitted must include a side by side comparison of item being proposed against item specified. Failure to point out deviations will result in the VA requiring removal and replacement of such work at the Contractor's expense.

View source 1
01page 53View official source ↗
“All deviations submitted must include a side by side comparison of item being proposed against item specified. Failure to point out deviations will result in the VA requiring removal and replacement of such work at the Contractor's expense.”
Source page 53

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 53
Requirement 8Verified

Failure to furnish these recommendations can be cause for rejection of the material.

View source 1
01page 234View official source ↗
“Failure to furnish these recommendations can be cause for rejection of the material.”
Source page 234

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 234
Requirement 9Verified

Failure to furnish these recommendations can be cause for rejection of the material and removal by the Contractor and no additional cost or time to the Government. 23 05 11 - 11

View source 1
01page 307View official source ↗
“Failure to furnish these recommendations can be cause for rejection of the material and removal by the Contractor and no additional cost or time to the Government. 23 05 11 - 11”
Source page 307

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 307
Requirement 10Verified

Failure to furnish these recommendations is a cause for rejection of the material. 2. All items that require access, such as for operating, cleaning, servicing, maintenance, and calibration, shall be easily and safely accessible by persons standing at floor level, or standing on

View source 1
01page 308View official source ↗
“Failure to furnish these recommendations is a cause for rejection of the material. 2. All items that require access, such as for operating, cleaning, servicing, maintenance, and calibration, shall be easily and safely accessible by persons standing at floor level, or standing on permanent platforms,”
Source page 308

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 308
Missing information2 checks · expand to review

A missing value is not a waiver. Check the source or ask the agency before relying on it.

Questions due

2 findings
Requirement 1Not found

—

Not found in reviewed sources

Requirement 2Not reviewed

—

Not reviewed — requirement not confirmed

2 additional fields have no reviewed finding.

Continue your review

6 more sections are available once you sign in

Pricing & payment · Bonds & insurance · Evaluation & award · Scope & delivery · Labor, sourcing & compliance · Contract terms & risk

Sign in — free

Extracted from the public documents linked above. This is an information aid, not a determination of bid eligibility or legal advice. Verify the original wording and any addenda before submitting a bid.

$500K – $1.0M
Closing date not confirmed
See all 32