BidEligible

DEPT OF DEFENSE · Dongducheon, KR-41

Cleaning of Food Service Exhaust Fans and Ducts for Dining Facilities in USAG Yongsan-Casey.

9 source documentsSource checked Oct 23Content updated
Open notice
Response deadline
6 days left
Published project value
Not confirmed
Check the pricing and payment terms below.
Solicitation number
W90VN827RA001

Dates to plan around

Times follow the original source.

  1. Response deadline
    Source wording
    2026-10-30T11:00:00+09:00
Document coverage
9 / 9documents readAll discovered documents read

9 documents found72% of weighted requirement checks reviewed

Before you bid

Review first

Start with these requirements and unresolved points.
  • Must do
    Exclusions & responsibility
    View 1 flagged requirement
    1. Requirement 1 ↗

      The Offeror shall review the list of excluded parties in the System for Award Management (SAM) (https://www.sam.gov) for entities excluded from receiving federal awards for "covered defense telecommunications equipment or services".

  • Must do
    Key personnel
    View 7 flagged requirements
    1. Requirement 1 ↗

      The PM's resume must clearly identify as required below: - Associate degree or bachelor's degree from an accredited college or university - Proposed position title

    2. Requirement 2 ↗

      The Electrical Engineer's resume must clearly identify as required below: - Education from a Related Two (2) or Four (4) year college program as Electrical Engineering - One (1) year of experience with the last five (5) years from the solicitation closing date as labor for cleani

    3. Requirement 3 ↗

      At a minimum, the resume shall include the PM's full name, description of qualifying work experience, period of experience, value or size of contract or project, company name or employer, and validating point of contact information.

    4. Requirement 4 ↗

      resume must clearly identify as required below:

    5. Requirement 5 ↗

      The offeror shall submit the PM's resume demonstrating relevant experience performing or managing food service exhaust system cleaning services and a copy of valid Annual Hygiene Training Certification issued by the Korean Facility Hygiene Management Association for Cy26. At a mi

    6. Requirement 6 ↗

      The PM's resume must clearly identify as required below: - Associate degree or bachelor's degree from an accredited college or university - Proposed position title - A brief description of work experience - Company name, phone number, and complete name of the employer - Length of

    7. Requirement 7 ↗

      The Electrical Engineer's resume must clearly identify as required below:

  • Must do
    Registrations
    View 4 flagged requirements
    1. Requirement 1 ↗

      All ve- hicles must be registered in accordance with current local requirements. 2.5.1.3.1 Contractor and Vendor Access.

    2. Requirement 2 ↗

      All vehicles must be registered in accordance with current local require- ments in which they are registered. 2.5.1.3.2 All Contractor personnel, not possessing a Common Access Card (CAC), request- ing access to USAG Yongsan-Casey will enter through the designated Visitor Control

    3. Requirement 3 ↗

      To access WAWF, the Contractor shall- (1) Have a designated electronic business point of contact in the System for Award Management at https://www.sam.gov; and (2) Be registered to use WAWF at https://wawf.eb.mil/ following the step-by-step procedures for self-registration availa

    4. Requirement 4 ↗

      (1) The Offeror shall enter, in the block with its name and address on the cover page of its offer, the annotation "Unique Entity Identifier" followed by the UEI that identifies the Offeror's name and address exactly as stated in the offer.

01

Eligibility & participation

Whether you can bid at all, and what you must already hold.

37 verified6 to confirm

Registrations

9 findings
Requirement 1Verified

All ve- hicles must be registered in accordance with current local requirements. 2.5.1.3.1 Contractor and Vendor Access.

View source 2
01page 14View official source ↗
“All ve- hicles must be registered in accordance with current local requirements. 2.5.1.3.1 Contractor and Vendor Access.”
Source page 14

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 14
02page 14View official source ↗
“All ve- hicles must be registered in accordance with current local requirements. 2.5.1.3.1 Contractor and Vendor Access.”
Source page 14

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 14
Requirement 2Verified

All vehicles must be registered in accordance with current local require- ments in which they are registered. 2.5.1.3.2 All Contractor personnel, not possessing a Common Access Card (CAC), request- ing access to USAG Yongsan-Casey will enter through the designated Visitor Control

View source 2
01page 14View official source ↗
“All vehicles must be registered in accordance with current local require- ments in which they are registered. 2.5.1.3.2 All Contractor personnel, not possessing a Common Access Card (CAC), request- ing access to USAG Yongsan-Casey will enter through the designated Visitor Control Center (VCC).”
Source page 14

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 14
02page 14View official source ↗
“All vehicles must be registered in accordance with current local require- ments in which they are registered. 2.5.1.3.2 All Contractor personnel, not possessing a Common Access Card (CAC), request- ing access to USAG Yongsan-Casey will enter through the designated Visitor Control Center (VCC).”
Source page 14

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 14
Requirement 3Verified

To access WAWF, the Contractor shall- (1) Have a designated electronic business point of contact in the System for Award Management at https://www.sam.gov; and (2) Be registered to use WAWF at https://wawf.eb.mil/ following the step-by-step procedures for self-registration availa

View source 1
01page 14View official source ↗
“To access WAWF, the Contractor shall- (1) Have a designated electronic business point of contact in the System for Award Management at https://www.sam.gov; and (2) Be registered to use WAWF at https://wawf.eb.mil/ following the step-by-step procedures for self-registration available at this web site”
Source page 14

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 14
Requirement 4Verified

(Deviation 2026-02 2026-O0038) Offeror Identification (Feb 2026) (Deviation 2026-O0038) If the Offeror will not have an active Federal Government contracts registration in the System for Award Management (https://www.sam.gov) when submitting its offer, it shall complete paragraph

Applies when: If the Offeror will not have an active Federal Government contracts registration in the System for Award Management (https://www

View source 1
01page 40View official source ↗
“(Deviation 2026-02 2026-O0038) Offeror Identification (Feb 2026) (Deviation 2026-O0038) If the Offeror will not have an active Federal Government contracts registration in the System for Award Management (https://www.sam.gov) when submitting its offer, it shall complete paragraphs (c) and (d) of thi”
Source page 40

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 40
Requirement 5Verified

(1) The Offeror shall enter, in the block with its name and address on the cover page of its offer, the annotation "Unique Entity Identifier" followed by the UEI that identifies the Offeror's name and address exactly as stated in the offer.

View source 1
01page 41View official source ↗
“(1) The Offeror shall enter, in the block with its name and address on the cover page of its offer, the annotation "Unique Entity Identifier" followed by the UEI that identifies the Offeror's name and address exactly as stated in the offer.”
Source page 41

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 41
Requirement 6Verified

(1) The Offeror shall provide its CAGE code with its offer with its name and location address or otherwise include it prominently in its offer.

View source 1
01page 43View official source ↗
“(1) The Offeror shall provide its CAGE code with its offer with its name and location address or otherwise include it prominently in its offer.”
Source page 43

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 43
Requirement 7Verified

Agency (NSPA) ( https://eportal.nspa.nato.int/AC135Public/scage/CageList.aspx) (2) The Offeror shall provide the CAGE code and legal business name (Do not use a "doing

View source 1
01page 43View official source ↗
“Agency (NSPA) ( https://eportal.nspa.nato.int/AC135Public/scage/CageList.aspx) (2) The Offeror shall provide the CAGE code and legal business name (Do not use a "doing”
Source page 43

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 43
Missing information · 2 checks
Not reviewed

—

Not reviewed — requirement not confirmed

Not found

—

Not found in reviewed sources

Set-aside

3 findings
Requirement 1Verified

HUBZONE

View source 1
01page 1View official source ↗
“TELEPHONE NUMBER (No collect 8. OFFER DUE DATE/ 7.FOR SOLICITATION calls) LOCAL TIME INFORMATION CALL: 9. ISSUED BY CODE 10. THIS ACQUISITION IS UNRESTRICTED OR SET ASIDE: % FOR: SMALL BUSINESS WOMEN-OWNED SMALL NORTH AMERICAN HUBZONE SMALL BUSINESS (WOSB) INDUSTRY CLASSIFICATION BUSINESS ECONOMICALLY STANDARD (NAICS):”
Source page 1

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 1
Missing information · 2 checks
Not reviewed

—

Not reviewed — requirement not confirmed

Not found

—

Not found in reviewed sources

Small business size

3 findings
Requirement 1Needs confirmation

—

Needs confirmation

View source 1
01page 1View official source ↗
“VETERAN-OWNED WOMEN-OWNED SMALL SIZE STANDARD:”
Source page 1

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 1
Missing information · 2 checks
Not reviewed

—

Not reviewed — requirement not confirmed

Not found

—

Not found in reviewed sources

Experience & references

7 findings
Requirement 1Needs confirmation

—

Needs confirmation

Applies when: at least two (2) years of project management experience

Applies to: person

View source 1
01page 4View official source ↗
“Project Manager: The offeror shall be evaluated on their submitted resume of Project Manager (PM) with at least two (2) years of project management experience.”
Source page 4

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 4
Requirement 2Needs confirmation

—

Needs confirmation

Applies when: within the last five (5) years from the solicitation closing date for food duct cleani

View source 2
01page 8View official source ↗
“TE-04 Contractor Qualifications Contractor Qualification: The prime contractor shall have a minimum of two (2) years of experience within the last five (5) years from the solicitation closing date for food duct cleaning service or related lines of business.”
Source page 8

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 8
02page 8View official source ↗
“TE-04 Contractor Qualifications Contractor Qualification: The prime contractor shall have a minimum of two (2) years of experience within the last five (5) years from the solicitation closing date for food duct cleaning service or related lines of business.”
Source page 8

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 8
Requirement 3Needs confirmation

—

Needs confirmation

Applies when: At least one (1) year of experience within the last five (5) years from the solicitation

View source 2
01page 9View official source ↗
“Experience: At least one (1) year of experience within the last five (5) years from the solicitation closing date as the Labor on Cleaning of Food Service Exhaust Fans and Ducts for Dining Facilities contract.”
Source page 9

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 9
02page 9View official source ↗
“Experience: At least one (1) year of experience within the last five (5) years from the solicitation closing date as the Labor on Cleaning of Food Service Exhaust Fans and Ducts for Dining Facilities contract.”
Source page 9

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 9
Requirement 4Needs confirmation

—

Needs confirmation

Applies when: within the last five (5) years on contracts for cleaning food service exhaust systems

Applies to: person

View source 1
01page 23View official source ↗
“The proposed Project Manager shall have an associate degree or bachelor's degree from an accredited college or university and a minimum of two (2) years of project management experience within the last five (5) years on contracts for cleaning food service exhaust systems (hoods, fans, and ducts).”
Source page 23

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 23
Requirement 5Needs confirmation

—

Needs confirmation

Applies when: at least one (1) year of experience within the last five (5) years from the solicitation

View source 1
01page 25View official source ↗
“The proposed Electrical Industrial Engineer shall have at least one (1) year of experience within the last five (5) years from the solicitation closing date as labor for cleaning food service exhaust fans and ducts for dining facility contracts.”
Source page 25

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 25
Missing information · 2 checks
Not reviewed

—

Not reviewed — requirement not confirmed

Not found

—

Not found in reviewed sources

Key personnel

24 findings
Requirement 1Verified
The Government will evaluate offers based on the following factors, listed in descending order of importance. : Evaluation Criteria: Factor 1. Technical Capability Subfactor (1), Prime Contractor's Registration and Certifications Subfactor (2), Key PersonnelRead full requirement Close full requirement

The Government will evaluate offers based on the following factors, listed in descending order of importance. : Evaluation Criteria: Factor 1. Technical Capability Subfactor (1), Prime Contractor's Registration and Certifications Subfactor (2), Key Personnel

Applies to: person

View source 1
01page 3View official source ↗
“The Government will evaluate offers based on the following factors, listed in descending order of importance. : Evaluation Criteria: Factor 1. Technical Capability Subfactor (1), Prime Contractor's Registration and Certifications Subfactor (2), Key Personnel”
Source page 3

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 3
Requirement 2Verified

(2) Subfactor 2: Key Personnel

Applies to: person

View source 3
01page 4View official source ↗
“(2) Subfactor 2: Key Personnel”
Source page 4

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 4
02page 18View official source ↗
“(2) Subfactor 2: Key Personnel”
Source page 18

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 18
03page 28View official source ↗
“(2) Subfactor 2: Key Personnel”
Source page 28

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 28
Requirement 3Verified

The PM's resume must clearly identify as required below: - Associate degree or bachelor's degree from an accredited college or university - Proposed position title

View source 1
01page 4View official source ↗
“The PM's resume must clearly identify as required below: - Associate degree or bachelor's degree from an accredited college or university - Proposed position title”
Source page 4

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 4
Requirement 4Verified

The Electrical Engineer's resume must clearly identify as required below: - Education from a Related Two (2) or Four (4) year college program as Electrical Engineering - One (1) year of experience with the last five (5) years from the solicitation closing date as labor for cleani

View source 2
01page 5View official source ↗
“The Electrical Engineer's resume must clearly identify as required below: - Education from a Related Two (2) or Four (4) year college program as Electrical Engineering - One (1) year of experience with the last five (5) years from the solicitation closing date as labor for cleaning food service exha”
Source page 5

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 5
02page 19View official source ↗
“The Electrical Engineer's resume must clearly identify as required below: - Education from a Related Two (2) or Four (4) year college program as Electrical Engineering - One (1) year of experience with the last five (5) years from the solicitation closing date as labor for cleaning food service exha”
Source page 19

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 19
Requirement 5Verified

The transition plan will have a ten (10) calendar days transition period that will be implemented by the Contractor and shall state Con- tractor key personnel on board, to include IT/Network accounts and access with the appropriate Government organizations.

Applies to: person

View source 2
01page 7View official source ↗
“The transition plan will have a ten (10) calendar days transition period that will be implemented by the Contractor and shall state Con- tractor key personnel on board, to include IT/Network accounts and access with the appropriate Government organizations.”
Source page 7

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 7
02page 7View official source ↗
“The transition plan will have a ten (10) calendar days transition period that will be implemented by the Contractor and shall state Con- tractor key personnel on board, to include IT/Network accounts and access with the appropriate Government organizations.”
Source page 7

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 7
Requirement 6Verified

The plan shall contain details that include but are not limited to; timelines for events, key personnel involved and interface with the Government and follow-on Contractor.

Applies to: person

View source 2
01page 7View official source ↗
“The plan shall contain details that include but are not limited to; timelines for events, key personnel involved and interface with the Government and follow-on Contractor.”
Source page 7

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 7
02page 7View official source ↗
“The plan shall contain details that include but are not limited to; timelines for events, key personnel involved and interface with the Government and follow-on Contractor.”
Source page 7

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 7
Requirement 7Verified

Retention of key personnel;

Applies to: person

View source 2
01page 7View official source ↗
“Retention of key personnel;”
Source page 7

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 7
02page 7View official source ↗
“Retention of key personnel;”
Source page 7

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 7
Requirement 8Verified

Contractor Employees. Key Personnel.

Applies to: person

View source 2
01page 8View official source ↗
“Contractor Employees. Key Personnel.”
Source page 8

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 8
02page 8View official source ↗
“Contractor Employees. Key Personnel.”
Source page 8

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 8
Requirement 9Verified

Sub-Factor 2: Key Personnel

Applies to: person

View source 3
01page 9View official source ↗
“Sub-Factor 2: Key Personnel”
Source page 9

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 9
02page 23View official source ↗
“Sub-Factor 2: Key Personnel”
Source page 23

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 23
03page 22View official source ↗
“Sub-Factor 2: Key Personnel”
Source page 22

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 22
Requirement 10Verified

Subfactor 2: Key

View source 3
01page 9View official source ↗
“Subfactor 2: Key”
Source page 9

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 9
02page 24View official source ↗
“Subfactor 2: Key”
Source page 24

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 24
03page 22View official source ↗
“Subfactor 2: Key”
Source page 22

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 22
Requirement 11Verified

The Project Manager shall be available after normal hours to serve as the central point of contact for Contractor operations.

Applies to: person

View source 2
01page 9View official source ↗
“The Project Manager shall be available after normal hours to serve as the central point of contact for Contractor operations.”
Source page 9

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 9
02page 9View official source ↗
“The Project Manager shall be available after normal hours to serve as the central point of contact for Contractor operations.”
Source page 9

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 9
Requirement 12Verified

Sub-factor 2. Key Personnel: (1) Project Manager (PM): The offeror shall provide a qualified Project Manager (PM) who will be responsible for the overall performance of the work.

Applies to: person

View source 3
01page 10View official source ↗
“Sub-factor 2. Key Personnel: (1) Project Manager (PM): The offeror shall provide a qualified Project Manager (PM) who will be responsible for the overall performance of the work.”
Source page 10

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 10
02page 24View official source ↗
“Sub-factor 2. Key Personnel: (1) Project Manager (PM): The offeror shall provide a qualified Project Manager (PM) who will be responsible for the overall performance of the work.”
Source page 24

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 24
03page 23View official source ↗
“Sub-factor 2. Key Personnel: (1) Project Manager (PM): The offeror shall provide a qualified Project Manager (PM) who will be responsible for the overall performance of the work.”
Source page 23

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 23
Requirement 13Verified

The proposed Project Manager shall have an associate degree or bachelor's degree from an accredited college or university and a minimum of two (2) years of project management experience within the last five (5) years on contracts for cleaning food service exhaust systems (hoods,

Applies when: within the last five (5) years on contracts for cleaning food service exhaust systems

Applies to: person

View source 2
01page 10View official source ↗
“The proposed Project Manager shall have an associate degree or bachelor's degree from an accredited college or university and a minimum of two (2) years of project management experience within the last five (5) years on contracts for cleaning food service exhaust systems (hoods, fans, and ducts).”
Source page 10

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 10
02page 23View official source ↗
“The proposed Project Manager shall have an associate degree or bachelor's degree from an accredited college or university and a minimum of two (2) years of project management experience within the last five (5) years on contracts for cleaning food service exhaust systems (hoods, fans, and ducts).”
Source page 23

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 23
Requirement 14Verified

At a minimum, the resume shall include the PM's full name, description of qualifying work experience, period of experience, value or size of contract or project, company name or employer, and validating point of contact information.

View source 2
01page 10View official source ↗
“At a minimum, the resume shall include the PM's full name, description of qualifying work experience, period of experience, value or size of contract or project, company name or employer, and validating point of contact information.”
Source page 10

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 10
02page 23View official source ↗
“At a minimum, the resume shall include the PM's full name, description of qualifying work experience, period of experience, value or size of contract or project, company name or employer, and validating point of contact information.”
Source page 23

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 23
Requirement 15Verified

N/A. 2.1.11 Contractor Employees. 2.1.11.1 Key Personnel. 2.1.11.1.1 Project Manager (PM).

Applies to: person

View source 2
01page 11View official source ↗
“N/A. 2.1.11 Contractor Employees. 2.1.11.1 Key Personnel. 2.1.11.1.1 Project Manager (PM).”
Source page 11

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 11
02page 11View official source ↗
“N/A. 2.1.11 Contractor Employees. 2.1.11.1 Key Personnel. 2.1.11.1.1 Project Manager (PM).”
Source page 11

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 11
Requirement 16Verified

The PM and any individuals designated as key personnel shall be able to understand, speak, read, and write the English language. 2.1.11.1.2 GFEBS PM Coordinator Lead.

Applies to: person

View source 2
01page 12View official source ↗
“The PM and any individuals designated as key personnel shall be able to understand, speak, read, and write the English language. 2.1.11.1.2 GFEBS PM Coordinator Lead.”
Source page 12

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 12
02page 12View official source ↗
“The PM and any individuals designated as key personnel shall be able to understand, speak, read, and write the English language. 2.1.11.1.2 GFEBS PM Coordinator Lead.”
Source page 12

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 12
Requirement 17Verified
W90VN827RA0010001 Page 18 of 32 Evaluation Criteria: Factor 1. Technical Capability Subfactor (1), Prime Contractor's Registration and Certifications Subfactor (2), Key Personnel Factor 2. Past Performance Factor 3. Price Factor 1. Technical Approach Technical capability will be Read full requirement Close full requirement

W90VN827RA0010001 Page 18 of 32 Evaluation Criteria: Factor 1. Technical Capability Subfactor (1), Prime Contractor's Registration and Certifications Subfactor (2), Key Personnel Factor 2. Past Performance Factor 3. Price Factor 1. Technical Approach Technical capability will be

Applies to: person

View source 1
01page 18View official source ↗
“W90VN827RA0010001 Page 18 of 32 Evaluation Criteria: Factor 1. Technical Capability Subfactor (1), Prime Contractor's Registration and Certifications Subfactor (2), Key Personnel Factor 2. Past Performance Factor 3. Price Factor 1. Technical Approach Technical capability will be evaluated to assess ”
Source page 18

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 18
Requirement 18Verified

resume must clearly identify as required below:

View source 1
01page 19View official source ↗
“resume must clearly identify as required below:”
Source page 19

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 19
Requirement 19Verified

Waste is generated by educational, health care, correctional and other institutional facilities. 7.1.1.43 Key Personnel.

Applies to: person

View source 2
01page 24View official source ↗
“Waste is generated by educational, health care, correctional and other institutional facilities. 7.1.1.43 Key Personnel.”
Source page 24

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 24
02page 24View official source ↗
“Waste is generated by educational, health care, correctional and other institutional facilities. 7.1.1.43 Key Personnel.”
Source page 24

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 24
Requirement 20Verified
When key personnel are used as an evaluation factor in best value procurement, an offer can be rejected if it does not have a firm commitment from the people who are listed in the proposal. 7.1.1.44 Lavatories, Latrines, or Bathrooms.Read full requirement Close full requirement

When key personnel are used as an evaluation factor in best value procurement, an offer can be rejected if it does not have a firm commitment from the people who are listed in the proposal. 7.1.1.44 Lavatories, Latrines, or Bathrooms.

Applies when: When key personnel are used as an evaluation factor in best value procurement, an offer can be rejected if it does not have a firm commitment from the people who are listed in the prop

Applies to: person

View source 2
01page 24View official source ↗
“When key personnel are used as an evaluation factor in best value procurement, an offer can be rejected if it does not have a firm commitment from the people who are listed in the proposal. 7.1.1.44 Lavatories, Latrines, or Bathrooms.”
Source page 24

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 24
02page 24View official source ↗
“When key personnel are used as an evaluation factor in best value procurement, an offer can be rejected if it does not have a firm commitment from the people who are listed in the proposal. 7.1.1.44 Lavatories, Latrines, or Bathrooms.”
Source page 24

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 24
Requirement 21Verified

The offeror shall submit the PM's resume demonstrating relevant experience performing or managing food service exhaust system cleaning services and a copy of valid Annual Hygiene Training Certification issued by the Korean Facility Hygiene Management Association for Cy26. At a mi

View source 1
01page 25View official source ↗
“The offeror shall submit the PM's resume demonstrating relevant experience performing or managing food service exhaust system cleaning services and a copy of valid Annual Hygiene Training Certification issued by the Korean Facility Hygiene Management Association for Cy26. At a minimum, the resume sh”
Source page 25

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 25
Requirement 22Verified
The Government will evaluate offers based on the following factors, listed in descending order of importance. : Evaluation Criteria: Factor 1. Technical Capability Subfactor (1), Prime Contractor's Registration and Certifications Subfactor (2), Key Personnel Factor 2. Past PerforRead full requirement Close full requirement

The Government will evaluate offers based on the following factors, listed in descending order of importance. : Evaluation Criteria: Factor 1. Technical Capability Subfactor (1), Prime Contractor's Registration and Certifications Subfactor (2), Key Personnel Factor 2. Past Perfor

Applies to: person

View source 1
01page 27View official source ↗
“The Government will evaluate offers based on the following factors, listed in descending order of importance. : Evaluation Criteria: Factor 1. Technical Capability Subfactor (1), Prime Contractor's Registration and Certifications Subfactor (2), Key Personnel Factor 2. Past Performance Factor 3. Pric”
Source page 27

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 27
Requirement 23Verified

The PM's resume must clearly identify as required below: - Associate degree or bachelor's degree from an accredited college or university - Proposed position title - A brief description of work experience - Company name, phone number, and complete name of the employer - Length of

View source 1
01page 28View official source ↗
“The PM's resume must clearly identify as required below: - Associate degree or bachelor's degree from an accredited college or university - Proposed position title - A brief description of work experience - Company name, phone number, and complete name of the employer - Length of work experience (ye”
Source page 28

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 28
Requirement 24Verified

The Electrical Engineer's resume must clearly identify as required below:

View source 1
01page 28View official source ↗
“The Electrical Engineer's resume must clearly identify as required below:”
Source page 28

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 28

Joint ventures & teaming

Verified

There may be more than one immediate owner (e.g., joint ventures).

View source 1
01page 41View official source ↗
“There may be more than one immediate owner (e.g., joint ventures).”
Source page 41

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 41

Exclusions & responsibility

3 findings
Requirement 1Verified
(Deviation 2026- O0038) (Alternate I) 52.204-91 Contractor Identification. 2026-02 (Deviation 2026-O0038) 52.209-6 Protecting the Government's 2026-02 Interest When Subcontracting With Contractors Debarred, Suspended, Proposed for Debarment, or Voluntarily Excluded.Read full requirement Close full requirement

(Deviation 2026- O0038) (Alternate I) 52.204-91 Contractor Identification. 2026-02 (Deviation 2026-O0038) 52.209-6 Protecting the Government's 2026-02 Interest When Subcontracting With Contractors Debarred, Suspended, Proposed for Debarment, or Voluntarily Excluded.

Applies when: When Subcontracting With Contractors Debarred, Suspended, Proposed for Debarment, or Voluntarily Excluded

View source 1
01page 32View official source ↗
“(Deviation 2026- O0038) (Alternate I) 52.204-91 Contractor Identification. 2026-02 (Deviation 2026-O0038) 52.209-6 Protecting the Government's 2026-02 Interest When Subcontracting With Contractors Debarred, Suspended, Proposed for Debarment, or Voluntarily Excluded.”
Source page 32

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 32
Requirement 2Verified

The Offeror shall review the list of excluded parties in the System for Award Management (SAM) (https://www.sam.gov) for entities excluded from receiving federal awards for "covered defense telecommunications equipment or services".

View source 1
01page 45View official source ↗
“The Offeror shall review the list of excluded parties in the System for Award Management (SAM) (https://www.sam.gov) for entities excluded from receiving federal awards for "covered defense telecommunications equipment or services".”
Source page 45

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 45
Requirement 3Verified

The Offeror shall review the list of excluded parties in the System for Award Management (SAM) at https://www.sam.gov for entities that are excluded when providing any equipment, system, or service to carry out covered missions that uses covered defense telecommunications equipme

Applies when: when providing any equipment, system, or service to carry out covered missions that uses covered defense telecommunications equipment or services as a substantial or essen

View source 1
01page 46View official source ↗
“The Offeror shall review the list of excluded parties in the System for Award Management (SAM) at https://www.sam.gov for entities that are excluded when providing any equipment, system, or service to carry out covered missions that uses covered defense telecommunications equipment or services as a ”
Source page 46

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 46

Conflicts of interest

Verified

NLT Not Later Than OCI Organizational Conflict of Interest

View source 2
01page 30View official source ↗
“NLT Not Later Than OCI Organizational Conflict of Interest”
Source page 30

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 30
02page 30View official source ↗
“NLT Not Later Than OCI Organizational Conflict of Interest”
Source page 30

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 30
Missing information2 checks · expand to review

A missing value is not a waiver. Check the source or ask the agency before relying on it.

Required licenses

2 findings
Requirement 1Not reviewed

—

Not reviewed — requirement not confirmed

Requirement 2Not found

—

Not found in reviewed sources

2 additional fields have no reviewed finding.

02

Deadlines & submission

When and how to submit, and whether you are still in time.

13 verified14 to confirm

Response deadline

3 findings
Requirement 1Verified

2026-10-30T11:00:00+09:00

View source 1
01https://sam.gov/api/prod/opps/v2/opportunities/4f1e25feb0e440edbcdeda296cf9fcd1 /data2/solicitation/deadlines/responseView official source ↗
“2026-10-30T11:00:00+09:00”
Missing information · 2 checks
Not found

—

Not found in reviewed sources

Not reviewed

—

Not reviewed — requirement not confirmed

How to submit

3 findings
Requirement 1Verified
W90VN827RA001 Page 2 of 52 Section A - Solicitation/Contract Form Instrument Name:Cleaning of Food Service Exhaust Fans and Ducts for Dining Facilities in USAG Yongsan-Casey Product Service Code : J073 SPECIAL NOTICE "All sources may submit a proposal or quote as applicable.Read full requirement Close full requirement

W90VN827RA001 Page 2 of 52 Section A - Solicitation/Contract Form Instrument Name:Cleaning of Food Service Exhaust Fans and Ducts for Dining Facilities in USAG Yongsan-Casey Product Service Code : J073 SPECIAL NOTICE "All sources may submit a proposal or quote as applicable.

View source 1
01page 2View official source ↗
“W90VN827RA001 Page 2 of 52 Section A - Solicitation/Contract Form Instrument Name:Cleaning of Food Service Exhaust Fans and Ducts for Dining Facilities in USAG Yongsan-Casey Product Service Code : J073 SPECIAL NOTICE "All sources may submit a proposal or quote as applicable.”
Source page 2

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 2
Missing information · 2 checks
Not found

—

Not found in reviewed sources

Not reviewed

—

Not reviewed — requirement not confirmed

Required submission files

3 findings
Requirement 1Verified

These licens- ing and certification shall maintain throughout the life of contract, and a copy of it shall be submitted to the Contracting Officer as a part of technical proposal.

View source 2
01page 8View official source ↗
“These licens- ing and certification shall maintain throughout the life of contract, and a copy of it shall be submitted to the Contracting Officer as a part of technical proposal.”
Source page 8

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 8
02page 8View official source ↗
“These licens- ing and certification shall maintain throughout the life of contract, and a copy of it shall be submitted to the Contracting Officer as a part of technical proposal.”
Source page 8

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 8
Missing information · 2 checks
Not found

—

Not found in reviewed sources

Not reviewed

—

Not reviewed — requirement not confirmed

Procurement contact

16 findings
Requirement 1Verified

Se Yong Kwon · seyong.kwon.ln@army.mil · 3157224863

View source 1
01https://sam.gov/api/prod/opps/v2/opportunities/4f1e25feb0e440edbcdeda296cf9fcd1 /data2/pointOfContact/0View official source ↗
“Se Yong Kwon · seyong.kwon.ln@army.mil · 3157224863”
Requirement 2Verified

Susie M. Lee · susie.m.lee3.civ@army.mil

View source 1
01https://sam.gov/api/prod/opps/v2/opportunities/4f1e25feb0e440edbcdeda296cf9fcd1 /data2/pointOfContact/1View official source ↗
“Susie M. Lee · susie.m.lee3.civ@army.mil”
Requirement 3Needs confirmation

—

Needs confirmation

Applies when: prior to outages that will impact the function of the system, special problems or circumMust be met by: prior to outages that will impact the function of the system, special problems or circum

View source 2
01page 6View official source ↗
“The Contractor shall inform the Fire Department point of contact (POC), prior to outages that will impact the function of the system, special problems or circumstances, which require Fire Department inspection.”
Source page 6

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 6
02page 6View official source ↗
“The Contractor shall inform the Fire Department point of contact (POC), prior to outages that will impact the function of the system, special problems or circumstances, which require Fire Department inspection.”
Source page 6

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 6
Requirement 4Needs confirmation

—

Needs confirmation

Applies to: person

View source 2
01page 9View official source ↗
“The Project Manager shall be available after normal hours to serve as the central point of contact for Contractor operations.”
Source page 9

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 9
02page 9View official source ↗
“The Project Manager shall be available after normal hours to serve as the central point of contact for Contractor operations.”
Source page 9

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 9
Requirement 5Needs confirmation

—

Needs confirmation

View source 2
01page 10View official source ↗
“At a minimum, the resume shall include the PM's full name, description of qualifying work experience, period of experience, value or size of contract or project, company name or employer, and validating point of contact information.”
Source page 10

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 10
02page 23View official source ↗
“At a minimum, the resume shall include the PM's full name, description of qualifying work experience, period of experience, value or size of contract or project, company name or employer, and validating point of contact information.”
Source page 23

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 23
Requirement 6Needs confirmation

—

Needs confirmation

View source 2
01page 11View official source ↗
“For each Past Performance submission, provide: The title of the contract/project A description of work completed Name of the Client Organization or Requiring Activity Length of contract/project (year/month/date - year/month/date) Value of contract/project Complete name, e-mail, and phone number of p”
Source page 11

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 11
02page 24View official source ↗
“For each Past Performance submission, provide: The title of the contract/project A description of work completed Name of the Client Organization or Requiring Activity Length of contract/project (year/month/date - year/month/date) Value of contract/project Complete name, e-mail, and phone number of p”
Source page 24

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 24
Requirement 7Needs confirmation

—

Needs confirmation

View source 1
01page 14View official source ↗
“To access WAWF, the Contractor shall- (1) Have a designated electronic business point of contact in the System for Award Management at https://www.sam.gov; and (2) Be registered to use WAWF at https://wawf.eb.mil/ following the step-by-step procedures for self-registration available at this web site”
Source page 14

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 14
Requirement 8Needs confirmation

—

Needs confirmation

View source 1
01page 14View official source ↗
“(Contracting Officer: Insert applicable invoice and receiving report document type(s) for fixed”
Source page 14

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 14
Requirement 9Needs confirmation

—

Needs confirmation

View source 1
01page 15View official source ↗
“(Contracting Officer: Insert either "Invoice 2in1" or the applicable invoice and receiving”
Source page 15

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 15
Requirement 10Needs confirmation

—

Needs confirmation

Applies when: If the contract provides for progress payments or performance-based payments, insert the DoDAAC for the contract administration office assigned the functions under FAR 42

View source 1
01page 17View official source ↗
“W90VN827RA001 Page 17 of 52 (**Contracting Officer: If the contract provides for progress payments or performance-based payments, insert the DoDAAC for the contract administration office assigned the functions under FAR 42.302(a)(13).) (4) Payment request.”
Source page 17

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 17
Requirement 11Needs confirmation

—

Needs confirmation

View source 1
01page 17View official source ↗
“(g) WAWF point of contact.”
Source page 17

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 17
Requirement 12Needs confirmation

—

Needs confirmation

View source 1
01page 17View official source ↗
“(1) The Contractor may obtain clarification regarding invoicing in WAWF from the following contracting activity's WAWF point of contact.”
Source page 17

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 17
Requirement 13Needs confirmation

—

Needs confirmation

View source 1
01page 25View official source ↗
“include the PM's full name, description of qualifying work experience, period of experience, value or size of contract or project, company name or employer, and validating point of contact”
Source page 25

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 25
Requirement 14Needs confirmation

—

Needs confirmation

View source 1
01page 26View official source ↗
“W90VN827RA0010001 Page 26 of 32 Value of contract/project Complete name, e-mail, and phone number of point of contact (POC) at Client Organization (b) The Government may send a Past Performance Questionnaire to the POC listed by the Offeror for each relevant contract, who will subsequently be reques”
Source page 26

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 26
Requirement 15Needs confirmation

—

Needs confirmation

View source 2
01page 30View official source ↗
“PM Preventive Maintenance POC Point of Contact”
Source page 30

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 30
02page 30View official source ↗
“PM Preventive Maintenance POC Point of Contact”
Source page 30

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 30
Requirement 16Needs confirmation

—

Needs confirmation

View source 1
01page 48View official source ↗
“Point of Contact: SIM, SANG YIM 722-4146”
Source page 48

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 48

Formatting & signatures

8 findings
Requirement 1Verified

Volume Factor Title Page Limits I. 1 Technical Approach, Overall Page Limit: Twenty (20) single-sided Subfactor 1: Prime pages Contractor's Registrations & Resumes: Required for all Key Certifications Personnel.

View source 2
01page 9View official source ↗
“Volume Factor Title Page Limits I. 1 Technical Approach, Overall Page Limit: Twenty (20) single-sided Subfactor 1: Prime pages Contractor's Registrations & Resumes: Required for all Key Certifications Personnel.”
Source page 9

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 9
02page 22View official source ↗
“Volume Factor Title Page Limits I. 1 Technical Approach, Overall Page Limit: Twenty (20) single-sided Subfactor 1: Prime pages Contractor's Registrations & Resumes: Required for all Key Certifications Personnel.”
Source page 22

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 22
Requirement 2Verified

Personnel Excluded from Overall Page Limit: Table of

View source 2
01page 9View official source ↗
“Personnel Excluded from Overall Page Limit: Table of”
Source page 9

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 9
02page 24View official source ↗
“Personnel Excluded from Overall Page Limit: Table of”
Source page 24

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 24
Requirement 3Verified

Subfactor 2: Key Personnel Excluded from Overall Page Limit: Table of Contents, Cover Letter, and Resumes II. 2 Past Performance Maximum Overall Page Limit: Five (5) numbered single-sided pages

Applies to: person

View source 1
01page 9View official source ↗
“Subfactor 2: Key Personnel Excluded from Overall Page Limit: Table of Contents, Cover Letter, and Resumes II. 2 Past Performance Maximum Overall Page Limit: Five (5) numbered single-sided pages”
Source page 9

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 9
Requirement 4Verified

NOTE: Pages that exceed the required page limitations will not be evaluated. Additional pages

View source 3
01page 10View official source ↗
“NOTE: Pages that exceed the required page limitations will not be evaluated. Additional pages”
Source page 10

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 10
02page 24View official source ↗
“NOTE: Pages that exceed the required page limitations will not be evaluated. Additional pages”
Source page 24

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 24
03page 23View official source ↗
“NOTE: Pages that exceed the required page limitations will not be evaluated. Additional pages”
Source page 23

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 23
Requirement 5Verified
Subfactor 2: Key Personnel Excluded from Overall Page Limit: Table of Contents, Cover Letter, and Resumes II. 2 Past Performance Maximum Overall Page Limit: Five (5) numbered single-sided pages III 3 Price No Limit for the price proposal and/or any supporting narrative informatioRead full requirement Close full requirement

Subfactor 2: Key Personnel Excluded from Overall Page Limit: Table of Contents, Cover Letter, and Resumes II. 2 Past Performance Maximum Overall Page Limit: Five (5) numbered single-sided pages III 3 Price No Limit for the price proposal and/or any supporting narrative informatio

Applies to: person

View source 2
01page 24View official source ↗
“Subfactor 2: Key Personnel Excluded from Overall Page Limit: Table of Contents, Cover Letter, and Resumes II. 2 Past Performance Maximum Overall Page Limit: Five (5) numbered single-sided pages III 3 Price No Limit for the price proposal and/or any supporting narrative information NOTE: Pages that e”
Source page 24

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 24
02page 22View official source ↗
“Subfactor 2: Key Personnel Excluded from Overall Page Limit: Table of Contents, Cover Letter, and Resumes II. 2 Past Performance Maximum Overall Page Limit: Five (5) numbered single-sided pages III 3 Price No Limit for the price proposal and/or any supporting narrative information”
Source page 22

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 22
Requirement 6Verified

Personnel Excluded from Overall Page Limit: Table

View source 1
01page 22View official source ↗
“Personnel Excluded from Overall Page Limit: Table”
Source page 22

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 22
Requirement 7Verified

Volume Factor Title Page Limits

View source 1
01page 23View official source ↗
“Volume Factor Title Page Limits”
Source page 23

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 23
Requirement 8Verified

W90VN827RA0010001 Page 24 of 32 I. 1 Technical Approach, Overall Page Limit: Twenty (20) single-sided Subfactor 1: Prime pages Contractor's Registrations & Resumes: Required for all Key Certifications Personnel.

View source 1
01page 24View official source ↗
“W90VN827RA0010001 Page 24 of 32 I. 1 Technical Approach, Overall Page Limit: Twenty (20) single-sided Subfactor 1: Prime pages Contractor's Registrations & Resumes: Required for all Key Certifications Personnel.”
Source page 24

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 24
Missing information6 checks · expand to review

A missing value is not a waiver. Check the source or ask the agency before relying on it.

Questions due

2 findings
Requirement 1Not found

—

Not found in reviewed sources

Requirement 2Not reviewed

—

Not reviewed — requirement not confirmed

Site visit / pre-bid meeting

2 findings
Requirement 1Not found

—

Not found in reviewed sources

Requirement 2Not reviewed

—

Not reviewed — requirement not confirmed

Acknowledge amendments

2 findings
Requirement 1Not found

—

Not found in reviewed sources

Requirement 2Not reviewed

—

Not reviewed — requirement not confirmed

6 additional fields have no reviewed finding.

Continue your review

6 more sections are available once you sign in

Pricing & payment · Bonds & insurance · Evaluation & award · Scope & delivery · Labor, sourcing & compliance · Contract terms & risk

Sign in — free

Extracted from the public documents linked above. This is an information aid, not a determination of bid eligibility or legal advice. Verify the original wording and any addenda before submitting a bid.

Bid review
6 days left
See all 8