TX-CADDO LAKE NWR-VC SIDING REPAIR

4 source documentsSource checked Oct 21Content updated
Open notice
Response deadline
14 days left
Published project value
Not confirmed
Check the pricing and payment terms below.
Solicitation number
140FF027Q0012
View official posting ↗Review requirements ↓Original posting details are available below.

Dates to plan around

Times follow the original source.

  1. Response deadline
    Source wording
    Proposal Due Date: 11/06/2026 5:00 PM EST
    Page 3
From the posting4 agency details · contact information and original wording
Solicitation number
Solicitation number 140FF027Q0012
Worth confirming on the posting
Contact
Drew Ferrall, Contract Specialist Department of the Interior US Fish and Wildlife Service john_ferrall@ios.doi.gov
Scope
The U.S. Fish and Wildlife Service has a construction project for work that requires removal of the existing damaged siding on the visitor center trailer (back) and the end of an a
View the official posting →Always the authority. An addendum can change any of this after we read it.
Document coverage
2 / 4documents readReview incomplete

4 documents found2 could not be read18% of weighted requirement checks reviewed

Newer source changes have not been verified. Confirm the latest notice and addenda before submitting.

Before you bid

Review first

Start with these requirements and unresolved points.
  • Must do
    Registrations
    View 2 flagged requirements
    1. Requirement 1 ↗

      The proposal/quotation MUST be electronically submitted via e-mail to Contract Specialist, Drew Ferrall at john_ferrall@ios.doi.gov by 5:00PM EST by November 6, 2026. Offerors shall be registered in SAM (System for Award Management, www.sam.gov) at the date and time proposals are

    2. Requirement 2 ↗

      Per FAR.204-7, to be eligible for contract award the offeror must be registered in SAM's database, which the primary Government repository for Contractor information required for the conduct of business with the Government.

  • Must do
01

Eligibility & participation

Whether you can bid at all, and what you must already hold.

18 verified3 to confirm

Registrations

10 findings
Requirement 1Verified

The Government will evaluate quotations based on price. System for Award Management (SAM) Registration: A prospective awardee shall be registered in the SAM database prior to award.

Applies when: prior to awardMust be met by: prior to award

View source 1
01notice bodyView official source ↗
“The Government will evaluate quotations based on price. System for Award Management (SAM) Registration: A prospective awardee shall be registered in the SAM database prior to award.”
Requirement 2Verified

System for Award Management (SAM) Registration: A prospective awardee shall be registered in the SAM database prior to award.

Applies when: prior to awardMust be met by: prior to award

View source 1
01notice bodyView official source ↗
“System for Award Management (SAM) Registration: A prospective awardee shall be registered in the SAM database prior to award.”
Requirement 3Verified

The proposal/quotation MUST be electronically submitted via e-mail to Contract Specialist, Drew Ferrall at john_ferrall@ios.doi.gov by 5:00PM EST by November 6, 2026. Offerors shall be registered in SAM (System for Award Management, www.sam.gov) at the date and time proposals are

View source 1
01page 3View official source ↗
“The proposal/quotation MUST be electronically submitted via e-mail to Contract Specialist, Drew Ferrall at john_ferrall@ios.doi.gov by 5:00PM EST by November 6, 2026. Offerors shall be registered in SAM (System for Award Management, www.sam.gov) at the date and time proposals are due.”
Source page 3

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 3
Requirement 4Verified

The apparent awardee shall be registered in SAM at the time of award.

Applies when: at the time of awardMust be met by: at the time of award

View source 1
01page 3View official source ↗
“The apparent awardee shall be registered in SAM at the time of award.”
Source page 3

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 3
Requirement 5Verified

If the Offeror has responded "will" in the representation in paragraph (d)(1) of this provision, the Offeror shall provide the following information as part of the offer: (i) For covered equipment— (A) The entity that produced the covered telecommunications equipment (include ent

Applies when: If the Offeror has responded "will" in the representation in paragraph (d)(1) of this provision, the Offeror shall provide the following information as part of the offer: (i) For cov

View source 1
01page 59View official source ↗
“If the Offeror has responded "will" in the representation in paragraph (d)(1) of this provision, the Offeror shall provide the following information as part of the offer: (i) For covered equipment— (A) The entity that produced the covered telecommunications equipment (include entity name, unique ent”
Source page 59

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 59
Requirement 6Verified

If the Offeror has responded "does" in the representation in paragraph (d)(2) of this provision, the Offeror shall provide the following information as part of the offer: (i) For covered equipment— (A) The entity that produced the covered telecommunications equipment (include ent

Applies when: If the Offeror has responded "does" in the representation in paragraph (d)(2) of this provision, the Offeror shall provide the following information as part of the offer: (i) For cov

View source 1
01page 59View official source ↗
“If the Offeror has responded "does" in the representation in paragraph (d)(2) of this provision, the Offeror shall provide the following information as part of the offer: (i) For covered equipment— (A) The entity that produced the covered telecommunications equipment (include entity name, unique ent”
Source page 59

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 59
Requirement 7Verified

Per FAR.204-7, to be eligible for contract award the offeror must be registered in SAM's database, which the primary Government repository for Contractor information required for the conduct of business with the Government.

View source 1
01page 62View official source ↗
“Per FAR.204-7, to be eligible for contract award the offeror must be registered in SAM's database, which the primary Government repository for Contractor information required for the conduct of business with the Government.”
Source page 62

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 62
Requirement 8Verified

By submission of a quote/proposal, the offeror acknowledges the requirement that a prospective awardee shall be registered in the SAM database prior to award, during performance, and through final payment of any contract, basic agreement, basic ordering agreement, or blanket purc

Applies when: prior to award, during performance, and through final payment of any contract, basic agrMust be met by: prior to award, during performance, and through final payment of any contract, basic agr

View source 1
01page 62View official source ↗
“By submission of a quote/proposal, the offeror acknowledges the requirement that a prospective awardee shall be registered in the SAM database prior to award, during performance, and through final payment of any contract, basic agreement, basic ordering agreement, or blanket purchasing agreement res”
Source page 62

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 62
Requirement 9Verified

L.2.1 A responsive quote/proposal shall consist of the following at minimum: L.2.1.1 SF 1442 signed L.2.1.2 Bid Schedule (Section B) L.2.1.3 Active SAM Registration L.2.1.1 Submit the completed Standard Form 1442 and all acknowledged amendments, if any.

Applies when: if any

View source 1
01page 63View official source ↗
“L.2.1 A responsive quote/proposal shall consist of the following at minimum: L.2.1.1 SF 1442 signed L.2.1.2 Bid Schedule (Section B) L.2.1.3 Active SAM Registration L.2.1.1 Submit the completed Standard Form 1442 and all acknowledged amendments, if any.”
Source page 63

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 63
Missing information · 1 check
Not reviewed

—

Not reviewed — requirement not confirmed

Set-aside

4 findings
Requirement 1Verified

SBA

View source 1
01https://sam.gov/api/prod/opps/v2/opportunities/50dfba6388644afdacd71eafb6ae4d39 /data2/solicitation/setAsideView official source ↗
“SBA”
Requirement 2Verified

SDVOSB,HUBZONE

View source 1
01page 53View official source ↗
“(iii) Is an 8(a), HUBZone, service-disabled veteran-owned, economically disadvantaged women-owned, or women-owned small business set-aside or sole-source award”
Source page 53

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 53
Missing information · 2 checks
Not reviewed

—

Not reviewed — requirement not confirmed

Not found

—

Not found in reviewed sources

Small business size

5 findings
Requirement 1Needs confirmation

—

Needs confirmation

View source 1
01page 52View official source ↗
“(2) The small business size standard is 19.0 Million.”
Source page 52

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 52
Requirement 2Needs confirmation

—

Needs confirmation

View source 1
01page 52View official source ↗
“(3) The small business size standard for a concern that submits an offer, other than on a construction or service acquisition, but proposes to furnish an end item that it did not itself manufacture, process, or produce is 500 employees, or 150 employees for information technology value-added reselle”
Source page 52

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 52
Requirement 3Needs confirmation

—

Needs confirmation

Applies when: within the last 12 months, are current, accurate, complete, and applicable to this sol

View source 1
01page 57View official source ↗
“provision have been entered or updated within the last 12 months, are current, accurate, complete, and applicable to this solicitation (including the business size standard applicable to”
Source page 57

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 57
Missing information · 2 checks
Not reviewed

—

Not reviewed — requirement not confirmed

Not found

—

Not found in reviewed sources

Key personnel

3 findings
Requirement 1Verified

The FI is not authorized to make technical decisions or give technical directions; the Contractor or the Contractor's Superintendent must contact the COTR regarding such decisions and directions.

Applies to: person

View source 1
01page 20View official source ↗
“The FI is not authorized to make technical decisions or give technical directions; the Contractor or the Contractor's Superintendent must contact the COTR regarding such decisions and directions.”
Source page 20

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 20
Requirement 2Verified
H.10.0 SUBSTITUTION – PROCESSION OF WORK Any proposed key personnel, minimum qualifications for incoming or replacement key personnel, subcontractors, processes, procedures or materials included in the quotation are hereby incorporated into the contract.Read full requirement Close full requirement

H.10.0 SUBSTITUTION – PROCESSION OF WORK Any proposed key personnel, minimum qualifications for incoming or replacement key personnel, subcontractors, processes, procedures or materials included in the quotation are hereby incorporated into the contract.

Applies to: subcontractor

View source 1
01page 28View official source ↗
“H.10.0 SUBSTITUTION – PROCESSION OF WORK Any proposed key personnel, minimum qualifications for incoming or replacement key personnel, subcontractors, processes, procedures or materials included in the quotation are hereby incorporated into the contract.”
Source page 28

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 28
Requirement 3Verified

CADDO LAKE NWR – VISITOR CENTER SIDING REPAIR SOLICITATION NO. 140FF027Q0012 FWS H.22.0 QUALITY CONTROL The Contractors Quality Control Inspector and/or Superintendent shall ensure all items on the Pre-Final Punch List, rejected and nonconforming work, along with all remaining wo

Applies to: person

View source 1
01page 32View official source ↗
“CADDO LAKE NWR – VISITOR CENTER SIDING REPAIR SOLICITATION NO. 140FF027Q0012 FWS H.22.0 QUALITY CONTROL The Contractors Quality Control Inspector and/or Superintendent shall ensure all items on the Pre-Final Punch List, rejected and nonconforming work, along with all remaining work conforms to the c”
Source page 32

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 32

Financial capacity

Verified

The bonds shall be in the form of firm commitment, supported by corporate sureties whose names appear on the list contained in Treasury Department Circular 570, individual sureties, or by other acceptable security such as postal money order, certified check, cashier's check, irre

Applies to: surety

View source 1
01page 48View official source ↗
“The bonds shall be in the form of firm commitment, supported by corporate sureties whose names appear on the list contained in Treasury Department Circular 570, individual sureties, or by other acceptable security such as postal money order, certified check, cashier's check, irrevocable letter of cr”
Source page 48

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 48

Joint ventures & teaming

2 findings
Requirement 1Verified

Under this contract, the following documents are required to be submitted as an attachment to the IPP invoice: 1. Invoice billed according to contract line items and rates. 2. Prime and subcontractor Certified Payrolls and Statement of Compliance in accordance with clause 52.222-

Applies when: If the partial payment is billed a

Applies to: subcontractor

View source 1
01page 21View official source ↗
“Under this contract, the following documents are required to be submitted as an attachment to the IPP invoice: 1. Invoice billed according to contract line items and rates. 2. Prime and subcontractor Certified Payrolls and Statement of Compliance in accordance with clause 52.222-8. 3. If the partial”
Source page 21

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 21
Requirement 2Verified

UEI) of team members (i.e. partnerships, joint ventures, teaming arrangements or parent companies/subsidiaries/affiliates) identified in the offeror’s quote/proposal.

View source 1
01page 65View official source ↗
“UEI) of team members (i.e. partnerships, joint ventures, teaming arrangements or parent companies/subsidiaries/affiliates) identified in the offeror’s quote/proposal.”
Source page 65

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 65

Exclusions & responsibility

Verified

(xvii) 52.209-6, Protecting the Government’s Interest When Subcontracting with Contractors Debarred, Suspended, or Proposed for Debarment (NOV 2021) (Applies to contracts over

Applies when: When Subcontracting with Contractors Debarred, Suspended, or Proposed for Debarment (NOV 2021) (Applies to contracts over

View source 1
01page 41View official source ↗
“(xvii) 52.209-6, Protecting the Government’s Interest When Subcontracting with Contractors Debarred, Suspended, or Proposed for Debarment (NOV 2021) (Applies to contracts over”
Source page 41

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 41
Missing information4 checks · expand to review

A missing value is not a waiver. Check the source or ask the agency before relying on it.

Required licenses

2 findings
Requirement 1Not found

—

Not found in reviewed sources

Requirement 2Not reviewed

—

Not reviewed — requirement not confirmed

Experience & references

2 findings
Requirement 1Not found

—

Not found in reviewed sources

Requirement 2Not reviewed

—

Not reviewed — requirement not confirmed

2 additional fields have no reviewed finding.

02

Deadlines & submission

When and how to submit, and whether you are still in time.

11 verified6 to confirm

Response deadline

3 findings
Requirement 1Verified

2026-11-06T17:00:00-05:00

View source 3
01page 3View official source ↗
“Proposal Due Date: 11/06/2026 5:00 PM EST”
Source page 3

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 3
02page 3View official source ↗
“Proposal Due Date: 11/06/2026”
Source page 3

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 3
03https://sam.gov/api/prod/opps/v2/opportunities/50dfba6388644afdacd71eafb6ae4d39 /data2/solicitation/deadlines/responseView official source ↗
“2026-11-06T17:00:00-05:00”
Missing information · 2 checks
Not reviewed

—

Not reviewed — requirement not confirmed

Not found

—

Not found in reviewed sources

How to submit

4 findings
Requirement 1Verified

Information on registration may be obtained via the Internet at https://sam.gov/content/entity-registration Proposal Submission: Quotes/Proposals (including any/all required documents) must be submitted via e-mail to john_ferrall@ios.doi.gov, no later than November 06, 2026, 5:00

Applies when: no later than November 06, 2026, 5:00 pm ESTMust be met by: no later than November 06, 2026, 5:00 pm EST

View source 1
01notice bodyView official source ↗
“Information on registration may be obtained via the Internet at https://sam.gov/content/entity-registration Proposal Submission: Quotes/Proposals (including any/all required documents) must be submitted via e-mail to john_ferrall@ios.doi.gov, no later than November 06, 2026, 5:00 pm EST.”
Requirement 2Verified

The proposal/quotation MUST be electronically submitted via e-mail to Contract Specialist, Drew Ferrall at john_ferrall@ios.doi.gov by 5:00PM EST by November 6, 2026. Offerors shall be registered in SAM (System for Award Management, www.sam.gov) at the date and time proposals are

View source 1
01page 3View official source ↗
“The proposal/quotation MUST be electronically submitted via e-mail to Contract Specialist, Drew Ferrall at john_ferrall@ios.doi.gov by 5:00PM EST by November 6, 2026. Offerors shall be registered in SAM (System for Award Management, www.sam.gov) at the date and time proposals are due.”
Source page 3

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 3
Requirement 3Verified

The proposal MUST be electronically submitted via e-mail to Contract Specialist, Drew Ferrall at john_ferrall@ios.doi.gov.

View source 1
01page 63View official source ↗
“The proposal MUST be electronically submitted via e-mail to Contract Specialist, Drew Ferrall at john_ferrall@ios.doi.gov.”
Source page 63

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 63
Missing information · 1 check
Not reviewed

—

Not reviewed — requirement not confirmed

Required submission files

3 findings
Requirement 1Verified

The Contractor's proposal shall include a justification for any time extension proposed.

View source 1
01page 31View official source ↗
“The Contractor's proposal shall include a justification for any time extension proposed.”
Source page 31

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 31
Missing information · 2 checks
Not reviewed

—

Not reviewed — requirement not confirmed

Not found

—

Not found in reviewed sources

Procurement contact

9 findings
Requirement 1Verified

Ferrall, John · john_ferrall@fws.gov · 5715473230

View source 1
01https://sam.gov/api/prod/opps/v2/opportunities/50dfba6388644afdacd71eafb6ae4d39 /data2/pointOfContact/0View official source ↗
“Ferrall, John · john_ferrall@fws.gov · 5715473230”
Requirement 2Verified

john_ferrall@ios.doi.gov

View source 1
01from the postingView official source ↗
“including any/all required documents) must be submitted via e-mail to john_ferrall@ios.doi.gov, no later than November 06, 2026, 5:00 pm EST. Please indicate the fo”
Requirement 3Verified

Contracting Point of Contact: Drew Ferrall, Contract Specialist Department of the Interior US Fish and Wildlife Service john_ferrall@ios.doi.gov

View source 1
01notice bodyView official source ↗
“Contracting Point of Contact: Drew Ferrall, Contract Specialist Department of the Interior US Fish and Wildlife Service john_ferrall@ios.doi.gov”
Requirement 4Verified

Drew Ferrall, Contract Specialist Department of the Interior US Fish and Wildlife Service john_ferrall@ios.doi.gov

View source 1
01from the postingView official source ↗
“Solicitation. Contracting Point of Contact: Drew Ferrall, Contract Specialist Department of the Interior US Fish and Wildlife Service john_ferrall@ios.doi.gov”
Requirement 5Needs confirmation

—

Needs confirmation

View source 1
01page 6View official source ↗
“CADDO LAKE NWR – VISITOR CENTER SIDING REPAIR SOLICITATION NO. 140FF027Q0012 FWS (End of clause) (End of Section A) SECTION B – PRICES (QUOTE SCHEDULE) Name of Firm: Address: City: State: Zip Code: Unique Entity ID (12 Digits assigned by SAM.gov) CAGE Code: Name and Title of Firm’s Point of Contact:”
Source page 6

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 6
Requirement 6Needs confirmation

—

Needs confirmation

View source 1
01page 21View official source ↗
“The Contractor Government Business Point of Contact (as listed in SAM) will receive enrollment instructions via email from the Federal Reserve Bank of St.”
Source page 21

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 21
Requirement 7Needs confirmation

—

Needs confirmation

View source 1
01page 56View official source ↗
“the Contracting Officer:”
Source page 56

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 56
Requirement 8Needs confirmation

—

Needs confirmation

Applies when: If any exception(s) are taken with this RFQ's scope of work, drawings and or specifications, the prospective offeror must notify the Government POC (Point Of Contact listed in Block; prior to submission of any offer/proposal in order for the Government to properlyMust be met by: prior to submission of any offer/proposal in order for the Government to properly

View source 1
01page 64View official source ↗
“If any exception(s) are taken with this RFQ's scope of work, drawings and or specifications, the prospective offeror must notify the Government POC (Point Of Contact listed in Block 9 of the Form SF 1442 - Solicitation, Offer, and Award), prior to submission of any offer/proposal in order for the Go”
Source page 64

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 64
Requirement 9Needs confirmation

—

Needs confirmation

Applies when: If any exception(s) are taken with this RFQ's drawings and or specifications, the prospective offeror must notify the Government POC (Point of Contact listed in Block 9 of the Form S; prior to submission of any offer/proposal in order for the Government to properly evaluaMust be met by: prior to submission of any offer/proposal in order for the Government to properly evalua

View source 1
01page 69View official source ↗
“If any exception(s) are taken with this RFQ's drawings and or specifications, the prospective offeror must notify the Government POC (Point of Contact listed in Block 9 of the Form SF 1442 - Solicitation, Offer, and Award), prior to submission of any offer/proposal in order for the Government to pro”
Source page 69

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 69

Bid opening

Needs confirmation

—

Needs confirmation

Applies when: If this is a sealed bid solicitation, offers will be publicly opened at that time

View source 1
01page 1View official source ↗
“If this is a sealed bid solicitation, offers will be publicly opened at that time.”
Source page 1

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 1

Offer acceptance period

Verified

60 days

View source 1
01page 3View official source ↗
“Proposal Acceptance Period: 60 days”
Source page 3

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 3

Grounds for rejection

Verified

Failure to fill-out could result in your bid being non-responsive.

View source 1
01page 64View official source ↗
“Failure to fill-out could result in your bid being non-responsive.”
Source page 64

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 64
Missing information6 checks · expand to review

A missing value is not a waiver. Check the source or ask the agency before relying on it.

Questions due

2 findings
Requirement 1Not found

—

Not found in reviewed sources

Requirement 2Not reviewed

—

Not reviewed — requirement not confirmed

Site visit / pre-bid meeting

2 findings
Requirement 1Not found

—

Not found in reviewed sources

Requirement 2Not reviewed

—

Not reviewed — requirement not confirmed

Acknowledge amendments

2 findings
Requirement 1Not found

—

Not found in reviewed sources

Requirement 2Not reviewed

—

Not reviewed — requirement not confirmed

4 additional fields have no reviewed finding.

Continue your review

6 more sections are available once you sign in

Pricing & payment · Bonds & insurance · Evaluation & award · Scope & delivery · Labor, sourcing & compliance · Contract terms & risk

Sign in — free

Extracted from the public documents linked above. This is an information aid, not a determination of bid eligibility or legal advice. Verify the original wording and any addenda before submitting a bid.

Bid review
14 days left
See all 7