DEPT OF DEFENSE
Guardrail Installation, Mansfield Hollow Lake, Mansfield, CT
- Response deadline
- 7 days left
- Published project value
- $25K – $100KAs stated in the source documents
- Solicitation number
- W912WJ27QA003
Dates to plan around
Times follow the original source.
- Response deadline
Source wording
2026-10-30T17:00:00-04:00
From the posting1 agency details · contact information and original wording
4 documents found68% of weighted requirement checks reviewed
Review first
Start with these requirements and unresolved points.- Must doRegistrations
View 2 flagged requirements
- Requirement 1 ↗
The invoice must also include the company letterhead, and this must match the data that is registered in the System for Award Management (SAM) registry.
- Requirement 2 ↗
To access WAWF, the Contractor shall- (1) Have a designated electronic business point of contact in the System for Award Management at https://www.sam.gov; and (2) Be registered to use WAWF at https://wawf.eb.mil/ following the step-by-step procedures for self-registration availa
- Requirement 1 ↗
- Must doSet-aside
View 2 flagged requirements
- Requirement 1 ↗
HUBZONE
- Requirement 2 ↗
SBA
- Requirement 1 ↗
Eligibility & participation
Whether you can bid at all, and what you must already hold.
Registrations
5 findingsTHE WORK CONSISTS OF: Furnish all equipment, materials, and labor for the provision and installation of approximately 250 linear feet of new pressure-treated guardrail at Mansfield Hollow Dam, Mansfield, CT in accordance with the following requirements and Statement of Work. The
Applies when: AT THE TIME OF SUBMISSION IN ORDER TO BE CONSIDEREDMust be met by: AT THE TIME OF SUBMISSION IN ORDER TO BE CONSIDERED
View source 1
“THE WORK CONSISTS OF: Furnish all equipment, materials, and labor for the provision and installation of approximately 250 linear feet of new pressure-treated guardrail at Mansfield Hollow Dam, Mansfield, CT in accordance with the following requirements and Statement of Work. The magnitude of constru”
The invoice must also include the company letterhead, and this must match the data that is registered in the System for Award Management (SAM) registry.
View source 1
“The invoice must also include the company letterhead, and this must match the data that is registered in the System for Award Management (SAM) registry.”
Source page 8
Page markings may include other requirements. The quotation above identifies this requirement.

To access WAWF, the Contractor shall- (1) Have a designated electronic business point of contact in the System for Award Management at https://www.sam.gov; and (2) Be registered to use WAWF at https://wawf.eb.mil/ following the step-by-step procedures for self-registration availa
View source 1
“To access WAWF, the Contractor shall- (1) Have a designated electronic business point of contact in the System for Award Management at https://www.sam.gov; and (2) Be registered to use WAWF at https://wawf.eb.mil/ following the step-by-step procedures for self-registration available at this web site”
Source page 18
Page markings may include other requirements. The quotation above identifies this requirement.

Missing information · 2 checks
—
Not found in reviewed sources
—
Not reviewed — requirement not confirmed
Set-aside
5 findingsSBA
View source 1
“SBA”
SDVOSB,HUBZONE
Applies when: unless the Contractor waived the price evaluation preferenceA waiver may be available
View source 1
“(2) Used the HUBZone price evaluation preference regardless of dollar value, unless the Contractor waived the price evaluation preference; or (3) Was an 8(a), HUBZone, service-disabled veteran-owned, economically disadvantaged women-owned, or women-owned small business set-aside or sole-source award regardless of dolla”
Source page 34
Page markings may include other requirements. The quotation above identifies this requirement.

HUBZONE
View source 1
“venture: .] Each HUBZone small business concern participating in the HUBZone joint venture must be certified as a HUBZone concern. [____Contractor to sign and date and insert”
Source page 35
Page markings may include other requirements. The quotation above identifies this requirement.

Missing information · 2 checks
—
Not found in reviewed sources
—
Not reviewed — requirement not confirmed
Small business size
8 findings—
The cited text does not establish a complete USD size standard.
Applies when: AT THE TIME OF SUBMISSION IN ORDER TO BE CONSIDEREDMust be met by: AT THE TIME OF SUBMISSION IN ORDER TO BE CONSIDERED
View source 1
“THE WORK CONSISTS OF: Furnish all equipment, materials, and labor for the provision and installation of approximately 250 linear feet of new pressure-treated guardrail at Mansfield Hollow Dam, Mansfield, CT in accordance with the following requirements and Statement of Work. The magnitude of constru”
—
Needs confirmation
View source 1
“Small business concern- (1) Means a concern, including its affiliates, that is independently owned and operated, not dominant in its field of operation, and qualified as a small business under the criteria in 13 CFR part 121 and the size standard in paragraph (c) of this clause.”
Source page 33
Page markings may include other requirements. The quotation above identifies this requirement.

—
Needs confirmation
Applies when: If the Contractor represented that it was a small business concern, a small disadvantaged business concern, or a joint venture that was any of the small business concerns identified; prior to award of this contract, the ContMust be met by: prior to award of this contract, the Cont
View source 1
“SBA determines affiliation based on the factors set forth at 13 CFR 121.103. (b) If the Contractor represented that it was a small business concern, a small disadvantaged business concern, or a joint venture that was any of the small business concerns identified in 19.000(a)(3) prior to award of thi”
Source page 33
Page markings may include other requirements. The quotation above identifies this requirement.

—
Needs confirmation
Applies when: at the time of this rerepresentation that corresponds to the North American Industry ClassificMust be met by: at the time of this rerepresentation that corresponds to the North American Industry Classific
View source 1
“(c) The Contractor shall rerepresent its size status in accordance with the size standard in effect at the time of this rerepresentation that corresponds to the North American Industry Classification System (NAICS) code(s) assigned to this contract.”
Source page 34
Page markings may include other requirements. The quotation above identifies this requirement.

—
Needs confirmation
View source 1
“The small business size standard corresponding to this NAICS code(s) can be found at https://www.sba.gov/document /support--table-size-standards.”
Source page 34
Page markings may include other requirements. The quotation above identifies this requirement.

—
Needs confirmation
Applies when: if the acquisit
View source 1
“(d) The small business size standard for a Contractor providing an end item that it does not manufacture, process, or produce itself, for a contract other than a construction or service contract, is 500 employees, or 150 employees for information technology value-added resellers under NAICS code 541”
Source page 34
Page markings may include other requirements. The quotation above identifies this requirement.

Missing information · 2 checks
—
Not found in reviewed sources
—
Not reviewed — requirement not confirmed
Key personnel
Government will review key personnel, subcontractor teaming arrangements, documents, and certifications as they relate to the solicitation.
Applies to: subcontractor
View source 1
“Government will review key personnel, subcontractor teaming arrangements, documents, and certifications as they relate to the solicitation.”
Source page 60
Page markings may include other requirements. The quotation above identifies this requirement.

Financial capacity
5 findingsAttach copy of response; if oral, attach summary.] [Include other applicable supporting information.] (End of clause) 52.228-13 Alternative Payment Protections. 2000-07 Alternative Payment Protections (July 2000) (a) The Contractor shall submit one of the following payment protec
Applies when: if oral, attach summary
View source 1
“Attach copy of response; if oral, attach summary.] [Include other applicable supporting information.] (End of clause) 52.228-13 Alternative Payment Protections. 2000-07 Alternative Payment Protections (July 2000) (a) The Contractor shall submit one of the following payment protections: Payment Bond ”
Source page 41
Page markings may include other requirements. The quotation above identifies this requirement.

(i) Payment Bond or (ii) Irrevocable Letter of Credit and
View source 1
“(i) Payment Bond or (ii) Irrevocable Letter of Credit and”
Source page 55
Page markings may include other requirements. The quotation above identifies this requirement.

(iii) Performance Bond A Payment Bond or Irrevocable Letter of Credit is the SELECTED payment protection for the
View source 1
“(iii) Performance Bond A Payment Bond or Irrevocable Letter of Credit is the SELECTED payment protection for the”
Source page 55
Page markings may include other requirements. The quotation above identifies this requirement.

(i) Payment bond or (ii) Irrevocable letter of credit
View source 1
“(i) Payment bond or (ii) Irrevocable letter of credit”
Source page 55
Page markings may include other requirements. The quotation above identifies this requirement.

(ii) Irrevocable letter of credit A Payment Bond or Irrevocable Letter of Credit is the SELECTED payment protection for the
View source 1
“(ii) Irrevocable letter of credit A Payment Bond or Irrevocable Letter of Credit is the SELECTED payment protection for the”
Source page 55
Page markings may include other requirements. The quotation above identifies this requirement.

Joint ventures & teaming
6 findingsSBA determines affiliation based on the factors set forth at 13 CFR 121.103. (b) If the Contractor represented that it was a small business concern, a small disadvantaged business concern, or a joint venture that was any of the small business concerns identified in 19.000(a)(3) pClose full requirement
SBA determines affiliation based on the factors set forth at 13 CFR 121.103. (b) If the Contractor represented that it was a small business concern, a small disadvantaged business concern, or a joint venture that was any of the small business concerns identified in 19.000(a)(3) p
Applies when: If the Contractor represented that it was a small business concern, a small disadvantaged business concern, or a joint venture that was any of the small business concerns identified; prior to award of this contract, the ContMust be met by: prior to award of this contract, the Cont
View source 1
“SBA determines affiliation based on the factors set forth at 13 CFR 121.103. (b) If the Contractor represented that it was a small business concern, a small disadvantaged business concern, or a joint venture that was any of the small business concerns identified in 19.000(a)(3) prior to award of thi”
Source page 33
Page markings may include other requirements. The quotation above identifies this requirement.

(2) [Complete only if the Contractor represented itself as a small business concern in paragraph (g)(1) of this clause.] The Contractor represents that it is, is not, a small disadvantaged business concern as defined in 13 CFR 124.1001. (3) Women-owned small business (WOSB) jointClose full requirement
(2) [Complete only if the Contractor represented itself as a small business concern in paragraph (g)(1) of this clause.] The Contractor represents that it is, is not, a small disadvantaged business concern as defined in 13 CFR 124.1001. (3) Women-owned small business (WOSB) joint
Applies when: if the Contractor represented itself as a small business concern in paragraph (g)(1) of this clause
View source 1
“(2) [Complete only if the Contractor represented itself as a small business concern in paragraph (g)(1) of this clause.] The Contractor represents that it is, is not, a small disadvantaged business concern as defined in 13 CFR 124.1001. (3) Women-owned small business (WOSB) joint venture eligible un”
Source page 35
Page markings may include other requirements. The quotation above identifies this requirement.

identifier of each party to the joint venture: __.]
View source 1
“identifier of each party to the joint venture: __.]”
Source page 35
Page markings may include other requirements. The quotation above identifies this requirement.

identifier of each party to the joint venture: __ .]
View source 1
“identifier of each party to the joint venture: __ .]”
Source page 35
Page markings may include other requirements. The quotation above identifies this requirement.

a HUBZone small business concern. ] The offeror represents, as part of its offer, that It is, is not a HUBZone joint venture that complies with the requirements of 13 CFR 126.616(a) through (c).
View source 1
“a HUBZone small business concern. ] The offeror represents, as part of its offer, that It is, is not a HUBZone joint venture that complies with the requirements of 13 CFR 126.616(a) through (c).”
Source page 35
Page markings may include other requirements. The quotation above identifies this requirement.

venture: .] Each HUBZone small business concern participating in the HUBZone joint venture
View source 1
“venture: .] Each HUBZone small business concern participating in the HUBZone joint venture”
Source page 35
Page markings may include other requirements. The quotation above identifies this requirement.

Exclusions & responsibility
The Offeror shall review the list of excluded parties in the System for Award Management (SAM) at https://www.sam.gov for entities that are excluded when providing any equipment, system, or service to carry out covered missions that uses covered defense telecommunications equipme
Applies when: when providing any equipment, system, or service to carry out covered missions that uses covered defense telecommunications equipment or services as a substantial or essen
View source 1
“The Offeror shall review the list of excluded parties in the System for Award Management (SAM) at https://www.sam.gov for entities that are excluded when providing any equipment, system, or service to carry out covered missions that uses covered defense telecommunications equipment or services as a ”
Source page 51
Page markings may include other requirements. The quotation above identifies this requirement.

Missing information4 checks · expand to review
A missing value is not a waiver. Check the source or ask the agency before relying on it.
Required licenses
2 findings—
Not found in reviewed sources
—
Not reviewed — requirement not confirmed
Experience & references
2 findings—
Not found in reviewed sources
—
Not reviewed — requirement not confirmed
2 additional fields have no reviewed finding.
Deadlines & submission
When and how to submit, and whether you are still in time.
Response deadline
3 findings2026-10-30T17:00:00-04:00
View source 1
“2026-10-30T17:00:00-04:00”
Missing information · 2 checks
—
Not found in reviewed sources
—
Not reviewed — requirement not confirmed
How to submit
5 findingsFailure to provide sufficient documentation for Government evaluation for these factors with quote submission shall result in a quote being deemed non-responsive. 4. This work is considered "new". 5. All responsible sources may submit a quote which, if timely received, must be co
Applies when: if timely received, must be considered by the Agency
View source 1
“Failure to provide sufficient documentation for Government evaluation for these factors with quote submission shall result in a quote being deemed non-responsive. 4. This work is considered "new". 5. All responsible sources may submit a quote which, if timely received, must be considered by the Agen”
Source page 53
Page markings may include other requirements. The quotation above identifies this requirement.

QUOTE SUBMISSION: 1. Quotes shall be submitted via email to the Contract Specialist listed above no later than the closing date and time identified in the solicitation or subsequent amendments. 2. The Government is under no obligation to consider any quote received after the soli
Applies when: no later than the closing date and time identified in the solicitation or subsequent amendmenMust be met by: no later than the closing date and time identified in the solicitation or subsequent amendmen
View source 1
“QUOTE SUBMISSION: 1. Quotes shall be submitted via email to the Contract Specialist listed above no later than the closing date and time identified in the solicitation or subsequent amendments. 2. The Government is under no obligation to consider any quote received after the solicitation closing dat”
Source page 54
Page markings may include other requirements. The quotation above identifies this requirement.

2. In accordance with FAR Part 52.204-7(b)(1) Contractors must be registered in the System for Award Management (SAM) database (www.SAM.gov) to submit a quote. Registered is considered
View source 1
“2. In accordance with FAR Part 52.204-7(b)(1) Contractors must be registered in the System for Award Management (SAM) database (www.SAM.gov) to submit a quote. Registered is considered”
Source page 56
Page markings may include other requirements. The quotation above identifies this requirement.

Missing information · 2 checks
—
Not found in reviewed sources
—
Not reviewed — requirement not confirmed
Procurement contact
13 findingsJennifer Samela · jennifer.m.samela@usace.army.mil · 9783188324
View source 1
“Jennifer Samela · jennifer.m.samela@usace.army.mil · 9783188324”
—
Needs confirmation
View source 1
“required location, the Contractor can request to install the post in a different alignment/spacing to be approved by the Technical Point of Contact. Only alternations approved in writing by the”
Source page 3
Page markings may include other requirements. The quotation above identifies this requirement.

—
Needs confirmation
View source 1
“Only alternations approved in writing by the Technical Point of Contact are considered.”
Source page 3
Page markings may include other requirements. The quotation above identifies this requirement.

—
Needs confirmation
View source 2
“Point of Contact (POC) Name:”
Source page 3
Page markings may include other requirements. The quotation above identifies this requirement.

“Point of Contact (POC) Name:”
Source page 4
Page markings may include other requirements. The quotation above identifies this requirement.

—
Needs confirmation
View source 1
“W912WJ27QA003 Page 5 of 62 Product specification & SDS sheets 2. Location: The required services shall by performed at the following location: Mansfield Hollow Dam at 141 Mansfield Hollow Road, Mansfield Center, CT 06250. 3. Site Visit: Contact the Technical Point of Contact (TPOC), Park Ranger Mari”
Source page 5
Page markings may include other requirements. The quotation above identifies this requirement.

—
Needs confirmation
View source 1
“W912WJ27QA003 Page 8 of 62 Authority of the Technical Point of Contact Contractor's Safety Program (including sub-contractors) Accident Prevention Plan and Activity Hazard Analysis Weekly Safety Meetings (Documented on NED Form 251) Accident Reporting (ENG Form 3394) Correspondence, Communication an”
Source page 8
Page markings may include other requirements. The quotation above identifies this requirement.

—
Needs confirmation
View source 1
“To access WAWF, the Contractor shall- (1) Have a designated electronic business point of contact in the System for Award Management at https://www.sam.gov; and (2) Be registered to use WAWF at https://wawf.eb.mil/ following the step-by-step procedures for self-registration available at this web site”
Source page 18
Page markings may include other requirements. The quotation above identifies this requirement.

—
Needs confirmation
View source 1
“(Contracting Officer: Insert applicable invoice and receiving report document type(s) for fixed”
Source page 19
Page markings may include other requirements. The quotation above identifies this requirement.

—
Needs confirmation
View source 1
“(Contracting Officer: Insert either "Invoice 2in1" or the applicable invoice and receiving report”
Source page 19
Page markings may include other requirements. The quotation above identifies this requirement.

—
Needs confirmation
Applies when: If multiple ship to/acceptance locations apply, insert "See Schedule" or "Not applicable
View source 1
“If multiple ship to/acceptance locations apply, insert "See Schedule" or "Not applicable.") (**Contracting Officer: If the contract provides for progress payments or performance-based payments, insert the DoDAAC for the contract administration office assigned the functions under FAR 42.302(a)(13).) ”
Source page 20
Page markings may include other requirements. The quotation above identifies this requirement.

—
Needs confirmation
View source 1
“(g) WAWF point of contact.”
Source page 20
Page markings may include other requirements. The quotation above identifies this requirement.

—
Needs confirmation
View source 1
“(Contracting Officer: Insert applicable information or "Not applicable.")”
Source page 20
Page markings may include other requirements. The quotation above identifies this requirement.

—
Needs confirmation
Applies when: If no dates/times for site visits are included in the solicitation, then interested vendors shall contact the Technical Point of Contact as identified in the solicitation to schedule
View source 1
“No other dates/times will be permitted for site visits. 3. If no dates/times for site visits are included in the solicitation, then interested vendors shall contact the Technical Point of Contact as identified in the solicitation to schedule a site visit. 4. No site visits will be permitted AFTER a ”
Source page 54
Page markings may include other requirements. The quotation above identifies this requirement.

Grounds for rejection
16 findingsTHE WORK CONSISTS OF: Furnish all equipment, materials, and labor for the provision and installation of approximately 250 linear feet of new pressure-treated guardrail at Mansfield Hollow Dam, Mansfield, CT in accordance with the following requirements and Statement of Work. The
Applies when: AT THE TIME OF SUBMISSION IN ORDER TO BE CONSIDEREDMust be met by: AT THE TIME OF SUBMISSION IN ORDER TO BE CONSIDERED
View source 1
“THE WORK CONSISTS OF: Furnish all equipment, materials, and labor for the provision and installation of approximately 250 linear feet of new pressure-treated guardrail at Mansfield Hollow Dam, Mansfield, CT in accordance with the following requirements and Statement of Work. The magnitude of constru”
SOLICITATION SURVEY Solicitation No.: W912WJ27QA003 **ALL INFORMATION MUST BE PROVIDED TO BE COMPLIANT WITH SOLICITATION. Failure to provide a completed solicitation survey will result in quote being deemed non-responsive and removed from consideration** Company Name: SAM CAGE Co
View source 1
“SOLICITATION SURVEY Solicitation No.: W912WJ27QA003 **ALL INFORMATION MUST BE PROVIDED TO BE COMPLIANT WITH SOLICITATION. Failure to provide a completed solicitation survey will result in quote being deemed non-responsive and removed from consideration** Company Name: SAM CAGE Code: Address: POC Nam”
Source page 1
Page markings may include other requirements. The quotation above identifies this requirement.

Failure to provide a completed solicitation survey will result in quote being deemed non-responsive and removed from consideration** Company Name: SAM CAGE Code: Address: POC Name/Phone/Email: Type of Business: Corporation LLC Sole Proprietor Other (describe): INFORMATION SUBMITT
View source 1
“Failure to provide a completed solicitation survey will result in quote being deemed non-responsive and removed from consideration** Company Name: SAM CAGE Code: Address: POC Name/Phone/Email: Type of Business: Corporation LLC Sole Proprietor Other (describe): INFORMATION SUBMITTED BELOW SHALL BE TH”
Source page 1
Page markings may include other requirements. The quotation above identifies this requirement.

6) If you are a prime contractor hiring a Subcontractor, provide the name, POC, and location of the subcontractor (vendors that state “to be determined” or “information provided upon request” will be deemed non-responsive and removed from consideration).Close full requirement
6) If you are a prime contractor hiring a Subcontractor, provide the name, POC, and location of the subcontractor (vendors that state “to be determined” or “information provided upon request” will be deemed non-responsive and removed from consideration).
Applies when: If you are a prime contractor hiring a Subcontractor, provide the name, POC, and location of the subcontractor (vendors that state “to be determined” or “information provided upon re; upon request” will be deemed non-responsive and removed from consideration)Must be met by: upon request” will be deemed non-responsive and removed from consideration)
Applies to: subcontractor
View source 1
“6) If you are a prime contractor hiring a Subcontractor, provide the name, POC, and location of the subcontractor (vendors that state “to be determined” or “information provided upon request” will be deemed non-responsive and removed from consideration).”
Source page 2
Page markings may include other requirements. The quotation above identifies this requirement.

If past performance is that of the subcontractor or you do not have any past performance, identify as such below with the drop downs. Failure to adhere to these requirements will result in quotes being deemed non-responsive.Close full requirement
If past performance is that of the subcontractor or you do not have any past performance, identify as such below with the drop downs. Failure to adhere to these requirements will result in quotes being deemed non-responsive.
Applies when: If past performance is that of the subcontractor or you do not have any past performance, identify as such below with the drop downs
Applies to: subcontractor
View source 1
“If past performance is that of the subcontractor or you do not have any past performance, identify as such below with the drop downs. Failure to adhere to these requirements will result in quotes being deemed non-responsive.”
Source page 3
Page markings may include other requirements. The quotation above identifies this requirement.

Failure to adhere to these requirements will result in quotes being deemed non-responsive.
View source 1
“Failure to adhere to these requirements will result in quotes being deemed non-responsive.”
Source page 3
Page markings may include other requirements. The quotation above identifies this requirement.

FAILURE TO DO SO MAY RESULT IN QUOTES BEING DEEMED NON-RESPONSIVE AND REMOVED FROM CONSIDERATION.
View source 2
“FAILURE TO DO SO MAY RESULT IN QUOTES BEING DEEMED NON-RESPONSIVE AND REMOVED FROM CONSIDERATION.”
Source page 4
Page markings may include other requirements. The quotation above identifies this requirement.

“Failure to do so may result in quotes being deemed non-responsive and removed from consideration.”
Source page 53
Page markings may include other requirements. The quotation above identifies this requirement.

USE OF A SOLICITATION SURVEY NOT ISSUED FOR THE RELEVANT SOLICITATION WILL RESULT IN QUOTES BEING DEEMED NON-RESPONSIVE AND REMOVED FROM CONSIDERATION.
View source 1
“USE OF A SOLICITATION SURVEY NOT ISSUED FOR THE RELEVANT SOLICITATION WILL RESULT IN QUOTES BEING DEEMED NON-RESPONSIVE AND REMOVED FROM CONSIDERATION.”
Source page 4
Page markings may include other requirements. The quotation above identifies this requirement.

Failure to provide sufficient documentation for Government evaluation for these factors with quote submission shall result in a quote being deemed non-responsive. 4. This work is considered "new". 5. All responsible sources may submit a quote which, if timely received, must be co
Applies when: if timely received, must be considered by the Agency
View source 1
“Failure to provide sufficient documentation for Government evaluation for these factors with quote submission shall result in a quote being deemed non-responsive. 4. This work is considered "new". 5. All responsible sources may submit a quote which, if timely received, must be considered by the Agen”
Source page 53
Page markings may include other requirements. The quotation above identifies this requirement.

3. Interested vendors shall submit signed copies of all material amendments (SF30) with their quotes. Failure to do so will result in quotes being deemed non-responsive and removed from
View source 1
“3. Interested vendors shall submit signed copies of all material amendments (SF30) with their quotes. Failure to do so will result in quotes being deemed non-responsive and removed from”
Source page 54
Page markings may include other requirements. The quotation above identifies this requirement.

Failure to do so will result in quotes being deemed non-responsive and removed from consideration.
View source 1
“Failure to do so will result in quotes being deemed non-responsive and removed from consideration.”
Source page 54
Page markings may include other requirements. The quotation above identifies this requirement.

Blank entries will not be considered and will result in quotes being deemed non-responsive 3. Failure to complete the Bid Schedule in its entirety and return same with a quote will result in quotes being deemed non-responsive. 4. When Bid Schedules or Contract Line Item Numbers (Close full requirement
Blank entries will not be considered and will result in quotes being deemed non-responsive 3. Failure to complete the Bid Schedule in its entirety and return same with a quote will result in quotes being deemed non-responsive. 4. When Bid Schedules or Contract Line Item Numbers (
Applies when: When Bid Schedules or Contract Line Item Numbers (CLINs) require unit pricing and total am
View source 1
“Blank entries will not be considered and will result in quotes being deemed non-responsive 3. Failure to complete the Bid Schedule in its entirety and return same with a quote will result in quotes being deemed non-responsive. 4. When Bid Schedules or Contract Line Item Numbers (CLINs) require unit ”
Source page 54
Page markings may include other requirements. The quotation above identifies this requirement.

W912WJ27QA003 Page 56 of 62 Failure to provide a Letter of Bond Ability as required will result in the Contractor's quote being deemed non-responsive.
View source 1
“W912WJ27QA003 Page 56 of 62 Failure to provide a Letter of Bond Ability as required will result in the Contractor's quote being deemed non-responsive.”
Source page 56
Page markings may include other requirements. The quotation above identifies this requirement.

W912WJ27QA003 Page 60 of 62 completed, and/or material amendments not signed and returned, the quote will be determined non-responsive, and quote will be eliminated from any further evaluation. ii.
View source 1
“W912WJ27QA003 Page 60 of 62 completed, and/or material amendments not signed and returned, the quote will be determined non-responsive, and quote will be eliminated from any further evaluation. ii.”
Source page 60
Page markings may include other requirements. The quotation above identifies this requirement.

If the quote schedule is not completed, the quote will be determined non-responsive, and quote will be eliminated from any further evaluation. iii.
Applies when: If the quote schedule is not completed, the quote will be determined non-responsive, and quote will be eliminated from any further evaluation
View source 1
“If the quote schedule is not completed, the quote will be determined non-responsive, and quote will be eliminated from any further evaluation. iii.”
Source page 60
Page markings may include other requirements. The quotation above identifies this requirement.

Per solicitation requirements, if the survey included with the solicitation documents is not completed, the quote will be determined non-responsive, and quote will be eliminated from any further evaluation. iv.
Applies when: if the survey included with the solicitation documents is not completed, the quote will be determined non-responsive, and quote will be eliminated from any further evaluation
View source 1
“Per solicitation requirements, if the survey included with the solicitation documents is not completed, the quote will be determined non-responsive, and quote will be eliminated from any further evaluation. iv.”
Source page 60
Page markings may include other requirements. The quotation above identifies this requirement.

Missing information8 checks · expand to review
A missing value is not a waiver. Check the source or ask the agency before relying on it.
Questions due
2 findings—
Not found in reviewed sources
—
Not reviewed — requirement not confirmed
Site visit / pre-bid meeting
2 findings—
Not found in reviewed sources
—
Not reviewed — requirement not confirmed
Required submission files
2 findings—
Not found in reviewed sources
—
Not reviewed — requirement not confirmed
Acknowledge amendments
2 findings—
Not found in reviewed sources
—
Not reviewed — requirement not confirmed
6 additional fields have no reviewed finding.
6 more sections are available once you sign in
Pricing & payment · Bonds & insurance · Evaluation & award · Scope & delivery · Labor, sourcing & compliance · Contract terms & risk
Sign in — freeExtracted from the public documents linked above. This is an information aid, not a determination of bid eligibility or legal advice. Verify the original wording and any addenda before submitting a bid.