INTERIOR, DEPARTMENT OF THE · NM

Y--Hickman Wildlife Water Catchment and Pipe Fence

20 source documentsSource checked Oct 21Content updated
Open notice
Response deadline
17 days left
Published project value
Not confirmed
Check the pricing and payment terms below.
Solicitation number
140L1726Q0054

Dates to plan around

Times follow the original source.

  1. Response deadline
    Source wording
    2026-11-09T15:00:00-05:00
Document coverage
20 / 20documents readAll discovered documents read

20 documents found61% of weighted requirement checks reviewed

Before you bid

Review first

Start with these requirements and unresolved points.
  • Must do
    Conflicts of interest
    View 1 flagged requirement
    1. Requirement 1 ↗

      work statements, etc.) or perform evaluation services which may create a current or subsequent Organizational Conflict of Interests (OCI) as defined in FAR Subpart 9.5. The Contractor shall notify the

  • Must do
    Financial capacity
    View 2 flagged requirements
    1. Requirement 1 ↗

      Quoters shall submit the following information in its entirety: Complete and Signed Standard Form (SF) 1442 Response to section L and M Payment bond or irrevocable letter of credit is required 10 calendar days after award Price schedule Offerors must submit your quote referencing

    2. Requirement 2 ↗

      (JUL 2000) (a) The Contractor shall submit one of the following payment protections: payment bond or irrevocable letter of credit (b) The amount of the payment protection shall be 100 percent of the contract price.

  • Must do
    Joint ventures & teaming
    View 2 flagged requirements
    1. Requirement 1 ↗

      requirements of 13 CFR 121.103(h) and 13 CFR 125.8(a) and (b). [ The offeror shall enter the name and unique entity identifier of each party to the joint

    2. Requirement 2 ↗

      identifier of each party to the joint venture: __.] Each HUBZone small business concern participating in the HUBZone joint venture must be certified as a HUBZone concern.

  • Must do
    Registrations
    View 2 flagged requirements
    1. Requirement 1 ↗

      SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT (A) (B) (C) (D) (E) (F) must be registered and active in the System for Award Management (sam.gov) at time an offer or quotation is submitted.

    2. Requirement 2 ↗

      To be eligible for an award all interested parties must be registered and active in the System for Award Management (sam.gov) at time an offer or quotation is submitted.

  • Must do
  • Conflict
    Acknowledge amendments
    View 2 flagged requirements
    1. Requirement 1 ↗

      Sources disagree — check both before relying on this

    2. Requirement 2 ↗

      Sources disagree — check both before relying on this

  • Conflict
    How to submit
    View 2 flagged requirements
    1. Requirement 1 ↗

      Sources disagree — check both before relying on this

    2. Requirement 2 ↗

      Sources disagree — check both before relying on this

01

Eligibility & participation

Whether you can bid at all, and what you must already hold.

20 verified14 to confirm

Registrations

4 findings
Requirement 1Verified

To be eligible for an award all interested parties must be registered and active in the System for Award Management (sam.gov) at time an offer or quotation is submitted.

View source 6
01page 5View official source ↗
“To be eligible for an award all interested parties must be registered and active in the System for Award Management (sam.gov) at time an offer or quotation is submitted.”
Source page 5

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 5
02page 5View official source ↗
“To be eligible for an award all interested parties must be registered and active in the System for Award Management (sam.gov) at time an offer or quotation is submitted.”
Source page 5

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 5
03page 5View official source ↗
“To be eligible for an award all interested parties must be registered and active in the System for Award Management (sam.gov) at time an offer or quotation is submitted.”
Source page 5

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 5
04page 5View official source ↗
“To be eligible for an award all interested parties must be registered and active in the System for Award Management (sam.gov) at time an offer or quotation is submitted.”
Source page 5

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 5
05page 4View official source ↗
“To be eligible for an award all interested parties must be registered and active in the System for Award Management (sam.gov) at time an offer or quotation is submitted.”
Source page 4

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 4
06page 4View official source ↗
“To be eligible for an award all interested parties must be registered and active in the System for Award Management (sam.gov) at time an offer or quotation is submitted.”
Source page 4

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 4
Requirement 2Verified

SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT (A) (B) (C) (D) (E) (F) must be registered and active in the System for Award Management (sam.gov) at time an offer or quotation is submitted.

View source 1
01page 6View official source ↗
“SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT (A) (B) (C) (D) (E) (F) must be registered and active in the System for Award Management (sam.gov) at time an offer or quotation is submitted.”
Source page 6

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 6
Missing information · 2 checks
Not found

—

Not found in reviewed sources

Not reviewed

—

Not reviewed — requirement not confirmed

Set-aside

4 findings
Requirement 1Verified

SBA

View source 1
01https://sam.gov/api/prod/opps/v2/opportunities/ef2f44cde9624993824a307085cdc590 /data2/solicitation/setAsideView official source ↗
“SBA”
Requirement 2Verified

SDVOSB,HUBZONE

View source 1
01page 10View official source ↗
“(3) Was an 8(a), HUBZone, service-disabled veteran-owned, economically disadvantaged women-owned, or women-owned small business set-aside or sole-source award regardless of dollar value.”
Source page 10

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 10
Missing information · 2 checks
Not found

—

Not found in reviewed sources

Not reviewed

—

Not reviewed — requirement not confirmed

Small business size

14 findings
Requirement 1Needs confirmation

—

The cited text does not establish a complete USD size standard.

View source 1
01page 18View official source ↗
“(2) The small business size standard is $19.0mil.”
Source page 18

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 18
Requirement 2Needs confirmation

—

Needs confirmation

View source 3
01page 2View official source ↗
“Offerors are advised that eligibility for award under this solicitation is now governed by the small business size standard applicable to the assigned NAICS code, and offers must be submitted accordingly.”
Source page 2

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 2
02page 2View official source ↗
“Offerors are advised that eligibility for award under this solicitation is now governed by the small business size standard applicable to the assigned NAICS code, and offers must be submitted accordingly.”
Source page 2

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 2
03page 3View official source ↗
“Offerors are advised that eligibility for award under this solicitation is now governed by the small business size standard applicable to the assigned NAICS code, and offers must be submitted accordingly.”
Source page 3

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 3
Requirement 3Needs confirmation

—

Needs confirmation

View source 1
01page 3View official source ↗
“SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT (A) (B) (C) (D) (E) (F) small business size standard applicable to the assigned NAICS code, and offers must be submitted accordingly.”
Source page 3

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 3
Requirement 4Needs confirmation

—

Needs confirmation

View source 1
01page 9View official source ↗
“Small business concern- (1) Means a concern, including its affiliates, that is independently owned and operated, not dominant in its field of operation, and qualified as a small business under the criteria in 13 CFR part 121 and the size standard in paragraph (c) of this clause.”
Source page 9

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 9
Requirement 5Needs confirmation

—

Needs confirmation

Applies when: If the Contractor represented that it was a small business concern, a small disadvantaged business concern, or a joint venture that was any of the small business concerns identified; prior to award of this contract, the ContMust be met by: prior to award of this contract, the Cont

View source 1
01page 9View official source ↗
“SBA determines affiliation based on the factors set forth at 13 CFR 121.103. (b) If the Contractor represented that it was a small business concern, a small disadvantaged business concern, or a joint venture that was any of the small business concerns identified in 19.000(a)(3) prior to award of thi”
Source page 9

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 9
Requirement 6Needs confirmation

—

Needs confirmation

Applies when: at the time of this rerepresentation that corresponds to the North American Industry ClassificMust be met by: at the time of this rerepresentation that corresponds to the North American Industry Classific

View source 1
01page 9View official source ↗
“(c) The Contractor shall rerepresent its size status in accordance with the size standard in effect at the time of this rerepresentation that corresponds to the North American Industry Classification System (NAICS) code(s) assigned to this contract.”
Source page 9

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 9
Requirement 7Needs confirmation

—

Needs confirmation

View source 1
01page 9View official source ↗
“The small business size standard corresponding to this NAICS code(s) can be found at https://www.sba.gov/document/support--table-size- standards.”
Source page 9

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 9
Requirement 8Needs confirmation

—

Needs confirmation

Applies when: if the acquisit

View source 1
01page 9View official source ↗
“(d) The small business size standard for a Contractor providing an end item that it does not manufacture, process, or produce itself, for a contract other than a construction or service contract, is 500 employees, or 150 employees for information technology value-added resellers under NAICS code 541”
Source page 9

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 9
Requirement 9Needs confirmation

—

Needs confirmation

View source 1
01page 18View official source ↗
“not dominant in its field of operation, and qualified as a small business under the criteria in 13 CFR part 121 and the size standard in paragraph (b) of this provision.”
Source page 18

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 18
Requirement 10Needs confirmation

—

Needs confirmation

Applies when: at least 51 percent unconditionally and directly owned (as defined at 13 CFR 124

View source 1
01page 18View official source ↗
“SBA determines affiliation based on the factors set forth at 13 CFR 121.103. Small disadvantaged business concern means a small business concern that- (1) Is at least 51 percent unconditionally and directly owned (as defined at 13 CFR 124.105) by one or more socially disadvantaged (as defined at 13 ”
Source page 18

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 18
Requirement 11Needs confirmation

—

Needs confirmation

View source 1
01page 18View official source ↗
“(3) The small business size standard for a concern that submits an offer, other than on a construction or service acquisition, but proposes to furnish an end item that it did not itself manufacture, process, or produce (i.e., nonmanufacturer), is 500 employees, or 150 employees for information techn”
Source page 18

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 18
Requirement 12Needs confirmation

—

Needs confirmation

View source 1
01page 19View official source ↗
“(c) Representations.(1) The offeror represents as part of its offer that- (i) it [ ] is, [ ] is not a small business concern; or (ii) It [ ] is, [ ] is not a small business joint venture that complies with the requirements of 13 CFR 121.103(h) and 13 CFR 125.8(a) and (b). [ The offeror shall enter t”
Source page 19

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 19
Missing information · 2 checks
Not found

—

Not found in reviewed sources

Not reviewed

—

Not reviewed — requirement not confirmed

Experience & references

4 findings
Requirement 1Needs confirmation

—

Needs confirmation

Applies when: at least three (3) projects and no more than ten (10) completed or ongoing, in the past

View source 1
01page 21View official source ↗
“FACTOR TECHNICAL SUBFACTOR 1 APPROACH TO ACCOMPLISHING THE WORK The contractor shall provide their approach for accomplishing the work (no more than 5 pages) SUBFACTOR 2 EXPERIENCE Provide a list of at least three (3) projects and no more than ten (10) completed or ongoing, in the past three (3) years in which you acte”
Source page 21

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 21
Requirement 2Needs confirmation

—

Needs confirmation

Applies when: at least three projects from the past three years involving “Vault Toilet Install

View source 1
01page 2View official source ↗
“Q17) Section L, Technical Subfactor 2, requests at least three projects from the past three years involving “Vault Toilet Install.” Because the current requirement is the Hickman Wildlife Water Catchment & Pipe Fence project, should offerors instead provide experience relevant to wildlife water catchments, pipe/cable f”
Source page 2

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 2
Missing information · 2 checks
Not found

—

Not found in reviewed sources

Not reviewed

—

Not reviewed — requirement not confirmed

Key personnel

4 findings
Requirement 1Verified

The COR is not authorized to change any of the terms and conditions of the resulting order. 1.6.11 Key Personnel: The contractor shall provide a contract manager who shall be responsible for the performance of the work.

Applies to: person

View source 2
01page 3View official source ↗
“The COR is not authorized to change any of the terms and conditions of the resulting order. 1.6.11 Key Personnel: The contractor shall provide a contract manager who shall be responsible for the performance of the work.”
Source page 3

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 3
02page 3View official source ↗
“The COR is not authorized to change any of the terms and conditions of the resulting order. 1.6.11 Key Personnel: The contractor shall provide a contract manager who shall be responsible for the performance of the work.”
Source page 3

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 3
Requirement 2Verified

Anything that can be physically delivered but may include non-manufactured things such as meeting minutes or reports. 2.1.6. KEY PERSONNEL.

Applies to: person

View source 2
01page 4View official source ↗
“Anything that can be physically delivered but may include non-manufactured things such as meeting minutes or reports. 2.1.6. KEY PERSONNEL.”
Source page 4

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 4
02page 4View official source ↗
“Anything that can be physically delivered but may include non-manufactured things such as meeting minutes or reports. 2.1.6. KEY PERSONNEL.”
Source page 4

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 4
Requirement 3Verified

Contractor personnel that are evaluated in a source selection process and that may be required to be used in the performance of a contract by the Key Personnel listed in the PWS.

Applies to: person

View source 2
01page 4View official source ↗
“Contractor personnel that are evaluated in a source selection process and that may be required to be used in the performance of a contract by the Key Personnel listed in the PWS.”
Source page 4

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 4
02page 4View official source ↗
“Contractor personnel that are evaluated in a source selection process and that may be required to be used in the performance of a contract by the Key Personnel listed in the PWS.”
Source page 4

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 4
Requirement 4Verified

When key personnel are used as an evaluation factor in best value procurement, an offer can be rejected if it does not have a firm commitment from the persons that are listed in the proposal. 2.1.7. PHYSICAL SECURITY.

Applies when: When key personnel are used as an evaluation factor in best value procurement, an offer can be rejected if it does not have a firm commitment from the persons that are listed in the pr

Applies to: person

View source 2
01page 4View official source ↗
“When key personnel are used as an evaluation factor in best value procurement, an offer can be rejected if it does not have a firm commitment from the persons that are listed in the proposal. 2.1.7. PHYSICAL SECURITY.”
Source page 4

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 4
02page 4View official source ↗
“When key personnel are used as an evaluation factor in best value procurement, an offer can be rejected if it does not have a firm commitment from the persons that are listed in the proposal. 2.1.7. PHYSICAL SECURITY.”
Source page 4

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 4

Financial capacity

2 findings
Requirement 1Verified

Quoters shall submit the following information in its entirety: Complete and Signed Standard Form (SF) 1442 Response to section L and M Payment bond or irrevocable letter of credit is required 10 calendar days after award Price schedule Offerors must submit your quote referencing

View source 6
01page 5View official source ↗
“Quoters shall submit the following information in its entirety: Complete and Signed Standard Form (SF) 1442 Response to section L and M Payment bond or irrevocable letter of credit is required 10 calendar days after award Price schedule Offerors must submit your quote referencing the solicitation nu”
Source page 5

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 5
02page 5View official source ↗
“Quoters shall submit the following information in its entirety: Complete and Signed Standard Form (SF) 1442 Response to section L and M Payment bond or irrevocable letter of credit is required 10 calendar days after award Price schedule Offerors must submit your quote referencing the solicitation nu”
Source page 5

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 5
03page 4View official source ↗
“Quoters shall submit the following information in its entirety: Complete and Signed Standard Form (SF) 1442 Response to section L and M Payment bond or irrevocable letter of credit is required 10 calendar days after award Price schedule Offerors must submit your quote referencing the Continued...”
Source page 4

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 4
04page 4View official source ↗
“Quoters shall submit the following information in its entirety: Complete and Signed Standard Form (SF) 1442 Response to section L and M Payment bond or irrevocable letter of credit is required 10 calendar days after award Price schedule Offerors must submit your quote referencing the solicitation nu”
Source page 4

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 4
05page 4View official source ↗
“Quoters shall submit the following information in its entirety: Complete and Signed Standard Form (SF) 1442 Response to section L and M Payment bond or irrevocable letter of credit is required 10 calendar days after award Price schedule Offerors must submit your quote referencing the solicitation nu”
Source page 4

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 4
06page 4View official source ↗
“Quoters shall submit the following information in its entirety: Complete and Signed Standard Form (SF) 1442 Response to section L and M Payment bond or irrevocable letter of credit is required 10 calendar days after award Price schedule Offerors must submit your quote referencing the solicitation nu”
Source page 4

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 4
Requirement 2Verified

(JUL 2000) (a) The Contractor shall submit one of the following payment protections: payment bond or irrevocable letter of credit (b) The amount of the payment protection shall be 100 percent of the contract price.

View source 1
01page 16View official source ↗
“(JUL 2000) (a) The Contractor shall submit one of the following payment protections: payment bond or irrevocable letter of credit (b) The amount of the payment protection shall be 100 percent of the contract price.”
Source page 16

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 16

Joint ventures & teaming

7 findings
Requirement 1Verified
SBA determines affiliation based on the factors set forth at 13 CFR 121.103. (b) If the Contractor represented that it was a small business concern, a small disadvantaged business concern, or a joint venture that was any of the small business concerns identified in 19.000(a)(3) pRead full requirement Close full requirement

SBA determines affiliation based on the factors set forth at 13 CFR 121.103. (b) If the Contractor represented that it was a small business concern, a small disadvantaged business concern, or a joint venture that was any of the small business concerns identified in 19.000(a)(3) p

Applies when: If the Contractor represented that it was a small business concern, a small disadvantaged business concern, or a joint venture that was any of the small business concerns identified; prior to award of this contract, the ContMust be met by: prior to award of this contract, the Cont

View source 1
01page 9View official source ↗
“SBA determines affiliation based on the factors set forth at 13 CFR 121.103. (b) If the Contractor represented that it was a small business concern, a small disadvantaged business concern, or a joint venture that was any of the small business concerns identified in 19.000(a)(3) prior to award of thi”
Source page 9

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 9
Requirement 2Verified

identifier of each party to the joint venture: __.]

View source 1
01page 10View official source ↗
“identifier of each party to the joint venture: __.]”
Source page 10

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 10
Requirement 3Verified

(3) Women-owned small business (WOSB) joint venture eligible under the WOSB Program.

View source 1
01page 19View official source ↗
“(3) Women-owned small business (WOSB) joint venture eligible under the WOSB Program.”
Source page 19

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 19
Requirement 4Verified

enter the name and unique entity identifier of each party to the joint venture: __.] (4) Economically disadvantaged women-owned small business (EDWOSB) joint venture.

View source 1
01page 19View official source ↗
“enter the name and unique entity identifier of each party to the joint venture: __.] (4) Economically disadvantaged women-owned small business (EDWOSB) joint venture.”
Source page 19

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 19
Requirement 5Verified

identifier of each party to the joint venture: __.] Each HUBZone small business concern

View source 1
01page 19View official source ↗
“identifier of each party to the joint venture: __.] Each HUBZone small business concern”
Source page 19

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 19
Requirement 6Verified

requirements of 13 CFR 121.103(h) and 13 CFR 125.8(a) and (b). [ The offeror shall enter the name and unique entity identifier of each party to the joint

View source 1
01page 19View official source ↗
“requirements of 13 CFR 121.103(h) and 13 CFR 125.8(a) and (b). [ The offeror shall enter the name and unique entity identifier of each party to the joint”
Source page 19

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 19
Requirement 7Verified

identifier of each party to the joint venture: __.] Each HUBZone small business concern participating in the HUBZone joint venture must be certified as a HUBZone concern.

View source 1
01page 19View official source ↗
“identifier of each party to the joint venture: __.] Each HUBZone small business concern participating in the HUBZone joint venture must be certified as a HUBZone concern.”
Source page 19

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 19

Conflicts of interest

3 findings
Requirement 1Verified
This right does not abrogate any other Government rights. 1.6.16 Organizational Conflict of Interest: Contractor and subcontractor personnel performing work under this contract may receive, have access to or participate in the development of proprietary or source selection informRead full requirement Close full requirement

This right does not abrogate any other Government rights. 1.6.16 Organizational Conflict of Interest: Contractor and subcontractor personnel performing work under this contract may receive, have access to or participate in the development of proprietary or source selection inform

Applies to: subcontractor

View source 2
01page 3View official source ↗
“This right does not abrogate any other Government rights. 1.6.16 Organizational Conflict of Interest: Contractor and subcontractor personnel performing work under this contract may receive, have access to or participate in the development of proprietary or source selection information (e.g., cost or”
Source page 3

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 3
02page 3View official source ↗
“This right does not abrogate any other Government rights. 1.6.16 Organizational Conflict of Interest: Contractor and subcontractor personnel performing work under this contract may receive, have access to or participate in the development of proprietary or source selection information (e.g., cost or”
Source page 3

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 3
Requirement 2Verified

work statements, etc.) or perform evaluation services which may create a current or subsequent Organizational Conflict of Interests (OCI) as defined in FAR Subpart 9.5. The Contractor shall notify the

View source 2
01page 3View official source ↗
“work statements, etc.) or perform evaluation services which may create a current or subsequent Organizational Conflict of Interests (OCI) as defined in FAR Subpart 9.5. The Contractor shall notify the”
Source page 3

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 3
02page 3View official source ↗
“work statements, etc.) or perform evaluation services which may create a current or subsequent Organizational Conflict of Interests (OCI) as defined in FAR Subpart 9.5. The Contractor shall notify the”
Source page 3

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 3
Requirement 3Verified

HIPAA Health Insurance Portability and Accountability Act of 1996 OCI Organizational Conflict of Interest

View source 2
01page 5View official source ↗
“HIPAA Health Insurance Portability and Accountability Act of 1996 OCI Organizational Conflict of Interest”
Source page 5

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 5
02page 5View official source ↗
“HIPAA Health Insurance Portability and Accountability Act of 1996 OCI Organizational Conflict of Interest”
Source page 5

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 5
Missing information2 checks · expand to review

A missing value is not a waiver. Check the source or ask the agency before relying on it.

Required licenses

2 findings
Requirement 1Not found

—

Not found in reviewed sources

Requirement 2Not reviewed

—

Not reviewed — requirement not confirmed

2 additional fields have no reviewed finding.

02

Deadlines & submission

When and how to submit, and whether you are still in time.

13 verified10 to confirm

Response deadline

3 findings
Requirement 1Verified

2026-11-09T15:00:00-05:00

View source 1
01https://sam.gov/api/prod/opps/v2/opportunities/ef2f44cde9624993824a307085cdc590 /data2/solicitation/deadlines/responseView official source ↗
“2026-11-09T15:00:00-05:00”
Missing information · 2 checks
Not found

—

Not found in reviewed sources

Not reviewed

—

Not reviewed — requirement not confirmed

How to submit

7 findings
Requirement 1Conflicting sources

—

Conflicting sources

View source 2
01page 2View official source ↗
“All proposals must be submitted in accordance with the instructions in the solicitation and any prior amendments.”
Source page 2

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 2
02page 2View official source ↗
“All proposals must be submitted in accordance with the instructions in the solicitation and any prior amendments.”
Source page 2

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 2
Requirement 2Conflicting sources

—

Conflicting sources

View source 3
01page 3View official source ↗
“Offerors are advised that eligibility for award under this solicitation is now governed by the small business size standard applicable to the assigned NAICS code, and offers must be submitted accordingly.”
Source page 3

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 3
02page 2View official source ↗
“Offerors are advised that eligibility for award under this solicitation is now governed by the small business size standard applicable to the assigned NAICS code, and offers must be submitted accordingly.”
Source page 2

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 2
03page 2View official source ↗
“Offerors are advised that eligibility for award under this solicitation is now governed by the small business size standard applicable to the assigned NAICS code, and offers must be submitted accordingly.”
Source page 2

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 2
Requirement 3Conflicting sources

—

Conflicting sources

View source 1
01page 3View official source ↗
“SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT (A) (B) (C) (D) (E) (F) small business size standard applicable to the assigned NAICS code, and offers must be submitted accordingly.”
Source page 3

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 3
Requirement 4Conflicting sources

—

Conflicting sources

View source 6
01page 5View official source ↗
“Quoters shall submit the following information in its entirety: Complete and Signed Standard Form (SF) 1442 Response to section L and M Payment bond or irrevocable letter of credit is required 10 calendar days after award Price schedule Offerors must submit your quote referencing the solicitation nu”
Source page 5

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 5
02page 5View official source ↗
“Quoters shall submit the following information in its entirety: Complete and Signed Standard Form (SF) 1442 Response to section L and M Payment bond or irrevocable letter of credit is required 10 calendar days after award Price schedule Offerors must submit your quote referencing the solicitation nu”
Source page 5

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 5
03page 4View official source ↗
“Quoters shall submit the following information in its entirety: Complete and Signed Standard Form (SF) 1442 Response to section L and M Payment bond or irrevocable letter of credit is required 10 calendar days after award Price schedule Offerors must submit your quote referencing the Continued...”
Source page 4

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 4
04page 4View official source ↗
“Quoters shall submit the following information in its entirety: Complete and Signed Standard Form (SF) 1442 Response to section L and M Payment bond or irrevocable letter of credit is required 10 calendar days after award Price schedule Offerors must submit your quote referencing the solicitation nu”
Source page 4

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 4
05page 4View official source ↗
“Quoters shall submit the following information in its entirety: Complete and Signed Standard Form (SF) 1442 Response to section L and M Payment bond or irrevocable letter of credit is required 10 calendar days after award Price schedule Offerors must submit your quote referencing the solicitation nu”
Source page 4

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 4
06page 4View official source ↗
“Quoters shall submit the following information in its entirety: Complete and Signed Standard Form (SF) 1442 Response to section L and M Payment bond or irrevocable letter of credit is required 10 calendar days after award Price schedule Offerors must submit your quote referencing the solicitation nu”
Source page 4

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 4
Requirement 5Verified

Failure to submit quotes according to the instructions provided within the solicitation may result in the respondent's quote not being considered for award.

Applies when: within the solicitation may result in the respondent's quote not being considered forMust be met by: within the solicitation may result in the respondent's quote not being considered for

View source 6
01page 5View official source ↗
“Failure to submit quotes according to the instructions provided within the solicitation may result in the respondent's quote not being considered for award.”
Source page 5

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 5
02page 5View official source ↗
“Failure to submit quotes according to the instructions provided within the solicitation may result in the respondent's quote not being considered for award.”
Source page 5

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 5
03page 4View official source ↗
“Failure to submit quotes according to the instructions provided within the solicitation may result in the respondent's quote not being considered for award.”
Source page 4

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 4
04page 4View official source ↗
“Failure to submit quotes according to the instructions provided within the solicitation may result in the respondent's quote not being considered for award.”
Source page 4

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 4
05page 4View official source ↗
“Failure to submit quotes according to the instructions provided within the solicitation may result in the respondent's quote not being considered for award.”
Source page 4

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 4
06page 4View official source ↗
“Failure to submit quotes according to the instructions provided within the solicitation may result in the respondent's quote not being considered for award.”
Source page 4

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 4
Missing information · 2 checks
Not found

—

Not found in reviewed sources

Not reviewed

—

Not reviewed — requirement not confirmed

Acknowledge amendments

4 findings
Requirement 1Conflicting sources

—

Conflicting sources

Applies when: prior to the amended closing date and time, Failure to acknowledge receipt of this amendMust be met by: prior to the amended closing date and time, Failure to acknowledge receipt of this amend

View source 6
01page 3View official source ↗
“All Offerors are required to acknowledge receipt of this amendment 02 by signature prior to the amended closing date and time, Failure to acknowledge receipt of this amendment prior to the time and date specified for opening of offers may result in rejection of the offer.”
Source page 3

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 3
02page 3View official source ↗
“All Offerors are required to acknowledge receipt of this amendment 02 by signature prior to the amended closing date and time, Failure to acknowledge receipt of this amendment prior to the time and date specified for opening of offers may result in rejection of the offer.”
Source page 3

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 3
03page 3View official source ↗
“All Offerors are required to acknowledge receipt of this amendment 02 by signature prior to the amended closing date and time, Failure to acknowledge receipt of this amendment prior to the time and date specified for opening of offers may result in rejection of the offer.”
Source page 3

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 3
04page 2View official source ↗
“All Offerors are required to acknowledge receipt of this amendment 02 by signature prior to the amended closing date and time, Failure to acknowledge receipt of this amendment prior to the time and date specified for opening of offers may result in rejection of the offer.”
Source page 2

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 2
05page 2View official source ↗
“All Offerors are required to acknowledge receipt of this amendment 02 by signature prior to the amended closing date and time, Failure to acknowledge receipt of this amendment prior to the time and date specified for opening of offers may result in rejection of the offer.”
Source page 2

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 2
06page 1View official source ↗
“All Offerors are required to acknowledge receipt of this amendment 02 by signature prior to the amended closing date and time, Failure to acknowledge receipt of this amendment prior to the time and date specified for opening of offers may result in rejection of the offer.”
Source page 1

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 1
Requirement 2Conflicting sources

—

Conflicting sources

Applies when: prior to the amended closing date and time, Failure to acknowledge receipt of this amendMust be met by: prior to the amended closing date and time, Failure to acknowledge receipt of this amend

View source 1
01page 2View official source ↗
“All Offerors are required to acknowledge receipt of this amendment 02 by signature prior to the amended closing date and time, Failure to acknowledge receipt of this amendment prior Continued...”
Source page 2

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 2
Missing information · 2 checks
Not found

—

Not found in reviewed sources

Not reviewed

—

Not reviewed — requirement not confirmed

Procurement contact

13 findings
Requirement 1Verified

Chevannes, Deronda · deronda_chevannes@ios.doi.gov · 0000000000

View source 1
01https://sam.gov/api/prod/opps/v2/opportunities/ef2f44cde9624993824a307085cdc590 /data2/pointOfContact/0View official source ↗
“Chevannes, Deronda · deronda_chevannes@ios.doi.gov · 0000000000”
Requirement 2Verified
A site visit will be held on Wednesday, September 23, 2026, at 8:00 AM MT, at the Socorro Field Office, 901 Old US Hwy 85, Socorro, NM 87801. The point of contact for the site visit only is Carlos Madril (cmadril@blm.gov, (575) 838- 1281); contact with this POC should be limited Read full requirement Close full requirement

A site visit will be held on Wednesday, September 23, 2026, at 8:00 AM MT, at the Socorro Field Office, 901 Old US Hwy 85, Socorro, NM 87801. The point of contact for the site visit only is Carlos Madril (cmadril@blm.gov, (575) 838- 1281); contact with this POC should be limited

View source 1
01page 1View official source ↗
“A site visit will be held on Wednesday, September 23, 2026, at 8:00 AM MT, at the Socorro Field Office, 901 Old US Hwy 85, Socorro, NM 87801. The point of contact for the site visit only is Carlos Madril (cmadril@blm.gov, (575) 838- 1281); contact with this POC should be limited strictly to matters ”
Source page 1

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 1
Requirement 3Verified
A site visit will be held on Wednesday, September 23, 2026, at 8:00 AM MT, at the Socorro Field Office, 901 Old US Hwy 85, Socorro, NM 87801. The point of contact for the site visit only is Carlos Madril (cmadril@blm.gov, (575) 838-1281); contact with this POC should be limited sRead full requirement Close full requirement

A site visit will be held on Wednesday, September 23, 2026, at 8:00 AM MT, at the Socorro Field Office, 901 Old US Hwy 85, Socorro, NM 87801. The point of contact for the site visit only is Carlos Madril (cmadril@blm.gov, (575) 838-1281); contact with this POC should be limited s

View source 6
01page 3View official source ↗
“A site visit will be held on Wednesday, September 23, 2026, at 8:00 AM MT, at the Socorro Field Office, 901 Old US Hwy 85, Socorro, NM 87801. The point of contact for the site visit only is Carlos Madril (cmadril@blm.gov, (575) 838-1281); contact with this POC should be limited strictly to matters c”
Source page 3

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 3
02page 3View official source ↗
“A site visit will be held on Wednesday, September 23, 2026, at 8:00 AM MT, at the Socorro Field Office, 901 Old US Hwy 85, Socorro, NM 87801. The point of contact for the site visit only is Carlos Madril (cmadril@blm.gov, (575) 838-1281); contact with this POC should be limited strictly to matters c”
Source page 3

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 3
03page 2View official source ↗
“A site visit will be held on Wednesday, September 23, 2026, at 8:00 AM MT, at the Socorro Field Office, 901 Old US Hwy 85, Socorro, NM 87801. The point of contact for the site visit only is Carlos Madril (cmadril@blm.gov, (575) 838-1281); contact with this POC should be limited strictly to matters c”
Source page 2

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 2
04page 2View official source ↗
“A site visit will be held on Wednesday, September 23, 2026, at 8:00 AM MT, at the Socorro Field Office, 901 Old US Hwy 85, Socorro, NM 87801. The point of contact for the site visit only is Carlos Madril (cmadril@blm.gov, (575) 838-1281); contact with this POC should be limited strictly to matters c”
Source page 2

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 2
05page 2View official source ↗
“A site visit will be held on Wednesday, September 23, 2026, at 8:00 AM MT, at the Socorro Field Office, 901 Old US Hwy 85, Socorro, NM 87801. The point of contact for the site visit only is Carlos Madril (cmadril@blm.gov, (575) 838-1281); contact with this POC should be limited strictly to matters c”
Source page 2

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 2
06page 2View official source ↗
“A site visit will be held on Wednesday, September 23, 2026, at 8:00 AM MT, at the Socorro Field Office, 901 Old US Hwy 85, Socorro, NM 87801. The point of contact for the site visit only is Carlos Madril (cmadril@blm.gov, (575) 838-1281); contact with this POC should be limited strictly to matters c”
Source page 2

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 2
Requirement 4Verified

Award will be made on an all or none basis. Point of Contact Buyer Deronda Chevannes Deronda_Chevannes@ios.doi.gov Continued...

View source 1
01page 3View official source ↗
“Award will be made on an all or none basis. Point of Contact Buyer Deronda Chevannes Deronda_Chevannes@ios.doi.gov Continued...”
Source page 3

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 3
Requirement 5Verified
Award will be made on an all or none basis. Point of Contact Buyer Deronda Chevannes Deronda_Chevannes@ios.doi.gov Contract Officer Chau_Nguyen@@ios.doi.gov Period of Performance: 11/13/2026 to 01/19/2027 Change Item 00010 to read as follows(amount shown is the obligated amount):Read full requirement Close full requirement

Award will be made on an all or none basis. Point of Contact Buyer Deronda Chevannes Deronda_Chevannes@ios.doi.gov Contract Officer Chau_Nguyen@@ios.doi.gov Period of Performance: 11/13/2026 to 01/19/2027 Change Item 00010 to read as follows(amount shown is the obligated amount):

View source 1
01page 4View official source ↗
“Award will be made on an all or none basis. Point of Contact Buyer Deronda Chevannes Deronda_Chevannes@ios.doi.gov Contract Officer Chau_Nguyen@@ios.doi.gov Period of Performance: 11/13/2026 to 01/19/2027 Change Item 00010 to read as follows(amount shown is the obligated amount): 00010 SFO Hickman W”
Source page 4

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 4
Requirement 6Verified
Award will be made on an all or none basis. Point of Contact Buyer Deronda Chevannes Deronda_Chevannes@ios.doi.gov Contract Officer Chau_Nguyen@@ios.doi.gov Period of Performance: 09/21/2026 to 11/20/2026 1.Active Registration - www.sam.gov.Read full requirement Close full requirement

Award will be made on an all or none basis. Point of Contact Buyer Deronda Chevannes Deronda_Chevannes@ios.doi.gov Contract Officer Chau_Nguyen@@ios.doi.gov Period of Performance: 09/21/2026 to 11/20/2026 1.Active Registration - www.sam.gov.

View source 1
01page 4View official source ↗
“Award will be made on an all or none basis. Point of Contact Buyer Deronda Chevannes Deronda_Chevannes@ios.doi.gov Contract Officer Chau_Nguyen@@ios.doi.gov Period of Performance: 09/21/2026 to 11/20/2026 1.Active Registration - www.sam.gov.”
Source page 4

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 4
Requirement 7Verified

Award will be made on an all or none basis. Point of Contact Buyer Deronda Chevannes Deronda_Chevannes@ios.doi.gov Contract Officer Continued...

View source 1
01page 4View official source ↗
“Award will be made on an all or none basis. Point of Contact Buyer Deronda Chevannes Deronda_Chevannes@ios.doi.gov Contract Officer Continued...”
Source page 4

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 4
Requirement 8Verified
Award will be made on an all or none basis. Point of Contact Buyer Deronda Chevannes Deronda_Chevannes@ios.doi.gov Contract Officer Chau_Nguyen@@ios.doi.gov Period of Performance: 11/17/2026 to 01/25/2027 1.Active Registration - www.sam.gov.Read full requirement Close full requirement

Award will be made on an all or none basis. Point of Contact Buyer Deronda Chevannes Deronda_Chevannes@ios.doi.gov Contract Officer Chau_Nguyen@@ios.doi.gov Period of Performance: 11/17/2026 to 01/25/2027 1.Active Registration - www.sam.gov.

View source 2
01page 5View official source ↗
“Award will be made on an all or none basis. Point of Contact Buyer Deronda Chevannes Deronda_Chevannes@ios.doi.gov Contract Officer Chau_Nguyen@@ios.doi.gov Period of Performance: 11/17/2026 to 01/25/2027 1.Active Registration - www.sam.gov.”
Source page 5

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 5
02page 5View official source ↗
“Award will be made on an all or none basis. Point of Contact Buyer Deronda Chevannes Deronda_Chevannes@ios.doi.gov Contract Officer Chau_Nguyen@@ios.doi.gov Period of Performance: 11/17/2026 to 01/25/2027 1.Active Registration - www.sam.gov.”
Source page 5

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 5
Requirement 9Verified
Award will be made on an all or none basis. Point of Contact Buyer Deronda Chevannes Deronda_Chevannes@ios.doi.gov Contract Officer Chau_Nguyen@@ios.doi.gov Period of Performance: 11/13/2026 to 01/19/2027 1.Active Registration - www.sam.gov.Read full requirement Close full requirement

Award will be made on an all or none basis. Point of Contact Buyer Deronda Chevannes Deronda_Chevannes@ios.doi.gov Contract Officer Chau_Nguyen@@ios.doi.gov Period of Performance: 11/13/2026 to 01/19/2027 1.Active Registration - www.sam.gov.

View source 1
01page 5View official source ↗
“Award will be made on an all or none basis. Point of Contact Buyer Deronda Chevannes Deronda_Chevannes@ios.doi.gov Contract Officer Chau_Nguyen@@ios.doi.gov Period of Performance: 11/13/2026 to 01/19/2027 1.Active Registration - www.sam.gov.”
Source page 5

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 5
Requirement 10Verified
SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT (A) (B) (C) (D) (E) (F) Award will be made on an all or none basis. Point of Contact Buyer Deronda Chevannes Deronda_Chevannes@ios.doi.gov Contract Officer Chau_Nguyen@@ios.doi.gov Period of Performance: 11/13/2026 to 01/19/2027 1Read full requirement Close full requirement

SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT (A) (B) (C) (D) (E) (F) Award will be made on an all or none basis. Point of Contact Buyer Deronda Chevannes Deronda_Chevannes@ios.doi.gov Contract Officer Chau_Nguyen@@ios.doi.gov Period of Performance: 11/13/2026 to 01/19/2027 1

View source 1
01page 5View official source ↗
“SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT (A) (B) (C) (D) (E) (F) Award will be made on an all or none basis. Point of Contact Buyer Deronda Chevannes Deronda_Chevannes@ios.doi.gov Contract Officer Chau_Nguyen@@ios.doi.gov Period of Performance: 11/13/2026 to 01/19/2027 1.Active Registration”
Source page 5

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 5
Requirement 11Needs confirmation

—

Needs confirmation

View source 1
01page 3View official source ↗
“Award will be made on an all or none basis. Point of Contact Continued...”
Source page 3

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 3
Requirement 12Needs confirmation

—

Needs confirmation

View source 2
01page 5View official source ↗
“PIPO Phase In/Phase Out POC Point of Contact”
Source page 5

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 5
02page 5View official source ↗
“PIPO Phase In/Phase Out POC Point of Contact”
Source page 5

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 5
Requirement 13Needs confirmation

—

Needs confirmation

View source 1
01page 6View official source ↗
“The Contractor Government Business Point of Contact (as listed in SAM) will receive enrollment instructions via email from the Federal Reserve Bank of St.”
Source page 6

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 6

Bid opening

Needs confirmation

—

Needs confirmation

Applies when: If this is a sealed bid solicitation, offers will be publicly opened at that time

View source 1
01page 1View official source ↗
“If this is a sealed bid solicitation, offers will be publicly opened at that time.”
Source page 1

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 1

Offer acceptance period

Verified

60 calendar days

View source 6
01page 5View official source ↗
“Quotes shall remain valid for a period of 60 calendar days from the specified offer due date.”
Source page 5

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 5
02page 5View official source ↗
“Quotes shall remain valid for a period of 60 calendar days from the specified offer due date.”
Source page 5

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 5
03page 5View official source ↗
“Quotes shall remain valid for a period of 60 calendar days from the specified offer due date.”
Source page 5

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 5
04page 4View official source ↗
“Quotes shall remain valid for a period of 60 calendar days from the specified offer due date.”
Source page 4

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 4
05page 4View official source ↗
“Quotes shall remain valid for a period of 60 calendar days from the specified offer due date.”
Source page 4

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 4
06page 4View official source ↗
“Quotes shall remain valid for a period of 60 calendar days from the specified offer due date.”
Source page 4

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 4
Missing information6 checks · expand to review

A missing value is not a waiver. Check the source or ask the agency before relying on it.

Questions due

2 findings
Requirement 1Not found

—

Not found in reviewed sources

Requirement 2Not reviewed

—

Not reviewed — requirement not confirmed

Site visit / pre-bid meeting

2 findings
Requirement 1Not found

—

Not found in reviewed sources

Requirement 2Not reviewed

—

Not reviewed — requirement not confirmed

Required submission files

2 findings
Requirement 1Not found

—

Not found in reviewed sources

Requirement 2Not reviewed

—

Not reviewed — requirement not confirmed

5 additional fields have no reviewed finding.

Continue your review

6 more sections are available once you sign in

Pricing & payment · Bonds & insurance · Evaluation & award · Scope & delivery · Labor, sourcing & compliance · Contract terms & risk