TRANSPORTATION, DEPARTMENT OF · Oklahoma City, OK
Mike Monroney Aeronautical Center (MMAC) Industrial Waste Water Treatment Plant Upgrades
- Response deadline
- 27 days left
- Published project value
- Not confirmedCheck the pricing and payment terms below.
- Solicitation number
- 6973GH-27-R-00005
Dates to plan around
Times follow the original source.
- Response deadline
Source wording
2026-11-19T16:00:00-06:00
From the posting2 agency details · contact information and original wording
15 documents found1 partially read2 could not be read38% of weighted requirement checks reviewed
Newer source changes have not been verified. Confirm the latest notice and addenda before submitting.
Review first
Start with these requirements and unresolved points.- Must doExclusions & responsibility
(c) Procedures: The offeror must review the list of excluded parties in the System for Award Management (SAM)
- Must doFinancial capacity
View 1 flagged requirement
- Requirement 1 ↗
(End of Clause) 3.4.1-1 PROPOSAL GUARANTEE (JAN 2017) (a) Offerors must furnish a proposal guarantee in the form of a proposal bond, a postal money order, a certified or cashier's check, an irrevocable letter of credit, or United States bonds or notes with a maturity of less than
- Requirement 1 ↗
- Must doRegistrations
View 4 flagged requirements
- Requirement 1 ↗
(2) The offeror must enter, in Representations, Certifications and Other Statements of Offerors Section of the solicitation, the UEI or EFT indicator that identifies the offeror's name and address exactly as stated in the offer.
- Requirement 2 ↗
To remain registered in the SAM database after the initial registration, the Contractor is required to review and update on an annual basis from the date of initial registration or subsequent updates its information in the SAM database to ensure it is current, accurate and comple
- Requirement 3 ↗
Assignees must be separately registered in the SAM database.
- Requirement 4 ↗
Therefore, the offeror must provide its UEI or EFT indicator below.
- Requirement 1 ↗
- Must doSet-aside
SBA
- Must doSite visit / pre-bid meeting
required
- ConflictHow to submit
View 2 flagged requirements
- Requirement 1 ↗
Sources disagree — check both before relying on this
- Requirement 2 ↗
Sources disagree — check both before relying on this
- Requirement 1 ↗
Eligibility & participation
Whether you can bid at all, and what you must already hold.
Registrations
6 findings(b)(1) By submission of an offer, the offeror acknowledges the requirement that a prospective awardee must be registered in the SAM database prior to award, during performance, and through final payment of any contract, basic agreement, basic ordering agreement, or blanket purcha
Applies when: prior to award, during performance, and through final payment of any contract, basic agrMust be met by: prior to award, during performance, and through final payment of any contract, basic agr
View source 1
“(b)(1) By submission of an offer, the offeror acknowledges the requirement that a prospective awardee must be registered in the SAM database prior to award, during performance, and through final payment of any contract, basic agreement, basic ordering agreement, or blanket purchasing agreement resul”
Source page 24
Page markings may include other requirements. The quotation above identifies this requirement.

(2) The offeror must enter, in Representations, Certifications and Other Statements of Offerors Section of the solicitation, the UEI or EFT indicator that identifies the offeror's name and address exactly as stated in the offer.
View source 1
“(2) The offeror must enter, in Representations, Certifications and Other Statements of Offerors Section of the solicitation, the UEI or EFT indicator that identifies the offeror's name and address exactly as stated in the offer.”
Source page 25
Page markings may include other requirements. The quotation above identifies this requirement.

To remain registered in the SAM database after the initial registration, the Contractor is required to review and update on an annual basis from the date of initial registration or subsequent updates its information in the SAM database to ensure it is current, accurate and comple
View source 1
“To remain registered in the SAM database after the initial registration, the Contractor is required to review and update on an annual basis from the date of initial registration or subsequent updates its information in the SAM database to ensure it is current, accurate and complete.”
Source page 25
Page markings may include other requirements. The quotation above identifies this requirement.

Assignees must be separately registered in the SAM database.
View source 1
“Assignees must be separately registered in the SAM database.”
Source page 25
Page markings may include other requirements. The quotation above identifies this requirement.

Therefore, the offeror must provide its UEI or EFT indicator below.
View source 1
“Therefore, the offeror must provide its UEI or EFT indicator below.”
Source page 62
Page markings may include other requirements. The quotation above identifies this requirement.

Missing information · 1 check
—
Not found in reviewed sources
Set-aside
2 findingsSBA
View source 1
“SBA”
Missing information · 1 check
—
Not found in reviewed sources
Small business size
2 findings—
Needs confirmation
View source 1
“(End of provision) 3.6.1-17 NORTH AMERICAN INDUSTRY CLASSIFICATION SYSTEM (NAICS) CODE (OCT 2022) The North American Industry Classification System (NAICS) code for this procurement is: 236220. The small business size standard as defined by the Small Business Administration (SBA) is the following: F”
Source page 69
Page markings may include other requirements. The quotation above identifies this requirement.

Missing information · 1 check
—
Not found in reviewed sources
Experience & references
3 findings—
Needs confirmation
Applies to: subcontractor
View source 1
“This factor has a fifteen (15) Page Limit (5) Factor 5 - Site Infrastructure Subcontractor Experience: The Offeror's proposed Site Infrastructure subcontractor is required to provide a minimum of two (2) projects valued at or above $250,000.00 that are wastewater related and will need to provide “Past Performance Exper”
Source page 67
Page markings may include other requirements. The quotation above identifies this requirement.

—
Needs confirmation
Applies to: person
View source 1
“To receive an “ACCEPTABLE” rating under this subfactor, the offeror’s proposal documents the qualifications and experience for the Project Manager AND Superintendent that meet the requirements in the table below. -Evidence showing the Construction Project Manager has a minimum of seven (7) years of experience in servin”
Source page 74
Page markings may include other requirements. The quotation above identifies this requirement.

Missing information · 1 check
—
Not found in reviewed sources
Key personnel
7 findings(End of Clause) 3.8.2-17 KEY PERSONNEL AND FACILITIES (JUL 2019) (a) The personnel and/or facilities as specified below are considered essential to the work being performed hereunder and may, with the consent of the contracting parties, be changed from time to time during the couClose full requirement
(End of Clause) 3.8.2-17 KEY PERSONNEL AND FACILITIES (JUL 2019) (a) The personnel and/or facilities as specified below are considered essential to the work being performed hereunder and may, with the consent of the contracting parties, be changed from time to time during the cou
Applies to: person
View source 1
“(End of Clause) 3.8.2-17 KEY PERSONNEL AND FACILITIES (JUL 2019) (a) The personnel and/or facilities as specified below are considered essential to the work being performed hereunder and may, with the consent of the contracting parties, be changed from time to time during the course of the contract.”
Source page 14
Page markings may include other requirements. The quotation above identifies this requirement.

(d) The key personnel and/or facilities under this contract are: Project Manager Superintendent [ ] [ ] [ ] [ ] [ ] [ ] (List key personnel and/or facilities) (End of clause) AC0090 ENVIRONMENTAL, SAFETY AND HEALTH (JULY 2016) (a) The Contractor shall ensure that no person employ
Applies to: person
View source 1
“(d) The key personnel and/or facilities under this contract are: Project Manager Superintendent [ ] [ ] [ ] [ ] [ ] [ ] (List key personnel and/or facilities) (End of clause) AC0090 ENVIRONMENTAL, SAFETY AND HEALTH (JULY 2016) (a) The Contractor shall ensure that no person employed on this contract ”
Source page 14
Page markings may include other requirements. The quotation above identifies this requirement.

Proposal Documentation Section Title I Contract Documentation & Price Proposal to include price breakdown Factor 1 - Relevant Experience Factor 2 - Past Performance II Factor 3 - Key Personnel, (6-page limit for each resume) Factor 4 - Packaged Wastewater Treatment Equipment (15-Close full requirement
Proposal Documentation Section Title I Contract Documentation & Price Proposal to include price breakdown Factor 1 - Relevant Experience Factor 2 - Past Performance II Factor 3 - Key Personnel, (6-page limit for each resume) Factor 4 - Packaged Wastewater Treatment Equipment (15-
Applies to: person
View source 1
“Proposal Documentation Section Title I Contract Documentation & Price Proposal to include price breakdown Factor 1 - Relevant Experience Factor 2 - Past Performance II Factor 3 - Key Personnel, (6-page limit for each resume) Factor 4 - Packaged Wastewater Treatment Equipment (15-page limit) Factor 5”
Source page 65
Page markings may include other requirements. The quotation above identifies this requirement.

(f) Section II - Relevant Experience / Past Performance / Key Personnel / Packaged Wastewater Treatment Equipment / Site Infrastructure Subcontractor Experience: The five (5) evaluation factors under this section will each be assigned a rating of "ACCEPTABLE" or "UNACCEPTABLE" inClose full requirement
(f) Section II - Relevant Experience / Past Performance / Key Personnel / Packaged Wastewater Treatment Equipment / Site Infrastructure Subcontractor Experience: The five (5) evaluation factors under this section will each be assigned a rating of "ACCEPTABLE" or "UNACCEPTABLE" in
Applies to: subcontractor
View source 1
“(f) Section II - Relevant Experience / Past Performance / Key Personnel / Packaged Wastewater Treatment Equipment / Site Infrastructure Subcontractor Experience: The five (5) evaluation factors under this section will each be assigned a rating of "ACCEPTABLE" or "UNACCEPTABLE" in accordance with Sec”
Source page 65
Page markings may include other requirements. The quotation above identifies this requirement.

While the FAA may consider data from other sources, the burden of providing thorough and complete past performance data rests with the Offeror (3) Factor 3 - Key Personnel - Key Personnel Qualifications: Offerors must provide a Resume for the Project Manager AND Superintendent th
Applies to: person
View source 1
“While the FAA may consider data from other sources, the burden of providing thorough and complete past performance data rests with the Offeror (3) Factor 3 - Key Personnel - Key Personnel Qualifications: Offerors must provide a Resume for the Project Manager AND Superintendent that will be employed ”
Source page 67
Page markings may include other requirements. The quotation above identifies this requirement.

Factor 3 - Key Personnel: Key Personnel Qualifications - Evaluation Criteria The Government will review all documentation submitted under Factor 3 within the page limit identified.
Applies when: within the page limit identifiedMust be met by: within the page limit identified
Applies to: person
View source 1
“Factor 3 - Key Personnel: Key Personnel Qualifications - Evaluation Criteria The Government will review all documentation submitted under Factor 3 within the page limit identified.”
Source page 74
Page markings may include other requirements. The quotation above identifies this requirement.

Superintendent - Construction Superintendent must be employed by the offeror, however past project experience is not required to have been completed while employed by the offeror Failure to demonstrate the minimally acceptability standards under this factor will result in an "UNA
Applies to: person
View source 1
“Superintendent - Construction Superintendent must be employed by the offeror, however past project experience is not required to have been completed while employed by the offeror Failure to demonstrate the minimally acceptability standards under this factor will result in an "UNACCEPTABLE" rating an”
Source page 74
Page markings may include other requirements. The quotation above identifies this requirement.

Financial capacity
(End of Clause) 3.4.1-1 PROPOSAL GUARANTEE (JAN 2017) (a) Offerors must furnish a proposal guarantee in the form of a proposal bond, a postal money order, a certified or cashier's check, an irrevocable letter of credit, or United States bonds or notes with a maturity of less than
View source 1
“(End of Clause) 3.4.1-1 PROPOSAL GUARANTEE (JAN 2017) (a) Offerors must furnish a proposal guarantee in the form of a proposal bond, a postal money order, a certified or cashier's check, an irrevocable letter of credit, or United States bonds or notes with a maturity of less than five years.”
Source page 26
Page markings may include other requirements. The quotation above identifies this requirement.

Joint ventures & teaming
4 findings(5) Bid Bond (6) Executed Teaming Agreement or Joint Venture agreements (if applicable)
Applies when: if applicable)
View source 1
“(5) Bid Bond (6) Executed Teaming Agreement or Joint Venture agreements (if applicable)”
Source page 65
Page markings may include other requirements. The quotation above identifies this requirement.

submitted project must be the amount of the offeror’s subcontract - If an offeror is proposing under Teaming Agreement, each Teaming Partner must have a minimum of one (1)
Applies when: If an offeror is proposing under Teaming Agreement, each Teaming Partner must have a minimum of one (1)
View source 1
“submitted project must be the amount of the offeror’s subcontract - If an offeror is proposing under Teaming Agreement, each Teaming Partner must have a minimum of one (1)”
Source page 66
Page markings may include other requirements. The quotation above identifies this requirement.

project must be the amount of the offeror’s subcontract - If an offeror is proposing under a Teaming Agreement, each Teaming Partner must have a minimum of one (1)
Applies when: If an offeror is proposing under a Teaming Agreement, each Teaming Partner must have a minimum of one (1)
View source 1
“project must be the amount of the offeror’s subcontract - If an offeror is proposing under a Teaming Agreement, each Teaming Partner must have a minimum of one (1)”
Source page 66
Page markings may include other requirements. The quotation above identifies this requirement.

(iii) The offeror must send out – and track the completion of - PPS(s) (See Section J, List of Attachments, Attachment 5 Past Performance Survey) to each of the offeror’s or if applicable joint venture member’s (i.e., each entity’s) clients.
Applies when: if applicable joint venture member’s (i
View source 1
“(iii) The offeror must send out – and track the completion of - PPS(s) (See Section J, List of Attachments, Attachment 5 Past Performance Survey) to each of the offeror’s or if applicable joint venture member’s (i.e., each entity’s) clients.”
Source page 67
Page markings may include other requirements. The quotation above identifies this requirement.

Exclusions & responsibility
4 findings3.2.2.7-6 PROTECTING THE GOVERNMENT'S INTEREST WHEN SUBCONTRACTING WITH CONTRACTORS DEBARRED, SUSPENDED, OR PROPOSED FOR DEBARMENT (APR 2023)
Applies when: WHEN SUBCONTRACTING WITH CONTRACTORS DEBARRED, SUSPENDED, OR PROPOSED FOR DEBARMENT (APR 2023)
View source 1
“3.2.2.7-6 PROTECTING THE GOVERNMENT'S INTEREST WHEN SUBCONTRACTING WITH CONTRACTORS DEBARRED, SUSPENDED, OR PROPOSED FOR DEBARMENT (APR 2023)”
Source page 18
Page markings may include other requirements. The quotation above identifies this requirement.

If the Contractor is suspended or debarred as a result of the MOU termination, the contractor is not eligible to participate in E- Verify during the period of its suspension or debarment.
Applies when: If the Contractor is suspended or debarred as a result of the MOU termination, the contractor is not eligible to participate in E- Verify during the period of its suspension or debar
View source 1
“If the Contractor is suspended or debarred as a result of the MOU termination, the contractor is not eligible to participate in E- Verify during the period of its suspension or debarment.”
Source page 29
Page markings may include other requirements. The quotation above identifies this requirement.

(A) Are [ ] are not [ ] presently debarred, suspended, proposed for debarment, or declared ineligible for the award of contracts by any Federal agency;
View source 1
“(A) Are [ ] are not [ ] presently debarred, suspended, proposed for debarment, or declared ineligible for the award of contracts by any Federal agency;”
Source page 55
Page markings may include other requirements. The quotation above identifies this requirement.

(c) Procedures: The offeror must review the list of excluded parties in the System for Award Management (SAM)
View source 1
“(c) Procedures: The offeror must review the list of excluded parties in the System for Award Management (SAM)”
Source page 59
Page markings may include other requirements. The quotation above identifies this requirement.

Conflicts of interest
2 findingsSection I - Contract Clauses Clause List 3.1.7-2 ORGANIZATIONAL CONFLICTS OF INTEREST (JAN 2023) 3.2.2.3-33 ORDER OF PRECEDENCE (APR 2024) 3.2.2.3-42 DIFFERING SITE CONDITIONS (APR 2024) 3.2.2.3-43 SITE INVESTIGATION AND CONDITIONS AFFECTING THE WORK (APR 2024) 3.2.2.3-45 MATERIAClose full requirement
Section I - Contract Clauses Clause List 3.1.7-2 ORGANIZATIONAL CONFLICTS OF INTEREST (JAN 2023) 3.2.2.3-33 ORDER OF PRECEDENCE (APR 2024) 3.2.2.3-42 DIFFERING SITE CONDITIONS (APR 2024) 3.2.2.3-43 SITE INVESTIGATION AND CONDITIONS AFFECTING THE WORK (APR 2024) 3.2.2.3-45 MATERIA
View source 1
“Section I - Contract Clauses Clause List 3.1.7-2 ORGANIZATIONAL CONFLICTS OF INTEREST (JAN 2023) 3.2.2.3-33 ORDER OF PRECEDENCE (APR 2024) 3.2.2.3-42 DIFFERING SITE CONDITIONS (APR 2024) 3.2.2.3-43 SITE INVESTIGATION AND CONDITIONS AFFECTING THE WORK (APR 2024) 3.2.2.3-45 MATERIAL AND WORKMANSHIP (J”
Source page 18
Page markings may include other requirements. The quotation above identifies this requirement.

These independent firms shall not be affiliated with or have had any business relation, nor any other relationship that would imply any conflict of interest with respect to the Contractor.
View source 1
“These independent firms shall not be affiliated with or have had any business relation, nor any other relationship that would imply any conflict of interest with respect to the Contractor.”
Source page 61
Page markings may include other requirements. The quotation above identifies this requirement.

Missing information1 checks · expand to review
A missing value is not a waiver. Check the source or ask the agency before relying on it.
Required licenses
—
Not found in reviewed sources
1 additional field have no reviewed finding.
Deadlines & submission
When and how to submit, and whether you are still in time.
Response deadline
2 findings2026-11-19T16:00:00-06:00
View source 1
“2026-11-19T16:00:00-06:00”
Missing information · 1 check
—
Not found in reviewed sources
Site visit / pre-bid meeting
3 findingsrequired
View source 1
“Please include the solicitation number 6973GH-27-R-00005 in the subject line of all email correspondence as indicated in Section L of the SIR ***ATTENTION: REVIEW SECTION L.1 OF THE SIR FOR THE MANDATORY SITE VISIT INSTRUCTIONS*** Prospective offerors are REQUIRED to attend a MANDATORY pre-proposal conference/site visi”
required
Applies when: Prior to Proposal Prospective offerors are REQUIRED to attend a MANDATORY pre-proposal cMust be met by: Prior to Proposal Prospective offerors are REQUIRED to attend a MANDATORY pre-proposal c
View source 1
“Section L - Instructions,Conditions, and Notices to Bidders Clause List L.1 Mandatory Site Visit/Submission of Questions Prior to Proposal Prospective offerors are REQUIRED to attend a MANDATORY pre-proposal conference/site visit to be held at 10:00 a.m.”
Source page 63
Page markings may include other requirements. The quotation above identifies this requirement.

Missing information · 1 check
—
Not found in reviewed sources
How to submit
7 findings—
Conflicting sources
View source 1
“Submit proposals for purchase of products or systems included in allowances in the form specified for Change Orders. 1.6 INFORMATIONAL SUBMITTALS ALLOWANCES 01 21 00 - 1 LDG / MMAC IWTP and Collection System Upgrade (Type B)”
Source page 25
Page markings may include other requirements. The quotation above identifies this requirement.

—
Conflicting sources
View source 1
“NOTE: Due to FAA email size limitations, it is highly recommended that offerors submit their email proposal for each Section as separate emails and in the email subject line state 6973GH-27-R-00005, Section/Factor “**” Submitted on Behalf of “<Insert Offeror Company>”.”
Source page 64
Page markings may include other requirements. The quotation above identifies this requirement.

(f) Documentation shall be submitted electronically in accordance with Section L, Clause 3.2.2.3-20, Electronic Offers.
View source 1
“(f) Documentation shall be submitted electronically in accordance with Section L, Clause 3.2.2.3-20, Electronic Offers.”
Source page 64
Page markings may include other requirements. The quotation above identifies this requirement.

Proposals must be emailed to andre.casiano@us.af.mil (g) VERY IMPORTANT NOTICE: Offerors are further advised that due to the size of the proposal documents as well as email security requirements, Offerors should not wait until the last minute to email proposal submission as any e
View source 1
“Proposals must be emailed to andre.casiano@us.af.mil (g) VERY IMPORTANT NOTICE: Offerors are further advised that due to the size of the proposal documents as well as email security requirements, Offerors should not wait until the last minute to email proposal submission as any email received after ”
Source page 64
Page markings may include other requirements. The quotation above identifies this requirement.

(b) Documentation shall be submitted electronically in accordance with Section L, Provision 3.2.2.3-20, Electronic Offers.
View source 1
“(b) Documentation shall be submitted electronically in accordance with Section L, Provision 3.2.2.3-20, Electronic Offers.”
Source page 65
Page markings may include other requirements. The quotation above identifies this requirement.

(End of provision) 3.2.2.3-20 OFFERS (JAN 2018) (a) The offeror (you) must submit responses to this SIR by the following electronic means : Email.
View source 1
“(End of provision) 3.2.2.3-20 OFFERS (JAN 2018) (a) The offeror (you) must submit responses to this SIR by the following electronic means : Email.”
Source page 69
Page markings may include other requirements. The quotation above identifies this requirement.

Missing information · 1 check
—
Not found in reviewed sources
Required submission files
2 findingsOfferors must complete and submit a minimum of three (3) "Past Performance Experience Information" (PPIE) forms, attached to the SIR , (Attachment 6 Past Performance Experience Form) in response to this factor.
View source 1
“Offerors must complete and submit a minimum of three (3) "Past Performance Experience Information" (PPIE) forms, attached to the SIR , (Attachment 6 Past Performance Experience Form) in response to this factor.”
Source page 65
Page markings may include other requirements. The quotation above identifies this requirement.

Missing information · 1 check
—
Not found in reviewed sources
Procurement contact
3 findingsAndre Casiano · andre.casiano@faa.gov · 4059547850
View source 1
“Andre Casiano · andre.casiano@faa.gov · 4059547850”
andre.casiano@faa.gov
View source 1
“applicable). Please advise the Contracting Officer, Andre Casiano, at andre.casiano@faa.gov in writing of your intent to attend by 12:00 p.m. Central Time, Frida”
—
Needs confirmation
View source 1
“Offeror’s must ensure that current and accurate point of contact information is provided with their submission for all clients contacted to complete and submit a PPS.”
Source page 74
Page markings may include other requirements. The quotation above identifies this requirement.

Bid opening
—
Needs confirmation
Applies when: If this is a sealed bid solicitation, offers will be publicly opened at that time
View source 1
“If this is a sealed bid solicitation, offers will be publicly opened at that time.”
Source page 1
Page markings may include other requirements. The quotation above identifies this requirement.

Formatting & signatures
5 findingsProposal Documentation Section Title I Contract Documentation & Price Proposal to include price breakdown Factor 1 - Relevant Experience Factor 2 - Past Performance II Factor 3 - Key Personnel, (6-page limit for each resume) Factor 4 - Packaged Wastewater Treatment Equipment (15-Close full requirement
Proposal Documentation Section Title I Contract Documentation & Price Proposal to include price breakdown Factor 1 - Relevant Experience Factor 2 - Past Performance II Factor 3 - Key Personnel, (6-page limit for each resume) Factor 4 - Packaged Wastewater Treatment Equipment (15-
Applies to: person
View source 1
“Proposal Documentation Section Title I Contract Documentation & Price Proposal to include price breakdown Factor 1 - Relevant Experience Factor 2 - Past Performance II Factor 3 - Key Personnel, (6-page limit for each resume) Factor 4 - Packaged Wastewater Treatment Equipment (15-page limit) Factor 5”
Source page 65
Page markings may include other requirements. The quotation above identifies this requirement.

experience to perform under the contract - Each Resume has a Six (6) Page Limit
View source 1
“experience to perform under the contract - Each Resume has a Six (6) Page Limit”
Source page 67
Page markings may include other requirements. The quotation above identifies this requirement.

This factor has a fifteen (15) Page Limit (5) Factor 5 - Site Infrastructure Subcontractor Experience: The Offeror's proposed Site Infrastructure subcontractor is required to provide a minimum of two (2) projects valued at or above $250,000.00 that are wastewater related and will
Applies to: subcontractor
View source 1
“This factor has a fifteen (15) Page Limit (5) Factor 5 - Site Infrastructure Subcontractor Experience: The Offeror's proposed Site Infrastructure subcontractor is required to provide a minimum of two (2) projects valued at or above $250,000.00 that are wastewater related and will need to provide “Pa”
Source page 67
Page markings may include other requirements. The quotation above identifies this requirement.

Factor 3 - Key Personnel: Key Personnel Qualifications - Evaluation Criteria The Government will review all documentation submitted under Factor 3 within the page limit identified.
Applies when: within the page limit identifiedMust be met by: within the page limit identified
Applies to: person
View source 1
“Factor 3 - Key Personnel: Key Personnel Qualifications - Evaluation Criteria The Government will review all documentation submitted under Factor 3 within the page limit identified.”
Source page 74
Page markings may include other requirements. The quotation above identifies this requirement.

Factor 4 – Packaged Wastewater Treatment Equipment - Evaluation Criteria The Government will review all documentation submitted under Factor 4 within the page limit identified.
Applies when: within the page limit identifiedMust be met by: within the page limit identified
View source 1
“Factor 4 – Packaged Wastewater Treatment Equipment - Evaluation Criteria The Government will review all documentation submitted under Factor 4 within the page limit identified.”
Source page 74
Page markings may include other requirements. The quotation above identifies this requirement.

Mandatory forms
3 findings1d Attachment 1d 13289-007_MMAC IWTP Drawings 06/10/2026 139 2 Attachment 2 SF25 Performance Bond 08/01/2016 3
View source 1
“1d Attachment 1d 13289-007_MMAC IWTP Drawings 06/10/2026 139 2 Attachment 2 SF25 Performance Bond 08/01/2016 3”
Source page 53
Page markings may include other requirements. The quotation above identifies this requirement.

3 Attachment 3 SF25A Payment Bond 08/01/2016 2 4 Attachment 4 SF24 Bid Bond 08/01/2016 2
View source 1
“3 Attachment 3 SF25A Payment Bond 08/01/2016 2 4 Attachment 4 SF24 Bid Bond 08/01/2016 2”
Source page 53
Page markings may include other requirements. The quotation above identifies this requirement.

Offerors must complete and submit: (1) Section A, Solicitation, Offer and Award, FAA Form 4400-82 (SF1442), Blocks 20a, 20b, and 20c (2) Section K, Representations and Certifications (3) Section B, Supplies or Services and Prices/Costs: Government format (4) Price Breakdown: Cont
View source 1
“Offerors must complete and submit: (1) Section A, Solicitation, Offer and Award, FAA Form 4400-82 (SF1442), Blocks 20a, 20b, and 20c (2) Section K, Representations and Certifications (3) Section B, Supplies or Services and Prices/Costs: Government format (4) Price Breakdown: Contractor Format, Ident”
Source page 65
Page markings may include other requirements. The quotation above identifies this requirement.

Offer acceptance period
7 findings90 calendar days
View source 1
“(c) The FAA requires a minimum acceptance period of 90 calendar days.”
Source page 54
Page markings may include other requirements. The quotation above identifies this requirement.

—
Needs confirmation
View source 1
“Section K - Representations, Certifications, and Other Statements of Bidders Clause List 3.2.2.3-82 PROHIBITION ON CONDUCTING RESTRICTED BUSINESS OPERATIONS IN SUDAN - CERTIFICATION (JUL 2012) 3.6.3-4 RECOVERED MATERIAL PRODUCTS CERTIFICATION (OCT 2024) 3.2.2.3-2 MINIMUM OFFER ACCEPTANCE PERIOD (APR”
Source page 54
Page markings may include other requirements. The quotation above identifies this requirement.

—
Needs confirmation
View source 1
“(b) This provision supersedes any language about the acceptance period appearing elsewhere in this SIR.”
Source page 54
Page markings may include other requirements. The quotation above identifies this requirement.

—
Needs confirmation
View source 1
“(d) The offeror may specify a longer acceptance period than the period shown in paragraph (c).”
Source page 54
Page markings may include other requirements. The quotation above identifies this requirement.

—
Needs confirmation
View source 1
“To specify a longer period, fill in the blank: The offeror allows the following acceptance period: _____ calendar days.”
Source page 54
Page markings may include other requirements. The quotation above identifies this requirement.

—
Needs confirmation
View source 1
“(e) The FAA may reject an offer allowing less than the FAA's minimum acceptance period.”
Source page 54
Page markings may include other requirements. The quotation above identifies this requirement.

—
Needs confirmation
Applies when: if the FAA accepts the offer in writing within: (1) The acceptance period stated in paragraph (c) of this provision; within: (1) The acceptance period stated in paragraph (c) of this provisionMust be met by: within: (1) The acceptance period stated in paragraph (c) of this provision
View source 1
“(f) The offeror agrees to fulfill the offer completely if the FAA accepts the offer in writing within: (1) The acceptance period stated in paragraph (c) of this provision; or (2) Any longer acceptance period stated in paragraph (d) of this provision.”
Source page 54
Page markings may include other requirements. The quotation above identifies this requirement.

Alternate proposals
3 findingsThe total evaluated price will be the sum of the base bid and the bid options the FAA elects to award.
View source 1
“The total evaluated price will be the sum of the base bid and the bid options the FAA elects to award.”
Source page 5
Page markings may include other requirements. The quotation above identifies this requirement.

The total evaluated price will be the sum of the base bid and the bid options the FAA elects to award. 3.1.9-1 ELECTRONIC COMMERCE AND SIGNATURE (JUL 2020) (a) The Electronic Signatures in Global and National Commerce Act (E-SIGN) establishes a legal equivalence between: Page 13Close full requirement
The total evaluated price will be the sum of the base bid and the bid options the FAA elects to award. 3.1.9-1 ELECTRONIC COMMERCE AND SIGNATURE (JUL 2020) (a) The Electronic Signatures in Global and National Commerce Act (E-SIGN) establishes a legal equivalence between: Page 13
View source 1
“The total evaluated price will be the sum of the base bid and the bid options the FAA elects to award. 3.1.9-1 ELECTRONIC COMMERCE AND SIGNATURE (JUL 2020) (a) The Electronic Signatures in Global and National Commerce Act (E-SIGN) establishes a legal equivalence between: Page 13”
Source page 13
Page markings may include other requirements. The quotation above identifies this requirement.

M.6 Cost/Price (a) The total evaluated price will be the sum of the base bid and the bid options the FAA elects to award.
View source 1
“M.6 Cost/Price (a) The total evaluated price will be the sum of the base bid and the bid options the FAA elects to award.”
Source page 75
Page markings may include other requirements. The quotation above identifies this requirement.

Grounds for rejection
4 findingsIn this event, the contractor must provide, or cause each of its employees to provide, such security information to AXP. Failure to cooperate with security processing will result in an unfavorable suitability determination. 13. The contractor must retrieve a current roster report
View source 1
“In this event, the contractor must provide, or cause each of its employees to provide, such security information to AXP. Failure to cooperate with security processing will result in an unfavorable suitability determination. 13. The contractor must retrieve a current roster report through VAP on a qu”
Source page 45
Page markings may include other requirements. The quotation above identifies this requirement.

Any offer that fails to provide all of the requisite items identified at (1) through (6) above, or otherwise takes exception, may be deemed non-responsive and ineligible for award.
View source 1
“Any offer that fails to provide all of the requisite items identified at (1) through (6) above, or otherwise takes exception, may be deemed non-responsive and ineligible for award.”
Source page 65
Page markings may include other requirements. The quotation above identifies this requirement.

(2) Conformance – Proposals must conform to the format and content instructions identified at L.6. Non-adherence to proposal format and content instructions may be considered non-responsive.
View source 1
“(2) Conformance – Proposals must conform to the format and content instructions identified at L.6. Non-adherence to proposal format and content instructions may be considered non-responsive.”
Source page 72
Page markings may include other requirements. The quotation above identifies this requirement.

Proposals found by the CO to be non-responsive may not receive further consideration.
View source 1
“Proposals found by the CO to be non-responsive may not receive further consideration.”
Source page 72
Page markings may include other requirements. The quotation above identifies this requirement.

Missing information2 checks · expand to review
A missing value is not a waiver. Check the source or ask the agency before relying on it.
Questions due
—
Not found in reviewed sources
Acknowledge amendments
—
Not found in reviewed sources
1 additional field have no reviewed finding.
6 more sections are available once you sign in
Pricing & payment · Bonds & insurance · Evaluation & award · Scope & delivery · Labor, sourcing & compliance · Contract terms & risk
Sign in — freeExtracted from the public documents linked above. This is an information aid, not a determination of bid eligibility or legal advice. Verify the original wording and any addenda before submitting a bid.