DEPT OF DEFENSE · Fort Eustis, VA

Fort Eustis Dredge Material Management Area (FEDMMA)

2 source documentsSource checked Sep 24Content updated
Open notice
Response deadline
39 days left
Published project value
Not confirmed
Check the pricing and payment terms below.
Solicitation number
Not confirmed
View official posting ↗Review requirements ↓Original posting details are available below.

Dates to plan around

Times follow the original source.

  1. Response deadline
    Source wording
    2026-12-01T14:00:00-05:00
From the posting1 agency details · contact information and original wording
Solicitation number
Solicitation W9123626BA0008
Worth confirming on the posting
View the official posting →Always the authority. An addendum can change any of this after we read it.
Document coverage
1 / 2documents readReview incomplete

2 documents found1 could not be read6% of weighted requirement checks reviewed

Before you bid

Review first

Start with these requirements and unresolved points.
01

Eligibility & participation

Whether you can bid at all, and what you must already hold.

7 verified

Set-aside

3 findings
Requirement 1Verified

SBA

View source 1
01https://sam.gov/api/prod/opps/v2/opportunities/43c5368ae19544698532c616a5ebc327 /data2/solicitation/setAsideView official source ↗
“SBA”
Missing information · 2 checks
Not found

—

Not found in reviewed sources

Not reviewed

—

Not reviewed — requirement not confirmed

Financial capacity

2 findings
Requirement 1Verified

If bidder's firm has a line of credit - provide information on how many figures bidder can borrow against the line of credit (e.g., medium 6 figures - exact line of credit is not required). b) The bidder shall provide the latest three complete fiscal year financial statements for

Applies when: If bidder's firm has a line of credit - provide information on how many figures bidder can borrow against the line of credit (e

View source 2
01page 6View official source ↗
“If bidder's firm has a line of credit - provide information on how many figures bidder can borrow against the line of credit (e.g., medium 6 figures - exact line of credit is not required). b) The bidder shall provide the latest three complete fiscal year financial statements for the prime contracto”
Source page 6

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 6
02page 14View official source ↗
“If bidder's firm has a line of credit - provide information on how many figures bidder can borrow against the line of credit (e.g., medium 6 figures - exact line of credit is not required). b) The bidder shall provide the latest three complete fiscal year financial statements for the prime contracto”
Source page 14

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 14
Requirement 2Verified

The Government may also utilize Dun & Bradstreet reports to evaluate the financial capacity of the bidder. c) Representations and Certifications.

View source 2
01page 6View official source ↗
“The Government may also utilize Dun & Bradstreet reports to evaluate the financial capacity of the bidder. c) Representations and Certifications.”
Source page 6

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 6
02page 14View official source ↗
“The Government may also utilize Dun & Bradstreet reports to evaluate the financial capacity of the bidder. c) Representations and Certifications.”
Source page 14

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 14

Joint ventures & teaming

4 findings
Requirement 1Verified
For Joint Venture arrangements, submit a copy of the JV agreement and the latest three complete fiscal year financial statements for each company in the Joint Venture and discuss the financial responsibilities among the companies.Read full requirement Close full requirement

For Joint Venture arrangements, submit a copy of the JV agreement and the latest three complete fiscal year financial statements for each company in the Joint Venture and discuss the financial responsibilities among the companies.

Applies when: For Joint Venture

View source 2
01page 6View official source ↗
“For Joint Venture arrangements, submit a copy of the JV agreement and the latest three complete fiscal year financial statements for each company in the Joint Venture and discuss the financial responsibilities among the companies.”
Source page 6

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 6
02page 14View official source ↗
“For Joint Venture arrangements, submit a copy of the JV agreement and the latest three complete fiscal year financial statements for each company in the Joint Venture and discuss the financial responsibilities among the companies.”
Source page 14

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 14
Requirement 2Verified
In the case of a joint venture (JV), experience may be submitted from the JV submitting the bid, experience of one of the members of the JV submitting the bid, or experience of a member of the submitting JV if performed by that member as part of a different JV.Read full requirement Close full requirement

In the case of a joint venture (JV), experience may be submitted from the JV submitting the bid, experience of one of the members of the JV submitting the bid, or experience of a member of the submitting JV if performed by that member as part of a different JV.

Applies when: if performed by that member as part of a different JV

View source 2
01page 8View official source ↗
“In the case of a joint venture (JV), experience may be submitted from the JV submitting the bid, experience of one of the members of the JV submitting the bid, or experience of a member of the submitting JV if performed by that member as part of a different JV.”
Source page 8

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 8
02page 16View official source ↗
“In the case of a joint venture (JV), experience may be submitted from the JV submitting the bid, experience of one of the members of the JV submitting the bid, or experience of a member of the submitting JV if performed by that member as part of a different JV.”
Source page 16

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 16
Requirement 3Verified

Bidders must represent in SAM.gov that they are a Small Business under NAICS code 237990. If bidder is submitting a bid as a Joint Venture (JV) submit your JV Agreement with your bid. 14. DISTRIBUTION OF ADVANCE NOTICES AND SOLICITATIONS Information regarding USACEs definition of

Applies when: If bidder is submitting a bid as a Joint Venture (JV) submit your JV Agreement with your bid

View source 1
01page 10View official source ↗
“Bidders must represent in SAM.gov that they are a Small Business under NAICS code 237990. If bidder is submitting a bid as a Joint Venture (JV) submit your JV Agreement with your bid. 14. DISTRIBUTION OF ADVANCE NOTICES AND SOLICITATIONS Information regarding USACEs definition of equitable adjustmen”
Source page 10

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 10
Requirement 4Verified
W9123626BA0080006 Page 19 of 19 If bidder is submitting a bid as a Joint Venture (JV) submit your JV Agreement with your bid. 14. DISTRIBUTION OF ADVANCE NOTICES AND SOLICITATIONS Information regarding USACEs definition of equitable adjustments for change orders under constructioRead full requirement Close full requirement

W9123626BA0080006 Page 19 of 19 If bidder is submitting a bid as a Joint Venture (JV) submit your JV Agreement with your bid. 14. DISTRIBUTION OF ADVANCE NOTICES AND SOLICITATIONS Information regarding USACEs definition of equitable adjustments for change orders under constructio

Applies when: If bidder is submitting a bid as a Joint Venture (JV) submit your JV Agreement with your bid

View source 1
01page 19View official source ↗
“W9123626BA0080006 Page 19 of 19 If bidder is submitting a bid as a Joint Venture (JV) submit your JV Agreement with your bid. 14. DISTRIBUTION OF ADVANCE NOTICES AND SOLICITATIONS Information regarding USACEs definition of equitable adjustments for change orders under construction contracts can be f”
Source page 19

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 19
Missing information8 checks · expand to review

A missing value is not a waiver. Check the source or ask the agency before relying on it.

Registrations

2 findings
Requirement 1Not found

—

Not found in reviewed sources

Requirement 2Not reviewed

—

Not reviewed — requirement not confirmed

Small business size

2 findings
Requirement 1Not found

—

Not found in reviewed sources

Requirement 2Not reviewed

—

Not reviewed — requirement not confirmed

Required licenses

2 findings
Requirement 1Not found

—

Not found in reviewed sources

Requirement 2Not reviewed

—

Not reviewed — requirement not confirmed

Experience & references

2 findings
Requirement 1Not found

—

Not found in reviewed sources

Requirement 2Not reviewed

—

Not reviewed — requirement not confirmed

4 additional fields have no reviewed finding.

02

Deadlines & submission

When and how to submit, and whether you are still in time.

15 verified2 to confirm

Response deadline

3 findings
Requirement 1Verified

2026-12-01T14:00:00-05:00

View source 1
01https://sam.gov/api/prod/opps/v2/opportunities/43c5368ae19544698532c616a5ebc327 /data2/solicitation/deadlines/responseView official source ↗
“2026-12-01T14:00:00-05:00”
Missing information · 2 checks
Not found

—

Not found in reviewed sources

Not reviewed

—

Not reviewed — requirement not confirmed

How to submit

6 findings
Requirement 1Verified

All bids must be submitted by electronic commerce only (that is, by submission via PIEE, as discussed below, only).

View source 2
01page 2View official source ↗
“All bids must be submitted by electronic commerce only (that is, by submission via PIEE, as discussed below, only).”
Source page 2

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 2
02page 10View official source ↗
“All bids must be submitted by electronic commerce only (that is, by submission via PIEE, as discussed below, only).”
Source page 10

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 10
Requirement 2Verified

In accordance with (IAW) RFO 52.214-7, LATE SUBMISSIONS, MODIFICATIONS, AND WITHDRAWALS OF BIDS, all bids must be received at the initial point of entry to the Government infrastructure not later than 6

View source 1
01page 2View official source ↗
“In accordance with (IAW) RFO 52.214-7, LATE SUBMISSIONS, MODIFICATIONS, AND WITHDRAWALS OF BIDS, all bids must be received at the initial point of entry to the Government infrastructure not later than 6”
Source page 2

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 2
Requirement 3Verified

October 2026 at 2:00 P.M. EDT. Bids shall be submitted through the Solicitation Module of the Procurement

View source 1
01page 2View official source ↗
“October 2026 at 2:00 P.M. EDT. Bids shall be submitted through the Solicitation Module of the Procurement”
Source page 2

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 2
Requirement 4Verified

In accordance with (IAW) RFO 52.214-7, LATE SUBMISSIONS, MODIFICATIONS, AND WITHDRAWALS OF BIDS, all bids must be received at the initial point of entry to the Government infrastructure not later than 1

View source 1
01page 11View official source ↗
“In accordance with (IAW) RFO 52.214-7, LATE SUBMISSIONS, MODIFICATIONS, AND WITHDRAWALS OF BIDS, all bids must be received at the initial point of entry to the Government infrastructure not later than 1”
Source page 11

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 11
Requirement 5Verified

December 2026 at 2:00 P.M. EDT. Bids shall be submitted through the Solicitation Module of the Procurement

View source 1
01page 11View official source ↗
“December 2026 at 2:00 P.M. EDT. Bids shall be submitted through the Solicitation Module of the Procurement”
Source page 11

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 11
Missing information · 1 check
Not reviewed

—

Not reviewed — requirement not confirmed

Procurement contact

3 findings
Requirement 1Verified

Michael Stevenson · michael.l.stevenson@usace.army.mil · 7572017233

View source 1
01https://sam.gov/api/prod/opps/v2/opportunities/43c5368ae19544698532c616a5ebc327 /data2/pointOfContact/0View official source ↗
“Michael Stevenson · michael.l.stevenson@usace.army.mil · 7572017233”
Requirement 2Needs confirmation

—

Needs confirmation

View source 3
01page 7View official source ↗
“Owner point of contact information f.”
Source page 7

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 7
02page 15View official source ↗
“Owner point of contact information f.”
Source page 15

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 15
03page 16View official source ↗
“Owner point of contact information f.”
Source page 16

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 16
Requirement 3Needs confirmation

—

Needs confirmation

View source 1
01page 7View official source ↗
“Owner point of contact information”
Source page 7

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 7

Formatting & signatures

2 findings
Requirement 1Verified

b) The bidder shall provide the latest three complete fiscal year financial statements for the prime contractor, certified by an independent accounting firm, if available, or if unavailable then signed by an authorized officer of

Applies when: if available, or if unavailable then signed by an authorized officer of

View source 2
01page 6View official source ↗
“b) The bidder shall provide the latest three complete fiscal year financial statements for the prime contractor, certified by an independent accounting firm, if available, or if unavailable then signed by an authorized officer of”
Source page 6

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 6
02page 14View official source ↗
“b) The bidder shall provide the latest three complete fiscal year financial statements for the prime contractor, certified by an independent accounting firm, if available, or if unavailable then signed by an authorized officer of”
Source page 14

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 14
Requirement 2Verified

The submission responding to the DRC must be provided in the form of a written detailed narrative, with a page limitation that shall not exceed five (5) single-sided pages in total.

View source 2
01page 6View official source ↗
“The submission responding to the DRC must be provided in the form of a written detailed narrative, with a page limitation that shall not exceed five (5) single-sided pages in total.”
Source page 6

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 6
02page 15View official source ↗
“The submission responding to the DRC must be provided in the form of a written detailed narrative, with a page limitation that shall not exceed five (5) single-sided pages in total.”
Source page 15

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 15

Mandatory forms

4 findings
Requirement 1Verified

Documents to be submitted prior to the Bid Closing Date: 1. Filled-in and signed SF1442 (page 1 and 2) 2. Filled-in and signed SF30s (for any amendments to the Solicitation) 3. Filled in Bid Schedule.

Applies when: prior to the Bid Closing Date: 1Must be met by: prior to the Bid Closing Date: 1

View source 2
01page 4View official source ↗
“Documents to be submitted prior to the Bid Closing Date: 1. Filled-in and signed SF1442 (page 1 and 2) 2. Filled-in and signed SF30s (for any amendments to the Solicitation) 3. Filled in Bid Schedule.”
Source page 4

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 4
02page 12View official source ↗
“Documents to be submitted prior to the Bid Closing Date: 1. Filled-in and signed SF1442 (page 1 and 2) 2. Filled-in and signed SF30s (for any amendments to the Solicitation) 3. Filled in Bid Schedule.”
Source page 12

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 12
Requirement 2Verified

Additionally, the bid submission shall provide signed BID by letter to include SF1442 and SF 30 acknowledgement of all Amendments.

View source 1
01page 4View official source ↗
“Additionally, the bid submission shall provide signed BID by letter to include SF1442 and SF 30 acknowledgement of all Amendments.”
Source page 4

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 4
Requirement 3Verified

In accordance with RFO FAR 52.204-7 SAM Registration please ensure that your Cage Code is listed on Block 14 of the SF1442 in order to be responsive.

View source 2
01page 10View official source ↗
“In accordance with RFO FAR 52.204-7 SAM Registration please ensure that your Cage Code is listed on Block 14 of the SF1442 in order to be responsive.”
Source page 10

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 10
02page 18View official source ↗
“In accordance with RFO FAR 52.204-7 SAM Registration please ensure that your Cage Code is listed on Block 14 of the SF1442 in order to be responsive.”
Source page 18

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 18
Requirement 4Verified

Additionally, the bid submission shall provide signed BID by letter to include SF1442 and SF 30 acknowledgement of all Amendments. 2. BASIS OF AWARD All blanks on the Attachment 3 Bid Schedule must be filled in by the bidder.

View source 1
01page 13View official source ↗
“Additionally, the bid submission shall provide signed BID by letter to include SF1442 and SF 30 acknowledgement of all Amendments. 2. BASIS OF AWARD All blanks on the Attachment 3 Bid Schedule must be filled in by the bidder.”
Source page 13

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 13

Grounds for rejection

2 findings
Requirement 1Verified
Failure to submit with the offer satisfactory evidence of the authority of all other persons may be cause for rejection of the offer as invalid or nonresponsive. 5. PRE-AWARD SAFETY CONFERENCE Where an apparent low bidder, in performance of contracts during the previous three-yeaRead full requirement Close full requirement

Failure to submit with the offer satisfactory evidence of the authority of all other persons may be cause for rejection of the offer as invalid or nonresponsive. 5. PRE-AWARD SAFETY CONFERENCE Where an apparent low bidder, in performance of contracts during the previous three-yea

View source 2
01page 8View official source ↗
“Failure to submit with the offer satisfactory evidence of the authority of all other persons may be cause for rejection of the offer as invalid or nonresponsive. 5. PRE-AWARD SAFETY CONFERENCE Where an apparent low bidder, in performance of contracts during the previous three-year period, incurred o”
Source page 8

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 8
02page 17View official source ↗
“Failure to submit with the offer satisfactory evidence of the authority of all other persons may be cause for rejection of the offer as invalid or nonresponsive. 5. PRE-AWARD SAFETY CONFERENCE Where an apparent low bidder, in performance of contracts during the previous three-year period, incurred o”
Source page 17

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 17
Requirement 2Verified

9. UNBALANCED BIDS Any bid which is materially unbalanced as to prices for the contract line items may be rejected as non-responsive

View source 2
01page 9View official source ↗
“9. UNBALANCED BIDS Any bid which is materially unbalanced as to prices for the contract line items may be rejected as non-responsive”
Source page 9

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 9
02page 17View official source ↗
“9. UNBALANCED BIDS Any bid which is materially unbalanced as to prices for the contract line items may be rejected as non-responsive”
Source page 17

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 17
Missing information8 checks · expand to review

A missing value is not a waiver. Check the source or ask the agency before relying on it.

Questions due

2 findings
Requirement 1Not found

—

Not found in reviewed sources

Requirement 2Not reviewed

—

Not reviewed — requirement not confirmed

Site visit / pre-bid meeting

2 findings
Requirement 1Not found

—

Not found in reviewed sources

Requirement 2Not reviewed

—

Not reviewed — requirement not confirmed

Required submission files

2 findings
Requirement 1Not found

—

Not found in reviewed sources

Requirement 2Not reviewed

—

Not reviewed — requirement not confirmed

Acknowledge amendments

2 findings
Requirement 1Not found

—

Not found in reviewed sources

Requirement 2Not reviewed

—

Not reviewed — requirement not confirmed

4 additional fields have no reviewed finding.

Continue your review

6 more sections are available once you sign in

Pricing & payment · Bonds & insurance · Evaluation & award · Scope & delivery · Labor, sourcing & compliance · Contract terms & risk

Sign in — free

Extracted from the public documents linked above. This is an information aid, not a determination of bid eligibility or legal advice. Verify the original wording and any addenda before submitting a bid.