Y1PZ--Project 629-25-104 ED Suicide Risk Mitigation Fence

11 source documentsSource checked Oct 24Content updated
Open notice
Response deadline
31 days left
Published project value
Not confirmed
Check the pricing and payment terms below.
Solicitation number
36C25626R0117

Dates to plan around

Times follow the original source.

  1. Response deadline
    Source wording
    2026-11-23T14:00:00-06:00
Document coverage
2 / 11documents readReview incomplete

11 documents found9 queued7% of weighted requirement checks reviewed

01

Eligibility & participation

Whether you can bid at all, and what you must already hold.

4 verified4 to confirm

Experience & references

5 findings
Requirement 1Needs confirmation

—

Needs confirmation

View source 1
01page 78View official source ↗
“The CQC system Manager is required to be a graduate engineer, graduate architect, or a graduate of construction management, with a minimum of 5 years construction experience on construction similar to the scope of this Contractor a PM or SRE to determine qualifications based on project complexity at construction review”
Source page 78

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 78
Requirement 2Needs confirmation

—

Needs confirmation

View source 1
01page 228View official source ↗
“Installers Qualifications: Work is to be performed by installer having a minimum of three (3) years’ experience for work relating to this Section.”
Source page 228

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 228
Requirement 3Needs confirmation

—

Needs confirmation

Applies when: within the past three (3) years

Applies to: person

View source 1
01page 239View official source ↗
“Submit evidence that key personnel have successfully performed surface preparation and application of coating on a minimum of three (3) similar projects within the past three (3) years. 09 91 00 - 3”
Source page 239

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 239
Requirement 4Needs confirmation

—

Needs confirmation

Applies when: at least three years

View source 1
01page 254View official source ↗
“Manufacturer’s Qualifications: The manufacturer shall regularly and currently produce, as one of the manufacturer's principal products, the materials and equipment specified for this project, and shall have manufactured the materials and equipment for at least three years.”
Source page 254

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 254
Missing information · 1 check
Not reviewed

—

Not reviewed — requirement not confirmed

Key personnel

2 findings
Requirement 1Verified
Emergency Department Drive Suicide Mitigation Fence Southeast Louisiana Veterans Healthcare System 2400 Canal Street, New Orleans, Louisiana 629-25-104 02-01-21 2. The name, qualifications (in resume format) duties, responsibilities, and authorities of each person assigned a CQC Read full requirement Close full requirement

Emergency Department Drive Suicide Mitigation Fence Southeast Louisiana Veterans Healthcare System 2400 Canal Street, New Orleans, Louisiana 629-25-104 02-01-21 2. The name, qualifications (in resume format) duties, responsibilities, and authorities of each person assigned a CQC

View source 1
01page 75View official source ↗
“Emergency Department Drive Suicide Mitigation Fence Southeast Louisiana Veterans Healthcare System 2400 Canal Street, New Orleans, Louisiana 629-25-104 02-01-21 2. The name, qualifications (in resume format) duties, responsibilities, and authorities of each person assigned a CQC function. 3. A copy ”
Source page 75

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 75
Requirement 2Verified

Submit evidence that key personnel have successfully performed surface preparation and application of coating on a minimum of three (3) similar projects within the past three (3) years. 09 91 00 - 3

Applies when: within the past three (3) years

Applies to: person

View source 1
01page 239View official source ↗
“Submit evidence that key personnel have successfully performed surface preparation and application of coating on a minimum of three (3) similar projects within the past three (3) years. 09 91 00 - 3”
Source page 239

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 239

Conflicts of interest

Verified

the task is under the control of the firm performing the task or has other possibilities of financial conflicts of interest in the

View source 1
01page 163View official source ↗
“the task is under the control of the firm performing the task or has other possibilities of financial conflicts of interest in the”
Source page 163

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 163

Prequalification

Verified
Emergency Department Drive Suicide Mitigation Fence Southeast Louisiana Veterans Healthcare System 2400 Canal Street, New Orleans, Louisiana 629-25-104 11-01-18 1. Review design and shop detail drawings for size, length, type and location of all welds to be made. 2. Approve weldiRead full requirement Close full requirement

Emergency Department Drive Suicide Mitigation Fence Southeast Louisiana Veterans Healthcare System 2400 Canal Street, New Orleans, Louisiana 629-25-104 11-01-18 1. Review design and shop detail drawings for size, length, type and location of all welds to be made. 2. Approve weldi

View source 1
01page 101View official source ↗
“Emergency Department Drive Suicide Mitigation Fence Southeast Louisiana Veterans Healthcare System 2400 Canal Street, New Orleans, Louisiana 629-25-104 11-01-18 1. Review design and shop detail drawings for size, length, type and location of all welds to be made. 2. Approve welding procedure qualifi”
Source page 101

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 101
Missing information8 checks · expand to review

A missing value is not a waiver. Check the source or ask the agency before relying on it.

Registrations

2 findings
Requirement 1Not found

—

Not found in reviewed sources

Requirement 2Not reviewed

—

Not reviewed — requirement not confirmed

Set-aside

2 findings
Requirement 1Not found

—

Not found in reviewed sources

Requirement 2Not reviewed

—

Not reviewed — requirement not confirmed

Small business size

2 findings
Requirement 1Not found

—

Not found in reviewed sources

Requirement 2Not reviewed

—

Not reviewed — requirement not confirmed

Required licenses

2 findings
Requirement 1Not found

—

Not found in reviewed sources

Requirement 2Not reviewed

—

Not reviewed — requirement not confirmed

3 additional fields have no reviewed finding.

02

Deadlines & submission

When and how to submit, and whether you are still in time.

6 verified1 to confirm

Response deadline

3 findings
Requirement 1Verified

2026-11-23T14:00:00-06:00

View source 1
01https://sam.gov/api/prod/opps/v2/opportunities/4ba55c09fda442edac0c51895c5340ea /data2/solicitation/deadlines/responseView official source ↗
“2026-11-23T14:00:00-06:00”
Missing information · 2 checks
Not found

—

Not found in reviewed sources

Not reviewed

—

Not reviewed — requirement not confirmed

Required submission files

2 findings
Requirement 1Verified

The qualification proposal shall include: 1. The name and address of the proposed consultant. 2. Information to show that the proposed consultant has the qualifications to meet the requirements specified in the preceding paragraph. 3. A representative sample of prior construction

View source 1
01page 41View official source ↗
“The qualification proposal shall include: 1. The name and address of the proposed consultant. 2. Information to show that the proposed consultant has the qualifications to meet the requirements specified in the preceding paragraph. 3. A representative sample of prior construction projects, which the”
Source page 41

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 41
Missing information · 1 check
Not reviewed

—

Not reviewed — requirement not confirmed

Procurement contact

2 findings
Requirement 1Verified

Keith Mainous · keith.mainous@va.gov

View source 1
01https://sam.gov/api/prod/opps/v2/opportunities/4ba55c09fda442edac0c51895c5340ea /data2/pointOfContact/0View official source ↗
“Keith Mainous · keith.mainous@va.gov”
Requirement 2Needs confirmation

—

Needs confirmation

View source 1
01page 179View official source ↗
“The Commissioning Manager shall be the single point of contact and communications for all commissioning related services by the Contractor.”
Source page 179

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 179

Formatting & signatures

Verified

3. A copy of the letter to the CQC System Manager signed by an

View source 1
01page 75View official source ↗
“3. A copy of the letter to the CQC System Manager signed by an”
Source page 75

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 75

Grounds for rejection

2 findings
Requirement 1Verified

Written verification will follow oral instructions. Failure to respond will be cause for the Contracting Officer to proceed against the Contractor.

View source 1
01page 24View official source ↗
“Written verification will follow oral instructions. Failure to respond will be cause for the Contracting Officer to proceed against the Contractor.”
Source page 24

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 24
Requirement 2Verified

All deviations submitted must include a side by side comparison of item being proposed against item specified. Failure to point out deviations will result in the VA requiring removal and replacement of such work at the Contractor's expense.

View source 1
01page 56View official source ↗
“All deviations submitted must include a side by side comparison of item being proposed against item specified. Failure to point out deviations will result in the VA requiring removal and replacement of such work at the Contractor's expense.”
Source page 56

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 56
Missing information8 checks · expand to review

A missing value is not a waiver. Check the source or ask the agency before relying on it.

Questions due

2 findings
Requirement 1Not found

—

Not found in reviewed sources

Requirement 2Not reviewed

—

Not reviewed — requirement not confirmed

Site visit / pre-bid meeting

2 findings
Requirement 1Not found

—

Not found in reviewed sources

Requirement 2Not reviewed

—

Not reviewed — requirement not confirmed

How to submit

2 findings
Requirement 1Not found

—

Not found in reviewed sources

Requirement 2Not reviewed

—

Not reviewed — requirement not confirmed

Acknowledge amendments

2 findings
Requirement 1Not found

—

Not found in reviewed sources

Requirement 2Not reviewed

—

Not reviewed — requirement not confirmed

5 additional fields have no reviewed finding.

Continue your review

6 more sections are available once you sign in

Pricing & payment · Bonds & insurance · Evaluation & award · Scope & delivery · Labor, sourcing & compliance · Contract terms & risk

Sign in — free

Extracted from the public documents linked above. This is an information aid, not a determination of bid eligibility or legal advice. Verify the original wording and any addenda before submitting a bid.

Bid review
31 days left
See all 6