VETERANS AFFAIRS, DEPARTMENT OF · Marion, IL
Y1DZ--Project Number 657-507, Correct Seismic Deficiencies for Building 14, Marion VAMC, Illinois Construction of New Boiler Plant and Demolition of Existing
- Response deadline
- 14 days left
- Published project value
- $20M – $50MAs stated in the source documents
- Solicitation number
- 36C10F26R0085
Dates to plan around
Times follow the original source.
- Response deadline
Source wording
2026-11-06T13:00:00-05:00
From the posting1 agency details · contact information and original wording
9 documents found1 partially read2 could not be read11% of weighted requirement checks reviewed
Newer source changes have not been verified. Confirm the latest notice and addenda before submitting.
Review first
Start with these requirements and unresolved points.- Must doJoint ventures & teaming
Offerors submitting as a joint venture must provide the agreement forming the joint venture. b.
- Must doRegistrations
View 2 flagged requirements
- Requirement 1 ↗
(d) The offeror shall post the information in paragraphs (c)(1)(i) through (c)(1)(iv) of this provision in FAPIIS as required through maintaining an active registration in the System for Award Management, which can be accessed via https://www.sam.gov (see 52.204-7).
- Requirement 2 ↗
is not a HUBZone joint venture that complies with the requirements of 13 CFR 126.616(a) through (c). [The Contractor shall enter the name and unique entity identifier of each party to the
- Requirement 1 ↗
- Must doSet-aside
View 2 flagged requirements
- Requirement 1 ↗
HUBZONE
- Requirement 2 ↗
SDVOSBC
- Requirement 1 ↗
Eligibility & participation
Whether you can bid at all, and what you must already hold.
Registrations
3 findings(d) The offeror shall post the information in paragraphs (c)(1)(i) through (c)(1)(iv) of this provision in FAPIIS as required through maintaining an active registration in the System for Award Management, which can be accessed via https://www.sam.gov (see 52.204-7).
View source 1
“(d) The offeror shall post the information in paragraphs (c)(1)(i) through (c)(1)(iv) of this provision in FAPIIS as required through maintaining an active registration in the System for Award Management, which can be accessed via https://www.sam.gov (see 52.204-7).”
Source page 44
Page markings may include other requirements. The quotation above identifies this requirement.

is not a HUBZone joint venture that complies with the requirements of 13 CFR 126.616(a) through (c). [The Contractor shall enter the name and unique entity identifier of each party to the
View source 1
“is not a HUBZone joint venture that complies with the requirements of 13 CFR 126.616(a) through (c). [The Contractor shall enter the name and unique entity identifier of each party to the”
Source page 50
Page markings may include other requirements. The quotation above identifies this requirement.

Missing information · 1 check
—
Not reviewed — requirement not confirmed
Set-aside
5 findingsSDVOSBC
View source 1
“SDVOSBC”
SDVOSB
View source 1
“This is a 100% Service-Disabled Veteran-Owned (SDVOSB) set-aside acquisition utilizing NAICS code 236220 with a size standard of $45M.”
Source page 1
Page markings may include other requirements. The quotation above identifies this requirement.

SDVOSB,HUBZONE
Applies when: unless the Contractor waived the price evaluation preferenceA waiver may be available
View source 1
“(2) Used the HUBZone price evaluation preference regardless of dollar value, unless the Contractor waived the price evaluation preference; or (3) Was an 8(a), HUBZone, service-disabled veteran-owned, economically disadvantaged women-owned, or women-owned small business set-aside or sole-source award regardless of dolla”
Source page 49
Page markings may include other requirements. The quotation above identifies this requirement.

HUBZONE
View source 1
“joint venture: _____.] Each HUBZone small business concern participating in the HUBZone joint venture must be certified as a HUBZone concern.”
Source page 50
Page markings may include other requirements. The quotation above identifies this requirement.

Missing information · 1 check
—
Not reviewed — requirement not confirmed
Small business size
13 findings$45,000,000
View source 1
“This is a 100% Service-Disabled Veteran-Owned (SDVOSB) set-aside acquisition utilizing NAICS code 236220 with a size standard of $45M.”
Source page 1
Page markings may include other requirements. The quotation above identifies this requirement.

—
Needs confirmation
View source 1
“Small business concern— (1) Means a concern, including its affiliates, that is independently owned and operated, not dominant in its field of operation, and qualified as a small business under the criteria in 13 CFR part 121 and the size standard in paragraph (c) of this clause.”
Source page 48
Page markings may include other requirements. The quotation above identifies this requirement.

—
Needs confirmation
Applies when: If the Contractor represented that it was a small business concern, a small disadvantaged business concern, or a joint venture that was any of the small business concerns identified; prior to award of this contract, the ContMust be met by: prior to award of this contract, the Cont
View source 1
“SBA determines affiliation based on the factors set forth at 13 CFR 121.103. (b) If the Contractor represented that it was a small business concern, a small disadvantaged business concern, or a joint venture that was any of the small business concerns identified in 19.000(a)(3) prior to award of thi”
Source page 48
Page markings may include other requirements. The quotation above identifies this requirement.

—
Needs confirmation
Applies when: at the time of this rerepresentation that corresponds to the North American Industry ClassificMust be met by: at the time of this rerepresentation that corresponds to the North American Industry Classific
View source 1
“(c) The Contractor shall rerepresent its size status in accordance with the size standard in effect at the time of this rerepresentation that corresponds to the North American Industry Classification System (NAICS) code(s) assigned to this contract.”
Source page 49
Page markings may include other requirements. The quotation above identifies this requirement.

—
Needs confirmation
View source 1
“The small business size standard corresponding to this NAICS code(s) can be found at https://www.sba.gov/document/support--table-size-standards.”
Source page 49
Page markings may include other requirements. The quotation above identifies this requirement.

—
Needs confirmation
Applies when: if the acquisit
View source 1
“(d) The small business size standard for a Contractor providing an end item that it does not manufacture, process, or produce itself, for a contract other than a construction or service contract, is 500 employees, or 150 employees for information technology value-added resellers under NAICS code 541”
Source page 49
Page markings may include other requirements. The quotation above identifies this requirement.

—
Needs confirmation
View source 1
“(iii) The business meets Federal small business size standards for the applicable North American Industry Classification System (NAICS) code identified in the solicitation document.”
Source page 69
Page markings may include other requirements. The quotation above identifies this requirement.

—
Needs confirmation
View source 1
“In order for a concern to submit an offer and be eligible for the award of a VOSB set-aside or sole source contract, the concern must qualify as a small business concern under the size standard corresponding to the NAICS code assigned to the contract and be certified and listed as a VOSB or SDVOSB p”
Source page 69
Page markings may include other requirements. The quotation above identifies this requirement.

—
Needs confirmation
View source 1
“By submitting an offer, the prospective contractor represents that it is an eligible and certified VOSB as defined in this clause, 13 CFR 121, 125, and 128, and VAAR subpart 819.70. (d) Agreement/LOS certification.”
Source page 70
Page markings may include other requirements. The quotation above identifies this requirement.

—
Needs confirmation
View source 1
“size, and government contracting programs at 13 CFR parts 121 and 125, including the non- manufacturer rule and limitations on-subcontracting (LOS) requirements in 13 CFR 121.406(b)”
Source page 70
Page markings may include other requirements. The quotation above identifies this requirement.

—
Needs confirmation
Applies when: unless a waiver as described in 13 CFR 121A waiver may be available
View source 1
“(ii) In the case of a contract for supplies from a non-manufacturer, the VOSB prime contractor will supply the product of a domestic small business manufacturer or processor, unless a waiver as described in 13 CFR 121.406(b)(5) has been granted.”
Source page 70
Page markings may include other requirements. The quotation above identifies this requirement.

—
Needs confirmation
View source 1
“A VOSB must meet the NAICS size standard assigned by the prime contractor and be listed in the SBA certification database to count as similarly situated.”
Source page 71
Page markings may include other requirements. The quotation above identifies this requirement.

Missing information · 1 check
—
Not reviewed — requirement not confirmed
Experience & references
3 findings—
Needs confirmation
Applies to: person
View source 1
“36C10F26R0085 The Project Superintendent should have a minimum of ten (10) years on-site construction experience.”
Source page 32
Page markings may include other requirements. The quotation above identifies this requirement.

—
Needs confirmation
View source 1
“Pursuant to 38 U.S.C. 8127(g), any business concern, including all its principals, that is determined by VA to have willfully and intentionally misrepresented a company’s VOSB status is subject to debarment from contracting with the Department for a period of not less than five years (see VAAR 809.406–2, Causes for Deb”
Source page 71
Page markings may include other requirements. The quotation above identifies this requirement.

Missing information · 1 check
—
Not reviewed — requirement not confirmed
Key personnel
10 findingsVOLUME II (Technical- Requirements): 1. TAB G – FACTOR 1 Organization/Technical Approach & Schedule 2. TAB H – FACTOR 2 Past Performance of the Offeror’s Team 3. TAB I – FACTOR 3 Key Personnel D.
Applies to: person
View source 1
“VOLUME II (Technical- Requirements): 1. TAB G – FACTOR 1 Organization/Technical Approach & Schedule 2. TAB H – FACTOR 2 Past Performance of the Offeror’s Team 3. TAB I – FACTOR 3 Key Personnel D.”
Source page 27
Page markings may include other requirements. The quotation above identifies this requirement.

Include a key personnel organization chart that clearly depicts the key positions and the names of the personnel, their firm affiliations and their job locations, and their job/position title within the organization.
Applies when: within the organizationMust be met by: within the organization
Applies to: person
View source 1
“Include a key personnel organization chart that clearly depicts the key positions and the names of the personnel, their firm affiliations and their job locations, and their job/position title within the organization.”
Source page 28
Page markings may include other requirements. The quotation above identifies this requirement.

The key personnel organization chart shall be consistent with the corporate organization chart and with the matrix of responsibilities assigned to the team firms. 1.3 Technical Approach for Construction: Describe the approach for the full scope of work in the contract.
Applies to: person
View source 1
“The key personnel organization chart shall be consistent with the corporate organization chart and with the matrix of responsibilities assigned to the team firms. 1.3 Technical Approach for Construction: Describe the approach for the full scope of work in the contract.”
Source page 28
Page markings may include other requirements. The quotation above identifies this requirement.

An entity may not establish past performance based on the past performance of its proposed key personnel, apart from that of Page 30 of 116
Applies to: person
View source 1
“An entity may not establish past performance based on the past performance of its proposed key personnel, apart from that of Page 30 of 116”
Source page 30
Page markings may include other requirements. The quotation above identifies this requirement.

Firm Fixed Price, Cost Reimbursable), and other project constraints affecting complexity. 2.6.9 Projects completed by affiliates, subsidiaries, parent companies, or similar will be given no weight. 3 Volume II, Tab I – Factor 3 – Key Personnel: 3.1 Provide resumes for the personnClose full requirement
Firm Fixed Price, Cost Reimbursable), and other project constraints affecting complexity. 2.6.9 Projects completed by affiliates, subsidiaries, parent companies, or similar will be given no weight. 3 Volume II, Tab I – Factor 3 – Key Personnel: 3.1 Provide resumes for the personn
Applies to: person
View source 1
“Firm Fixed Price, Cost Reimbursable), and other project constraints affecting complexity. 2.6.9 Projects completed by affiliates, subsidiaries, parent companies, or similar will be given no weight. 3 Volume II, Tab I – Factor 3 – Key Personnel: 3.1 Provide resumes for the personnel proposed for the ”
Source page 31
Page markings may include other requirements. The quotation above identifies this requirement.

Indicate whether each individual has had a significant role in any of the project examples cited in Factor 2. For each person, provide a brief resume using the Key Personnel Resume form (Attachment 1).
Applies to: person
View source 1
“Indicate whether each individual has had a significant role in any of the project examples cited in Factor 2. For each person, provide a brief resume using the Key Personnel Resume form (Attachment 1).”
Source page 31
Page markings may include other requirements. The quotation above identifies this requirement.

The Contracting Officer may request proof of the superintendent's qualifications at any point in the project if the performance of the superintendent is in question. 3.3 Project Manager: The Project Manager shall have a minimum of five (5) years construction experience.
Applies when: if the performance of the superintendent is in question
Applies to: person
View source 1
“The Contracting Officer may request proof of the superintendent's qualifications at any point in the project if the performance of the superintendent is in question. 3.3 Project Manager: The Project Manager shall have a minimum of five (5) years construction experience.”
Source page 32
Page markings may include other requirements. The quotation above identifies this requirement.

Additional consideration will be given to a proposed SSHO who has at least two (2) years of experience in the employ of the Offeror and/or has previously worked on a project with other proposed key personnel. 3.6 Source Selection Evaluation Criteria for Factor 3 – Key Personnel: Close full requirement
Additional consideration will be given to a proposed SSHO who has at least two (2) years of experience in the employ of the Offeror and/or has previously worked on a project with other proposed key personnel. 3.6 Source Selection Evaluation Criteria for Factor 3 – Key Personnel:
Applies when: at least two (2) years of experience in the employ of the Offeror and/or has previously
Applies to: person
View source 1
“Additional consideration will be given to a proposed SSHO who has at least two (2) years of experience in the employ of the Offeror and/or has previously worked on a project with other proposed key personnel. 3.6 Source Selection Evaluation Criteria for Factor 3 – Key Personnel: 3.6.1 For this facto”
Source page 32
Page markings may include other requirements. The quotation above identifies this requirement.

Note: Other sections of the solicitation may identify additional criteria for these and other key
View source 1
“Note: Other sections of the solicitation may identify additional criteria for these and other key”
Source page 33
Page markings may include other requirements. The quotation above identifies this requirement.

The technical factors listed below are all equal in importance to one another: 1. Organizational/Technical Approach & Schedule 2. Past Performance 3. Key Personnel ii.
Applies to: person
View source 1
“The technical factors listed below are all equal in importance to one another: 1. Organizational/Technical Approach & Schedule 2. Past Performance 3. Key Personnel ii.”
Source page 34
Page markings may include other requirements. The quotation above identifies this requirement.

Financial capacity
(b) The bidder shall furnish a bid guarantee in the form of a firm commitment, e.g., bid bond supported by good and sufficient surety or sureties acceptable to the Government, postal money order, certified check, cashier's check, irrevocable letter of credit, or, under Treasury D
Applies to: surety
View source 1
“(b) The bidder shall furnish a bid guarantee in the form of a firm commitment, e.g., bid bond supported by good and sufficient surety or sureties acceptable to the Government, postal money order, certified check, cashier's check, irrevocable letter of credit, or, under Treasury Department regulation”
Source page 35
Page markings may include other requirements. The quotation above identifies this requirement.

Joint ventures & teaming
13 findingsOfferors submitting as a joint venture must provide the agreement forming the joint venture. b.
View source 1
“Offerors submitting as a joint venture must provide the agreement forming the joint venture. b.”
Source page 25
Page markings may include other requirements. The quotation above identifies this requirement.

Offers submitted in the name of a Joint Venture must be signed in accordance with the terms and conditions specified in the joint venture agreement as evidenced in the proposal. 2. TAB B – Proposal Pricing Schedule. 3. TAB C – Representations and Certifications. 4. TAB D – Propos
Applies when: in the joint venture
View source 1
“Offers submitted in the name of a Joint Venture must be signed in accordance with the terms and conditions specified in the joint venture agreement as evidenced in the proposal. 2. TAB B – Proposal Pricing Schedule. 3. TAB C – Representations and Certifications. 4. TAB D – Proposal Data Sheet – See ”
Source page 27
Page markings may include other requirements. The quotation above identifies this requirement.

If a separate ID has been created for a joint venture it must also be submitted.
Applies when: If a separate ID has been created for a joint venture it must also be submitted
View source 1
“If a separate ID has been created for a joint venture it must also be submitted.”
Source page 27
Page markings may include other requirements. The quotation above identifies this requirement.

FAR clause 52.228-1, “Bid Guarantee” will be included in the contract. 6. TAB F – Joint Venture Agreement, if applicable. ii.
Applies when: if applicable
View source 1
“FAR clause 52.228-1, “Bid Guarantee” will be included in the contract. 6. TAB F – Joint Venture Agreement, if applicable. ii.”
Source page 27
Page markings may include other requirements. The quotation above identifies this requirement.

Offerors should clearly but concisely describe the organizational and technical approach to project management and execution. 1.2 Organizational Approach: Describe what firms (Offeror/Prime and subcontractors), their resources and how their resources will be utilized, their rolesClose full requirement
Offerors should clearly but concisely describe the organizational and technical approach to project management and execution. 1.2 Organizational Approach: Describe what firms (Offeror/Prime and subcontractors), their resources and how their resources will be utilized, their roles
Applies to: subcontractor
View source 1
“Offerors should clearly but concisely describe the organizational and technical approach to project management and execution. 1.2 Organizational Approach: Describe what firms (Offeror/Prime and subcontractors), their resources and how their resources will be utilized, their roles and responsibilitie”
Source page 27
Page markings may include other requirements. The quotation above identifies this requirement.

overall organization and how well it is organized, structured and staffed to execute the entire scope of work. Joint venture participant’s contribution to the organization should be
View source 1
“overall organization and how well it is organized, structured and staffed to execute the entire scope of work. Joint venture participant’s contribution to the organization should be”
Source page 28
Page markings may include other requirements. The quotation above identifies this requirement.

Other sources may include, but are not limited to, past performance information retrieved through Contractor Performance Assessment Reporting System (CPARS), using all UEI/CAGE/DUNS numbers of team members (partnership, joint venture, teaming arrangement, etc.) identified in the Close full requirement
Other sources may include, but are not limited to, past performance information retrieved through Contractor Performance Assessment Reporting System (CPARS), using all UEI/CAGE/DUNS numbers of team members (partnership, joint venture, teaming arrangement, etc.) identified in the
View source 1
“Other sources may include, but are not limited to, past performance information retrieved through Contractor Performance Assessment Reporting System (CPARS), using all UEI/CAGE/DUNS numbers of team members (partnership, joint venture, teaming arrangement, etc.) identified in the Offeror’s response, ”
Source page 29
Page markings may include other requirements. The quotation above identifies this requirement.

In addition, the Offeror must include documentation of an unequivocal teaming agreement or letter of commitment in this section of the proposal, signed by an authorized representative of the proposed subcontractor. 2.6 Source Selection Evaluation Criteria for Factor 2 – Past Perf
Applies to: subcontractor
View source 1
“In addition, the Offeror must include documentation of an unequivocal teaming agreement or letter of commitment in this section of the proposal, signed by an authorized representative of the proposed subcontractor. 2.6 Source Selection Evaluation Criteria for Factor 2 – Past Performance: 2.6.1 The G”
Source page 30
Page markings may include other requirements. The quotation above identifies this requirement.

Mentor firms are encouraged to assist protégé firms under VA's Mentor-Protégé Program in obtaining acceptable bid, payment, and performance bonds, when required, as a prime contractor under a solicitation or contract and in obtaining any required bonds under subcontracts.Close full requirement
Mentor firms are encouraged to assist protégé firms under VA's Mentor-Protégé Program in obtaining acceptable bid, payment, and performance bonds, when required, as a prime contractor under a solicitation or contract and in obtaining any required bonds under subcontracts.
Applies when: when required, as a prime contractor under a solicitation or contract and in obtaining any required bonds under subcontracts
View source 1
“Mentor firms are encouraged to assist protégé firms under VA's Mentor-Protégé Program in obtaining acceptable bid, payment, and performance bonds, when required, as a prime contractor under a solicitation or contract and in obtaining any required bonds under subcontracts.”
Source page 41
Page markings may include other requirements. The quotation above identifies this requirement.

SBA determines affiliation based on the factors set forth at 13 CFR 121.103. (b) If the Contractor represented that it was a small business concern, a small disadvantaged business concern, or a joint venture that was any of the small business concerns identified in 19.000(a)(3) pClose full requirement
SBA determines affiliation based on the factors set forth at 13 CFR 121.103. (b) If the Contractor represented that it was a small business concern, a small disadvantaged business concern, or a joint venture that was any of the small business concerns identified in 19.000(a)(3) p
Applies when: If the Contractor represented that it was a small business concern, a small disadvantaged business concern, or a joint venture that was any of the small business concerns identified; prior to award of this contract, the ContMust be met by: prior to award of this contract, the Cont
View source 1
“SBA determines affiliation based on the factors set forth at 13 CFR 121.103. (b) If the Contractor represented that it was a small business concern, a small disadvantaged business concern, or a joint venture that was any of the small business concerns identified in 19.000(a)(3) prior to award of thi”
Source page 48
Page markings may include other requirements. The quotation above identifies this requirement.

(f) Joint ventures.
View source 1
“(f) Joint ventures.”
Source page 71
Page markings may include other requirements. The quotation above identifies this requirement.

A joint venture agrees that, in the performance of the contract, the applicable percentage specified in paragraph (d) of this clause will be performed by the aggregate of the joint venture participants.
View source 1
“A joint venture agrees that, in the performance of the contract, the applicable percentage specified in paragraph (d) of this clause will be performed by the aggregate of the joint venture participants.”
Source page 71
Page markings may include other requirements. The quotation above identifies this requirement.

A joint venture may be considered eligible as a VOSB if the joint venture complies with the requirements in 13 CFR 128.402 and the managing joint venture partner makes the representations under paragraph (c) of this clause.Close full requirement
A joint venture may be considered eligible as a VOSB if the joint venture complies with the requirements in 13 CFR 128.402 and the managing joint venture partner makes the representations under paragraph (c) of this clause.
Applies when: if the joint venture complies with the requirements in 13 CFR 128
View source 1
“A joint venture may be considered eligible as a VOSB if the joint venture complies with the requirements in 13 CFR 128.402 and the managing joint venture partner makes the representations under paragraph (c) of this clause.”
Source page 71
Page markings may include other requirements. The quotation above identifies this requirement.

Exclusions & responsibility
(e) In the event that the Contractor does not comply with the requirements set forth in paragraphs (a) through (d) of this clause, this contract may be terminated or suspended in whole or in part, and the Contractor may be suspended or debarred in accordance with 29 CFR 471.14 anClose full requirement
(e) In the event that the Contractor does not comply with the requirements set forth in paragraphs (a) through (d) of this clause, this contract may be terminated or suspended in whole or in part, and the Contractor may be suspended or debarred in accordance with 29 CFR 471.14 an
View source 1
“(e) In the event that the Contractor does not comply with the requirements set forth in paragraphs (a) through (d) of this clause, this contract may be terminated or suspended in whole or in part, and the Contractor may be suspended or debarred in accordance with 29 CFR 471.14 and subpart 9.4. Such ”
Source page 51
Page markings may include other requirements. The quotation above identifies this requirement.

Missing information2 checks · expand to review
A missing value is not a waiver. Check the source or ask the agency before relying on it.
Required licenses
2 findings—
Not reviewed — requirement not confirmed
—
Not found in reviewed sources
2 additional fields have no reviewed finding.
Deadlines & submission
When and how to submit, and whether you are still in time.
Response deadline
3 findings2026-11-06T13:00:00-05:00
View source 1
“2026-11-06T13:00:00-05:00”
Missing information · 2 checks
—
Not reviewed — requirement not confirmed
—
Not found in reviewed sources
How to submit
6 findingsThis requirement will be advertised for 100% Service-Disabled Veteran-Owned Small Business (SDVOSB) competition; any legally organized firm may submit a proposal.
View source 1
“This requirement will be advertised for 100% Service-Disabled Veteran-Owned Small Business (SDVOSB) competition; any legally organized firm may submit a proposal.”
Source page 25
Page markings may include other requirements. The quotation above identifies this requirement.

All proposals shall be submitted electronically, except for the Bid Bond. c.
View source 1
“All proposals shall be submitted electronically, except for the Bid Bond. c.”
Source page 25
Page markings may include other requirements. The quotation above identifies this requirement.

Submit proposals electronically via email to the following: 003C4C.acquisitions@va.gov e.
View source 1
“Submit proposals electronically via email to the following: 003C4C.acquisitions@va.gov e.”
Source page 25
Page markings may include other requirements. The quotation above identifies this requirement.

The Offeror shall also submit its Tax ID number on the proposal data sheet. 5. TAB E - Bid Bond –The Offeror is required to submit a bid bond for this project.
View source 1
“The Offeror shall also submit its Tax ID number on the proposal data sheet. 5. TAB E - Bid Bond –The Offeror is required to submit a bid bond for this project.”
Source page 27
Page markings may include other requirements. The quotation above identifies this requirement.

(3) Proposals shall be submitted to the Contracting Officer or ACO and the resident engineer as expeditiously as possible, but not later than calendar days, after receipt of a written change order by the Contracting Officer.
View source 1
“(3) Proposals shall be submitted to the Contracting Officer or ACO and the resident engineer as expeditiously as possible, but not later than calendar days, after receipt of a written change order by the Contracting Officer.”
Source page 77
Page markings may include other requirements. The quotation above identifies this requirement.

Missing information · 1 check
—
Not reviewed — requirement not confirmed
Required submission files
4 findingsRestrictions on Offeror-Provided Information. “Confidential” projects cannot be submitted to demonstrate capability unless all of the information required for evaluation as specified herein can nonetheless be provided to the Government as part of the Offeror’s technical proposal.Close full requirement
Restrictions on Offeror-Provided Information. “Confidential” projects cannot be submitted to demonstrate capability unless all of the information required for evaluation as specified herein can nonetheless be provided to the Government as part of the Offeror’s technical proposal.
Applies when: unless all of the information required for evaluation as specified herein can nonetheless be provided to the Government as part of the Offeror’s technical proposal
View source 1
“Restrictions on Offeror-Provided Information. “Confidential” projects cannot be submitted to demonstrate capability unless all of the information required for evaluation as specified herein can nonetheless be provided to the Government as part of the Offeror’s technical proposal.”
Source page 26
Page markings may include other requirements. The quotation above identifies this requirement.

Each volume of the proposal shall contain a detailed table of contents.
View source 1
“Each volume of the proposal shall contain a detailed table of contents.”
Source page 26
Page markings may include other requirements. The quotation above identifies this requirement.

Offers submitted in the name of a Joint Venture must be signed in accordance with the terms and conditions specified in the joint venture agreement as evidenced in the proposal. 2. TAB B – Proposal Pricing Schedule. 3. TAB C – Representations and Certifications. 4. TAB D – Propos
Applies when: in the joint venture
View source 1
“Offers submitted in the name of a Joint Venture must be signed in accordance with the terms and conditions specified in the joint venture agreement as evidenced in the proposal. 2. TAB B – Proposal Pricing Schedule. 3. TAB C – Representations and Certifications. 4. TAB D – Proposal Data Sheet – See ”
Source page 27
Page markings may include other requirements. The quotation above identifies this requirement.

Missing information · 1 check
—
Not reviewed — requirement not confirmed
Procurement contact
2 findingsCharles (Chuck) Boswell · Charles.Boswell@va.gov · 202-431-6522
View source 1
“Charles (Chuck) Boswell · Charles.Boswell@va.gov · 202-431-6522”
—
Needs confirmation
Applies when: If the Offeror is unable
View source 1
“project the Offeror includes in its RFP response for “Past Performance.” Ensure correct phone numbers and email addresses are provided for the client point of contact. If the Offeror is unable”
Source page 29
Page markings may include other requirements. The quotation above identifies this requirement.

Bid opening
3 findings—
Needs confirmation
Applies when: If this is a sealed bid solicitation, offers must be publicly opened at that time
View source 1
“If this is a sealed bid solicitation, offers must be publicly opened at that time.”
Source page 1
Page markings may include other requirements. The quotation above identifies this requirement.

—
Needs confirmation
View source 1
“(End of Provision) 2.3 52.228-1 BID GUARANTEE (SEP 1996) (a) Failure to furnish a bid guarantee in the proper form and amount, by the time set for opening of bids, may be cause for rejection of the bid.”
Source page 35
Page markings may include other requirements. The quotation above identifies this requirement.

—
Needs confirmation
Applies when: upon execution of contractual documents and bonds (including any necessary coinsuranMust be met by: upon execution of contractual documents and bonds (including any necessary coinsuran
View source 1
“The Contracting Officer will return bid guarantees, other than bid bonds— (1) To unsuccessful bidders as soon as practicable after the opening of bids; and (2) To the successful bidder upon execution of contractual documents and bonds (including any necessary coinsurance or reinsurance agreements), ”
Source page 35
Page markings may include other requirements. The quotation above identifies this requirement.

Formatting & signatures
3 findingsWritten material shall be on single sided 8 ½ x 11 size pages in no less than a 10 pitch or 10 font.
View source 1
“Written material shall be on single sided 8 ½ x 11 size pages in no less than a 10 pitch or 10 font.”
Source page 26
Page markings may include other requirements. The quotation above identifies this requirement.

Written material shall be on single sided 8 ½ x 11 size pages in no less than a 10 pitch or 10 font. Page limitations, where specified in the RFP, shall be considered a maximum.
View source 1
“Written material shall be on single sided 8 ½ x 11 size pages in no less than a 10 pitch or 10 font. Page limitations, where specified in the RFP, shall be considered a maximum.”
Source page 26
Page markings may include other requirements. The quotation above identifies this requirement.

In addition, the Offeror must include documentation of an unequivocal teaming agreement or letter of commitment in this section of the proposal, signed by an authorized representative of the proposed subcontractor. 2.6 Source Selection Evaluation Criteria for Factor 2 – Past Perf
Applies to: subcontractor
View source 1
“In addition, the Offeror must include documentation of an unequivocal teaming agreement or letter of commitment in this section of the proposal, signed by an authorized representative of the proposed subcontractor. 2.6 Source Selection Evaluation Criteria for Factor 2 – Past Performance: 2.6.1 The G”
Source page 30
Page markings may include other requirements. The quotation above identifies this requirement.

Grounds for rejection
(End of Provision) 2.3 52.228-1 BID GUARANTEE (SEP 1996) (a) Failure to furnish a bid guarantee in the proper form and amount, by the time set for opening of bids, may be cause for rejection of the bid.
View source 1
“(End of Provision) 2.3 52.228-1 BID GUARANTEE (SEP 1996) (a) Failure to furnish a bid guarantee in the proper form and amount, by the time set for opening of bids, may be cause for rejection of the bid.”
Source page 35
Page markings may include other requirements. The quotation above identifies this requirement.

Missing information6 checks · expand to review
A missing value is not a waiver. Check the source or ask the agency before relying on it.
Questions due
2 findings—
Not reviewed — requirement not confirmed
—
Not found in reviewed sources
Site visit / pre-bid meeting
2 findings—
Not reviewed — requirement not confirmed
—
Not found in reviewed sources
Acknowledge amendments
2 findings—
Not reviewed — requirement not confirmed
—
Not found in reviewed sources
4 additional fields have no reviewed finding.
6 more sections are available once you sign in
Pricing & payment · Bonds & insurance · Evaluation & award · Scope & delivery · Labor, sourcing & compliance · Contract terms & risk
Sign in — freeExtracted from the public documents linked above. This is an information aid, not a determination of bid eligibility or legal advice. Verify the original wording and any addenda before submitting a bid.