VETERANS AFFAIRS, DEPARTMENT OF
Z1DA--Project 695-24-107 Replace Boilers 4 and 5 Clement J. Zablocki, VA Medical Center 5000 West National Avenue Milwaukee, WI 53295
- Response deadline
- 26 days left
- Published project value
- Not confirmedCheck the pricing and payment terms below.
- Solicitation number
- 36C25227B0001
Dates to plan around
Times follow the original source.
- Response deadline
Source wording
2026-11-18T11:00:00-06:00
- Bid opening
Source wording
The virtual public bid opening will be held at 1:00PM local time on November 18, 2026, at the link and/or the phone # provided above.
8 documents found1 partially read7% of weighted requirement checks reviewed
Newer source changes have not been verified. Confirm the latest notice and addenda before submitting.
Review first
Start with these requirements and unresolved points.- Must doRegistrations
View 1 flagged requirement
- Requirement 1 ↗
(d) The offeror shall post the information in paragraphs (c)(1)(i) through (c)(1)(iv) of this provision in FAPIIS as required through maintaining an active registration in the System for Award Management, which can be accessed via https://www.sam.gov (see 52.204-7).
- Requirement 1 ↗
- Must doSet-aside
SDVOSBC
Eligibility & participation
Whether you can bid at all, and what you must already hold.
Registrations
3 findingsFAR DEVIATION FEB 2026 INSTRUCTIONS: System updates may lag policy updates. The System for Award Management (SAM) may continue to require entities to complete representations based on provisions that are not included in agency solicitations. Examples include 52.222-25, AffirmativClose full requirement
FAR DEVIATION FEB 2026 INSTRUCTIONS: System updates may lag policy updates. The System for Award Management (SAM) may continue to require entities to complete representations based on provisions that are not included in agency solicitations. Examples include 52.222-25, Affirmativ
Applies when: when making award decisions or enforce requirements
View source 1
“FAR DEVIATION FEB 2026 INSTRUCTIONS: System updates may lag policy updates. The System for Award Management (SAM) may continue to require entities to complete representations based on provisions that are not included in agency solicitations. Examples include 52.222-25, Affirmative Action Compliance,”
(d) The offeror shall post the information in paragraphs (c)(1)(i) through (c)(1)(iv) of this provision in FAPIIS as required through maintaining an active registration in the System for Award Management, which can be accessed via https://www.sam.gov (see 52.204-7).
View source 1
“(d) The offeror shall post the information in paragraphs (c)(1)(i) through (c)(1)(iv) of this provision in FAPIIS as required through maintaining an active registration in the System for Award Management, which can be accessed via https://www.sam.gov (see 52.204-7).”
Missing information · 1 check
—
Not reviewed — requirement not confirmed
Set-aside
3 findingsSDVOSBC
View source 1
“SDVOSBC”
Missing information · 2 checks
—
Not found in reviewed sources
—
Not reviewed — requirement not confirmed
Financial capacity
(b) The bidder shall furnish a bid guarantee in the form of a firm commitment, e.g., bid bond supported by good and sufficient surety or sureties acceptable to the Government, postal money order, certified check, cashier's check, irrevocable letter of credit, or, under Treasury D
Applies to: surety
View source 1
“(b) The bidder shall furnish a bid guarantee in the form of a firm commitment, e.g., bid bond supported by good and sufficient surety or sureties acceptable to the Government, postal money order, certified check, cashier's check, irrevocable letter of credit, or, under Treasury Department regulation”
Joint ventures & teaming
4 findings(d) Joint venturers.
View source 1
“(d) Joint venturers.”
A contract with joint venturers may involve any combination of individuals, partnerships, or corporations.
View source 1
“A contract with joint venturers may involve any combination of individuals, partnerships, or corporations.”
The contract shall be signed by each participant in the joint venture in the manner prescribed in paragraphs (a) through (c) of this section for each type of participant.
Applies when: in the joint venture
View source 1
“The contract shall be signed by each participant in the joint venture in the manner prescribed in paragraphs (a) through (c) of this section for each type of participant.”
When a corporation is participating, the contracting officer shall verify that the corporation is authorized to participate in the joint venture.
Applies when: When a corporation is participating, the contracting officer shall verify that the corporation is authorized to participate in the joint venture
View source 1
“When a corporation is participating, the contracting officer shall verify that the corporation is authorized to participate in the joint venture.”
Missing information6 checks · expand to review
A missing value is not a waiver. Check the source or ask the agency before relying on it.
Small business size
2 findings—
Not found in reviewed sources
—
Not reviewed — requirement not confirmed
Required licenses
2 findings—
Not found in reviewed sources
—
Not reviewed — requirement not confirmed
Experience & references
2 findings—
Not found in reviewed sources
—
Not reviewed — requirement not confirmed
4 additional fields have no reviewed finding.
Deadlines & submission
When and how to submit, and whether you are still in time.
Response deadline
3 findings2026-11-18T11:00:00-06:00
View source 3
“2026-11-18T11:00:00-06:00”
“BIDS DUE: Vendor bids are due via email as shown above at 11AM local time on November 18, 2026”
“BIDS DUE: Vendor bids are due via email as shown above at 11AM local time on November 18, 2026. The virtual public bid opening will be held at 1:00PM”
Missing information · 2 checks
—
Not found in reviewed sources
—
Not reviewed — requirement not confirmed
How to submit
3 findingsPlease note: Transmission issues can happen unexpectedly at any time, it is the responsibility of the bidder to ensure bids are received before the bid due date and time. 4) Bidders shall submit a bid bond with their bid in accordance with FAR 52.228-1. Noncompliance with this re
Applies when: before the bid due date and timeMust be met by: before the bid due date and time
View source 1
“Please note: Transmission issues can happen unexpectedly at any time, it is the responsibility of the bidder to ensure bids are received before the bid due date and time. 4) Bidders shall submit a bid bond with their bid in accordance with FAR 52.228-1. Noncompliance with this requirement will resul”
Missing information · 2 checks
—
Not found in reviewed sources
—
Not reviewed — requirement not confirmed
Procurement contact
Kristine Sutton · Kristine.Sutton@va.gov · 414-844-4876
View source 1
“Kristine Sutton · Kristine.Sutton@va.gov · 414-844-4876”
Bid opening
5 findings2026-11-18T13:00:00
View source 1
“The virtual public bid opening will be held at 1:00PM local time on November 18, 2026, at the link and/or the phone # provided above.”
—
Needs confirmation
Applies when: prior to bid opening) Meeting ID: 247 074 689 067 769 Passcode: Zs6gN2Sm Dial-in by phonMust be met by: prior to bid opening) Meeting ID: 247 074 689 067 769 Passcode: Zs6gN2Sm Dial-in by phon
View source 1
“2) The virtual bid opening will be available to the public via Microsoft Teams at the following link and/or phone number: Join the meeting now (Meeting will be available to be accessed 15 min prior to bid opening) Meeting ID: 247 074 689 067 769 Passcode: Zs6gN2Sm Dial-in by phone: +1 872-701-0185,,”
—
Needs confirmation
View source 1
“(b) A bid guarantee is required in an amount not less than 20 percent of the bid price but shall not exceed $3,000,000. Failure to furnish the required bid guarantee on form SF24, in the proper amount, by the time set for opening of bids, will result in rejection of the bid in all cases except those”
—
Needs confirmation
View source 1
“(a) Failure to furnish a bid guarantee in the proper form and amount, by the time set for opening of bids, may be cause for rejection of the bid.”
—
Needs confirmation
Applies when: upon execution of contractual documents and bonds (including any necessary coinsuranMust be met by: upon execution of contractual documents and bonds (including any necessary coinsuran
View source 1
“The Contracting Officer will return bid guarantees, other than bid bonds— (1) To unsuccessful bidders as soon as practicable after the opening of bids; and (2) To the successful bidder upon execution of contractual documents and bonds (including any necessary coinsurance or reinsurance agreements), ”
Mandatory forms
4 findings(b) A bid guarantee is required in an amount not less than 20 percent of the bid price but shall not exceed $3,000,000. Failure to furnish the required bid guarantee on form SF24, in the proper amount, by the time set for opening of bids, will result in rejection of the bid in alClose full requirement
(b) A bid guarantee is required in an amount not less than 20 percent of the bid price but shall not exceed $3,000,000. Failure to furnish the required bid guarantee on form SF24, in the proper amount, by the time set for opening of bids, will result in rejection of the bid in al
View source 1
“(b) A bid guarantee is required in an amount not less than 20 percent of the bid price but shall not exceed $3,000,000. Failure to furnish the required bid guarantee on form SF24, in the proper amount, by the time set for opening of bids, will result in rejection of the bid in all cases except those”
(c) The bidder to whom a contract is awarded will be required to furnish a Payment Bond, on form SF25A, and a Performance Bond, on form SF25. Each bond shall be issued for a penal sum equal to the value of the awarded contract.
View source 1
“(c) The bidder to whom a contract is awarded will be required to furnish a Payment Bond, on form SF25A, and a Performance Bond, on form SF25. Each bond shall be issued for a penal sum equal to the value of the awarded contract.”
Copies of forms SF25 and SF25A may be obtained from the Contracting Officer upon request.
Applies when: upon requestMust be met by: upon request
View source 1
“Copies of forms SF25 and SF25A may be obtained from the Contracting Officer upon request.”
(d) Bidders are to ensure the most current version of SF24, SF25, and SF25A bond forms are used.
View source 1
“(d) Bidders are to ensure the most current version of SF24, SF25, and SF25A bond forms are used.”
Alternate proposals
4 findingsBase Bid LUMP SUM: CLIN 0001 $___________________________ Alternate Bid Item 1 – Demo/Removal of One Boiler (#5) instead of both (#4 and #5) Base Bid general construction minus the following: Alternate Bid Item #1 includes the demo and removal of just existing Boiler #5, allowingClose full requirement
Base Bid LUMP SUM: CLIN 0001 $___________________________ Alternate Bid Item 1 – Demo/Removal of One Boiler (#5) instead of both (#4 and #5) Base Bid general construction minus the following: Alternate Bid Item #1 includes the demo and removal of just existing Boiler #5, allowing
View source 1
“Base Bid LUMP SUM: CLIN 0001 $___________________________ Alternate Bid Item 1 – Demo/Removal of One Boiler (#5) instead of both (#4 and #5) Base Bid general construction minus the following: Alternate Bid Item #1 includes the demo and removal of just existing Boiler #5, allowing the VA to utilize e”
Price for Alternate Bid Item 1: $__________________________
View source 1
“Price for Alternate Bid Item 1: $__________________________”
NOTICE TO BIDDERS: Award will be made on Base Bid, subject to available funding. In the event bids on the Base Bid exceed available funding, a single award will be made exclusively on the amount of funding available for Alternate Bid Item 1. Award will be made to the responsible Close full requirement
NOTICE TO BIDDERS: Award will be made on Base Bid, subject to available funding. In the event bids on the Base Bid exceed available funding, a single award will be made exclusively on the amount of funding available for Alternate Bid Item 1. Award will be made to the responsible
View source 1
“NOTICE TO BIDDERS: Award will be made on Base Bid, subject to available funding. In the event bids on the Base Bid exceed available funding, a single award will be made exclusively on the amount of funding available for Alternate Bid Item 1. Award will be made to the responsible bidder who submitted”
A single award will be made on Base Bid or Alternate Bid, subject to available funding at time of award.
View source 1
“A single award will be made on Base Bid or Alternate Bid, subject to available funding at time of award.”
Grounds for rejection
4 findingsThe contractor must submit proof of current (as of time of bid) SAM and DSBS registries with their bid and any bidder that is not current shall be rendered non-responsive outright and shall not be considered for award.
View source 1
“The contractor must submit proof of current (as of time of bid) SAM and DSBS registries with their bid and any bidder that is not current shall be rendered non-responsive outright and shall not be considered for award.”
Bidders that fail to do so will be rendered non-responsive outright and shall not be considered for award. “VAAR 852.219-73 was included in this solicitation and references the SBA certification database at https://veterans.certify.sba.gov/.Close full requirement
Bidders that fail to do so will be rendered non-responsive outright and shall not be considered for award. “VAAR 852.219-73 was included in this solicitation and references the SBA certification database at https://veterans.certify.sba.gov/.
View source 1
“Bidders that fail to do so will be rendered non-responsive outright and shall not be considered for award. “VAAR 852.219-73 was included in this solicitation and references the SBA certification database at https://veterans.certify.sba.gov/.”
(b) A bid guarantee is required in an amount not less than 20 percent of the bid price but shall not exceed $3,000,000. Failure to furnish the required bid guarantee on form SF24, in the proper amount, by the time set for opening of bids, will result in rejection of the bid in alClose full requirement
(b) A bid guarantee is required in an amount not less than 20 percent of the bid price but shall not exceed $3,000,000. Failure to furnish the required bid guarantee on form SF24, in the proper amount, by the time set for opening of bids, will result in rejection of the bid in al
View source 1
“(b) A bid guarantee is required in an amount not less than 20 percent of the bid price but shall not exceed $3,000,000. Failure to furnish the required bid guarantee on form SF24, in the proper amount, by the time set for opening of bids, will result in rejection of the bid in all cases except those”
(a) Failure to furnish a bid guarantee in the proper form and amount, by the time set for opening of bids, may be cause for rejection of the bid.
View source 1
“(a) Failure to furnish a bid guarantee in the proper form and amount, by the time set for opening of bids, may be cause for rejection of the bid.”
Missing information8 checks · expand to review
A missing value is not a waiver. Check the source or ask the agency before relying on it.
Questions due
2 findings—
Not found in reviewed sources
—
Not reviewed — requirement not confirmed
Site visit / pre-bid meeting
2 findings—
Not found in reviewed sources
—
Not reviewed — requirement not confirmed
Required submission files
2 findings—
Not found in reviewed sources
—
Not reviewed — requirement not confirmed
Acknowledge amendments
2 findings—
Not found in reviewed sources
—
Not reviewed — requirement not confirmed
3 additional fields have no reviewed finding.
6 more sections are available once you sign in
Pricing & payment · Bonds & insurance · Evaluation & award · Scope & delivery · Labor, sourcing & compliance · Contract terms & risk
Sign in — freeExtracted from the public documents linked above. This is an information aid, not a determination of bid eligibility or legal advice. Verify the original wording and any addenda before submitting a bid.