DEPT OF DEFENSE · Tinker AFB, OK
WWYK250063 - INSTALL REACT VII FACILITY, B9001, POST V19
- Response deadline
- 10 days left
- Published project value
- Not confirmedCheck the pricing and payment terms below.
- Solicitation number
- FA813727R0002
Dates to plan around
Times follow the original source.
- Response deadline
Source wording
2026-11-02T14:00:00-06:00
From the posting1 agency details · contact information and original wording
136 documents found4 need OCR10 could not be read34% of weighted requirement checks reviewed
Newer source changes have not been verified. Confirm the latest notice and addenda before submitting.
Review first
Start with these requirements and unresolved points.- Must doJoint ventures & teaming
View 1 flagged requirement
- Requirement 1 ↗
unique entity identifier of each party to the joint venture: .] Each HUBZone small business concern participating in the HUBZone joint venture must be certified as a
- Requirement 1 ↗
- Must doRegistrations
View 2 flagged requirements
- Requirement 1 ↗
To access WAWF, the Contractor shall- (1) Have a designated electronic business point of contact in the System for Award Management at https://www.sam.gov; and (2) Be registered to use WAWF at https://wawf.eb.mil/ following the step-by-step procedures for self-registration availa
- Requirement 2 ↗
(d) The offeror shall post the information in paragraphs (c)(1)(i) through (c)(1)(iv) of this provision in FAPIIS as required through maintaining an active registration in the System for Award Management, which can be accessed via https://www.sam.gov (see 52.204-7).
- Requirement 1 ↗
- Must doSet-aside
View 2 flagged requirements
- Requirement 1 ↗
HUBZONE
- Requirement 2 ↗
WOSB
- Requirement 1 ↗
Eligibility & participation
Whether you can bid at all, and what you must already hold.
Registrations
3 findingsTo access WAWF, the Contractor shall- (1) Have a designated electronic business point of contact in the System for Award Management at https://www.sam.gov; and (2) Be registered to use WAWF at https://wawf.eb.mil/ following the step-by-step procedures for self-registration availa
View source 1
“To access WAWF, the Contractor shall- (1) Have a designated electronic business point of contact in the System for Award Management at https://www.sam.gov; and (2) Be registered to use WAWF at https://wawf.eb.mil/ following the step-by-step procedures for self-registration available at this web site”
Source page 8
Page markings may include other requirements. The quotation above identifies this requirement.

(d) The offeror shall post the information in paragraphs (c)(1)(i) through (c)(1)(iv) of this provision in FAPIIS as required through maintaining an active registration in the System for Award Management, which can be accessed via https://www.sam.gov (see 52.204-7).
View source 1
“(d) The offeror shall post the information in paragraphs (c)(1)(i) through (c)(1)(iv) of this provision in FAPIIS as required through maintaining an active registration in the System for Award Management, which can be accessed via https://www.sam.gov (see 52.204-7).”
Source page 34
Page markings may include other requirements. The quotation above identifies this requirement.

Missing information · 1 check
—
Not reviewed — requirement not confirmed
Set-aside
4 findingsWOSB
View source 1
“WOSB”
SDVOSB,HUBZONE
Applies when: unless the Contractor waived the price evaluation preferenceA waiver may be available
View source 1
“(2) Used the HUBZone price evaluation preference regardless of dollar value, unless the Contractor waived the price evaluation preference; or (3) Was an 8(a), HUBZone, service-disabled veteran-owned, economically disadvantaged women-owned, or women-owned small business set-aside or sole-source award regardless of dolla”
Source page 18
Page markings may include other requirements. The quotation above identifies this requirement.

HUBZONE
View source 1
“unique entity identifier of each party to the joint venture: .] Each HUBZone small business concern participating in the HUBZone joint venture must be certified as a”
Source page 19
Page markings may include other requirements. The quotation above identifies this requirement.

Missing information · 1 check
—
Not reviewed — requirement not confirmed
Small business size
8 findings—
Needs confirmation
View source 1
“Size Standard: USD 45,000,000.00 Annual receipts”
Source page 3
Page markings may include other requirements. The quotation above identifies this requirement.

—
Needs confirmation
View source 1
“concern, without regard to its socioeconomic status); and (2) Is considered small for the size standard under the North American Industry Classification System (NAICS) code the prime contractor assigned to the subcontract.”
Source page 16
Page markings may include other requirements. The quotation above identifies this requirement.

—
Needs confirmation
View source 1
“FA813727R0002 Page 18 of 46 Small business concern- (1) Means a concern, including its affiliates, that is independently owned and operated, not dominant in its field of operation, and qualified as a small business under the criteria in 13 CFR part 121 and the size standard in paragraph (c) of this ”
Source page 18
Page markings may include other requirements. The quotation above identifies this requirement.

—
Needs confirmation
Applies when: If the Contractor represented that it was a small business concern, a small disadvantaged business concern, or a joint venture that was any of the small business concerns identified; prior to award of this contract, the ContMust be met by: prior to award of this contract, the Cont
View source 1
“SBA determines affiliation based on the factors set forth at 13 CFR 121.103. (b) If the Contractor represented that it was a small business concern, a small disadvantaged business concern, or a joint venture that was any of the small business concerns identified in 19.000(a)(3) prior to award of thi”
Source page 18
Page markings may include other requirements. The quotation above identifies this requirement.

—
Needs confirmation
Applies when: at the time of this rerepresentation that corresponds to the North American Industry ClassificMust be met by: at the time of this rerepresentation that corresponds to the North American Industry Classific
View source 1
“(c) The Contractor shall rerepresent its size status in accordance with the size standard in effect at the time of this rerepresentation that corresponds to the North American Industry Classification System (NAICS) code(s) assigned to this contract.”
Source page 18
Page markings may include other requirements. The quotation above identifies this requirement.

—
Needs confirmation
View source 1
“The small business size standard corresponding to this NAICS code(s) can be found at https:// www.sba.gov/document/support--table-size-standards.”
Source page 18
Page markings may include other requirements. The quotation above identifies this requirement.

—
Needs confirmation
Applies when: if the acquisit
View source 1
“(d) The small business size standard for a Contractor providing an end item that it does not manufacture, process, or produce itself, for a contract other than a construction or service contract, is 500 employees, or 150 employees for information technology value-added resellers under NAICS code 541”
Source page 18
Page markings may include other requirements. The quotation above identifies this requirement.

Missing information · 1 check
—
Not reviewed — requirement not confirmed
Joint ventures & teaming
8 findings(g) A joint venture agrees that, in the performance of the contract, the applicable percentage specified in paragraph (e) of this clause will be performed by the aggregate of the joint venture participants.
View source 1
“(g) A joint venture agrees that, in the performance of the contract, the applicable percentage specified in paragraph (e) of this clause will be performed by the aggregate of the joint venture participants.”
Source page 17
Page markings may include other requirements. The quotation above identifies this requirement.

(1) In a joint venture comprised of a small business protege and its mentor approved by the Small Business Administration, the small business protege shall perform at least 40 percent of the work performed by the joint venture.
Applies when: In a joint venture; at least 40 percent of the work performed by the joint venture
View source 1
“(1) In a joint venture comprised of a small business protege and its mentor approved by the Small Business Administration, the small business protege shall perform at least 40 percent of the work performed by the joint venture.”
Source page 17
Page markings may include other requirements. The quotation above identifies this requirement.

Work performed by the small business protege in the joint venture must be more than administrative functions.
Applies when: Work performed by the small business protege in the joint venture
View source 1
“Work performed by the small business protege in the joint venture must be more than administrative functions.”
Source page 17
Page markings may include other requirements. The quotation above identifies this requirement.

(2) In an 8(a) joint venture, the 8(a) participant(s) shall perform at least 40 percent of the work performed by the joint venture.
Applies when: In an 8(a) joint venture; at least 40 percent of the work performed by the joint venture
View source 1
“(2) In an 8(a) joint venture, the 8(a) participant(s) shall perform at least 40 percent of the work performed by the joint venture.”
Source page 17
Page markings may include other requirements. The quotation above identifies this requirement.

Work performed by the 8(a) participants in the joint venture must be more than administrative functions.
Applies when: Work performed by the 8(a) participants in the joint venture
View source 1
“Work performed by the 8(a) participants in the joint venture must be more than administrative functions.”
Source page 17
Page markings may include other requirements. The quotation above identifies this requirement.

SBA determines affiliation based on the factors set forth at 13 CFR 121.103. (b) If the Contractor represented that it was a small business concern, a small disadvantaged business concern, or a joint venture that was any of the small business concerns identified in 19.000(a)(3) pClose full requirement
SBA determines affiliation based on the factors set forth at 13 CFR 121.103. (b) If the Contractor represented that it was a small business concern, a small disadvantaged business concern, or a joint venture that was any of the small business concerns identified in 19.000(a)(3) p
Applies when: If the Contractor represented that it was a small business concern, a small disadvantaged business concern, or a joint venture that was any of the small business concerns identified; prior to award of this contract, the ContMust be met by: prior to award of this contract, the Cont
View source 1
“SBA determines affiliation based on the factors set forth at 13 CFR 121.103. (b) If the Contractor represented that it was a small business concern, a small disadvantaged business concern, or a joint venture that was any of the small business concerns identified in 19.000(a)(3) prior to award of thi”
Source page 18
Page markings may include other requirements. The quotation above identifies this requirement.

entity identifier of each party to the joint venture: __.]
View source 1
“entity identifier of each party to the joint venture: __.]”
Source page 19
Page markings may include other requirements. The quotation above identifies this requirement.

unique entity identifier of each party to the joint venture: .] Each HUBZone small business concern participating in the HUBZone joint venture must be certified as a
View source 1
“unique entity identifier of each party to the joint venture: .] Each HUBZone small business concern participating in the HUBZone joint venture must be certified as a”
Source page 19
Page markings may include other requirements. The quotation above identifies this requirement.

Exclusions & responsibility
The Offeror shall review the list of excluded parties in the System for Award Management (SAM) at https://www.sam.gov for entities that are excluded when providing any equipment, system, or service to carry out covered missions that uses covered defense telecommunications equipme
Applies when: when providing any equipment, system, or service to carry out covered missions that uses covered defense telecommunications equipment or services as a substantial or essen
View source 1
“The Offeror shall review the list of excluded parties in the System for Award Management (SAM) at https://www.sam.gov for entities that are excluded when providing any equipment, system, or service to carry out covered missions that uses covered defense telecommunications equipment or services as a ”
Source page 37
Page markings may include other requirements. The quotation above identifies this requirement.

Missing information4 checks · expand to review
A missing value is not a waiver. Check the source or ask the agency before relying on it.
Required licenses
2 findings—
Not found in reviewed sources
—
Not reviewed — requirement not confirmed
Experience & references
2 findings—
Not found in reviewed sources
—
Not reviewed — requirement not confirmed
4 additional fields have no reviewed finding.
Deadlines & submission
When and how to submit, and whether you are still in time.
Response deadline
2 findings2026-11-02T14:00:00-06:00
View source 1
“2026-11-02T14:00:00-06:00”
Missing information · 1 check
—
Not found in reviewed sources
Required submission files
3 findingsThe technical volume shall include: a) Technical Proposal Cover Sheet.
View source 1
“The technical volume shall include: a) Technical Proposal Cover Sheet.”
Source page 40
Page markings may include other requirements. The quotation above identifies this requirement.

The technical proposal shall include a cover sheet containing date, RFP number, project number and title, bidder contact information, and assertion the proposal meets the mandatory completion date stated in the RFP or attachments. b) Project Narrative.
View source 1
“The technical proposal shall include a cover sheet containing date, RFP number, project number and title, bidder contact information, and assertion the proposal meets the mandatory completion date stated in the RFP or attachments. b) Project Narrative.”
Source page 40
Page markings may include other requirements. The quotation above identifies this requirement.

Missing information · 1 check
—
Not found in reviewed sources
Procurement contact
11 findingsIsaac Demmers · isaac.demmers@us.af.mil
View source 1
“Isaac Demmers · isaac.demmers@us.af.mil”
Tamra Torres · Tamra.torres@us.af.mil · 4053393513
View source 1
“Tamra Torres · Tamra.torres@us.af.mil · 4053393513”
isaac.demmers@us.af.mil
View source 1
“ligible to propose. Please submit your RSVP to SSgt Isaac Demmers at "isaac.demmers@us.af.mil" and CC Tamra Torres at "tamra.torres@us.af.mil". THIS POSTING IS FOR”
(1) The Contractor may obtain clarification regarding invoicing in WAWF from the following contracting activity's WAWF point of contact. 72CPTS_FMASSYSTEMS@US.AF.MIL (2) Contact the WAWF helpdesk at 866-618-5988, if assistance is needed.Close full requirement
(1) The Contractor may obtain clarification regarding invoicing in WAWF from the following contracting activity's WAWF point of contact. 72CPTS_FMASSYSTEMS@US.AF.MIL (2) Contact the WAWF helpdesk at 866-618-5988, if assistance is needed.
Applies when: if assistance is needed
View source 1
“(1) The Contractor may obtain clarification regarding invoicing in WAWF from the following contracting activity's WAWF point of contact. 72CPTS_FMASSYSTEMS@US.AF.MIL (2) Contact the WAWF helpdesk at 866-618-5988, if assistance is needed.”
Source page 10
Page markings may include other requirements. The quotation above identifies this requirement.

12) POINT OF CONTACT: All questions from prime contractors shall be submitted to the Contracting Specialist via email at isaac.demmers@us.af.mil on company
View source 1
“12) POINT OF CONTACT: All questions from prime contractors shall be submitted to the Contracting Specialist via email at isaac.demmers@us.af.mil on company”
Source page 40
Page markings may include other requirements. The quotation above identifies this requirement.

—
Needs confirmation
View source 1
“To access WAWF, the Contractor shall- (1) Have a designated electronic business point of contact in the System for Award Management at https://www.sam.gov; and (2) Be registered to use WAWF at https://wawf.eb.mil/ following the step-by-step procedures for self-registration available at this web site”
Source page 8
Page markings may include other requirements. The quotation above identifies this requirement.

—
Needs confirmation
View source 1
“(Contracting Officer: Insert applicable invoice and receiving report document type(s) for fixed price line items that require shipment of a deliverable.)”
Source page 8
Page markings may include other requirements. The quotation above identifies this requirement.

—
Needs confirmation
View source 1
“(Contracting Officer: Insert either "Invoice 2in1" or the applicable invoice and receiving report document type(s) for fixed price line items for services.)”
Source page 8
Page markings may include other requirements. The quotation above identifies this requirement.

—
Needs confirmation
View source 1
“(g) WAWF point of contact.”
Source page 10
Page markings may include other requirements. The quotation above identifies this requirement.

—
Needs confirmation
View source 1
“Such inquiries shall be directed to the contracting officer.”
Source page 12
Page markings may include other requirements. The quotation above identifies this requirement.

—
Needs confirmation
Applies when: within the SOWMust be met by: within the SOW
View source 1
“4) Provide a Team List of the primary point of contacts IAW Section 1.3 Contractor Specific Requirements within the SOW.”
Source page 41
Page markings may include other requirements. The quotation above identifies this requirement.

Bid opening
—
Needs confirmation
Applies when: If this is a sealed bid solicitation, offers will be publicly opened at that time
View source 1
“If this is a sealed bid solicitation, offers will be publicly opened at that time.”
Source page 1
Page markings may include other requirements. The quotation above identifies this requirement.

Offer acceptance period
—
Needs confirmation
View source 1
“5) ACCEPTANCE PERIOD: Attention is called to Blocks 13D and 17 of the SF 1442. In accordance with (IAW) Block 17, the number inserted must be equal to or greater”
Source page 39
Page markings may include other requirements. The quotation above identifies this requirement.

Grounds for rejection
Any and all questions regarding these specifications and/or drawings must be submitted in writing to the Contract Specialist identified in Block 7 of the SF 1442. Any information obtained outside this procedure and acted upon may cause the resultant offeror to be non-responsive.
Applies when: upon may cause the resultant offeror to be non-responsiveMust be met by: upon may cause the resultant offeror to be non-responsive
View source 1
“Any and all questions regarding these specifications and/or drawings must be submitted in writing to the Contract Specialist identified in Block 7 of the SF 1442. Any information obtained outside this procedure and acted upon may cause the resultant offeror to be non-responsive.”
Source page 39
Page markings may include other requirements. The quotation above identifies this requirement.

Missing information4 checks · expand to review
A missing value is not a waiver. Check the source or ask the agency before relying on it.
Questions due
—
Not found in reviewed sources
Site visit / pre-bid meeting
—
Not found in reviewed sources
How to submit
—
Not found in reviewed sources
Acknowledge amendments
—
Not found in reviewed sources
4 additional fields have no reviewed finding.
6 more sections are available once you sign in
Pricing & payment · Bonds & insurance · Evaluation & award · Scope & delivery · Labor, sourcing & compliance · Contract terms & risk
Sign in — freeExtracted from the public documents linked above. This is an information aid, not a determination of bid eligibility or legal advice. Verify the original wording and any addenda before submitting a bid.