VETERANS AFFAIRS, DEPARTMENT OF · Brooklyn, NY
Y1DZ--Brooklyn Upgrade Life Safety/Critical Branch Electrical Distribution Construction
- Response deadline
- 14 days left
- Published project value
- Not confirmedCheck the pricing and payment terms below.
- Solicitation number
- Not confirmed
Dates to plan around
Times follow the original source.
- Response deadline
Source wording
2026-11-06T14:00:00-05:00
From the posting1 agency details · contact information and original wording
9 documents found2 could not be read9% of weighted requirement checks reviewed
Newer source changes have not been verified. Confirm the latest notice and addenda before submitting.
Review first
Start with these requirements and unresolved points.- Must doRegistrations
View 4 flagged requirements
- Requirement 1 ↗
Do NOT include pricing in cents. 5. Contractor is required to fill in their Unique Entity Identifier associated with SAM.gov in Block No. 14 on Standard Form (SF) 1442. 6. PLEASE NOTE: The Contractor agrees to attend any Post Award conference convened by the contracting activity
- Requirement 2 ↗
BID PACKAGE CONTENTS: (a) Standard Form (SF) 1442 Solicitation, Offer and Award: The offeror must complete & sign the “OFFER” section of the SF 1442 and include the company’s Unique Entity Identifier number associated with SAM.gov in Block 14. (b) Acknowledgement of All Amendment
- Requirement 3 ↗
(d) The offeror shall post the information in paragraphs (c)(1)(i) through (c)(1)(iv) of this provision in FAPIIS as required through maintaining an active registration in the System for Award Management, which can be accessed via https://www.sam.gov (see 52.204-7).
- Requirement 4 ↗
is not a HUBZone joint venture that complies with the requirements of 13 CFR 126.616(a) through (c). [The Contractor shall enter the name and unique entity identifier of each party to the
- Requirement 1 ↗
- Must doSet-aside
View 2 flagged requirements
- Requirement 1 ↗
HUBZONE
- Requirement 2 ↗
SBA
- Requirement 1 ↗
Eligibility & participation
Whether you can bid at all, and what you must already hold.
Registrations
8 findingsDo NOT include pricing in cents. 5. Contractor is required to fill in their Unique Entity Identifier associated with SAM.gov in Block No. 14 on Standard Form (SF) 1442. 6. PLEASE NOTE: The Contractor agrees to attend any Post Award conference convened by the contracting activity
View source 1
“Do NOT include pricing in cents. 5. Contractor is required to fill in their Unique Entity Identifier associated with SAM.gov in Block No. 14 on Standard Form (SF) 1442. 6. PLEASE NOTE: The Contractor agrees to attend any Post Award conference convened by the contracting activity or contract administ”
Source page 7
Page markings may include other requirements. The quotation above identifies this requirement.

BID PACKAGE CONTENTS: (a) Standard Form (SF) 1442 Solicitation, Offer and Award: The offeror must complete & sign the “OFFER” section of the SF 1442 and include the company’s Unique Entity Identifier number associated with SAM.gov in Block 14. (b) Acknowledgement of All Amendment
View source 1
“BID PACKAGE CONTENTS: (a) Standard Form (SF) 1442 Solicitation, Offer and Award: The offeror must complete & sign the “OFFER” section of the SF 1442 and include the company’s Unique Entity Identifier number associated with SAM.gov in Block 14. (b) Acknowledgement of All Amendments: The offeror must ”
Source page 10
Page markings may include other requirements. The quotation above identifies this requirement.

36C77626B0020 2.13 SYSTEM FOR AWARD MANAGEMENT The FAR requires that federal contractors register in the System for Award Management (SAM) at https://sam.gov/ and enter all mandatory information into the system.
View source 1
“36C77626B0020 2.13 SYSTEM FOR AWARD MANAGEMENT The FAR requires that federal contractors register in the System for Award Management (SAM) at https://sam.gov/ and enter all mandatory information into the system.”
Source page 12
Page markings may include other requirements. The quotation above identifies this requirement.

In compliance with FAR 52.204-7, an offeror must have an active registration in SAM at the time an offer is submitted and at the time of award. 2.14 DEVIATION NOTICE (FEB 2025) System updates may lag policy updates.
Applies when: at the time of awardMust be met by: at the time of award
View source 1
“In compliance with FAR 52.204-7, an offeror must have an active registration in SAM at the time an offer is submitted and at the time of award. 2.14 DEVIATION NOTICE (FEB 2025) System updates may lag policy updates.”
Source page 12
Page markings may include other requirements. The quotation above identifies this requirement.

Entities are not required to, nor are they able to, update their entity registration to remove these representations in SAM. 2.15 REVIEW REQUIRED REGISTRATION WITH CONTRACTOR PERFORMANCE ASSESSMENT SYSTEM (CPARS) (a) As prescribed in FAR 42.1102(e), the VA evaluates contractor paClose full requirement
Entities are not required to, nor are they able to, update their entity registration to remove these representations in SAM. 2.15 REVIEW REQUIRED REGISTRATION WITH CONTRACTOR PERFORMANCE ASSESSMENT SYSTEM (CPARS) (a) As prescribed in FAR 42.1102(e), the VA evaluates contractor pa
View source 1
“Entities are not required to, nor are they able to, update their entity registration to remove these representations in SAM. 2.15 REVIEW REQUIRED REGISTRATION WITH CONTRACTOR PERFORMANCE ASSESSMENT SYSTEM (CPARS) (a) As prescribed in FAR 42.1102(e), the VA evaluates contractor past performance on al”
Source page 12
Page markings may include other requirements. The quotation above identifies this requirement.

(d) The offeror shall post the information in paragraphs (c)(1)(i) through (c)(1)(iv) of this provision in FAPIIS as required through maintaining an active registration in the System for Award Management, which can be accessed via https://www.sam.gov (see 52.204-7).
View source 1
“(d) The offeror shall post the information in paragraphs (c)(1)(i) through (c)(1)(iv) of this provision in FAPIIS as required through maintaining an active registration in the System for Award Management, which can be accessed via https://www.sam.gov (see 52.204-7).”
Source page 24
Page markings may include other requirements. The quotation above identifies this requirement.

is not a HUBZone joint venture that complies with the requirements of 13 CFR 126.616(a) through (c). [The Contractor shall enter the name and unique entity identifier of each party to the
View source 1
“is not a HUBZone joint venture that complies with the requirements of 13 CFR 126.616(a) through (c). [The Contractor shall enter the name and unique entity identifier of each party to the”
Source page 34
Page markings may include other requirements. The quotation above identifies this requirement.

Missing information · 1 check
—
Not reviewed — requirement not confirmed
Set-aside
4 findingsSBA
View source 1
“SBA”
SDVOSB,HUBZONE
Applies when: unless the Contractor waived the price evaluation preferenceA waiver may be available
View source 1
“(2) Used the HUBZone price evaluation preference regardless of dollar value, unless the Contractor waived the price evaluation preference; or (3) Was an 8(a), HUBZone, service-disabled veteran-owned, economically disadvantaged women-owned, or women-owned small business set-aside or sole-source award regardless of dolla”
Source page 33
Page markings may include other requirements. The quotation above identifies this requirement.

HUBZONE
View source 1
“joint venture: _____.] Each HUBZone small business concern participating in the HUBZone joint venture must be certified as a HUBZone concern.”
Source page 34
Page markings may include other requirements. The quotation above identifies this requirement.

Missing information · 1 check
—
Not reviewed — requirement not confirmed
Small business size
9 findings—
Needs confirmation
View source 1
“Small business concern, as used in this clause— (1) Means a concern, including its affiliates, that is independently owned and operated, not dominant in the field of operation in which it is bidding on Government contracts, and qualified as a small business under the size standards in this solicitat”
Source page 30
Page markings may include other requirements. The quotation above identifies this requirement.

—
Needs confirmation
View source 1
“SBA determines affiliation based on the factors set forth at 13 CFR 121.103. (b) Applicability.”
Source page 30
Page markings may include other requirements. The quotation above identifies this requirement.

—
Needs confirmation
View source 1
“regard to its socioeconomic status); and (2) Is considered small for the size standard under the North American Industry Classification”
Source page 30
Page markings may include other requirements. The quotation above identifies this requirement.

—
Needs confirmation
View source 1
“Small business concern— (1) Means a concern, including its affiliates, that is independently owned and operated, not dominant in its field of operation, and qualified as a small business under the criteria in 13 CFR part 121 and the size standard in paragraph (c) of this clause.”
Source page 32
Page markings may include other requirements. The quotation above identifies this requirement.

—
Needs confirmation
Applies when: If the Contractor represented that it was a small business concern, a small disadvantaged business concern, or a joint venture that was any of the small business concerns identified; prior to award of this contract, the ContMust be met by: prior to award of this contract, the Cont
View source 1
“SBA determines affiliation based on the factors set forth at 13 CFR 121.103. (b) If the Contractor represented that it was a small business concern, a small disadvantaged business concern, or a joint venture that was any of the small business concerns identified in 19.000(a)(3) prior to award of thi”
Source page 32
Page markings may include other requirements. The quotation above identifies this requirement.

—
Needs confirmation
Applies when: at the time of this rerepresentation that corresponds to the North American Industry ClassificMust be met by: at the time of this rerepresentation that corresponds to the North American Industry Classific
View source 1
“(c) The Contractor shall rerepresent its size status in accordance with the size standard in effect at the time of this rerepresentation that corresponds to the North American Industry Classification System (NAICS) code(s) assigned to this contract.”
Source page 33
Page markings may include other requirements. The quotation above identifies this requirement.

—
Needs confirmation
View source 1
“The small business size standard corresponding to this NAICS code(s) can be found at https://www.sba.gov/document/support--table-size-standards.”
Source page 33
Page markings may include other requirements. The quotation above identifies this requirement.

—
Needs confirmation
Applies when: if the acquisit
View source 1
“(d) The small business size standard for a Contractor providing an end item that it does not manufacture, process, or produce itself, for a contract other than a construction or service contract, is 500 employees, or 150 employees for information technology value-added resellers under NAICS code 541”
Source page 33
Page markings may include other requirements. The quotation above identifies this requirement.

Missing information · 1 check
—
Not reviewed — requirement not confirmed
Financial capacity
(b) The bidder shall furnish a bid guarantee in the form of a firm commitment, e.g., bid bond supported by good and sufficient surety or sureties acceptable to the Government, postal money order, certified check, cashier's check, irrevocable letter of credit, or, under Treasury D
Applies to: surety
View source 1
“(b) The bidder shall furnish a bid guarantee in the form of a firm commitment, e.g., bid bond supported by good and sufficient surety or sureties acceptable to the Government, postal money order, certified check, cashier's check, irrevocable letter of credit, or, under Treasury Department regulation”
Source page 16
Page markings may include other requirements. The quotation above identifies this requirement.

Joint ventures & teaming
6 findings(g) A joint venture agrees that, in the performance of the contract, the applicable percentage specified in paragraph (e) of this clause will be performed by the aggregate of the joint venture participants.
View source 1
“(g) A joint venture agrees that, in the performance of the contract, the applicable percentage specified in paragraph (e) of this clause will be performed by the aggregate of the joint venture participants.”
Source page 32
Page markings may include other requirements. The quotation above identifies this requirement.

(1) In a joint venture comprised of a small business protégé and its mentor approved by the Small Business Administration, the small business protégé shall perform at least 40 percent of the work performed by the joint venture.
Applies when: In a joint venture; at least 40 percent of the work performed by the joint venture
View source 1
“(1) In a joint venture comprised of a small business protégé and its mentor approved by the Small Business Administration, the small business protégé shall perform at least 40 percent of the work performed by the joint venture.”
Source page 32
Page markings may include other requirements. The quotation above identifies this requirement.

Work performed by the small business protégé in the joint venture must be more than administrative functions.
Applies when: Work performed by the small business protégé in the joint venture
View source 1
“Work performed by the small business protégé in the joint venture must be more than administrative functions.”
Source page 32
Page markings may include other requirements. The quotation above identifies this requirement.

(2) In an 8(a) joint venture, the 8(a) participant(s) shall perform at least 40 percent of the work performed by the joint venture.
Applies when: In an 8(a) joint venture; at least 40 percent of the work performed by the joint venture
View source 1
“(2) In an 8(a) joint venture, the 8(a) participant(s) shall perform at least 40 percent of the work performed by the joint venture.”
Source page 32
Page markings may include other requirements. The quotation above identifies this requirement.

Work performed by the 8(a) participants in the joint venture must be more than administrative functions.
Applies when: Work performed by the 8(a) participants in the joint venture
View source 1
“Work performed by the 8(a) participants in the joint venture must be more than administrative functions.”
Source page 32
Page markings may include other requirements. The quotation above identifies this requirement.

SBA determines affiliation based on the factors set forth at 13 CFR 121.103. (b) If the Contractor represented that it was a small business concern, a small disadvantaged business concern, or a joint venture that was any of the small business concerns identified in 19.000(a)(3) pClose full requirement
SBA determines affiliation based on the factors set forth at 13 CFR 121.103. (b) If the Contractor represented that it was a small business concern, a small disadvantaged business concern, or a joint venture that was any of the small business concerns identified in 19.000(a)(3) p
Applies when: If the Contractor represented that it was a small business concern, a small disadvantaged business concern, or a joint venture that was any of the small business concerns identified; prior to award of this contract, the ContMust be met by: prior to award of this contract, the Cont
View source 1
“SBA determines affiliation based on the factors set forth at 13 CFR 121.103. (b) If the Contractor represented that it was a small business concern, a small disadvantaged business concern, or a joint venture that was any of the small business concerns identified in 19.000(a)(3) prior to award of thi”
Source page 32
Page markings may include other requirements. The quotation above identifies this requirement.

Missing information4 checks · expand to review
A missing value is not a waiver. Check the source or ask the agency before relying on it.
Required licenses
2 findings—
Not reviewed — requirement not confirmed
—
Not found in reviewed sources
Experience & references
2 findings—
Not reviewed — requirement not confirmed
—
Not found in reviewed sources
4 additional fields have no reviewed finding.
Deadlines & submission
When and how to submit, and whether you are still in time.
Response deadline
3 findings2026-11-06T14:00:00-05:00
View source 1
“2026-11-06T14:00:00-05:00”
Missing information · 2 checks
—
Not reviewed — requirement not confirmed
—
Not found in reviewed sources
How to submit
4 findingsThe bid bond must be submitted electronically as part of the bid package. 1.3 PAYMENT & PERFORMANCE BONDS The offeror to whom award is made will be required to furnish two bonds.
View source 1
“The bid bond must be submitted electronically as part of the bid package. 1.3 PAYMENT & PERFORMANCE BONDS The offeror to whom award is made will be required to furnish two bonds.”
Source page 8
Page markings may include other requirements. The quotation above identifies this requirement.

(b) Only emailed bids will be accepted.
View source 1
“(b) Only emailed bids will be accepted.”
Source page 10
Page markings may include other requirements. The quotation above identifies this requirement.

(3) Proposals shall be submitted to the Contracting Officer or ACO and the resident engineer as expeditiously as possible, but not later than 30 calendar days, after receipt of a written change order by the Contracting Officer.
View source 1
“(3) Proposals shall be submitted to the Contracting Officer or ACO and the resident engineer as expeditiously as possible, but not later than 30 calendar days, after receipt of a written change order by the Contracting Officer.”
Source page 63
Page markings may include other requirements. The quotation above identifies this requirement.

Missing information · 1 check
—
Not reviewed — requirement not confirmed
Acknowledge amendments
2 findingsThe offeror is responsible for obtaining and acknowledging any amendments to the solicitation. Failure to acknowledge an amendment may result in the offer being deemed nonresponsive. 2.7 PREPARATION OF BIDS The Government will not pay for any costs incurred in preparation and subClose full requirement
The offeror is responsible for obtaining and acknowledging any amendments to the solicitation. Failure to acknowledge an amendment may result in the offer being deemed nonresponsive. 2.7 PREPARATION OF BIDS The Government will not pay for any costs incurred in preparation and sub
View source 1
“The offeror is responsible for obtaining and acknowledging any amendments to the solicitation. Failure to acknowledge an amendment may result in the offer being deemed nonresponsive. 2.7 PREPARATION OF BIDS The Government will not pay for any costs incurred in preparation and submission of bids. 2.8”
Source page 10
Page markings may include other requirements. The quotation above identifies this requirement.

Missing information · 1 check
—
Not reviewed — requirement not confirmed
Procurement contact
2 findingsSierra Tate · sierra.tate@va.gov · (216) 447-8321
View source 1
“Sierra Tate · sierra.tate@va.gov · (216) 447-8321”
Bridget May · bridget.may@va.gov · 2164478321
View source 1
“Bridget May · bridget.may@va.gov · 2164478321”
Bid opening
5 findings—
Needs confirmation
Applies when: If this is a sealed bid solicitation, offers must be publicly opened at that time
View source 1
“If this is a sealed bid solicitation, offers must be publicly opened at that time.”
Source page 1
Page markings may include other requirements. The quotation above identifies this requirement.

—
Needs confirmation
View source 1
“(c) The bid opening will be conducted via teleconference.”
Source page 10
Page markings may include other requirements. The quotation above identifies this requirement.

—
Needs confirmation
View source 1
“BID OPENING: (a) The bid opening will be conducted via teleconference.”
Source page 11
Page markings may include other requirements. The quotation above identifies this requirement.

—
Needs confirmation
View source 1
“(End of Provision) 2.22 52.228-1 BID GUARANTEE (SEP 1996) (a) Failure to furnish a bid guarantee in the proper form and amount, by the time set for opening of bids, may be cause for rejection of the bid.”
Source page 16
Page markings may include other requirements. The quotation above identifies this requirement.

—
Needs confirmation
Applies when: upon execution of contractual documents and bonds (including any necessary coinsuranMust be met by: upon execution of contractual documents and bonds (including any necessary coinsuran
View source 1
“The Contracting Officer will return bid guarantees, other than bid bonds— (1) To unsuccessful bidders as soon as practicable after the opening of bids; and (2) To the successful bidder upon execution of contractual documents and bonds (including any necessary coinsurance or reinsurance agreements), ”
Source page 16
Page markings may include other requirements. The quotation above identifies this requirement.

Alternate proposals
Note: All references to Alternate No. 1 and Alternate No. 2 in the specs and drawings are to be disregarded.
View source 1
“Note: All references to Alternate No. 1 and Alternate No. 2 in the specs and drawings are to be disregarded.”
Source page 1
Page markings may include other requirements. The quotation above identifies this requirement.

Grounds for rejection
3 findingsBids submitted by any method other than email are not allowed and will be deemed non-responsive and therefore ineligible for award.
View source 1
“Bids submitted by any method other than email are not allowed and will be deemed non-responsive and therefore ineligible for award.”
Source page 10
Page markings may include other requirements. The quotation above identifies this requirement.

(d) Failure to provide electronic bids and the electronic copy of the bid bond on the date and time set for bid opening, will deem the bid non-responsive.
View source 1
“(d) Failure to provide electronic bids and the electronic copy of the bid bond on the date and time set for bid opening, will deem the bid non-responsive.”
Source page 10
Page markings may include other requirements. The quotation above identifies this requirement.

(End of Provision) 2.22 52.228-1 BID GUARANTEE (SEP 1996) (a) Failure to furnish a bid guarantee in the proper form and amount, by the time set for opening of bids, may be cause for rejection of the bid.
View source 1
“(End of Provision) 2.22 52.228-1 BID GUARANTEE (SEP 1996) (a) Failure to furnish a bid guarantee in the proper form and amount, by the time set for opening of bids, may be cause for rejection of the bid.”
Source page 16
Page markings may include other requirements. The quotation above identifies this requirement.

Missing information6 checks · expand to review
A missing value is not a waiver. Check the source or ask the agency before relying on it.
Questions due
2 findings—
Not reviewed — requirement not confirmed
—
Not found in reviewed sources
Site visit / pre-bid meeting
2 findings—
Not reviewed — requirement not confirmed
—
Not found in reviewed sources
Required submission files
2 findings—
Not reviewed — requirement not confirmed
—
Not found in reviewed sources
4 additional fields have no reviewed finding.
6 more sections are available once you sign in
Pricing & payment · Bonds & insurance · Evaluation & award · Scope & delivery · Labor, sourcing & compliance · Contract terms & risk
Sign in — freeExtracted from the public documents linked above. This is an information aid, not a determination of bid eligibility or legal advice. Verify the original wording and any addenda before submitting a bid.