DEPT OF DEFENSE · Tinker AFB, OK
2-STEP SEALED BID - TINKER AFB WWYK250019 Remove and Replace Fire Sprinkler in Plasma Booth Dust Collectors and Replace the Building F/A System, B3221
- Response deadline
- 7 days left
- Published project value
- Not confirmedCheck the pricing and payment terms below.
- Solicitation number
- FA813726R0021
Dates to plan around
Times follow the original source.
- Response deadline
Source wording
2026-10-30T14:00:00-05:00
From the posting3 agency details · contact information and original wording
9 documents found1 need OCR1 could not be read24% of weighted requirement checks reviewed
Newer source changes have not been verified. Confirm the latest notice and addenda before submitting.
Review first
Start with these requirements and unresolved points.- Must doJoint ventures & teaming
FA813726R00210001 Page 16 of 41 joint venture must be more than administrative functions.
- Must doRegistrations
View 2 flagged requirements
- Requirement 1 ↗
To access WAWF, the Contractor shall- (1) Have a designated electronic business point of contact in the System for Award Management at https://www.sam.gov; and (2) Be registered to use WAWF at https://wawf.eb.mil/ following the step-by-step procedures for self-registration availa
- Requirement 2 ↗
(d) The offeror shall post the information in paragraphs (c)(1)(i) through (c)(1)(iv) of this provision in FAPIIS as required through maintaining an active registration in the System for Award Management, which can be accessed via https://www.sam.gov (see 52.204-7).
- Requirement 1 ↗
- Must doSet-aside
SBA
- ConflictHow to submit
View 3 flagged requirements
- Requirement 1 ↗
Sources disagree — check both before relying on this
- Requirement 2 ↗
Sources disagree — check both before relying on this
- Requirement 3 ↗
Sources disagree — check both before relying on this
- Requirement 1 ↗
Eligibility & participation
Whether you can bid at all, and what you must already hold.
Registrations
4 findingsTo access WAWF, the Contractor shall- (1) Have a designated electronic business point of contact in the System for Award Management at https://www.sam.gov; and (2) Be registered to use WAWF at https://wawf.eb.mil/ following the step-by-step procedures for self-registration availa
View source 1
“To access WAWF, the Contractor shall- (1) Have a designated electronic business point of contact in the System for Award Management at https://www.sam.gov; and (2) Be registered to use WAWF at https://wawf.eb.mil/ following the step-by-step procedures for self-registration available at this web site”
Source page 8
Page markings may include other requirements. The quotation above identifies this requirement.

(d) The offeror shall post the information in paragraphs (c)(1)(i) through (c)(1)(iv) of this provision in FAPIIS as required through maintaining an active registration in the System for Award Management, which can be accessed via https://www.sam.gov (see 52.204-7).
View source 1
“(d) The offeror shall post the information in paragraphs (c)(1)(i) through (c)(1)(iv) of this provision in FAPIIS as required through maintaining an active registration in the System for Award Management, which can be accessed via https://www.sam.gov (see 52.204-7).”
Source page 26
Page markings may include other requirements. The quotation above identifies this requirement.

Missing information · 2 checks
—
Not found in reviewed sources
—
Not reviewed — requirement not confirmed
Set-aside
3 findingsSBA
View source 1
“SBA”
Missing information · 2 checks
—
Not found in reviewed sources
—
Not reviewed — requirement not confirmed
Small business size
4 findings—
Needs confirmation
View source 1
“Size Standard: USD 45,000,000.00 Annual receipts”
Source page 3
Page markings may include other requirements. The quotation above identifies this requirement.

—
Needs confirmation
View source 1
“FA813726R00210001 Page 15 of 41 concern, without regard to its socioeconomic status); and (2) Is considered small for the size standard under the North American Industry Classification System (NAICS) code the prime contractor assigned to the subcontract.”
Source page 15
Page markings may include other requirements. The quotation above identifies this requirement.

Missing information · 2 checks
—
Not found in reviewed sources
—
Not reviewed — requirement not confirmed
Key personnel
3 findings2.4. Technical Subfactor 3: Key Personnel Certification
Applies to: person
View source 2
“2.4. Technical Subfactor 3: Key Personnel Certification”
Source page 33
Page markings may include other requirements. The quotation above identifies this requirement.

“2.4. Technical Subfactor 3: Key Personnel Certification”
Source page 6
Page markings may include other requirements. The quotation above identifies this requirement.

2.4. Technical Subfactor 3, Key Personnel: This subfactor is met when the offeror provide proof of current certifications for
Applies when: when the offeror provide proof of current certifications for
Applies to: person
View source 2
“2.4. Technical Subfactor 3, Key Personnel: This subfactor is met when the offeror provide proof of current certifications for”
Source page 40
Page markings may include other requirements. The quotation above identifies this requirement.

“2.4. Technical Subfactor 3, Key Personnel: This subfactor is met when the offeror provide proof of current certifications for”
Source page 11
Page markings may include other requirements. The quotation above identifies this requirement.

2.4. Technical Subfactor 3, Key Personnel: This subfactor is met when the offeror provide proof of current certifications for key personnel IAW Section 1.3.2.6 Qualified Fire Protection Engineer and 1.3.2.7 Systems Designer(s) within the SOW.Close full requirement
2.4. Technical Subfactor 3, Key Personnel: This subfactor is met when the offeror provide proof of current certifications for key personnel IAW Section 1.3.2.6 Qualified Fire Protection Engineer and 1.3.2.7 Systems Designer(s) within the SOW.
Applies when: when the offeror provide proof of current certifications for key personnel IAW Section 1; within the SOWMust be met by: within the SOW
Applies to: person
View source 2
“2.4. Technical Subfactor 3, Key Personnel: This subfactor is met when the offeror provide proof of current certifications for key personnel IAW Section 1.3.2.6 Qualified Fire Protection Engineer and 1.3.2.7 Systems Designer(s) within the SOW.”
Source page 40
Page markings may include other requirements. The quotation above identifies this requirement.

“2.4. Technical Subfactor 3, Key Personnel: This subfactor is met when the offeror provide proof of current certifications for key personnel IAW Section 1.3.2.6 Qualified Fire Protection Engineer and 1.3.2.7 Systems Designer(s) within the SOW.”
Source page 11
Page markings may include other requirements. The quotation above identifies this requirement.

Financial capacity
(b) The bidder shall furnish a bid guarantee in the form of a firm commitment, e.g., bid bond supported by good and sufficient surety or sureties acceptable to the Government, postal money order, certified check, cashier's check, irrevocable letter of credit, or, under Treasury D
Applies to: surety
View source 1
“(b) The bidder shall furnish a bid guarantee in the form of a firm commitment, e.g., bid bond supported by good and sufficient surety or sureties acceptable to the Government, postal money order, certified check, cashier's check, irrevocable letter of credit, or, under Treasury Department regulation”
Source page 36
Page markings may include other requirements. The quotation above identifies this requirement.

Joint ventures & teaming
5 findings(g) A joint venture agrees that, in the performance of the contract, the applicable percentage specified in paragraph (e) of this clause will be performed by the aggregate of the joint venture participants.
View source 1
“(g) A joint venture agrees that, in the performance of the contract, the applicable percentage specified in paragraph (e) of this clause will be performed by the aggregate of the joint venture participants.”
Source page 15
Page markings may include other requirements. The quotation above identifies this requirement.

(1) In a joint venture comprised of a small business protégé and its mentor approved by the Small Business Administration, the small business protégé shall perform at least 40 percent of the work performed by the joint venture.
Applies when: In a joint venture; at least 40 percent of the work performed by the joint venture
View source 1
“(1) In a joint venture comprised of a small business protégé and its mentor approved by the Small Business Administration, the small business protégé shall perform at least 40 percent of the work performed by the joint venture.”
Source page 15
Page markings may include other requirements. The quotation above identifies this requirement.

Work performed by the small business protégé in the joint venture must be more than administrative functions.
Applies when: Work performed by the small business protégé in the joint venture
View source 1
“Work performed by the small business protégé in the joint venture must be more than administrative functions.”
Source page 15
Page markings may include other requirements. The quotation above identifies this requirement.

(2) In an 8(a) joint venture, the 8(a) participant(s) shall perform at least 40 percent of the work performed by the joint venture.
Applies when: In an 8(a) joint venture; at least 40 percent of the work performed by the joint venture
View source 1
“(2) In an 8(a) joint venture, the 8(a) participant(s) shall perform at least 40 percent of the work performed by the joint venture.”
Source page 15
Page markings may include other requirements. The quotation above identifies this requirement.

FA813726R00210001 Page 16 of 41 joint venture must be more than administrative functions.
View source 1
“FA813726R00210001 Page 16 of 41 joint venture must be more than administrative functions.”
Source page 16
Page markings may include other requirements. The quotation above identifies this requirement.

Exclusions & responsibility
The Offeror shall review the list of excluded parties in the System for Award Management (SAM) at https://www.sam.gov for entities that are excluded when providing any equipment, system, or service to carry out covered missions that uses covered defense telecommunications equipme
Applies when: when providing any equipment, system, or service to carry out covered missions that uses covered defense telecommunications equipment or services as a substantial or essen
View source 1
“The Offeror shall review the list of excluded parties in the System for Award Management (SAM) at https://www.sam.gov for entities that are excluded when providing any equipment, system, or service to carry out covered missions that uses covered defense telecommunications equipment or services as a ”
Source page 28
Page markings may include other requirements. The quotation above identifies this requirement.

Missing information4 checks · expand to review
A missing value is not a waiver. Check the source or ask the agency before relying on it.
Required licenses
2 findings—
Not found in reviewed sources
—
Not reviewed — requirement not confirmed
Experience & references
2 findings—
Not found in reviewed sources
—
Not reviewed — requirement not confirmed
2 additional fields have no reviewed finding.
Deadlines & submission
When and how to submit, and whether you are still in time.
Response deadline
2 findings2026-10-30T14:00:00-05:00
View source 1
“2026-10-30T14:00:00-05:00”
Missing information · 1 check
—
Not found in reviewed sources
Site visit / pre-bid meeting
2 findingsTinker AFB, B3221 Project specific documents are attached to this posting. If you experience any difficulty at receiving or access to the project specific documents, send an email
View source 1
“Project Location: Tinker AFB, B3221 Project specific documents are attached to this posting. If you experience any difficulty at receiving or access to the project specific documents, send an email”
Missing information · 1 check
—
Not found in reviewed sources
How to submit
4 findings—
Conflicting sources
View source 1
“You must attend the site visit to be eligible to submit a proposal.”
—
Conflicting sources
View source 2
“The electronic copies of the proposal shall be submitted in a format readable by Microsoft (MS) Word 2007, 2010, or 2013, MS Excel 2007, 2010 or 2013, MS-Power Point 2007, 2010, or 2013, and MS-Project 2013, and Adobe Acrobat Portable Document Format (PDF), as applicable.”
Source page 30
Page markings may include other requirements. The quotation above identifies this requirement.

“The electronic copies of the proposal shall be submitted in a format readable by Microsoft (MS) Word 2007, 2010, or 2013, MS Excel 2007, 2010 or 2013, MS-Power Point 2007, 2010, or 2013, and MS-Project 2013, and Adobe Acrobat Portable Document Format (PDF), as applicable.”
Source page 4
Page markings may include other requirements. The quotation above identifies this requirement.

—
Conflicting sources
View source 2
“Any unacknowledged amendments in the offeror's proposal will render the offeror ineligible for award. 1.11. Proposals and modifications to proposals shall be submitted in via previously mentioned method addressed to the contracting specialist/contracting officer at the address shown on OPR and showi”
Source page 31
Page markings may include other requirements. The quotation above identifies this requirement.

“Any unacknowledged amendments in the offeror's proposal will render the offeror ineligible for award. 1.11. Proposals and modifications to proposals shall be submitted in via previously mentioned method addressed to the contracting specialist/contracting officer at the address shown on OPR and showi”
Source page 4
Page markings may include other requirements. The quotation above identifies this requirement.

obtained(only one supplier, potential suppliers/subcontractors are unresponsive or respond with 'no bid', etc.), a justification for the single quote shall be submitted as a part of the proposal package.
Applies to: subcontractor
View source 2
“obtained(only one supplier, potential suppliers/subcontractors are unresponsive or respond with 'no bid', etc.), a justification for the single quote shall be submitted as a part of the proposal package.”
Source page 34
Page markings may include other requirements. The quotation above identifies this requirement.

“obtained(only one supplier, potential suppliers/subcontractors are unresponsive or respond with 'no bid', etc.), a justification for the single quote shall be submitted as a part of the proposal package.”
Source page 7
Page markings may include other requirements. The quotation above identifies this requirement.

Required submission files
16 findingsOnce the RFIs have been provided to the offeror(s), a request for technical proposal (RFTP) will be sent to the offeror(s) to submit the technical proposal to the government contracting office.
View source 1
“Once the RFIs have been provided to the offeror(s), a request for technical proposal (RFTP) will be sent to the offeror(s) to submit the technical proposal to the government contracting office.”
Technical proposals are not to have any pricing, unit nor total, but does need to have all material and quantiles as required for any proposal.
View source 1
“Technical proposals are not to have any pricing, unit nor total, but does need to have all material and quantiles as required for any proposal.”
A technical evaluation of the technical proposal will be conducted and only the offeror(s) found to be technically acceptable will proceed to Step-Two.
View source 1
“A technical evaluation of the technical proposal will be conducted and only the offeror(s) found to be technically acceptable will proceed to Step-Two.”
Sealed offers in original and 1 copies to perform the work required are due at the place specified in Item 8 by 02:00 PM (hour) local time 02 Oct 2026 (date).
View source 1
“Sealed offers in original and 1 copies to perform the work required are due at the place specified in Item 8 by 02:00 PM (hour) local time 02 Oct 2026 (date).”
Source page 1
Page markings may include other requirements. The quotation above identifies this requirement.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing items 8 and 15, and returning 1 copies of the amendment;
Applies when: prior to the hour and date specified in the solicitation or as amended, by one of the foMust be met by: prior to the hour and date specified in the solicitation or as amended, by one of the fo
View source 1
“Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing items 8 and 15, and returning 1 copies of the amendment;”
Source page 1
Page markings may include other requirements. The quotation above identifies this requirement.

OFFER DATE (Type or print) AWARD (To be completed by Government) 21. ITEMS ACCEPTED: 22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA 24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO THE UNITED (4 copies unless otherwise specified)
Applies when: unless otherwise specified) STATES CODE AT 10 U
View source 1
“OFFER DATE (Type or print) AWARD (To be completed by Government) 21. ITEMS ACCEPTED: 22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA 24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO THE UNITED (4 copies unless otherwise specified) STATES CODE AT 10 U”
Source page 2
Page markings may include other requirements. The quotation above identifies this requirement.

The following limitation only applies to the Technical Volume.
View source 2
“The following limitation only applies to the Technical Volume.”
Source page 31
Page markings may include other requirements. The quotation above identifies this requirement.

“The following limitation only applies to the Technical Volume.”
Source page 5
Page markings may include other requirements. The quotation above identifies this requirement.

The technical proposal should be specific and complete.
View source 2
“The technical proposal should be specific and complete.”
Source page 32
Page markings may include other requirements. The quotation above identifies this requirement.

“The technical proposal should be specific and complete.”
Source page 5
Page markings may include other requirements. The quotation above identifies this requirement.

The technical volume shall include: a)Technical Volume Cover Sheet.
View source 2
“The technical volume shall include: a)Technical Volume Cover Sheet.”
Source page 32
Page markings may include other requirements. The quotation above identifies this requirement.

“The technical volume shall include: a)Technical Volume Cover Sheet.”
Source page 5
Page markings may include other requirements. The quotation above identifies this requirement.

These limitations shall apply to both electronic and hard copy proposals. 2.0. Factor 1 - Technical 2.1. In the Technical Volume of the proposal, address your proposed approach to meeting the minimum performance or capability requirements of the technical requirements identified
View source 1
“These limitations shall apply to both electronic and hard copy proposals. 2.0. Factor 1 - Technical 2.1. In the Technical Volume of the proposal, address your proposed approach to meeting the minimum performance or capability requirements of the technical requirements identified in the OPR.”
Source page 5
Page markings may include other requirements. The quotation above identifies this requirement.

The price volume shall include a cover sheet containing date, OPR number, project number and title, offeror contact information, CLIN prices and the total price. b)Detailed Price Proposal 1)Design Price proposals shall include proposed labor categories, labor hours per category,
View source 2
“The price volume shall include a cover sheet containing date, OPR number, project number and title, offeror contact information, CLIN prices and the total price. b)Detailed Price Proposal 1)Design Price proposals shall include proposed labor categories, labor hours per category, and labor rates per ”
Source page 33
Page markings may include other requirements. The quotation above identifies this requirement.

“The price volume shall include a cover sheet containing date, OPR number, project number and title, offeror contact information, CLIN prices and the total price. b)Detailed Price Proposal 1)Design Price proposals shall include proposed labor categories, labor hours per category, and labor rates per ”
Source page 7
Page markings may include other requirements. The quotation above identifies this requirement.

The offeror's proposal shall include a signed copy of the Model Order. 4.2. The offeror shall provide required information to complete clauses as required.
View source 2
“The offeror's proposal shall include a signed copy of the Model Order. 4.2. The offeror shall provide required information to complete clauses as required.”
Source page 35
Page markings may include other requirements. The quotation above identifies this requirement.

“The offeror's proposal shall include a signed copy of the Model Order. 4.2. The offeror shall provide required information to complete clauses as required.”
Source page 8
Page markings may include other requirements. The quotation above identifies this requirement.

RFO Clauses Incorporated by Reference Number Title Effective Date Alternate/ Deviation Variation Effective Date Section M - Evaluation Factors for Award Header Miscellaneous Text (Modified): 1.0. Basis for Order Award 1.1. This acquisition will utilize Sealed Bidding procedures, Close full requirement
RFO Clauses Incorporated by Reference Number Title Effective Date Alternate/ Deviation Variation Effective Date Section M - Evaluation Factors for Award Header Miscellaneous Text (Modified): 1.0. Basis for Order Award 1.1. This acquisition will utilize Sealed Bidding procedures,
View source 1
“RFO Clauses Incorporated by Reference Number Title Effective Date Alternate/ Deviation Variation Effective Date Section M - Evaluation Factors for Award Header Miscellaneous Text (Modified): 1.0. Basis for Order Award 1.1. This acquisition will utilize Sealed Bidding procedures, with technical propo”
Source page 9
Page markings may include other requirements. The quotation above identifies this requirement.

The evaluation focuses on the technical approach as described in each offeror's technical volume.
View source 2
“The evaluation focuses on the technical approach as described in each offeror's technical volume.”
Source page 39
Page markings may include other requirements. The quotation above identifies this requirement.

“The evaluation focuses on the technical approach as described in each offeror's technical volume.”
Source page 10
Page markings may include other requirements. The quotation above identifies this requirement.

FA813726R00210001 Page 32 of 41 2.1. In the Technical Volume of the proposal, address your proposed approach to meeting the minimum performance or capability requirements of the technical requirements identified in the OPR.Close full requirement
FA813726R00210001 Page 32 of 41 2.1. In the Technical Volume of the proposal, address your proposed approach to meeting the minimum performance or capability requirements of the technical requirements identified in the OPR.
View source 1
“FA813726R00210001 Page 32 of 41 2.1. In the Technical Volume of the proposal, address your proposed approach to meeting the minimum performance or capability requirements of the technical requirements identified in the OPR.”
Source page 32
Page markings may include other requirements. The quotation above identifies this requirement.

FA813726R00210001 Page 38 of 41 Section M - Evaluation Factors for Award 1.0. Basis for Order Award 1.1. This acquisition will utilize Sealed Bidding procedures, with technical proposals, in accordance with RFO 14.307(a)(3) as supplemented.Close full requirement
FA813726R00210001 Page 38 of 41 Section M - Evaluation Factors for Award 1.0. Basis for Order Award 1.1. This acquisition will utilize Sealed Bidding procedures, with technical proposals, in accordance with RFO 14.307(a)(3) as supplemented.
View source 1
“FA813726R00210001 Page 38 of 41 Section M - Evaluation Factors for Award 1.0. Basis for Order Award 1.1. This acquisition will utilize Sealed Bidding procedures, with technical proposals, in accordance with RFO 14.307(a)(3) as supplemented.”
Source page 38
Page markings may include other requirements. The quotation above identifies this requirement.

Procurement contact
12 findingsHailie Reyes · hailie.reyes@us.af.mil
View source 1
“Hailie Reyes · hailie.reyes@us.af.mil”
Stephen Palmer · stephen.palmer@us.af.mil · 4057394182
View source 1
“Stephen Palmer · stephen.palmer@us.af.mil · 4057394182”
(1) The Contractor may obtain clarification regarding invoicing in WAWF from the following contracting activity's WAWF point of contact. 72CPTS_FMASSYSTEMS@US.AF.MIL (Contracting Officer: Insert applicable information or "Not applicable.") (2) Contact the WAWF helpdesk at 866-618Close full requirement
(1) The Contractor may obtain clarification regarding invoicing in WAWF from the following contracting activity's WAWF point of contact. 72CPTS_FMASSYSTEMS@US.AF.MIL (Contracting Officer: Insert applicable information or "Not applicable.") (2) Contact the WAWF helpdesk at 866-618
Applies when: if assistance is needed
View source 1
“(1) The Contractor may obtain clarification regarding invoicing in WAWF from the following contracting activity's WAWF point of contact. 72CPTS_FMASSYSTEMS@US.AF.MIL (Contracting Officer: Insert applicable information or "Not applicable.") (2) Contact the WAWF helpdesk at 866-618-5988, if assistance”
Source page 10
Page markings may include other requirements. The quotation above identifies this requirement.

—
Needs confirmation
Applies when: if applicable
View source 2
“Your proposal, to include work plan, price, and bid bond must be provided to this office not later than the response stated on the SF 1442, block 13a, or amendment if applicable. 1.5. The Procurement Contracting Officer (PCO) is the sole point of contact for this acquisition.”
Source page 4
Page markings may include other requirements. The quotation above identifies this requirement.

“Your proposal, to include work plan, price, and bid bond must be provided to this office not later than the response stated on the SF 1442, block 13a, or amendment if applicable. 1.5. The Procurement Contracting Officer (PCO) is the sole point of contact for this acquisition.”
Source page 30
Page markings may include other requirements. The quotation above identifies this requirement.

—
Needs confirmation
Applies when: within theMust be met by: within the
View source 2
“2.2.4. Provide a Team List of the primary point of contacts IAW Section 1.3.2 Contractor Specific Requirements within the”
Source page 6
Page markings may include other requirements. The quotation above identifies this requirement.

“2.2.4. Provide a Team List of the primary point of contacts IAW Section 1.3.2 Contractor Specific Requirements within the”
Source page 32
Page markings may include other requirements. The quotation above identifies this requirement.

—
Needs confirmation
View source 1
“To access WAWF, the Contractor shall- (1) Have a designated electronic business point of contact in the System for Award Management at https://www.sam.gov; and (2) Be registered to use WAWF at https://wawf.eb.mil/ following the step-by-step procedures for self-registration available at this web site”
Source page 8
Page markings may include other requirements. The quotation above identifies this requirement.

—
Needs confirmation
Applies when: If multiple ship to/acceptance locations apply, insert "See Schedule" or "Not applicable
View source 1
“If multiple ship to/acceptance locations apply, insert "See Schedule" or "Not applicable.") (**Contracting Officer: If the contract provides for progress payments or performance-based payments, insert the DoDAAC for the contract administration office assigned the functions under FAR 42.302(a)(13).)”
Source page 9
Page markings may include other requirements. The quotation above identifies this requirement.

—
Needs confirmation
View source 2
“After reviewing the SAM database information, the offeror verifies by submission of this offer that the representation and certifications currently posted electronically. 4.6. Provide the name, title, telephone number, and email address for the company/division point of contact regarding decisions m”
Source page 9
Page markings may include other requirements. The quotation above identifies this requirement.

“After reviewing the SAM database information, the offeror verifies by submission of this offer that the representation and certifications currently posted electronically. 4.6. Provide the name, title, telephone number, and email address for the company/division point of contact regarding decisions m”
Source page 35
Page markings may include other requirements. The quotation above identifies this requirement.

—
Needs confirmation
View source 1
“(g) WAWF point of contact.”
Source page 10
Page markings may include other requirements. The quotation above identifies this requirement.

—
Needs confirmation
View source 1
“(Contracting Officer: Insert applicable information or "Not applicable.")”
Source page 10
Page markings may include other requirements. The quotation above identifies this requirement.

—
Needs confirmation
View source 2
“2.2.4. Sufficient description of your team list of the primary point of contacts. The responsible offeror shall meet”
Source page 11
Page markings may include other requirements. The quotation above identifies this requirement.

“2.2.4. Sufficient description of your team list of the primary point of contacts. The responsible offeror shall meet”
Source page 39
Page markings may include other requirements. The quotation above identifies this requirement.

—
Needs confirmation
View source 1
“Such inquiries shall be directed to the contracting officer.”
Source page 12
Page markings may include other requirements. The quotation above identifies this requirement.

Bid opening
3 findings—
Needs confirmation
Applies when: If this is a sealed bid solicitation, offers will be publicly opened at that time
View source 1
“If this is a sealed bid solicitation, offers will be publicly opened at that time.”
Source page 1
Page markings may include other requirements. The quotation above identifies this requirement.

—
Needs confirmation
View source 1
“(Sep 1996) Bid Guarantee (Sept 1996) (a) Failure to furnish a bid guarantee in the proper form and amount, by the time set for opening of bids, may be cause for rejection of the bid.”
Source page 36
Page markings may include other requirements. The quotation above identifies this requirement.

—
Needs confirmation
Applies when: upon execution of contractual documents and bonds (including any necessary coinsuranMust be met by: upon execution of contractual documents and bonds (including any necessary coinsuran
View source 1
“The Contracting Officer will return bid guarantees, other than bid bonds- (1) To unsuccessful bidders as soon as practicable after the opening of bids; and (2) To the successful bidder upon execution of contractual documents and bonds (including any necessary coinsurance or reinsurance agreements), ”
Source page 36
Page markings may include other requirements. The quotation above identifies this requirement.

Offer acceptance period
2 findings—
Needs confirmation
View source 1
“FA813726R00210001 Page 8 of 12 4.4. The proposal acceptance period (validity) is specified on the SF 1442, block 13d of the model contract/solicitation.”
Source page 9
Page markings may include other requirements. The quotation above identifies this requirement.

—
Needs confirmation
View source 1
“4.4. The proposal acceptance period (validity) is specified on the SF 1442, block 13d of the model contract/solicitation.”
Source page 35
Page markings may include other requirements. The quotation above identifies this requirement.

Grounds for rejection
2 findings4.3. Bid Guarantee (Bond): A bid guarantee (minimum of 20% of proposal) is required IAW RFO 28.101-1. Failure to furnish a bid guarantee in the proper form and amount may be a cause for rejection of your bid.
View source 2
“4.3. Bid Guarantee (Bond): A bid guarantee (minimum of 20% of proposal) is required IAW RFO 28.101-1. Failure to furnish a bid guarantee in the proper form and amount may be a cause for rejection of your bid.”
Source page 35
Page markings may include other requirements. The quotation above identifies this requirement.

“4.3. Bid Guarantee (Bond): A bid guarantee (minimum of 20% of proposal) is required IAW RFO 28.101-1. Failure to furnish a bid guarantee in the proper form and amount may be a cause for rejection of your bid.”
Source page 8
Page markings may include other requirements. The quotation above identifies this requirement.

(Sep 1996) Bid Guarantee (Sept 1996) (a) Failure to furnish a bid guarantee in the proper form and amount, by the time set for opening of bids, may be cause for rejection of the bid.
View source 1
“(Sep 1996) Bid Guarantee (Sept 1996) (a) Failure to furnish a bid guarantee in the proper form and amount, by the time set for opening of bids, may be cause for rejection of the bid.”
Source page 36
Page markings may include other requirements. The quotation above identifies this requirement.

Missing information2 checks · expand to review
A missing value is not a waiver. Check the source or ask the agency before relying on it.
Questions due
—
Not found in reviewed sources
Acknowledge amendments
—
Not found in reviewed sources
4 additional fields have no reviewed finding.
6 more sections are available once you sign in
Pricing & payment · Bonds & insurance · Evaluation & award · Scope & delivery · Labor, sourcing & compliance · Contract terms & risk
Sign in — freeExtracted from the public documents linked above. This is an information aid, not a determination of bid eligibility or legal advice. Verify the original wording and any addenda before submitting a bid.