BidEligible

INTERIOR, DEPARTMENT OF THE · Montrose, CO

Y--BLM-CO GAOA UFO MPLC WAREHOUSE IMPROVEMENT

23 source documentsSource checked Oct 19Content updated
Open notice
Response deadline
7 days left
Published project value
Not confirmed
Check the pricing and payment terms below.
Solicitation number
140L1726R0001
View official posting ↗Review requirements ↓Original posting details are available below.

Dates to plan around

Times follow the original source.

  1. Response deadline
    Source wording
    2026-10-30T12:00:00-06:00
  2. Questions due
    Source wording
    Final Questions due October 14, 2026 1200 MD, NOON.
    Page 1
  3. Site visit / pre-bid meeting
    Source wording
    Site Visit: September 17, 2026, at 11:00 a.m. MDT
    Page 1
From the posting2 agency details · contact information and original wording
Contract term
Work shall be completed within 180 days of the
NAICS
NAICS 236220
View the official posting →Always the authority. An addendum can change any of this after we read it.
Document coverage
23 / 23documents readAll discovered documents read

23 documents found56% of weighted requirement checks reviewed

Before you bid

Review first

Start with these requirements and unresolved points.
01

Eligibility & participation

Whether you can bid at all, and what you must already hold.

16 verified23 to confirm

Registrations

3 findings
Requirement 1Verified

(d) The offeror shall post the information in paragraphs (c)(1)(i) through (c)(1)(iv) of this provision in FAPIIS as required through maintaining an active registration in the System for Award Management, which can be accessed via https://www.sam.gov (see 52.204-7).

View source 1
01page 47View official source ↗
“(d) The offeror shall post the information in paragraphs (c)(1)(i) through (c)(1)(iv) of this provision in FAPIIS as required through maintaining an active registration in the System for Award Management, which can be accessed via https://www.sam.gov (see 52.204-7).”
Source page 47

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 47
Missing information · 2 checks
Not reviewed

—

Not reviewed — requirement not confirmed

Not found

—

Not found in reviewed sources

Set-aside

6 findings
Requirement 1Verified

SBA

View source 1
01https://sam.gov/api/prod/opps/v2/opportunities/3da24418848e455b9a461ad58a83e13e /data2/solicitation/setAsideView official source ↗
“SBA”
Requirement 2Verified

SDVOSB,HUBZONE

Applies when: unless the Contractor waived the price evaluation preferenceA waiver may be available

View source 4
01page 9View official source ↗
“(2) Used the HUBZone price evaluation preference regardless of dollar value, unless the Contractor waived the price evaluation preference; or (3) Was an 8(a), HUBZone, service-disabled veteran-owned, economically disadvantaged women-owned, or women-owned small business set-aside or sole-source award regardless of dolla”
Source page 9

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 9
02page 7View official source ↗
“(2) Used the HUBZone price evaluation preference regardless of dollar value, unless the Contractor waived the price evaluation preference; or (3) Was an 8(a), HUBZone, service-disabled veteran-owned, economically disadvantaged women-owned, or women-owned small business set-aside or sole-source award regardless of dolla”
Source page 7

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 7
03page 9View official source ↗
“(2) Used the HUBZone price evaluation preference regardless of dollar value, unless the Contractor waived the price evaluation preference; or (3) Was an 8(a), HUBZone, service-disabled veteran-owned, economically disadvantaged women-owned, or women-owned small business set-aside or sole-source award regardless of dolla”
Source page 9

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 9
04page 7View official source ↗
“(2) Used the HUBZone price evaluation preference regardless of dollar value, unless the Contractor waived the price evaluation preference; or (3) Was an 8(a), HUBZone, service-disabled veteran-owned, economically disadvantaged women-owned, or women-owned small business set-aside or sole-source award regardless of dolla”
Source page 7

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 7
Requirement 3Verified

HUBZONE

View source 5
01page 10View official source ↗
“identifier of each party to the joint venture: .] Each HUBZone small business concern participating in the HUBZone joint venture must be certified as a HUBZone”
Source page 10

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 10
02page 8View official source ↗
“identifier of each party to the joint venture: .] Each HUBZone small business concern participating in the HUBZone joint venture must be certified as a HUBZone”
Source page 8

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 8
03page 10View official source ↗
“identifier of each party to the joint venture: .] Each HUBZone small business concern participating in the HUBZone joint venture must be certified as a HUBZone”
Source page 10

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 10
04page 8View official source ↗
“identifier of each party to the joint venture: .] Each HUBZone small business concern participating in the HUBZone joint venture must be certified as a HUBZone”
Source page 8

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 8
05page 51View official source ↗
“identifier of each party to the joint venture: __.] Each HUBZone small business concern participating in the HUBZone joint venture must be certified as a HUBZone concern.”
Source page 51

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 51
Requirement 4Verified

SDVOSB,HUBZONE

View source 1
01page 36View official source ↗
“(3) Was an 8(a), HUBZone, service-disabled veteran-owned, economically disadvantaged women-owned, or women-owned small business set-aside or sole-source award regardless of dollar value.”
Source page 36

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 36
Missing information · 2 checks
Not reviewed

—

Not reviewed — requirement not confirmed

Not found

—

Not found in reviewed sources

Small business size

13 findings
Requirement 1Verified

$45,000,000

View source 1
01page 50View official source ↗
“(2) The small business size standard is $45M.”
Source page 50

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 50
Requirement 2Needs confirmation

—

Needs confirmation

View source 5
01page 7View official source ↗
“Small business concern- (1) Means a concern, including its affiliates, that is independently owned and operated, not dominant in its field of operation, and qualified as a small business under the criteria in 13 CFR part 121 and the size standard in paragraph (c) of this clause.”
Source page 7

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 7
02page 7View official source ↗
“Small business concern- (1) Means a concern, including its affiliates, that is independently owned and operated, not dominant in its field of operation, and qualified as a small business under the criteria in 13 CFR part 121 and the size standard in paragraph (c) of this clause.”
Source page 7

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 7
03page 9View official source ↗
“Small business concern- (1) Means a concern, including its affiliates, that is independently owned and operated, not dominant in its field of operation, and qualified as a small business under the criteria in 13 CFR part 121 and the size standard in paragraph (c) of this clause.”
Source page 9

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 9
04page 9View official source ↗
“Small business concern- (1) Means a concern, including its affiliates, that is independently owned and operated, not dominant in its field of operation, and qualified as a small business under the criteria in 13 CFR part 121 and the size standard in paragraph (c) of this clause.”
Source page 9

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 9
05page 35View official source ↗
“Small business concern- (1) Means a concern, including its affiliates, that is independently owned and operated, not dominant in its field of operation, and qualified as a small business under the criteria in 13 CFR part 121 and the size standard in paragraph (c) of this clause.”
Source page 35

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 35
Requirement 3Needs confirmation

—

Needs confirmation

Applies when: If the Contractor represented that it was a small business concern, a small disadvantaged business concern, or a joint venture that was any of the small business concerns identified; prior to award of this contract, the ContMust be met by: prior to award of this contract, the Cont

View source 5
01page 7View official source ↗
“SBA determines affiliation based on the factors set forth at 13 CFR 121.103. (b) If the Contractor represented that it was a small business concern, a small disadvantaged business concern, or a joint venture that was any of the small business concerns identified in 19.000(a)(3) prior to award of thi”
Source page 7

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 7
02page 7View official source ↗
“SBA determines affiliation based on the factors set forth at 13 CFR 121.103. (b) If the Contractor represented that it was a small business concern, a small disadvantaged business concern, or a joint venture that was any of the small business concerns identified in 19.000(a)(3) prior to award of thi”
Source page 7

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 7
03page 9View official source ↗
“SBA determines affiliation based on the factors set forth at 13 CFR 121.103. (b) If the Contractor represented that it was a small business concern, a small disadvantaged business concern, or a joint venture that was any of the small business concerns identified in 19.000(a)(3) prior to award of thi”
Source page 9

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 9
04page 9View official source ↗
“SBA determines affiliation based on the factors set forth at 13 CFR 121.103. (b) If the Contractor represented that it was a small business concern, a small disadvantaged business concern, or a joint venture that was any of the small business concerns identified in 19.000(a)(3) prior to award of thi”
Source page 9

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 9
05page 35View official source ↗
“SBA determines affiliation based on the factors set forth at 13 CFR 121.103. (b) If the Contractor represented that it was a small business concern, a small disadvantaged business concern, or a joint venture that was any of the small business concerns identified in 19.000(a)(3) prior to award of thi”
Source page 35

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 35
Requirement 4Needs confirmation

—

Needs confirmation

Applies when: at the time of this rerepresentation that corresponds to the North American Industry ClassificMust be met by: at the time of this rerepresentation that corresponds to the North American Industry Classific

View source 5
01page 7View official source ↗
“(c) The Contractor shall rerepresent its size status in accordance with the size standard in effect at the time of this rerepresentation that corresponds to the North American Industry Classification System (NAICS) code(s) assigned to this contract.”
Source page 7

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 7
02page 7View official source ↗
“(c) The Contractor shall rerepresent its size status in accordance with the size standard in effect at the time of this rerepresentation that corresponds to the North American Industry Classification System (NAICS) code(s) assigned to this contract.”
Source page 7

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 7
03page 9View official source ↗
“(c) The Contractor shall rerepresent its size status in accordance with the size standard in effect at the time of this rerepresentation that corresponds to the North American Industry Classification System (NAICS) code(s) assigned to this contract.”
Source page 9

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 9
04page 9View official source ↗
“(c) The Contractor shall rerepresent its size status in accordance with the size standard in effect at the time of this rerepresentation that corresponds to the North American Industry Classification System (NAICS) code(s) assigned to this contract.”
Source page 9

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 9
05page 35View official source ↗
“(c) The Contractor shall rerepresent its size status in accordance with the size standard in effect at the time of this rerepresentation that corresponds to the North American Industry Classification System (NAICS) code(s) assigned to this contract.”
Source page 35

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 35
Requirement 5Needs confirmation

—

Needs confirmation

View source 5
01page 7View official source ↗
“The small business size standard corresponding to this NAICS code(s) can be found at https://www.sba.gov/document/support--table-size- standards.”
Source page 7

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 7
02page 7View official source ↗
“The small business size standard corresponding to this NAICS code(s) can be found at https://www.sba.gov/document/support--table-size- standards.”
Source page 7

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 7
03page 9View official source ↗
“The small business size standard corresponding to this NAICS code(s) can be found at https://www.sba.gov/document/support--table-size- standards.”
Source page 9

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 9
04page 9View official source ↗
“The small business size standard corresponding to this NAICS code(s) can be found at https://www.sba.gov/document/support--table-size- standards.”
Source page 9

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 9
05page 35View official source ↗
“The small business size standard corresponding to this NAICS code(s) can be found at https://www.sba.gov/document/support--table-size- standards.”
Source page 35

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 35
Requirement 6Needs confirmation

—

Needs confirmation

Applies when: if the acquisit

View source 5
01page 7View official source ↗
“(d) The small business size standard for a Contractor providing an end item that it does not manufacture, process, or produce itself, for a contract other than a construction or service contract, is 500 employees, or 150 employees for information technology value-added resellers under NAICS code 541”
Source page 7

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 7
02page 7View official source ↗
“(d) The small business size standard for a Contractor providing an end item that it does not manufacture, process, or produce itself, for a contract other than a construction or service contract, is 500 employees, or 150 employees for information technology value-added resellers under NAICS code 541”
Source page 7

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 7
03page 9View official source ↗
“(d) The small business size standard for a Contractor providing an end item that it does not manufacture, process, or produce itself, for a contract other than a construction or service contract, is 500 employees, or 150 employees for information technology value-added resellers under NAICS code 541”
Source page 9

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 9
04page 9View official source ↗
“(d) The small business size standard for a Contractor providing an end item that it does not manufacture, process, or produce itself, for a contract other than a construction or service contract, is 500 employees, or 150 employees for information technology value-added resellers under NAICS code 541”
Source page 9

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 9
05page 35View official source ↗
“(d) The small business size standard for a Contractor providing an end item that it does not manufacture, process, or produce itself, for a contract other than a construction or service contract, is 500 employees, or 150 employees for information technology value-added resellers under NAICS code 541”
Source page 35

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 35
Requirement 7Needs confirmation

—

Needs confirmation

View source 1
01page 33View official source ↗
“concern, without regard to its socioeconomic status); and (2) Is considered small for the size standard under the North American Industry”
Source page 33

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 33
Requirement 8Needs confirmation

—

Needs confirmation

View source 1
01page 50View official source ↗
“not dominant in its field of operation, and qualified as a small business under the criteria in 13 CFR part 121 and the size standard in paragraph (b) of this provision.”
Source page 50

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 50
Requirement 9Needs confirmation

—

Needs confirmation

Applies when: at least 51 percent unconditionally and directly owned (as defined at 13 CFR 124

View source 1
01page 50View official source ↗
“SBA determines affiliation based on the factors set forth at 13 CFR 121.103. Small disadvantaged business concern means a small business concern that- (1) Is at least 51 percent unconditionally and directly owned (as defined at 13 CFR 124.105) by one or more socially disadvantaged (as defined at 13 ”
Source page 50

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 50
Requirement 10Needs confirmation

—

Needs confirmation

View source 1
01page 50View official source ↗
“(3) The small business size standard for a concern that submits an offer, other than on a construction or service acquisition, but proposes to furnish an end item that it did not itself manufacture, process, or produce (i.e., nonmanufacturer), is 500 employees, or 150 employees for information techn”
Source page 50

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 50
Requirement 11Needs confirmation

—

Needs confirmation

View source 1
01page 51View official source ↗
“(c) Representations.(1) The offeror represents as part of its offer that- (i) it [ ] is, [ ] is not a small business concern; or (ii) It [ ] is, [ ] is not a small business joint venture that complies with the requirements of 13 CFR 121.103(h) and 13 CFR 125.8(a) and (b). [ The offeror shall enter t”
Source page 51

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 51
Missing information · 2 checks
Not reviewed

—

Not reviewed — requirement not confirmed

Not found

—

Not found in reviewed sources

Experience & references

4 findings
Requirement 1Needs confirmation

—

Needs confirmation

Applies when: At least five (5) years’ experience in project planning

View source 2
01page 21View official source ↗
“It is expected that the contractor’s principal team leaders have the following credentials: 1)At least five (5) years’ experience in project planning. 2)Three (3) to five (5) years of experience in warehouse improvements. 3)Formal training in warehouse improvements. 4)Identify to the degree possible, the percentage of”
Source page 21

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 21
02page 19View official source ↗
“It is expected that the contractor’s principal team leaders have the following credentials: 1)At least five (5) years’ experience in project planning. 2)Three (3) to five (5) years of experience in warehouse improvements. 3)Formal training in warehouse improvements. 4)Identify to the degree possible, the percentage of”
Source page 19

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 19
Requirement 2Needs confirmation

—

Needs confirmation

View source 1
01page 29View official source ↗
“WAREHOUSE IMPROVEMENTS AND REPAIRS SPECIFICATIONS PART 3 EXECUTION 3.1 ROOFING CONTRACTOR QUALIFICATIONS AND PAST EXPERIENCE The Contractor completing work covered by this section shall have a minimum of 5 years' experience installing and repairing metal roofs.”
Source page 29

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 29
Missing information · 2 checks
Not reviewed

—

Not reviewed — requirement not confirmed

Not found

—

Not found in reviewed sources

Key personnel

3 findings
Requirement 1Verified
• This performance requirement ensures that a substantial portion of the work remains in the hands of the prime small business. 5. Reliance on Team/Subcontractor Experience: Section L requires key personnel, subcontracting staff, and past performance/relevant experience.Read full requirement Close full requirement

• This performance requirement ensures that a substantial portion of the work remains in the hands of the prime small business. 5. Reliance on Team/Subcontractor Experience: Section L requires key personnel, subcontracting staff, and past performance/relevant experience.

Applies to: subcontractor

View source 1
01page 1View official source ↗
“• This performance requirement ensures that a substantial portion of the work remains in the hands of the prime small business. 5. Reliance on Team/Subcontractor Experience: Section L requires key personnel, subcontracting staff, and past performance/relevant experience.”
Source page 1

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 1
Requirement 2Verified

FACTOR II- QUALIFICATIONS AND EXPERIENCE OF KEY PERSONNEL: Offerors shall submit a one-page resume of all key personnel proposed for this contract.

Applies to: person

View source 2
01page 21View official source ↗
“FACTOR II- QUALIFICATIONS AND EXPERIENCE OF KEY PERSONNEL: Offerors shall submit a one-page resume of all key personnel proposed for this contract.”
Source page 21

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 21
02page 19View official source ↗
“FACTOR II- QUALIFICATIONS AND EXPERIENCE OF KEY PERSONNEL: Offerors shall submit a one-page resume of all key personnel proposed for this contract.”
Source page 19

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 19
Requirement 3Verified

In addition, the offeror shall document the previous experience of key personnel in working together on projects of similar scope and magnitude.

Applies to: person

View source 2
01page 21View official source ↗
“In addition, the offeror shall document the previous experience of key personnel in working together on projects of similar scope and magnitude.”
Source page 21

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 21
02page 19View official source ↗
“In addition, the offeror shall document the previous experience of key personnel in working together on projects of similar scope and magnitude.”
Source page 19

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 19

Financial capacity

Verified

(b) The bidder shall furnish a bid guarantee in the form of a firm commitment, e.g., bid bond supported by good and sufficient surety or sureties acceptable to the Government, postal money order, certified check, cashier's check, irrevocable letter of credit, or, under Treasury D

Applies to: surety

View source 1
01page 54View official source ↗
“(b) The bidder shall furnish a bid guarantee in the form of a firm commitment, e.g., bid bond supported by good and sufficient surety or sureties acceptable to the Government, postal money order, certified check, cashier's check, irrevocable letter of credit, or, under Treasury Department regulation”
Source page 54

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 54

Joint ventures & teaming

16 findings
Requirement 1Conflicting sources

—

Conflicting sources

View source 4
01page 10View official source ↗
“identifier of each party to the joint venture: .]”
Source page 10

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 10
02page 8View official source ↗
“identifier of each party to the joint venture: .]”
Source page 8

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 8
03page 10View official source ↗
“identifier of each party to the joint venture: .]”
Source page 10

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 10
04page 8View official source ↗
“identifier of each party to the joint venture: .]”
Source page 8

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 8
Requirement 2Conflicting sources

—

Conflicting sources

View source 4
01page 10View official source ↗
“identifier of each party to the joint venture: .] Each HUBZone small business”
Source page 10

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 10
02page 8View official source ↗
“identifier of each party to the joint venture: .] Each HUBZone small business”
Source page 8

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 8
03page 10View official source ↗
“identifier of each party to the joint venture: .] Each HUBZone small business”
Source page 10

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 10
04page 8View official source ↗
“identifier of each party to the joint venture: .] Each HUBZone small business”
Source page 8

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 8
Requirement 3Conflicting sources

—

Conflicting sources

View source 4
01page 10View official source ↗
“identifier of each party to the joint venture: .] Each HUBZone small business concern participating in the HUBZone joint venture must be certified as a HUBZone”
Source page 10

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 10
02page 8View official source ↗
“identifier of each party to the joint venture: .] Each HUBZone small business concern participating in the HUBZone joint venture must be certified as a HUBZone”
Source page 8

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 8
03page 10View official source ↗
“identifier of each party to the joint venture: .] Each HUBZone small business concern participating in the HUBZone joint venture must be certified as a HUBZone”
Source page 10

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 10
04page 8View official source ↗
“identifier of each party to the joint venture: .] Each HUBZone small business concern participating in the HUBZone joint venture must be certified as a HUBZone”
Source page 8

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 8
Requirement 4Conflicting sources

—

Conflicting sources

View source 1
01page 31View official source ↗
“It includes but is not limited to an individual, partnership, corporation, joint venture, association, or cooperative.”
Source page 31

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 31
Requirement 5Conflicting sources

—

Conflicting sources

View source 1
01page 34View official source ↗
“(g) A joint venture agrees that, in the performance of the contract, the applicable percentage specified in paragraph (e) of this clause will be performed by the aggregate of the joint venture participants.”
Source page 34

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 34
Requirement 6Conflicting sources

—

Conflicting sources

View source 1
01page 36View official source ↗
“identifier of each party to the joint venture: __.]”
Source page 36

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 36
Requirement 7Conflicting sources

—

Conflicting sources

View source 1
01page 51View official source ↗
“(3) Women-owned small business (WOSB) joint venture eligible under the WOSB Program.”
Source page 51

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 51
Requirement 8Conflicting sources

—

Conflicting sources

View source 1
01page 51View official source ↗
“enter the name and unique entity identifier of each party to the joint venture: __.] (4) Economically disadvantaged women-owned small business (EDWOSB) joint venture.”
Source page 51

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 51
Requirement 9Conflicting sources

—

Conflicting sources

View source 1
01page 51View official source ↗
“identifier of each party to the joint venture: __.] Each HUBZone small business concern”
Source page 51

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 51
Requirement 10Conflicting sources

—

Conflicting sources

View source 1
01page 51View official source ↗
“requirements of 13 CFR 121.103(h) and 13 CFR 125.8(a) and (b). [ The offeror shall enter the name and unique entity identifier of each party to the joint”
Source page 51

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 51
Requirement 11Conflicting sources

—

Conflicting sources

View source 1
01page 51View official source ↗
“identifier of each party to the joint venture: __.] Each HUBZone small business concern participating in the HUBZone joint venture must be certified as a HUBZone concern.”
Source page 51

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 51
Requirement 12Verified
SBA determines affiliation based on the factors set forth at 13 CFR 121.103. (b) If the Contractor represented that it was a small business concern, a small disadvantaged business concern, or a joint venture that was any of the small business concerns identified in 19.000(a)(3) pRead full requirement Close full requirement

SBA determines affiliation based on the factors set forth at 13 CFR 121.103. (b) If the Contractor represented that it was a small business concern, a small disadvantaged business concern, or a joint venture that was any of the small business concerns identified in 19.000(a)(3) p

Applies when: If the Contractor represented that it was a small business concern, a small disadvantaged business concern, or a joint venture that was any of the small business concerns identified; prior to award of this contract, the ContMust be met by: prior to award of this contract, the Cont

View source 5
01page 9View official source ↗
“SBA determines affiliation based on the factors set forth at 13 CFR 121.103. (b) If the Contractor represented that it was a small business concern, a small disadvantaged business concern, or a joint venture that was any of the small business concerns identified in 19.000(a)(3) prior to award of thi”
Source page 9

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 9
02page 7View official source ↗
“SBA determines affiliation based on the factors set forth at 13 CFR 121.103. (b) If the Contractor represented that it was a small business concern, a small disadvantaged business concern, or a joint venture that was any of the small business concerns identified in 19.000(a)(3) prior to award of thi”
Source page 7

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 7
03page 9View official source ↗
“SBA determines affiliation based on the factors set forth at 13 CFR 121.103. (b) If the Contractor represented that it was a small business concern, a small disadvantaged business concern, or a joint venture that was any of the small business concerns identified in 19.000(a)(3) prior to award of thi”
Source page 9

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 9
04page 7View official source ↗
“SBA determines affiliation based on the factors set forth at 13 CFR 121.103. (b) If the Contractor represented that it was a small business concern, a small disadvantaged business concern, or a joint venture that was any of the small business concerns identified in 19.000(a)(3) prior to award of thi”
Source page 7

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 7
05page 35View official source ↗
“SBA determines affiliation based on the factors set forth at 13 CFR 121.103. (b) If the Contractor represented that it was a small business concern, a small disadvantaged business concern, or a joint venture that was any of the small business concerns identified in 19.000(a)(3) prior to award of thi”
Source page 35

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 35
Requirement 13Verified

(1) In a joint venture comprised of a small business protégé and its mentor approved by the Small Business Administration, the small business protégé shall perform at least 40 percent of the work performed by the joint venture.

Applies when: In a joint venture; at least 40 percent of the work performed by the joint venture

View source 1
01page 34View official source ↗
“(1) In a joint venture comprised of a small business protégé and its mentor approved by the Small Business Administration, the small business protégé shall perform at least 40 percent of the work performed by the joint venture.”
Source page 34

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 34
Requirement 14Verified

Work performed by the small business protégé in the joint venture must be more than administrative functions.

Applies when: Work performed by the small business protégé in the joint venture

View source 1
01page 34View official source ↗
“Work performed by the small business protégé in the joint venture must be more than administrative functions.”
Source page 34

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 34
Requirement 15Verified

(2) In an 8(a) joint venture, the 8(a) participant(s) shall perform at least 40 percent of the work performed by the joint venture.

Applies when: In an 8(a) joint venture; at least 40 percent of the work performed by the joint venture

View source 1
01page 34View official source ↗
“(2) In an 8(a) joint venture, the 8(a) participant(s) shall perform at least 40 percent of the work performed by the joint venture.”
Source page 34

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 34
Requirement 16Verified

Work performed by the 8(a) participants in the joint venture must be more than administrative functions.

Applies when: Work performed by the 8(a) participants in the joint venture

View source 1
01page 34View official source ↗
“Work performed by the 8(a) participants in the joint venture must be more than administrative functions.”
Source page 34

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 34

Exclusions & responsibility

Verified

(A) Are [ ] are not [ ] presently debarred, suspended, proposed for debarment, or declared ineligible for the award of contracts by any Federal agency;

View source 1
01page 45View official source ↗
“(A) Are [ ] are not [ ] presently debarred, suspended, proposed for debarment, or declared ineligible for the award of contracts by any Federal agency;”
Source page 45

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 45
Missing information2 checks · expand to review

A missing value is not a waiver. Check the source or ask the agency before relying on it.

Required licenses

2 findings
Requirement 1Not reviewed

—

Not reviewed — requirement not confirmed

Requirement 2Not found

—

Not found in reviewed sources

2 additional fields have no reviewed finding.

02

Deadlines & submission

When and how to submit, and whether you are still in time.

17 verified10 to confirm

Response deadline

3 findings
Requirement 1Verified

2026-10-30T12:00:00-06:00

View source 1
01https://sam.gov/api/prod/opps/v2/opportunities/3da24418848e455b9a461ad58a83e13e /data2/solicitation/deadlines/responseView official source ↗
“2026-10-30T12:00:00-06:00”
Missing information · 2 checks
Not found

—

Not found in reviewed sources

Not reviewed

—

Not reviewed — requirement not confirmed

Questions due

3 findings
Requirement 1Verified

2026-10-14

View source 1
01page 1View official source ↗
“Final Questions due October 14, 2026 1200 MD, NOON.”
Source page 1

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 1
Missing information · 2 checks
Not found

—

Not found in reviewed sources

Not reviewed

—

Not reviewed — requirement not confirmed

Site visit / pre-bid meeting

3 findings
Requirement 1Verified

2026-09-17T11:00:00-06:00

View source 1
01page 1View official source ↗
“Site Visit: September 17, 2026, at 11:00 a.m. MDT”
Source page 1

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 1
Missing information · 2 checks
Not found

—

Not found in reviewed sources

Not reviewed

—

Not reviewed — requirement not confirmed

How to submit

6 findings
Requirement 1Conflicting sources

—

Conflicting sources

View source 2
01page 20View official source ↗
“(JUL 2013) Instructions for Proposal Instructions for Proposal Section L - Instructions to Offerors The offeror’s proposal must be submitted in two parts: a technical proposal and a price proposal.”
Source page 20

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 20
02page 18View official source ↗
“(JUL 2013) Instructions for Proposal Instructions for Proposal Section L - Instructions to Offerors The offeror’s proposal must be submitted in two parts: a technical proposal and a price proposal.”
Source page 18

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 18
Requirement 2Conflicting sources

—

Conflicting sources

View source 1
01page 56View official source ↗
“L.1 General Instructions 1. Proposals shall be submitted in two separate, clearly labeled volumes: Volume I - Technical and Past Performance, and Volume II - Price.”
Source page 56

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 56
Requirement 3Conflicting sources

—

Conflicting sources

View source 1
01page 56View official source ↗
“3. Submission method: Proposals shall be submitted via email to [insert email address]. The subject line”
Source page 56

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 56
Requirement 4Conflicting sources

—

Conflicting sources

View source 1
01page 56View official source ↗
“The Government reserves the right to request further price information to confirm binding rates were used. 10. Offerors shall submit a bid guarantee (bid bond) in the amount of twenty percent (20%) of the bid price,”
Source page 56

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 56
Missing information · 2 checks
Not found

—

Not found in reviewed sources

Not reviewed

—

Not reviewed — requirement not confirmed

Required submission files

8 findings
Requirement 1Verified

(JUL 2013) Instructions for Proposal Instructions for Proposal Section L - Instructions to Offerors The offeror’s proposal must be submitted in two parts: a technical proposal and a price proposal.

View source 2
01page 20View official source ↗
“(JUL 2013) Instructions for Proposal Instructions for Proposal Section L - Instructions to Offerors The offeror’s proposal must be submitted in two parts: a technical proposal and a price proposal.”
Source page 20

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 20
02page 18View official source ↗
“(JUL 2013) Instructions for Proposal Instructions for Proposal Section L - Instructions to Offerors The offeror’s proposal must be submitted in two parts: a technical proposal and a price proposal.”
Source page 18

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 18
Requirement 2Verified

FACTOR I- TECHNICAL PROPOSAL: Offerors are required to submit a comprehensive and complete

View source 2
01page 20View official source ↗
“FACTOR I- TECHNICAL PROPOSAL: Offerors are required to submit a comprehensive and complete”
Source page 20

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 20
02page 18View official source ↗
“FACTOR I- TECHNICAL PROPOSAL: Offerors are required to submit a comprehensive and complete”
Source page 18

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 18
Requirement 3Verified

Volume I- Non-priced Volume FACTOR I- TECHNICAL PROPOSAL: Offerors are required to submit a comprehensive and complete technical proposal that demonstrates their ability to perform the work described in this solicitation.

View source 2
01page 20View official source ↗
“Volume I- Non-priced Volume FACTOR I- TECHNICAL PROPOSAL: Offerors are required to submit a comprehensive and complete technical proposal that demonstrates their ability to perform the work described in this solicitation.”
Source page 20

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 20
02page 18View official source ↗
“Volume I- Non-priced Volume FACTOR I- TECHNICAL PROPOSAL: Offerors are required to submit a comprehensive and complete technical proposal that demonstrates their ability to perform the work described in this solicitation.”
Source page 18

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 18
Requirement 4Verified

The technical proposal is expected to contain written and visual material.

View source 2
01page 20View official source ↗
“The technical proposal is expected to contain written and visual material.”
Source page 20

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 20
02page 18View official source ↗
“The technical proposal is expected to contain written and visual material.”
Source page 18

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 18
Requirement 5Verified

For ease of evaluation, offerors are to submit the technical proposal organized into the following four parts:

View source 2
01page 20View official source ↗
“For ease of evaluation, offerors are to submit the technical proposal organized into the following four parts:”
Source page 20

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 20
02page 18View official source ↗
“For ease of evaluation, offerors are to submit the technical proposal organized into the following four parts:”
Source page 18

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 18
Requirement 6Verified

For ease of evaluation, offerors are to submit the technical proposal organized into the following volume and factors: Volume I- Non-priced Factors FACTOR I Technical Experience: The offeror shall demonstrate past experience completing work of a similar size, scope, and complexit

View source 2
01page 21View official source ↗
“For ease of evaluation, offerors are to submit the technical proposal organized into the following volume and factors: Volume I- Non-priced Factors FACTOR I Technical Experience: The offeror shall demonstrate past experience completing work of a similar size, scope, and complexity as the BLM UFO War”
Source page 21

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 21
02page 19View official source ↗
“For ease of evaluation, offerors are to submit the technical proposal organized into the following volume and factors: Volume I- Non-priced Factors FACTOR I Technical Experience: The offeror shall demonstrate past experience completing work of a similar size, scope, and complexity as the BLM UFO War”
Source page 19

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 19
Missing information · 2 checks
Not found

—

Not found in reviewed sources

Not reviewed

—

Not reviewed — requirement not confirmed

Procurement contact

5 findings
Requirement 1Verified

Strickland, Courtni · cstrickland@ios.doi.gov

View source 1
01https://sam.gov/api/prod/opps/v2/opportunities/3da24418848e455b9a461ad58a83e13e /data2/pointOfContact/0View official source ↗
“Strickland, Courtni · cstrickland@ios.doi.gov”
Requirement 2Verified
Best Value. 9. Will Chau Nguyen (cnguyen@ios.doi.gov) be the proposal submission email point of contact? Courtni Strickland cstrickland@ios.doi.gov 10. Can you provide name and contact for the solar company or the original contractor who installed the system? The BLM does not havRead full requirement Close full requirement

Best Value. 9. Will Chau Nguyen (cnguyen@ios.doi.gov) be the proposal submission email point of contact? Courtni Strickland cstrickland@ios.doi.gov 10. Can you provide name and contact for the solar company or the original contractor who installed the system? The BLM does not hav

View source 1
01page 2View official source ↗
“Best Value. 9. Will Chau Nguyen (cnguyen@ios.doi.gov) be the proposal submission email point of contact? Courtni Strickland cstrickland@ios.doi.gov 10. Can you provide name and contact for the solar company or the original contractor who installed the system? The BLM does not have this information. ”
Source page 2

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 2
Requirement 3Needs confirmation

—

Needs confirmation

View source 1
01page 1View official source ↗
“Point of Contact: Greg Caplan”
Source page 1

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 1
Requirement 4Needs confirmation

—

Needs confirmation

View source 5
01page 4View official source ↗
“The Contractor Government Business Point of Contact (as listed in SAM) will receive enrollment instructions via email from the Federal Reserve Bank of St.”
Source page 4

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 4
02page 4View official source ↗
“The Contractor Government Business Point of Contact (as listed in SAM) will receive enrollment instructions via email from the Federal Reserve Bank of St.”
Source page 4

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 4
03page 6View official source ↗
“The Contractor Government Business Point of Contact (as listed in SAM) will receive enrollment instructions via email from the Federal Reserve Bank of St.”
Source page 6

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 6
04page 6View official source ↗
“The Contractor Government Business Point of Contact (as listed in SAM) will receive enrollment instructions via email from the Federal Reserve Bank of St.”
Source page 6

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 6
05page 9View official source ↗
“The Contractor Government Business Point of Contact (as listed in SAM) will receive enrollment instructions via email from the Federal Reserve Bank of St.”
Source page 9

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 9
Requirement 5Needs confirmation

—

Needs confirmation

View source 1
01page 56View official source ↗
“For each reference, provide: project name and location; dollar value; period of performance; a point of contact (name, title, phone, and email); and a brief description of the work performed and its relevance to this requirement. 6. The Government will review the references provided, as well as info”
Source page 56

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 56

Bid opening

3 findings
Requirement 1Needs confirmation

—

Needs confirmation

Applies when: If this is a sealed bid solicitation, offers will be publicly opened at that time

View source 1
01page 1View official source ↗
“If this is a sealed bid solicitation, offers will be publicly opened at that time.”
Source page 1

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 1
Requirement 2Needs confirmation

—

Needs confirmation

View source 1
01page 54View official source ↗
“(a) Failure to furnish a bid guarantee in the proper form and amount, by the time set for opening of bids, may be cause for rejection of the bid.”
Source page 54

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 54
Requirement 3Needs confirmation

—

Needs confirmation

Applies when: upon execution of contractual documents and bonds (including any necessary coinsuranMust be met by: upon execution of contractual documents and bonds (including any necessary coinsuran

View source 1
01page 54View official source ↗
“The Contracting Officer will return bid guarantees, other than bid bonds, (1) to unsuccessful bidders as soon as practicable after the opening of bids, and (2) to the successful bidder upon execution of contractual documents and bonds (including any necessary coinsurance or reinsurance agreements), ”
Source page 54

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 54

Formatting & signatures

4 findings
Requirement 1Verified

Q: Can the 3 page limit be increased for proposal submission? A: No background check is required.

View source 1
01page 1View official source ↗
“Q: Can the 3 page limit be increased for proposal submission? A: No background check is required.”
Source page 1

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 1
Requirement 2Verified

• Payment Bond (FAR 52.228–15): 100% of original contract price, before work begins. 52.228–13) are only for contracts valued between $35,000 and $150,000 Alternative payment protections shall be 100% of the contract and is required 10 days after the award. 7. Proposal Page Limit

Applies when: before work beginsMust be met by: before work begins

View source 1
01page 2View official source ↗
“• Payment Bond (FAR 52.228–15): 100% of original contract price, before work begins. 52.228–13) are only for contracts valued between $35,000 and $150,000 Alternative payment protections shall be 100% of the contract and is required 10 days after the award. 7. Proposal Page Limit: Q&A 1 states the p”
Source page 2

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 2
Requirement 3Verified

Please confirm whether the 10-page limit applies only to Volume I and whether resumes, project examples/past-performance narratives, photographs, project schedule, and QC plan count toward that 10-page limit.

View source 1
01page 2View official source ↗
“Please confirm whether the 10-page limit applies only to Volume I and whether resumes, project examples/past-performance narratives, photographs, project schedule, and QC plan count toward that 10-page limit.”
Source page 2

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 2
Requirement 4Verified
Proposals that do not include this information in the subject line may be delayed in processing and are submitted at the Offeror's risk. 4. Page limit: Volume I (Technical and Past Performance) shall not exceed 3 pages, single-sided, 12- point Arial or Times New Roman font, 1-incRead full requirement Close full requirement

Proposals that do not include this information in the subject line may be delayed in processing and are submitted at the Offeror's risk. 4. Page limit: Volume I (Technical and Past Performance) shall not exceed 3 pages, single-sided, 12- point Arial or Times New Roman font, 1-inc

View source 1
01page 56View official source ↗
“Proposals that do not include this information in the subject line may be delayed in processing and are submitted at the Offeror's risk. 4. Page limit: Volume I (Technical and Past Performance) shall not exceed 3 pages, single-sided, 12- point Arial or Times New Roman font, 1-inch margins.”
Source page 56

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 56

Mandatory forms

Verified
Sample Description / Location Asbestos Content MWW-6 0010419-006 Wall Texture, White None Detected Office MWW-7 0010419-007 Wall Texture, White None Detected Hallway MWW-8 0010419-008 Wall Texture, White None Detected Entrance MWW-9 0010419-009 Wall Texture, White None Detected WRead full requirement Close full requirement

Sample Description / Location Asbestos Content MWW-6 0010419-006 Wall Texture, White None Detected Office MWW-7 0010419-007 Wall Texture, White None Detected Hallway MWW-8 0010419-008 Wall Texture, White None Detected Entrance MWW-9 0010419-009 Wall Texture, White None Detected W

View source 1
01page 19View official source ↗
“Sample Description / Location Asbestos Content MWW-6 0010419-006 Wall Texture, White None Detected Office MWW-7 0010419-007 Wall Texture, White None Detected Hallway MWW-8 0010419-008 Wall Texture, White None Detected Entrance MWW-9 0010419-009 Wall Texture, White None Detected Women's Shower & Lock”
Source page 19

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 19

Grounds for rejection

Verified

(a) Failure to furnish a bid guarantee in the proper form and amount, by the time set for opening of bids, may be cause for rejection of the bid.

View source 1
01page 54View official source ↗
“(a) Failure to furnish a bid guarantee in the proper form and amount, by the time set for opening of bids, may be cause for rejection of the bid.”
Source page 54

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 54
Missing information2 checks · expand to review

A missing value is not a waiver. Check the source or ask the agency before relying on it.

Acknowledge amendments

2 findings
Requirement 1Not found

—

Not found in reviewed sources

Requirement 2Not reviewed

—

Not reviewed — requirement not confirmed

3 additional fields have no reviewed finding.

Continue your review

6 more sections are available once you sign in

Pricing & payment · Bonds & insurance · Evaluation & award · Scope & delivery · Labor, sourcing & compliance · Contract terms & risk

Sign in — free

Extracted from the public documents linked above. This is an information aid, not a determination of bid eligibility or legal advice. Verify the original wording and any addenda before submitting a bid.

Bid review
7 days left
See all 46