NATIONAL AERONAUTICS AND SPACE ADMINISTRATION · OH
Aerospace Power Systems Laboratory (APSL) Facility
- Response deadline
- Not confirmedConfirm the deadline with the buyer.
- Published project value
- $5.5MAs stated in the source documents
- Solicitation number
- 80GRC026R0010
Dates to plan around
Times follow the original source.
- Response deadline — conflicting source time; verify with buyer
Source wording
2026-10-30T13:00:00-04:00
- Response deadline — conflicting source time; verify with buyer
Source wording
Proposals Due - 3/15/2027
Page 44
2 documents found62% of weighted requirement checks reviewed
Review first
Start with these requirements and unresolved points.- Must doRegistrations
View 5 flagged requirements
- Requirement 1 ↗
(d) The offeror shall post the information in paragraphs (c)(1)(i) through (c)(1)(iv) of this provision in FAPIIS as required through maintaining an active registration in the System for Award Management, which can be accessed via https://www.sam.gov (see 52.204-7).
- Requirement 2 ↗
The offeror represents as part of its offer that it _ is, _ is not a joint venture that complies with the requirements of 13 CFR 127.506(a) through (c). [ The offeror shall enter the name and unique entity identifier of each party to the joint venture: __.] (4) Economically disad
- Requirement 3 ↗
The offeror represents as part of its offer that it _ is, _ is not a joint venture that complies with the requirements of 13 CFR 127.506(a) through (c). [ The offeror shall enter the name and unique entity identifier of each party to the joint venture: __.]
- Requirement 4 ↗
The offeror represents as part of its offer that it _ is, _ is not a SDVOSB joint venture eligible under the SDVOSB Program that complies with the requirements of 13 CFR 128.402. [ The offeror shall enter the name and unique entity identifier of each party to the joint venture:__
- Requirement 5 ↗
HUBZone joint venture that complies with the requirements of 13 CFR 126.616(a) through (c). [ The offeror shall enter the name and unique entity identifier of each party to the joint venture: __.] Each HUBZone
- Requirement 1 ↗
- Must doSet-aside
HUBZONE
- ConflictJoint ventures & teaming
View 6 flagged requirements
- Requirement 1 ↗
Sources disagree — check both before relying on this
- Requirement 2 ↗
Sources disagree — check both before relying on this
- Requirement 3 ↗
Sources disagree — check both before relying on this
- Requirement 4 ↗
Sources disagree — check both before relying on this
- Requirement 5 ↗
Sources disagree — check both before relying on this
- Requirement 6 ↗
Sources disagree — check both before relying on this
- Requirement 1 ↗
Eligibility & participation
Whether you can bid at all, and what you must already hold.
Registrations
5 findings(d) The offeror shall post the information in paragraphs (c)(1)(i) through (c)(1)(iv) of this provision in FAPIIS as required through maintaining an active registration in the System for Award Management, which can be accessed via https://www.sam.gov (see 52.204-7).
View source 1
“(d) The offeror shall post the information in paragraphs (c)(1)(i) through (c)(1)(iv) of this provision in FAPIIS as required through maintaining an active registration in the System for Award Management, which can be accessed via https://www.sam.gov (see 52.204-7).”
The offeror represents as part of its offer that it _ is, _ is not a joint venture that complies with the requirements of 13 CFR 127.506(a) through (c). [ The offeror shall enter the name and unique entity identifier of each party to the joint venture: __.] (4) Economically disad
View source 1
“The offeror represents as part of its offer that it _ is, _ is not a joint venture that complies with the requirements of 13 CFR 127.506(a) through (c). [ The offeror shall enter the name and unique entity identifier of each party to the joint venture: __.] (4) Economically disadvantaged women-owned”
The offeror represents as part of its offer that it _ is, _ is not a joint venture that complies with the requirements of 13 CFR 127.506(a) through (c). [ The offeror shall enter the name and unique entity identifier of each party to the joint venture: __.]
View source 1
“The offeror represents as part of its offer that it _ is, _ is not a joint venture that complies with the requirements of 13 CFR 127.506(a) through (c). [ The offeror shall enter the name and unique entity identifier of each party to the joint venture: __.]”
The offeror represents as part of its offer that it _ is, _ is not a SDVOSB joint venture eligible under the SDVOSB Program that complies with the requirements of 13 CFR 128.402. [ The offeror shall enter the name and unique entity identifier of each party to the joint venture:__
View source 1
“The offeror represents as part of its offer that it _ is, _ is not a SDVOSB joint venture eligible under the SDVOSB Program that complies with the requirements of 13 CFR 128.402. [ The offeror shall enter the name and unique entity identifier of each party to the joint venture:__.] (6) HUBZone joint”
HUBZone joint venture that complies with the requirements of 13 CFR 126.616(a) through (c). [ The offeror shall enter the name and unique entity identifier of each party to the joint venture: __.] Each HUBZone
View source 1
“HUBZone joint venture that complies with the requirements of 13 CFR 126.616(a) through (c). [ The offeror shall enter the name and unique entity identifier of each party to the joint venture: __.] Each HUBZone”
Set-aside
3 findingsNo set-aside specified
View source 1
“NONE”
SDVOSB,HUBZONE
Applies when: unless the offeror waives the price evaluation preferenceA waiver may be available
View source 1
“(ii) Uses the HUBZone price evaluation preference regardless of dollar value, unless the offeror waives the price evaluation preference; or (iii) Is an 8(a), HUBZone, service-disabled veteran-owned, economically disadvantaged women-owned, or women-owned small business set-aside or sole-source award regardless of dollar”
HUBZONE
View source 1
“shall enter the name and unique entity identifier of each party to the joint venture: __.] Each HUBZone small business concern participating in the HUBZone joint venture must be certified as a HUBZone”
Small business size
5 findings—
The cited text does not establish a complete USD size standard.
View source 3
“The NAICS Code and Size Standard are 236220 (Commercial and Institutional Building Construction) and $45M size standard, respectively.”
“Page 42 of 62 citizens of the United States, and the concern is certified by SBA or an approved third-party certifier in accordance with 13 CFR 127.300. (b)(1) The North American Industry Classification System (NAICS) code for this acquisition is 236220. (2) The small business size standard is $45.0”
“The North American Industry Classification System (NAICS) code for this acquisition is 236220, and the small business size standard is Insert $45.0M.”
—
Needs confirmation
View source 1
“(1) Means a concern, including its affiliates, that is independently owned and operated, not dominant in its field of operation, and qualified as a small business under the criteria in 13 CFR part 121 and the size”
—
Needs confirmation
Applies when: at least 51 percent unconditionally and directly owned (as defined at 13 CFR 124
View source 1
“SBA determines affiliation based on the factors set forth at 13 CFR 121.103. Small disadvantaged business concern means a small business concern that- (1) Is at least 51 percent unconditionally and directly owned (as defined at 13 CFR 124.105) by one or more socially disadvantaged (as defined at 13 ”
—
Needs confirmation
View source 1
“(3) The small business size standard for a concern that submits an offer, other than on a construction or service acquisition, but proposes to furnish an end item that it did not itself manufacture, process, or produce (i.e., nonmanufacturer), is 500 employees, or 150 employees for information techn”
—
Needs confirmation
View source 1
“(c) Representations.(1) The offeror represents as part of its offer that— (i) it _ is, _ is not a small business concern; or (ii) It _ is, _ is not a small business joint venture that complies with the requirements of 13 CFR 121.103 (h) and 13 CFR 125.8(a) and (b). [ The offeror shall enter the name”
Key personnel
7 findings(d) To implement the partnership, it is anticipated that within 30 days of the Notice to Proceed the prime Contractor’s key personnel, its subcontractors, the A&E design contractor, and NASA personnel will attend a partnership development and team building workshop.Close full requirement
(d) To implement the partnership, it is anticipated that within 30 days of the Notice to Proceed the prime Contractor’s key personnel, its subcontractors, the A&E design contractor, and NASA personnel will attend a partnership development and team building workshop.
Applies when: within 30 days of the Notice to Proceed the prime Contractor’s key personnel, its subcMust be met by: within 30 days of the Notice to Proceed the prime Contractor’s key personnel, its subc
Applies to: subcontractor
View source 1
“(d) To implement the partnership, it is anticipated that within 30 days of the Notice to Proceed the prime Contractor’s key personnel, its subcontractors, the A&E design contractor, and NASA personnel will attend a partnership development and team building workshop.”
Capability to Perform based on relevant experience and past performance includes organizational structure and key personnel qualifications, in-house design and construction capabilities or teaming arrangements, and capacity to manage an estimated $50M project with concurrent desiClose full requirement
Capability to Perform based on relevant experience and past performance includes organizational structure and key personnel qualifications, in-house design and construction capabilities or teaming arrangements, and capacity to manage an estimated $50M project with concurrent desi
Applies to: person
View source 1
“Capability to Perform based on relevant experience and past performance includes organizational structure and key personnel qualifications, in-house design and construction capabilities or teaming arrangements, and capacity to manage an estimated $50M project with concurrent design and construction ”
Organizational structure and key personnel qualifications.
Applies to: person
View source 1
“Organizational structure and key personnel qualifications.”
Examples of acceptable: The offeror provides a clear and logical organizational structure that supports integrated design-build delivery. Key personnel are identified and possess relevant qualifications and experience managing similar projects.Close full requirement
Examples of acceptable: The offeror provides a clear and logical organizational structure that supports integrated design-build delivery. Key personnel are identified and possess relevant qualifications and experience managing similar projects.
Applies to: person
View source 1
“Examples of acceptable: The offeror provides a clear and logical organizational structure that supports integrated design-build delivery. Key personnel are identified and possess relevant qualifications and experience managing similar projects.”
Examples of unacceptable: The organizational structure is unclear or incomplete. Key personnel are
Applies to: person
View source 1
“Examples of unacceptable: The organizational structure is unclear or incomplete. Key personnel are”
Technical evaluation criteria are subject to change and are in no particular order: Design Concepts - The offeror's detailed design approach Key Personnel and Team Organization - Integration of design and construction activities, Project Management Plan - Strategies for managing Close full requirement
Technical evaluation criteria are subject to change and are in no particular order: Design Concepts - The offeror's detailed design approach Key Personnel and Team Organization - Integration of design and construction activities, Project Management Plan - Strategies for managing
Applies to: person
View source 1
“Technical evaluation criteria are subject to change and are in no particular order: Design Concepts - The offeror's detailed design approach Key Personnel and Team Organization - Integration of design and construction activities, Project Management Plan - Strategies for managing schedule, risk, and ”
Contract Period or Dates of Performance Provided by Offeror: *Contractor performed as the Prime Contractor Sub-Contractor Key Personnel.
Applies to: person
View source 1
“Contract Period or Dates of Performance Provided by Offeror: *Contractor performed as the Prime Contractor Sub-Contractor Key Personnel.”
Financial capacity
2 findings(b) The bidder shall furnish a bid guarantee in the form of a firm commitment, e.g., bid bond supported by good and sufficient surety or sureties acceptable to the Government, postal money order, certified check, cashier’s check, irrevocable letter of credit, or, under Treasury D
Applies to: surety
View source 1
“(b) The bidder shall furnish a bid guarantee in the form of a firm commitment, e.g., bid bond supported by good and sufficient surety or sureties acceptable to the Government, postal money order, certified check, cashier’s check, irrevocable letter of credit, or, under Treasury Department regulation”
Financial Responsibility: Affirmative responses to questions 14 through 19 on the Financial Questionnaire
View source 1
“Financial Responsibility: Affirmative responses to questions 14 through 19 on the Financial Questionnaire”
Joint ventures & teaming
30 findings—
Conflicting sources
View source 1
“For proposals submitted as joint ventures (JV), facility clearance must be granted in the”
—
Conflicting sources
View source 1
“(c) Representations.(1) The offeror represents as part of its offer that— (i) it _ is, _ is not a small business concern; or (ii) It _ is, _ is not a small business joint venture that complies with the requirements of 13 CFR 121.103 (h) and 13 CFR 125.8(a) and (b). [ The offeror shall enter the name”
—
Conflicting sources
View source 1
“The offeror represents as part of its offer that it _ is, _ is not a joint venture that complies with the requirements of 13 CFR 127.506(a) through (c). [ The offeror shall enter the name and unique entity identifier of each party to the joint venture: __.] (4) Economically disadvantaged women-owned”
—
Conflicting sources
View source 1
“The offeror represents as part of its offer that it _ is, _ is not a joint venture that complies with the requirements of 13 CFR 127.506(a) through (c). [ The offeror shall enter the name and unique entity identifier of each party to the joint venture: __.]”
—
Conflicting sources
View source 1
“The offeror represents as part of its offer that it _ is, _ is not a SDVOSB joint venture eligible under the SDVOSB Program that complies with the requirements of 13 CFR 128.402. [ The offeror shall enter the name and unique entity identifier of each party to the joint venture:__.] (6) HUBZone joint”
—
Conflicting sources
View source 1
“HUBZone joint venture that complies with the requirements of 13 CFR 126.616(a) through (c). [ The offeror shall enter the name and unique entity identifier of each party to the joint venture: __.] Each HUBZone”
—
Conflicting sources
View source 1
“shall enter the name and unique entity identifier of each party to the joint venture: __.] Each HUBZone small business concern participating in the HUBZone joint venture must be certified as a HUBZone”
—
Conflicting sources
View source 1
“Note: Joint Venture (Additional Documentation): 1. All proposals submitted by joint ventures shall include a copy of the joint venture agreement which fully discloses the legal identity of each member of the joint venture, the relationship between the members, the form of ownership of each member, a”
—
Conflicting sources
View source 1
“2. An authorized representative of each member of the joint venture shall sign the submission”
—
Conflicting sources
View source 1
“3. Representations and certifications, financial information, and relevant experience and past performance information shall be submitted for each member of the joint venture.”
party to the joint venture: __.]
View source 1
“party to the joint venture: __.]”
(3) Women-owned small business (WOSB) joint venture eligible under the WOSB Program.
View source 1
“(3) Women-owned small business (WOSB) joint venture eligible under the WOSB Program.”
the joint venture: __.]
View source 1
“the joint venture: __.]”
the joint venture: __.] (4) Economically disadvantaged women-owned small business (EDWOSB) joint venture. The offeror
View source 1
“the joint venture: __.] (4) Economically disadvantaged women-owned small business (EDWOSB) joint venture. The offeror”
HUBZone small business concern.] The offeror represents, as part of its offer, that it _ is, _ is not a HUBZone joint venture that complies with the requirements of 13 CFR 126.616(a) through (c). [ The offeror
View source 1
“HUBZone small business concern.] The offeror represents, as part of its offer, that it _ is, _ is not a HUBZone joint venture that complies with the requirements of 13 CFR 126.616(a) through (c). [ The offeror”
Page 43 of 62 (5) SDVOSB joint venture eligible under the SDVOSB Program. [Complete only if the offeror is certified as a SDVOSB concern].
Applies when: if the offeror is certified as a SDVOSB concern]
View source 1
“Page 43 of 62 (5) SDVOSB joint venture eligible under the SDVOSB Program. [Complete only if the offeror is certified as a SDVOSB concern].”
Describe the Offeror's legal structure; integrated Design-Builder, joint venture, limited liability company, prime-sub contractors, or other. 7. Provide information specifically addressing each element under RFO FAR 9.104-1 to demonstrate responsibility.Close full requirement
Describe the Offeror's legal structure; integrated Design-Builder, joint venture, limited liability company, prime-sub contractors, or other. 7. Provide information specifically addressing each element under RFO FAR 9.104-1 to demonstrate responsibility.
View source 1
“Describe the Offeror's legal structure; integrated Design-Builder, joint venture, limited liability company, prime-sub contractors, or other. 7. Provide information specifically addressing each element under RFO FAR 9.104-1 to demonstrate responsibility.”
Note: Joint Venture (Additional Documentation):
View source 1
“Note: Joint Venture (Additional Documentation):”
4. Statement confirming the Joint Venture Agreement does not limit a party's performance or financial
View source 1
“4. Statement confirming the Joint Venture Agreement does not limit a party's performance or financial”
Note: Additional Technical Qualifications Instructions: 1. Provide a description of the Offeror's Teaming Agreement(s). Use of the DBIA Standard Teaming
View source 1
“Note: Additional Technical Qualifications Instructions: 1. Provide a description of the Offeror's Teaming Agreement(s). Use of the DBIA Standard Teaming”
Use of the DBIA Standard Teaming Agreement is preferred.
View source 1
“Use of the DBIA Standard Teaming Agreement is preferred.”
Use of the American Institute of Architects and Associated General Contractors of America (AIA-AGC) Teaming Agreement is also acceptable.
View source 1
“Use of the American Institute of Architects and Associated General Contractors of America (AIA-AGC) Teaming Agreement is also acceptable.”
Disclose which form of Teaming Agreement is being used.
View source 1
“Disclose which form of Teaming Agreement is being used.”
The Offeror may use these Teaming Agreements or other agreements that are specifically developed for your team.
View source 1
“The Offeror may use these Teaming Agreements or other agreements that are specifically developed for your team.”
Include the Constructor, Lead Architectural /Engineering firm, Key Trade Partners, and other subcontractors or trade subcontractors in the Teaming Agreement.
Applies to: subcontractor
View source 1
“Include the Constructor, Lead Architectural /Engineering firm, Key Trade Partners, and other subcontractors or trade subcontractors in the Teaming Agreement.”
For Joint Ventures, projects may be submitted for the Joint Venture as an entity or for individual members of the Joint Venture.
Applies when: for the Joint Venture
View source 1
“For Joint Ventures, projects may be submitted for the Joint Venture as an entity or for individual members of the Joint Venture.”
All firms in a Joint Venture arrangement shall display prior experience under this factor either as an individual firm or Joint Venture.
Applies when: in a Joint Venture
View source 1
“All firms in a Joint Venture arrangement shall display prior experience under this factor either as an individual firm or Joint Venture.”
Business Sizes: (State: Small Business (SB), Small Disadvantaged Business (SDB), Service-Disabled Veteran Owned SB (SDVOSB), Women-Owned Small Business (WOSB), and/or Historically Underutilized Business Zone (HUBZone), Large business (LB). 2.Legal Structure a.Type of Legal StructClose full requirement
Business Sizes: (State: Small Business (SB), Small Disadvantaged Business (SDB), Service-Disabled Veteran Owned SB (SDVOSB), Women-Owned Small Business (WOSB), and/or Historically Underutilized Business Zone (HUBZone), Large business (LB). 2.Legal Structure a.Type of Legal Struct
View source 1
“Business Sizes: (State: Small Business (SB), Small Disadvantaged Business (SDB), Service-Disabled Veteran Owned SB (SDVOSB), Women-Owned Small Business (WOSB), and/or Historically Underutilized Business Zone (HUBZone), Large business (LB). 2.Legal Structure a.Type of Legal Structure: i.Integrated De”
Use the below space to describe your firm's legal structure: integrated Design-Builder, joint venture, limited liability company (LLC), prime-sub contractors, or other. 3. Responsible Determination in accordance with FAR 9.104-1 General Standards Please provide information as an Close full requirement
Use the below space to describe your firm's legal structure: integrated Design-Builder, joint venture, limited liability company (LLC), prime-sub contractors, or other. 3. Responsible Determination in accordance with FAR 9.104-1 General Standards Please provide information as an
View source 1
“Use the below space to describe your firm's legal structure: integrated Design-Builder, joint venture, limited liability company (LLC), prime-sub contractors, or other. 3. Responsible Determination in accordance with FAR 9.104-1 General Standards Please provide information as an attachment to this f”
6.If an individual doing business as a sole proprietorship, please complete the following: Name Years as Owner 7.If a joint venture, partnership, limited liability company (“LLC”), or other association, provide the following for each member of the joint venture, each partner, eacClose full requirement
6.If an individual doing business as a sole proprietorship, please complete the following: Name Years as Owner 7.If a joint venture, partnership, limited liability company (“LLC”), or other association, provide the following for each member of the joint venture, each partner, eac
Applies when: If an individual doing business as a sole proprietorship, please complete the following: Name Years as Owner 7
View source 1
“6.If an individual doing business as a sole proprietorship, please complete the following: Name Years as Owner 7.If a joint venture, partnership, limited liability company (“LLC”), or other association, provide the following for each member of the joint venture, each partner, each member or manager ”
Exclusions & responsibility
4 findingsOct 2016 52.204-19 Incorporation by Reference of Representations and Dec 2014 Certifications. 52.209-6 Protecting the Government’s Interest When Subcontracting Jan 2025 with Contractors Debarred, Suspended, or Proposed for Debarment.Close full requirement
Oct 2016 52.204-19 Incorporation by Reference of Representations and Dec 2014 Certifications. 52.209-6 Protecting the Government’s Interest When Subcontracting Jan 2025 with Contractors Debarred, Suspended, or Proposed for Debarment.
Applies when: When Subcontracting Jan 2025 with Contractors Debarred, Suspended, or Proposed for Debarment
View source 1
“Oct 2016 52.204-19 Incorporation by Reference of Representations and Dec 2014 Certifications. 52.209-6 Protecting the Government’s Interest When Subcontracting Jan 2025 with Contractors Debarred, Suspended, or Proposed for Debarment.”
(i) The Offeror and/or any of its Principals— (A) Are _ are not _ presently debarred, suspended, proposed for debarment, or declared ineligible
View source 1
“(i) The Offeror and/or any of its Principals— (A) Are _ are not _ presently debarred, suspended, proposed for debarment, or declared ineligible”
State the name of the organization debarred, the year of the event, the owner of the project, and the basis for the action.
View source 1
“State the name of the organization debarred, the year of the event, the owner of the project, and the basis for the action.”
History of Performance (Past Performance) 14.Has the entity or any of its affiliates ever been terminated for default on a construction contract? Yes* No *If “yes,” explain on a separate page. 15.In the last five (5) years has the entity or any of its affiliates, been debarred, dClose full requirement
History of Performance (Past Performance) 14.Has the entity or any of its affiliates ever been terminated for default on a construction contract? Yes* No *If “yes,” explain on a separate page. 15.In the last five (5) years has the entity or any of its affiliates, been debarred, d
Applies when: If “yes,” explain on a separate page
View source 1
“History of Performance (Past Performance) 14.Has the entity or any of its affiliates ever been terminated for default on a construction contract? Yes* No *If “yes,” explain on a separate page. 15.In the last five (5) years has the entity or any of its affiliates, been debarred, disqualified, removed”
Missing information2 checks · expand to review
A missing value is not a waiver. Check the source or ask the agency before relying on it.
Required licenses
—
Not found in reviewed sources
Experience & references
—
Not found in reviewed sources
2 additional fields have no reviewed finding.
Deadlines & submission
When and how to submit, and whether you are still in time.
Response deadline
2 findings—
Conflicting response deadlines — confirm the exact time with the buyer before bidding
View source 1
“2026-10-30T13:00:00-04:00”
—
Conflicting response deadlines — confirm the exact time with the buyer before bidding
View source 2
“Proposals Due - 3/15/2027”
“Phase 2 RFP Proposals Due - 3/15/2027”
How to submit
7 findings—
Conflicting sources
View source 1
“Glenn Research Center Lewis Field Cleveland, OH 44135-3191 September 25, 2026 Office of Procurement Reply to Attn of: TO: All Potential Offerors SUBJECT: Request for Proposals (RFP) for Aerospace Power Systems Laboratory (APSL), Solicitation No. 80GRC026R0010 You are invited to submit a proposal in ”
—
Conflicting sources
View source 1
“(f) Immediately after all files have been uploaded and the proposal has been submitted in its entirety, the offeror is requested to notify John Christel at the following email address: john.a.christel@nasa.gov with a listing of all documents by filename that were submitted via EFSS Box.”
—
Conflicting sources
View source 1
“Click on each button to complete the requirements for sharing data with NASA. 5.Upload proposal files to this folder.”
—
Conflicting sources
View source 1
“Proposals can only be submitted through Box. 5”
Proposals for this solicitation are required to be submitted through NASA’s Enterprise File Sharing and Sync Box (EFSS Box), a FedRAMP Moderate certified platform.
View source 1
“Proposals for this solicitation are required to be submitted through NASA’s Enterprise File Sharing and Sync Box (EFSS Box), a FedRAMP Moderate certified platform.”
Questions regarding this solicitation shall be submitted via e- mail no later than 2:00 PM EST on September 21, 2026. Include in the subject line "RFP Phase 1 80GRC026R0010." Questions or comments should be submitted in accordance with above to allow for analysis and disseminatio
Applies when: no later than 2:00 PM EST on September 21, 2026Must be met by: no later than 2:00 PM EST on September 21, 2026
View source 1
“Questions regarding this solicitation shall be submitted via e- mail no later than 2:00 PM EST on September 21, 2026. Include in the subject line "RFP Phase 1 80GRC026R0010." Questions or comments should be submitted in accordance with above to allow for analysis and dissemination of responses.”
(b) Prior to the submission of proposal files, offerors interested in submitting a proposal in response to this solicitation should notify John Christel of their intent to submit a proposal at least 48 hours prior to the intended submission date, at the following email address: jClose full requirement
(b) Prior to the submission of proposal files, offerors interested in submitting a proposal in response to this solicitation should notify John Christel of their intent to submit a proposal at least 48 hours prior to the intended submission date, at the following email address: j
Applies when: Prior to the submission of proposal files, offerors interested in submitting a proposalMust be met by: Prior to the submission of proposal files, offerors interested in submitting a proposal
View source 1
“(b) Prior to the submission of proposal files, offerors interested in submitting a proposal in response to this solicitation should notify John Christel of their intent to submit a proposal at least 48 hours prior to the intended submission date, at the following email address: john.a.christel@nasa.”
Procurement contact
8 findingsJohn Christel · john.a.christel@nasa.gov · 216-433-8828
View source 1
“John Christel · john.a.christel@nasa.gov · 216-433-8828”
Aaron A. Olmsted · aaron.a.olmsted@nasa.gov · 216-433-6843
View source 1
“Aaron A. Olmsted · aaron.a.olmsted@nasa.gov · 216-433-6843”
—
Needs confirmation
Applies when: If a message appears that the email address is associated with an existing account, contact your company’s/institution’s/organization’s Box Admin/point of contact to find out the pro
View source 1
“Individuals who already have a Box account should skip to Step 2. Note: If a message appears that the email address is associated with an existing account, contact your company’s/institution’s/organization’s Box Admin/point of contact to find out the process for signing up.”
—
Needs confirmation
Applies when: If a message appears that the email address is associated with an existing account, contact your company’s/institution’s/organization’s Box Admin/point of contact to find out the pro
View source 1
“Note: If a message appears that the email address is associated with an existing account, contact your company’s/institution’s/organization’s Box Admin/point of contact to find out the process for signing up.”
—
Needs confirmation
View source 1
“Do not attempt to message the NASA RFP Point of Contact via Box.”
—
Needs confirmation
View source 1
“Email is the only way to contact the NASA RFP Point of Contact.”
—
Needs confirmation
Applies when: If you or anyone in your organization encounters a problem with setting up their Box account, contact the NASA RFP Point of Contact immediately so it can be resolved
View source 1
“Note: If you or anyone in your organization encounters a problem with setting up their Box account, contact the NASA RFP Point of Contact immediately so it can be resolved.”
—
Needs confirmation
View source 1
“ATTACHMENT 4 – Offeror Information Form 80GRC026R0010 – Aerospace Power Systems Laboratory 1.Offeror Information a.Offeror Name: b.Name of person authorized to contractually bind the company: i.Phone Number: ii.Email Address: c.Name of point of contact (POC): i.Phone Number: ii.Email Address: d.Desi”
Bid opening
3 findings—
Needs confirmation
Applies when: If this is a sealed bid solicitation, offers will be publicly opened at that time
View source 1
“If this is a sealed bid solicitation, offers will be publicly opened at that time.”
—
Needs confirmation
View source 1
“(Sep 1996) (a) Failure to furnish a bid guarantee in the proper form and amount, by the time set for opening of bids, may be cause for rejection of the bid.”
—
Needs confirmation
Applies when: upon execution of contractual documents and bonds (including any necessary coinsuranMust be met by: upon execution of contractual documents and bonds (including any necessary coinsuran
View source 1
“The Contracting Officer will return bid guarantees, other than bid bonds- (1) To unsuccessful bidders as soon as practicable after the opening of bids; and (2) To the successful bidder upon execution of contractual documents and bonds (including any necessary coinsurance or reinsurance agreements), ”
Formatting & signatures
9 findingswith your RFP response in accordance with the guidance provided in OMB M-24-06 and M-25-29. This information will not be evaluated as part of the RFQ submission, will not count toward the page limit, and may
View source 1
“with your RFP response in accordance with the guidance provided in OMB M-24-06 and M-25-29. This information will not be evaluated as part of the RFQ submission, will not count toward the page limit, and may”
L.2: Phase 1 Proposal Page Limitations (NFS 1852.215-81) (APR 2015) The following page limitations are established for each portion of the proposal submitted in response to this solicitation.
View source 1
“L.2: Phase 1 Proposal Page Limitations (NFS 1852.215-81) (APR 2015) The following page limitations are established for each portion of the proposal submitted in response to this solicitation.”
A page is defined as one side of a sheet, 8 1/2" x 11", with at least one inch margins on all sides, using not smaller than 12 point type (Times New Roman).
Applies when: at least one inch margins on all sides, using not smaller than 12 point type (Times New
View source 1
“A page is defined as one side of a sheet, 8 1/2" x 11", with at least one inch margins on all sides, using not smaller than 12 point type (Times New Roman).”
Table of contents, cover page and title page are excluded from the page limits identified below.
View source 1
“Table of contents, cover page and title page are excluded from the page limits identified below.”
If final revisions are requested, separate page limitations will be specified in the Government's request for that submission.
Applies when: If final revisions are requested, separate page limitations will be specified in the Government's request for that submission
View source 1
“If final revisions are requested, separate page limitations will be specified in the Government's request for that submission.”
VOLUME TITLE COPIES PAGE LIMIT REQUIRED
View source 1
“VOLUME TITLE COPIES PAGE LIMIT REQUIRED”
Not included in page limits. 5. Financial Questionnaire: The Offeror must provide a completed Attachment 7, Financial Questionnaire, to the Government.
View source 1
“Not included in page limits. 5. Financial Questionnaire: The Offeror must provide a completed Attachment 7, Financial Questionnaire, to the Government.”
Not included in page limits.
View source 1
“Not included in page limits.”
ATTACHMENT 3 - Proposal Submission Checklist 80GRC026R0010 – Aerospace Power Systems Laboratory Item Description Page Limitation Completed VOLUME I - Administrative 1 Executive Summary 3 pages Solicitation SF1442 - Completed and acknowledgement of all amendments;Close full requirement
ATTACHMENT 3 - Proposal Submission Checklist 80GRC026R0010 – Aerospace Power Systems Laboratory Item Description Page Limitation Completed VOLUME I - Administrative 1 Executive Summary 3 pages Solicitation SF1442 - Completed and acknowledgement of all amendments;
View source 1
“ATTACHMENT 3 - Proposal Submission Checklist 80GRC026R0010 – Aerospace Power Systems Laboratory Item Description Page Limitation Completed VOLUME I - Administrative 1 Executive Summary 3 pages Solicitation SF1442 - Completed and acknowledgement of all amendments;”
Mandatory forms
2 findingsOnce completed, both forms shall be signed by the NASA COTR and sent to the Office of Protective Services POC for Non-Government Investigations. d.
View source 1
“Once completed, both forms shall be signed by the NASA COTR and sent to the Office of Protective Services POC for Non-Government Investigations. d.”
ATTACHMENT 3 - Proposal Submission Checklist 80GRC026R0010 – Aerospace Power Systems Laboratory Item Description Page Limitation Completed VOLUME I - Administrative 1 Executive Summary 3 pages Solicitation SF1442 - Completed and acknowledgement of all amendments;Close full requirement
ATTACHMENT 3 - Proposal Submission Checklist 80GRC026R0010 – Aerospace Power Systems Laboratory Item Description Page Limitation Completed VOLUME I - Administrative 1 Executive Summary 3 pages Solicitation SF1442 - Completed and acknowledgement of all amendments;
View source 1
“ATTACHMENT 3 - Proposal Submission Checklist 80GRC026R0010 – Aerospace Power Systems Laboratory Item Description Page Limitation Completed VOLUME I - Administrative 1 Executive Summary 3 pages Solicitation SF1442 - Completed and acknowledgement of all amendments;”
Alternate proposals
Unless specifically authorized by the solicitation instructions, alternate proposal submissions must not be submitted.
Applies when: Unless specifically authorized by the solicitation instructions, alternate proposal submissions must not be submitted
View source 1
“Unless specifically authorized by the solicitation instructions, alternate proposal submissions must not be submitted.”
Grounds for rejection
2 findings(Sep 1996) (a) Failure to furnish a bid guarantee in the proper form and amount, by the time set for opening of bids, may be cause for rejection of the bid.
View source 1
“(Sep 1996) (a) Failure to furnish a bid guarantee in the proper form and amount, by the time set for opening of bids, may be cause for rejection of the bid.”
Any non-responsive proposal will be handled in accordance with NFS 1815.108-70, "Identification of Unacceptable Proposals", Offerors whose proposals are found to be non-responsive in any area or offerors who has an active exclusion listed in SAM will be eliminated from the competClose full requirement
Any non-responsive proposal will be handled in accordance with NFS 1815.108-70, "Identification of Unacceptable Proposals", Offerors whose proposals are found to be non-responsive in any area or offerors who has an active exclusion listed in SAM will be eliminated from the compet
View source 1
“Any non-responsive proposal will be handled in accordance with NFS 1815.108-70, "Identification of Unacceptable Proposals", Offerors whose proposals are found to be non-responsive in any area or offerors who has an active exclusion listed in SAM will be eliminated from the competition without furthe”
Missing information4 checks · expand to review
A missing value is not a waiver. Check the source or ask the agency before relying on it.
Questions due
—
Not found in reviewed sources
Site visit / pre-bid meeting
—
Not found in reviewed sources
Required submission files
—
Not found in reviewed sources
Acknowledge amendments
—
Not found in reviewed sources
2 additional fields have no reviewed finding.
6 more sections are available once you sign in
Pricing & payment · Bonds & insurance · Evaluation & award · Scope & delivery · Labor, sourcing & compliance · Contract terms & risk
Sign in — freeExtracted from the public documents linked above. This is an information aid, not a determination of bid eligibility or legal advice. Verify the original wording and any addenda before submitting a bid.