BidEligible

HOMELAND SECURITY, DEPARTMENT OF · GA

Building 262 Renovation, FLETC Glynco, Georgia

34 source documentsSource checked Oct 24Content updated
Open notice
Response deadline
17 days left
Published project value
Not confirmed
Check the pricing and payment terms below.
Solicitation number
70LGLY27RSSB00001

Dates to plan around

Times follow the original source.

  1. Response deadline
    Source wording
    2026-11-09T11:00:00-05:00
Document coverage
2 / 34documents readReview incomplete

34 documents found5 queued27 restricted12% of weighted requirement checks reviewed

Before you bid

Review first

Start with these requirements and unresolved points.
  • Must do
    Required licenses
    View 1 flagged requirement
    1. Requirement 1 ↗

      PPQ’s, Offerors shall submit: (a) A copy of License(s) Contractor to submit current license and qualifications.

  • Must do
    Registrations
    View 2 flagged requirements
    1. Requirement 1 ↗

      Vehicles must be registered with FLETC.

    2. Requirement 2 ↗

      (d) The offeror shall post the information in paragraphs (c)(1)(i) through (c)(1)(iv) of this provision in FAPIIS as required through maintaining an active registration in the System for Award Management, which can be accessed via https://www.sam.gov (see 52.204-7).

  • Must do
01

Eligibility & participation

Whether you can bid at all, and what you must already hold.

21 verified9 to confirm

Registrations

3 findings
Requirement 1Verified

Vehicles must be registered with FLETC.

View source 1
01page 13View official source ↗
“Vehicles must be registered with FLETC.”
Source page 13

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 13
Requirement 2Verified

(d) The offeror shall post the information in paragraphs (c)(1)(i) through (c)(1)(iv) of this provision in FAPIIS as required through maintaining an active registration in the System for Award Management, which can be accessed via https://www.sam.gov (see 52.204-7).

View source 1
01page 68View official source ↗
“(d) The offeror shall post the information in paragraphs (c)(1)(i) through (c)(1)(iv) of this provision in FAPIIS as required through maintaining an active registration in the System for Award Management, which can be accessed via https://www.sam.gov (see 52.204-7).”
Source page 68

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 68
Missing information · 1 check
Not reviewed

—

Not reviewed — requirement not confirmed

Set-aside

3 findings
Requirement 1Verified

SBA

View source 1
01https://sam.gov/api/prod/opps/v2/opportunities/65f66615f3ec4ae3924ac43a67abe1b6 /data2/solicitation/setAsideView official source ↗
“SBA”
Requirement 2Verified

SDVOSB,HUBZONE

Applies when: unless the Contractor waived the price evaluation preferenceA waiver may be available

View source 1
01page 50View official source ↗
“(2) Used the HUBZone price evaluation preference regardless of dollar value, unless the Contractor waived the price evaluation preference; or (3) Was an 8(a), HUBZone, service-disabled veteran-owned, economically disadvantaged women-owned, or women-owned small business set-aside or sole-source award regardless of dolla”
Source page 50

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 50
Missing information · 1 check
Not reviewed

—

Not reviewed — requirement not confirmed

Small business size

9 findings
Requirement 1Needs confirmation

—

Needs confirmation

View source 1
01page 49View official source ↗
“Small business concern— (1) Means a concern, including its affiliates, that is independently owned and operated, not dominant in the field of operation in which it is bidding on Government contracts, and qualified as a small business under the criteria in 13 CFR part 121 and the size standard in par”
Source page 49

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 49
Requirement 2Needs confirmation

—

Needs confirmation

Applies when: If the Contractor represented that it was any of the small business concerns identified in 19; prior to award of this contract, the Contractor shall rerepresent its size and socioeconMust be met by: prior to award of this contract, the Contractor shall rerepresent its size and socioecon

View source 1
01page 49View official source ↗
“SBA determines affiliation based on the factors set forth at 13 CFR 121.103. (b) If the Contractor represented that it was any of the small business concerns identified in 19.000(a)(3) prior to award of this contract, the Contractor shall rerepresent its size and socioeconomic status according to pa”
Source page 49

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 49
Requirement 3Needs confirmation

—

Needs confirmation

Applies when: at the time of this rerepresentation that corresponds to the North American Industry ClassificMust be met by: at the time of this rerepresentation that corresponds to the North American Industry Classific

View source 1
01page 50View official source ↗
“(d) The Contractor shall rerepresent its size status in accordance with the size standard in effect at the time of this rerepresentation that corresponds to the North American Industry Classification System (NAICS) code(s) assigned to this contract.”
Source page 50

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 50
Requirement 4Needs confirmation

—

Needs confirmation

View source 1
01page 50View official source ↗
“The small business size standard corresponding to this NAICS code(s) can be found at https://www.sba.gov/document/support--table-size-standards.”
Source page 50

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 50
Requirement 5Needs confirmation

—

Needs confirmation

Applies when: if the acquisition— (1) Was set aside for small business and has a value above the simplified acquisition t

View source 1
01page 50View official source ↗
“(e) The small business size standard for a Contractor providing an end item that it does not manufacture, process, or produce itself, for a contract other than a construction or service contract, is 500 employees if the acquisition— (1) Was set aside for small business and has a value above the simp”
Source page 50

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 50
Requirement 6Needs confirmation

—

Needs confirmation

View source 1
01page 60View official source ↗
“(2) The small business size standard is ____$45M_________.”
Source page 60

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 60
Requirement 7Needs confirmation

—

Needs confirmation

View source 1
01page 60View official source ↗
“(3) The small business size standard for a concern that submits an offer, other than on a construction or service acquisition, but proposes to furnish an end item that it did not itself manufacture, process, or produce is 500 employees, or 150 employees for information technology value-added reselle”
Source page 60

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 60
Requirement 8Needs confirmation

—

Needs confirmation

Applies when: within the last 12 months, are current, accurate, complete, and applicable to this sol

View source 1
01page 64View official source ↗
“provision have been entered or updated within the last 12 months, are current, accurate, complete, and applicable to this solicitation (including the business size standard applicable to”
Source page 64

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 64
Missing information · 1 check
Not reviewed

—

Not reviewed — requirement not confirmed

Required licenses

2 findings
Requirement 1Verified

PPQ’s, Offerors shall submit: (a) A copy of License(s) Contractor to submit current license and qualifications.

View source 1
01page 74View official source ↗
“PPQ’s, Offerors shall submit: (a) A copy of License(s) Contractor to submit current license and qualifications.”
Source page 74

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 74
Missing information · 1 check
Not reviewed

—

Not reviewed — requirement not confirmed

Experience & references

2 findings
Requirement 1Needs confirmation

—

Needs confirmation

View source 1
01page 74View official source ↗
“The Prime contractor for the commercial renovation is to have a minimum of 5 years’ experience in the industry of installation of plumbing, painting, and/or similar work.”
Source page 74

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 74
Missing information · 1 check
Not reviewed

—

Not reviewed — requirement not confirmed

Key personnel

6 findings
Requirement 1Verified

G.14 Daily Report to Inspector The Contractor’s Superintendent shall complete for each day and submit electronically daily, prior to 10 AM of the following day, Form FTC-FMD-42 (12/09), Daily Report to Inspector to the Government Project Manager, Building 200, FLETC, Glynco GA.

Applies when: prior to 10 AM of the following day, Form FTC-FMD-42 (12/09), Daily Report to InspectorMust be met by: prior to 10 AM of the following day, Form FTC-FMD-42 (12/09), Daily Report to Inspector

Applies to: person

View source 1
01page 9View official source ↗
“G.14 Daily Report to Inspector The Contractor’s Superintendent shall complete for each day and submit electronically daily, prior to 10 AM of the following day, Form FTC-FMD-42 (12/09), Daily Report to Inspector to the Government Project Manager, Building 200, FLETC, Glynco GA.”
Source page 9

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 9
Requirement 2Verified
The Contractor will be allowed access to the facilities to familiarize supervisors, key personnel, and staff with equipment, reporting, work scheduling and procedures (including operations, priorities, safety, security, etc.).Read full requirement Close full requirement

The Contractor will be allowed access to the facilities to familiarize supervisors, key personnel, and staff with equipment, reporting, work scheduling and procedures (including operations, priorities, safety, security, etc.).

Applies to: person

View source 1
01page 36View official source ↗
“The Contractor will be allowed access to the facilities to familiarize supervisors, key personnel, and staff with equipment, reporting, work scheduling and procedures (including operations, priorities, safety, security, etc.).”
Source page 36

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 36
Requirement 3Verified

At a minimum the incumbent contractor Project Manager shall be available to attend the post- 38

Applies to: person

View source 1
01page 36View official source ↗
“At a minimum the incumbent contractor Project Manager shall be available to attend the post- 38”
Source page 36

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 36
Requirement 4Verified

H.58 CONTRACTOR’S STAFF The Contractor shall maintain sufficient off-site support staff, and competent full-time staff at the Project site authorized to act on behalf of the Contractor to coordinate, inspect, and provide general direction of the work and progress of the subcontra

Applies to: subcontractor

View source 1
01page 47View official source ↗
“H.58 CONTRACTOR’S STAFF The Contractor shall maintain sufficient off-site support staff, and competent full-time staff at the Project site authorized to act on behalf of the Contractor to coordinate, inspect, and provide general direction of the work and progress of the subcontractors. Key personnel”
Source page 47

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 47
Requirement 5Verified
The following provisions and clauses are incorporated by reference: (b) Clauses. _X___3052.204-71 Contractor Employee Access. _X___3052.205-70 Advertisement, Publicizing Awards, and Releases. _X__ 3052.215-70 Key Personnel or Facilities. _X___3052.228-70 Insurance. _X_3052.242-72Read full requirement Close full requirement

The following provisions and clauses are incorporated by reference: (b) Clauses. _X___3052.204-71 Contractor Employee Access. _X___3052.205-70 Advertisement, Publicizing Awards, and Releases. _X__ 3052.215-70 Key Personnel or Facilities. _X___3052.228-70 Insurance. _X_3052.242-72

Applies to: person

View source 1
01page 57View official source ↗
“The following provisions and clauses are incorporated by reference: (b) Clauses. _X___3052.204-71 Contractor Employee Access. _X___3052.205-70 Advertisement, Publicizing Awards, and Releases. _X__ 3052.215-70 Key Personnel or Facilities. _X___3052.228-70 Insurance. _X_3052.242-72 Contracting Officer”
Source page 57

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 57
Requirement 6Verified

A search was unable to identify any relevant past performance information for the offeror, key personnel, or subcontractors.

Applies to: subcontractor

View source 1
01page 73View official source ↗
“A search was unable to identify any relevant past performance information for the offeror, key personnel, or subcontractors.”
Source page 73

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 73

Financial capacity

4 findings
Requirement 1Verified

(b) The bidder shall furnish a bid guarantee in the form of a firm commitment, e.g., bid bond supported by good and sufficient surety or sureties acceptable to the Government, postal money order, certified check, cashier's check, irrevocable letter of credit, or, under Treasury 7

Applies to: surety

View source 1
01page 5View official source ↗
“(b) The bidder shall furnish a bid guarantee in the form of a firm commitment, e.g., bid bond supported by good and sufficient surety or sureties acceptable to the Government, postal money order, certified check, cashier's check, irrevocable letter of credit, or, under Treasury 7”
Source page 5

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 5
Requirement 2Verified

G.10 Irrevocable Letter of Credit As prescribed in FAR 28.204-3, an Irrevocable Letter of Credit is acceptable for all types of bonds, if all provisions of FAR 28.204-3 and FAR -14 are met.

Applies when: if all provisions of FAR 28

View source 1
01page 7View official source ↗
“G.10 Irrevocable Letter of Credit As prescribed in FAR 28.204-3, an Irrevocable Letter of Credit is acceptable for all types of bonds, if all provisions of FAR 28.204-3 and FAR -14 are met.”
Source page 7

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 7
Requirement 3Verified

FAR -14 requires a specific format for the Irrevocable Letter of Credit and the letter from the Financial Institution confirming an Irrevocable Letter of Credit.

View source 1
01page 7View official source ↗
“FAR -14 requires a specific format for the Irrevocable Letter of Credit and the letter from the Financial Institution confirming an Irrevocable Letter of Credit.”
Source page 7

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 7
Requirement 4Verified
(NOV 2024) J - List of Documents, Exhibits and Other Attachments List of Documents, Exhibits, and Other Attachments Attachment Title Number 1 Statement of Work & Specifications 2 SF 25 - Performance Bonds 3 SF 25A - Payment Bonds 4 SF 28 - Affidavit of Individual Surety 5 Format Read full requirement Close full requirement

(NOV 2024) J - List of Documents, Exhibits and Other Attachments List of Documents, Exhibits, and Other Attachments Attachment Title Number 1 Statement of Work & Specifications 2 SF 25 - Performance Bonds 3 SF 25A - Payment Bonds 4 SF 28 - Affidavit of Individual Surety 5 Format

Applies to: surety

View source 1
01page 58View official source ↗
“(NOV 2024) J - List of Documents, Exhibits and Other Attachments List of Documents, Exhibits, and Other Attachments Attachment Title Number 1 Statement of Work & Specifications 2 SF 25 - Performance Bonds 3 SF 25A - Payment Bonds 4 SF 28 - Affidavit of Individual Surety 5 Format for Irrevocable Lett”
Source page 58

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 58

Joint ventures & teaming

5 findings
Requirement 1Verified

127, and the representation in paragraph (h)(4)(i) of this clause is accurate for each WOSB concern eligible under the WOSB Program participating in the joint venture. [ The Contractor

Applies when: in the joint venture

View source 1
01page 51View official source ↗
“127, and the representation in paragraph (h)(4)(i) of this clause is accurate for each WOSB concern eligible under the WOSB Program participating in the joint venture. [ The Contractor”
Source page 51

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 51
Requirement 2Verified

127, and the representation in paragraph (h)(5)(i) of this clause is accurate for each EDWOSB concern participating in the joint venture. [ The Contractor shall enter the name or names of

Applies when: in the joint venture

View source 1
01page 51View official source ↗
“127, and the representation in paragraph (h)(5)(i) of this clause is accurate for each EDWOSB concern participating in the joint venture. [ The Contractor shall enter the name or names of”
Source page 51

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 51
Requirement 3Verified

concern participating in the joint venture. [ The Contractor shall enter the name or names of the EDWOSB concern and other small businesses that are participating in the joint venture:

Applies when: in the joint venture

View source 1
01page 51View official source ↗
“concern participating in the joint venture. [ The Contractor shall enter the name or names of the EDWOSB concern and other small businesses that are participating in the joint venture:”
Source page 51

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 51
Requirement 4Verified

13 CFR part 126, and the representation in paragraph (h)(8)(i) of this clause is accurate for each HUBZone small business concern participating in the HUBZone joint venture. [The

View source 1
01page 52View official source ↗
“13 CFR part 126, and the representation in paragraph (h)(8)(i) of this clause is accurate for each HUBZone small business concern participating in the HUBZone joint venture. [The”
Source page 52

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 52
Requirement 5Verified

If the Offeror has more than one immediate owner (such as a joint venture), then the Offeror shall respond to paragraph (c) and if applicable, paragraph (d) of this provision for each participant in the joint venture.

Applies when: If the Offeror has more than one immediate owner (such as a joint venture), then the Offeror shall respond to paragraph (c) and if applicable, paragraph (d) of this provision for eac

View source 1
01page 65View official source ↗
“If the Offeror has more than one immediate owner (such as a joint venture), then the Offeror shall respond to paragraph (c) and if applicable, paragraph (d) of this provision for each participant in the joint venture.”
Source page 65

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 65

Exclusions & responsibility

Verified
(AUG 2025) 52.204-14 Service Contract Reporting Requirements (AUG 2025) 52.204-16 Commercial and Government Entity Code Reporting (AUG 2020) 52.209-6 Protecting the Government's Interest When Subcontracting With Contractors Debarred, Suspended, or Proposed for Debarment.Read full requirement Close full requirement

(AUG 2025) 52.204-14 Service Contract Reporting Requirements (AUG 2025) 52.204-16 Commercial and Government Entity Code Reporting (AUG 2020) 52.209-6 Protecting the Government's Interest When Subcontracting With Contractors Debarred, Suspended, or Proposed for Debarment.

Applies when: When Subcontracting With Contractors Debarred, Suspended, or Proposed for Debarment

View source 1
01page 48View official source ↗
“(AUG 2025) 52.204-14 Service Contract Reporting Requirements (AUG 2025) 52.204-16 Commercial and Government Entity Code Reporting (AUG 2020) 52.209-6 Protecting the Government's Interest When Subcontracting With Contractors Debarred, Suspended, or Proposed for Debarment.”
Source page 48

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 48

2 additional fields have no reviewed finding.

02

Deadlines & submission

When and how to submit, and whether you are still in time.

14 verified3 to confirm

Response deadline

3 findings
Requirement 1Verified

2026-11-09T11:00:00-05:00

View source 1
01https://sam.gov/api/prod/opps/v2/opportunities/65f66615f3ec4ae3924ac43a67abe1b6 /data2/solicitation/deadlines/responseView official source ↗
“2026-11-09T11:00:00-05:00”
Missing information · 2 checks
Not reviewed

—

Not reviewed — requirement not confirmed

Not found

—

Not found in reviewed sources

How to submit

6 findings
Requirement 1Verified

DIRECTIONS FOR SUBMITTING PROPOSALS All proposals shall be submitted electronically.

View source 1
01page 69View official source ↗
“DIRECTIONS FOR SUBMITTING PROPOSALS All proposals shall be submitted electronically.”
Source page 69

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 69
Requirement 2Verified

The Offeror shall submit bid schedule documentation via Excel, utilizing Exhibit A (Proposal Breakdown).

View source 1
01page 69View official source ↗
“The Offeror shall submit bid schedule documentation via Excel, utilizing Exhibit A (Proposal Breakdown).”
Source page 69

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 69
Requirement 3Verified
Please submit your proposal to the attention of the Contracting Officer at the following email address: brett.zeigler@fletc.dhs.gov Proposal Due Date and Time: Request For Proposal No: 70LGLY27RSSB00001 Due Date of Proposal: See Block 13 of the Solicitation Time by which ProposalRead full requirement Close full requirement

Please submit your proposal to the attention of the Contracting Officer at the following email address: brett.zeigler@fletc.dhs.gov Proposal Due Date and Time: Request For Proposal No: 70LGLY27RSSB00001 Due Date of Proposal: See Block 13 of the Solicitation Time by which Proposal

View source 1
01page 69View official source ↗
“Please submit your proposal to the attention of the Contracting Officer at the following email address: brett.zeigler@fletc.dhs.gov Proposal Due Date and Time: Request For Proposal No: 70LGLY27RSSB00001 Due Date of Proposal: See Block 13 of the Solicitation Time by which Proposals are Due: See Block”
Source page 69

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 69
Requirement 4Verified

Proposals shall be submitted in accordance with the following instructions: Proposals shall be organized and tabbed in accordance with Submission Requirements identified below.

View source 1
01page 70View official source ↗
“Proposals shall be submitted in accordance with the following instructions: Proposals shall be organized and tabbed in accordance with Submission Requirements identified below.”
Source page 70

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 70
Missing information · 2 checks
Not reviewed

—

Not reviewed — requirement not confirmed

Not found

—

Not found in reviewed sources

Procurement contact

3 findings
Requirement 1Verified

Brett Zeigler · brett.zeigler@fletc.dhs.gov · 9122805263

View source 1
01https://sam.gov/api/prod/opps/v2/opportunities/65f66615f3ec4ae3924ac43a67abe1b6 /data2/pointOfContact/0View official source ↗
“Brett Zeigler · brett.zeigler@fletc.dhs.gov · 9122805263”
Requirement 2Verified

Shannon D. Anthony, Contracting Officer · Shannon.Anthony@fletc.dhs.gov

View source 1
01https://sam.gov/api/prod/opps/v2/opportunities/65f66615f3ec4ae3924ac43a67abe1b6 /data2/pointOfContact/1View official source ↗
“Shannon D. Anthony, Contracting Officer · Shannon.Anthony@fletc.dhs.gov”
Requirement 3Needs confirmation

—

Needs confirmation

View source 1
01page 64View official source ↗
“the Contracting Officer:”
Source page 64

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 64

Bid opening

2 findings
Requirement 1Needs confirmation

—

Needs confirmation

View source 1
01page 5View official source ↗
“G.7 Bonds – 52.228-1 Bid Guarantee (SEP 1996) (Not required for subject requirement) (a) Failure to furnish a bid guarantee in the proper form and amount, by the time set for opening of bids, may be cause for rejection of the bid.”
Source page 5

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 5
Requirement 2Needs confirmation

—

Needs confirmation

Applies when: upon execution of contractual documents and bonds (including any necessary coinsuranMust be met by: upon execution of contractual documents and bonds (including any necessary coinsuran

View source 1
01page 6View official source ↗
“The Contracting Officer will return bid guarantees, other than bid bonds- (1) To unsuccessful bidders as soon as practicable after the opening of bids; and (2) To the successful bidder upon execution of contractual documents and bonds (including any necessary coinsurance or reinsurance agreements), ”
Source page 6

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 6

Mandatory forms

3 findings
Requirement 1Verified

All forms must be completed in their entirety.

View source 1
01page 23View official source ↗
“All forms must be completed in their entirety.”
Source page 23

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 23
Requirement 2Verified

Completed forms shall be submitted as directed by the CO. 31

View source 1
01page 29View official source ↗
“Completed forms shall be submitted as directed by the CO. 31”
Source page 29

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 29
Requirement 3Verified

All forms must be completed in their entirety by all Contractor and subcontractor personnel subject to the requirement.

Applies to: subcontractor

View source 1
01page 32View official source ↗
“All forms must be completed in their entirety by all Contractor and subcontractor personnel subject to the requirement.”
Source page 32

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 32

Alternate proposals

2 findings
Requirement 1Verified

(2) Alternate prices;

View source 1
01page 72View official source ↗
“(2) Alternate prices;”
Source page 72

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 72
Requirement 2Verified

(d) Alternate proposals will not be considered unless this solicitation authorizes their submission.

Applies when: unless this solicitation authorizes their submission

View source 1
01page 72View official source ↗
“(d) Alternate proposals will not be considered unless this solicitation authorizes their submission.”
Source page 72

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 72

Grounds for rejection

2 findings
Requirement 1Verified
G.7 Bonds – 52.228-1 Bid Guarantee (SEP 1996) (Not required for subject requirement) (a) Failure to furnish a bid guarantee in the proper form and amount, by the time set for opening of bids, may be cause for rejection of the bid.Read full requirement Close full requirement

G.7 Bonds – 52.228-1 Bid Guarantee (SEP 1996) (Not required for subject requirement) (a) Failure to furnish a bid guarantee in the proper form and amount, by the time set for opening of bids, may be cause for rejection of the bid.

View source 1
01page 5View official source ↗
“G.7 Bonds – 52.228-1 Bid Guarantee (SEP 1996) (Not required for subject requirement) (a) Failure to furnish a bid guarantee in the proper form and amount, by the time set for opening of bids, may be cause for rejection of the bid.”
Source page 5

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 5
Requirement 2Verified
In addition, the contracting company COR or PM will notify CSO/PER of the contractor termination/separation date. Failure to return FLETC identification badge or PIV card will result in the Contractor being charged as proscribed in paragraph c. above.Read full requirement Close full requirement

In addition, the contracting company COR or PM will notify CSO/PER of the contractor termination/separation date. Failure to return FLETC identification badge or PIV card will result in the Contractor being charged as proscribed in paragraph c. above.

View source 1
01page 25View official source ↗
“In addition, the contracting company COR or PM will notify CSO/PER of the contractor termination/separation date. Failure to return FLETC identification badge or PIV card will result in the Contractor being charged as proscribed in paragraph c. above.”
Source page 25

Page markings may include other requirements. The quotation above identifies this requirement.

Source document page 25
Missing information8 checks · expand to review

A missing value is not a waiver. Check the source or ask the agency before relying on it.

Questions due

2 findings
Requirement 1Not reviewed

—

Not reviewed — requirement not confirmed

Requirement 2Not found

—

Not found in reviewed sources

Site visit / pre-bid meeting

2 findings
Requirement 1Not reviewed

—

Not reviewed — requirement not confirmed

Requirement 2Not found

—

Not found in reviewed sources

Required submission files

2 findings
Requirement 1Not reviewed

—

Not reviewed — requirement not confirmed

Requirement 2Not found

—

Not found in reviewed sources

Acknowledge amendments

2 findings
Requirement 1Not reviewed

—

Not reviewed — requirement not confirmed

Requirement 2Not found

—

Not found in reviewed sources

3 additional fields have no reviewed finding.

Continue your review

6 more sections are available once you sign in

Pricing & payment · Bonds & insurance · Evaluation & award · Scope & delivery · Labor, sourcing & compliance · Contract terms & risk

Sign in — free

Extracted from the public documents linked above. This is an information aid, not a determination of bid eligibility or legal advice. Verify the original wording and any addenda before submitting a bid.

Bid review
17 days left
See all 12