Construction Services for the Gate 7 Parking Garage St. Elizabeths West Campus

10 source documentsSource checked Sep 28Content updated
Open notice
Response deadline
3 days left
Published project value
Not confirmed
Check the pricing and payment terms below.
Solicitation number
47PB5126R0038
View official posting ↗Review requirements ↓Original posting details are available below.

Dates to plan around

Times follow the original source.

  1. Response deadline
    Source wording
    2026-10-26T16:00:00-04:00
From the posting1 agency details · contact information and original wording
View the official posting →Always the authority. An addendum can change any of this after we read it.
Document coverage
10 / 10documents readAll discovered documents read

10 documents found64% of weighted requirement checks reviewed

Before you bid

Review first

Start with these requirements and unresolved points.
  • Must do
    Financial capacity
    View 1 flagged requirement
    1. Requirement 1 ↗

      (2) Qualifications of Offerors Offerors submitting a proposal in response to this Solicitation shall submit with their proposal evidence of their financial responsibility and capacity to perform the Contract.

  • Must do
    Joint ventures & teaming
    View 4 flagged requirements
    1. Requirement 1 ↗

      Requirements of Joint Venture Offerors (1) All offers submitted by joint ventures must include a copy of an executed joint venture agreement (with original signatures) which fully discloses the legal identity of each member of the joint venture, the relationship between the membe

    2. Requirement 2 ↗

      (2) An authorized representative of each member of the joint venture must sign the SF 1442 accompanying an offer regardless of any agency relationship established between the members.

    3. Requirement 3 ↗

      The joint venture must also provide a certificate that identifies a principal representative of the joint venture with full authority to bind the joint venture.

    4. Requirement 4 ↗

      (4) Representations and certifications, financial information, and past performance information must be submitted for each member of the joint venture.

  • Must do
    Key personnel
    View 2 flagged requirements
    1. Requirement 1 ↗

      Submission Required by Offeror The Offeror shall submit resumes for each proposed key person.

    2. Requirement 2 ↗

      Each resume shall clearly identify the individual’s role on the Gate 7 Parking Garage project and demonstrate the individual’s qualifications for that role.

  • Must do
    Registrations
    View 5 flagged requirements
    1. Requirement 1 ↗

      Other Information to Submit with Proposal (1) Representations and Certifications Offerors are reminded their SAM registration status must be “Active”, at the time their offer is submitted, to be considered for award (see 52.204-7 (GSA Class Deviation RFO-2025-04)).

    2. Requirement 2 ↗

      Offerors submitting a proposal in response to this Solicitation shall complete electronic Annual Representations and Certifications in conjunction with required Entity registration in System for Award Management (SAM), accessed via System for Award Management.

    3. Requirement 3 ↗

      (2) CPARS Registration: Each award requiring an evaluation must be

    4. Requirement 4 ↗

      (d) The offeror shall post the information in paragraphs (c)(1)(i) through (c)(1)(iv) of this provision in FAPIIS as required through maintaining an active registration in the System for Award Management, which can be accessed via https://www.sam.gov (see 52.204-7).

    5. Requirement 5 ↗

      Recipient contractors must be registered as “active” in the System for Award Management (SAM) database at www.sam.gov, and have a Lawful Government Purpose to access such information.

01

Eligibility & participation

Whether you can bid at all, and what you must already hold.

42 verified12 to confirm

Registrations

8 findings
Requirement 1Verified

All prospective offerors are also required to use the System for Award Management at SAM.gov for registering their firm and completing representations and certifications.

View source 1
01notice bodyView official source ↗
“All prospective offerors are also required to use the System for Award Management at SAM.gov for registering their firm and completing representations and certifications.”
Requirement 2Verified

Recipient contractors must be registered as “active” in the System for Award Management (SAM) database at www.sam.gov, and have a Lawful Government Purpose to access such information.

View source 1
01page 10View official source ↗
“Recipient contractors must be registered as “active” in the System for Award Management (SAM) database at www.sam.gov, and have a Lawful Government Purpose to access such information.”
Requirement 3Verified

If a subcontractor is not registered in the SAM database and has a Lawful Government Purpose to possess CUI building information in furtherance of the contract, the subcontractor must provide to the contractor its DUNS number or its tax ID number and a copy of its business licens

Applies when: If a subcontractor is not registered in the SAM database and has a Lawful Government Purpose to possess CUI building information in furtherance of the contract, the subcontractor mus

Applies to: subcontractor

View source 1
01page 10View official source ↗
“If a subcontractor is not registered in the SAM database and has a Lawful Government Purpose to possess CUI building information in furtherance of the contract, the subcontractor must provide to the contractor its DUNS number or its tax ID number and a copy of its business license.”
Requirement 4Verified

Other Information to Submit with Proposal (1) Representations and Certifications Offerors are reminded their SAM registration status must be “Active”, at the time their offer is submitted, to be considered for award (see 52.204-7 (GSA Class Deviation RFO-2025-04)).

View source 1
01page 28View official source ↗
“Other Information to Submit with Proposal (1) Representations and Certifications Offerors are reminded their SAM registration status must be “Active”, at the time their offer is submitted, to be considered for award (see 52.204-7 (GSA Class Deviation RFO-2025-04)).”
Requirement 5Verified

Offerors submitting a proposal in response to this Solicitation shall complete electronic Annual Representations and Certifications in conjunction with required Entity registration in System for Award Management (SAM), accessed via System for Award Management.

View source 1
01page 28View official source ↗
“Offerors submitting a proposal in response to this Solicitation shall complete electronic Annual Representations and Certifications in conjunction with required Entity registration in System for Award Management (SAM), accessed via System for Award Management.”
Requirement 6Verified

In accordance with FAR 52.204-90 (GSA Class Deviation RFO-2025-04), if an Offeror will not have an active Federal Government contracts registration in SAM when submitting its offer, it shall complete paragraphs (c) and (d) of FAR 52.204-90 and include its responses with its offer

Applies when: if an Offeror will not have an active Federal Government contracts registration in SAM when submitting its offer, it shall complete paragraphs (c) and (d) of FAR 52

View source 1
01page 28View official source ↗
“In accordance with FAR 52.204-90 (GSA Class Deviation RFO-2025-04), if an Offeror will not have an active Federal Government contracts registration in SAM when submitting its offer, it shall complete paragraphs (c) and (d) of FAR 52.204-90 and include its responses with its offer.”
Requirement 7Verified

(2) CPARS Registration: Each award requiring an evaluation must be

View source 1
01page 31View official source ↗
“(2) CPARS Registration: Each award requiring an evaluation must be”
Requirement 8Verified

(d) The offeror shall post the information in paragraphs (c)(1)(i) through (c)(1)(iv) of this provision in FAPIIS as required through maintaining an active registration in the System for Award Management, which can be accessed via https://www.sam.gov (see 52.204-7).

View source 1
01page 35View official source ↗
“(d) The offeror shall post the information in paragraphs (c)(1)(i) through (c)(1)(iv) of this provision in FAPIIS as required through maintaining an active registration in the System for Award Management, which can be accessed via https://www.sam.gov (see 52.204-7).”

Key personnel

23 findings
Requirement 1Verified

Phase 1 Factor 1 - Safety Performance Record (25%) Factor 2 - Relevant Experience of the Offeror (25%) Factor 3 - Key Personnel Qualifications (25%) Factor 4 - Past Performance of Offeror (25%) Phase 1 proposals must address all Phase 1 evaluation factors stated herein.

Applies to: person

View source 1
01page 10View official source ↗
“Phase 1 Factor 1 - Safety Performance Record (25%) Factor 2 - Relevant Experience of the Offeror (25%) Factor 3 - Key Personnel Qualifications (25%) Factor 4 - Past Performance of Offeror (25%) Phase 1 proposals must address all Phase 1 evaluation factors stated herein.”
Requirement 2Verified

Construction Contractor Team 1. STAFFING/KEY PERSONNEL The Contractor must provide qualified personnel with the expertise, credentials, experience, and capacity necessary to perform the Work required under this contract.

Applies to: person

View source 1
01page 13View official source ↗
“Construction Contractor Team 1. STAFFING/KEY PERSONNEL The Contractor must provide qualified personnel with the expertise, credentials, experience, and capacity necessary to perform the Work required under this contract.”
Requirement 3Verified

The Contractor’s staff must be sufficient to support the project schedule, maintain campus operations, coordinate with GSA and the Project Delivery Team, manage the Work within an active high-security campus, and complete the project in accordance with the contract documents. 2.

Applies when: within an active high-security campus, and complete the project in accordance with theMust be met by: within an active high-security campus, and complete the project in accordance with the

View source 1
01page 13View official source ↗
“The Contractor’s staff must be sufficient to support the project schedule, maintain campus operations, coordinate with GSA and the Project Delivery Team, manage the Work within an active high-security campus, and complete the project in accordance with the contract documents. 2. OTHER PERSONNEL In a”
Requirement 4Verified

environmental constraints, limited staging, or utility coordination ● Key personnel assigned to the project, if relevant to the proposed team

Applies when: if relevant to the proposed team

Applies to: person

View source 1
01page 14View official source ↗
“environmental constraints, limited staging, or utility coordination ● Key personnel assigned to the project, if relevant to the proposed team”
Requirement 5Verified

FACTOR 3 - Key Personnel Qualifications This factor evaluates the qualifications, experience, availability, and proposed roles of the Offeror’s key personnel for the Gate 7 Parking Garage project.

Applies to: person

View source 1
01page 14View official source ↗
“FACTOR 3 - Key Personnel Qualifications This factor evaluates the qualifications, experience, availability, and proposed roles of the Offeror’s key personnel for the Gate 7 Parking Garage project.”
Requirement 6Verified
The Government will evaluate the extent to which the proposed key personnel demonstrate relevant construction experience, technical knowledge, leadership ability, and role-specific qualifications necessary to support successful performance of construction services for a complex pRead full requirement Close full requirement

The Government will evaluate the extent to which the proposed key personnel demonstrate relevant construction experience, technical knowledge, leadership ability, and role-specific qualifications necessary to support successful performance of construction services for a complex p

Applies when: within an active,Must be met by: within an active,

Applies to: person

View source 1
01page 14View official source ↗
“The Government will evaluate the extent to which the proposed key personnel demonstrate relevant construction experience, technical knowledge, leadership ability, and role-specific qualifications necessary to support successful performance of construction services for a complex parking garage projec”
Requirement 7Verified

The Offeror shall propose qualified key personnel for the construction phase.

Applies to: person

View source 1
01page 14View official source ↗
“The Offeror shall propose qualified key personnel for the construction phase.”
Requirement 8Verified

At a minimum, the Offeror shall identify the following key personnel: Document: C201-GC/JULY 2026 (The Solicitation) Page 14 of 77

Applies to: person

View source 1
01page 14View official source ↗
“At a minimum, the Offeror shall identify the following key personnel: Document: C201-GC/JULY 2026 (The Solicitation) Page 14 of 77”
Requirement 9Verified
GSA Solicitation No. 47PB5126R0038 ● Project Executive ● Project Manager ● General Superintendent / Construction Superintendent ● Quality Control Manager ● Site Safety and Occupational Health Officer / Safety and Occupational Health Manager ● Scheduler The Offeror may identify adRead full requirement Close full requirement

GSA Solicitation No. 47PB5126R0038 ● Project Executive ● Project Manager ● General Superintendent / Construction Superintendent ● Quality Control Manager ● Site Safety and Occupational Health Officer / Safety and Occupational Health Manager ● Scheduler The Offeror may identify ad

Applies when: if the Offeror be

Applies to: person

View source 1
01page 15View official source ↗
“GSA Solicitation No. 47PB5126R0038 ● Project Executive ● Project Manager ● General Superintendent / Construction Superintendent ● Quality Control Manager ● Site Safety and Occupational Health Officer / Safety and Occupational Health Manager ● Scheduler The Offeror may identify additional key personn”
Requirement 10Verified

The Project Executive shall have experience overseeing major construction projects of similar size, scope, complexity, and stakeholder sensitivity. 2. Project Manager The Project Manager shall be responsible for overall day-to-day contract administration, project management, coor

Applies to: person

View source 1
01page 15View official source ↗
“The Project Executive shall have experience overseeing major construction projects of similar size, scope, complexity, and stakeholder sensitivity. 2. Project Manager The Project Manager shall be responsible for overall day-to-day contract administration, project management, coordination with GSA an”
Requirement 11Verified

3. General Superintendent / Construction Superintendent The Superintendent shall be responsible for daily on-site field supervision,

Applies to: person

View source 1
01page 15View official source ↗
“3. General Superintendent / Construction Superintendent The Superintendent shall be responsible for daily on-site field supervision,”
Requirement 12Verified

Submission Required by Offeror The Offeror shall submit resumes for each proposed key person.

View source 1
01page 16View official source ↗
“Submission Required by Offeror The Offeror shall submit resumes for each proposed key person.”
Requirement 13Verified

Each resume shall clearly identify the individual’s role on the Gate 7 Parking Garage project and demonstrate the individual’s qualifications for that role.

View source 1
01page 16View official source ↗
“Each resume shall clearly identify the individual’s role on the Gate 7 Parking Garage project and demonstrate the individual’s qualifications for that role.”
Requirement 14Verified

During performance of the Work required under this contract, the Contractor must obtain written consent from the Contracting Officer before making any substitution for key personnel, major

Applies when: before making any substitution for key personnel, majorMust be met by: before making any substitution for key personnel, major

Applies to: person

View source 1
01page 16View official source ↗
“During performance of the Work required under this contract, the Contractor must obtain written consent from the Contracting Officer before making any substitution for key personnel, major”
Requirement 15Verified

The Offeror shall also provide a brief Key Personnel Team Narrative describing how the proposed key personnel will work together, coordinate project responsibilities, manage communication, and support successful project delivery.

Applies to: person

View source 1
01page 17View official source ↗
“The Offeror shall also provide a brief Key Personnel Team Narrative describing how the proposed key personnel will work together, coordinate project responsibilities, manage communication, and support successful project delivery.”
Requirement 16Verified

The narrative should identify any prior working relationships among the proposed key personnel on relevant projects.

Applies to: person

View source 1
01page 17View official source ↗
“The narrative should identify any prior working relationships among the proposed key personnel on relevant projects.”
Requirement 17Verified

The narrative should identify any prior working relationships among the proposed key personnel on relevant projects. Resumes shall be limited to two (2) pages per individual.

Applies to: person

View source 1
01page 17View official source ↗
“The narrative should identify any prior working relationships among the proposed key personnel on relevant projects. Resumes shall be limited to two (2) pages per individual.”
Requirement 18Verified

The Key Personnel Team Narrative shall be limited to two (2) pages total.

Applies to: person

View source 1
01page 17View official source ↗
“The Key Personnel Team Narrative shall be limited to two (2) pages total.”
Requirement 19Verified
The Phase 1 RFQ non-price factors are: ● Factor 1 – Safety Performance Record ● Factor 2 – Relevant Experience of the Offeror ● Factor 3 – Key Personnel Qualifications ● Factor 4 – Past Performance of Offeror The Government will not require Offerors to resubmit their full Phase 1Read full requirement Close full requirement

The Phase 1 RFQ non-price factors are: ● Factor 1 – Safety Performance Record ● Factor 2 – Relevant Experience of the Offeror ● Factor 3 – Key Personnel Qualifications ● Factor 4 – Past Performance of Offeror The Government will not require Offerors to resubmit their full Phase 1

Applies to: person

View source 1
01page 20View official source ↗
“The Phase 1 RFQ non-price factors are: ● Factor 1 – Safety Performance Record ● Factor 2 – Relevant Experience of the Offeror ● Factor 3 – Key Personnel Qualifications ● Factor 4 – Past Performance of Offeror The Government will not require Offerors to resubmit their full Phase 1 qualifications subm”
Requirement 20Verified

Material changes may include changes to key personnel, teaming arrangements, corporate structure, relevant experience, past performance information, or other information that could affect the Phase 1 evaluation result.

Applies to: person

View source 1
01page 21View official source ↗
“Material changes may include changes to key personnel, teaming arrangements, corporate structure, relevant experience, past performance information, or other information that could affect the Phase 1 evaluation result.”
Requirement 21Verified

● Project staffing and key personnel;

Applies to: person

View source 1
01page 37View official source ↗
“● Project staffing and key personnel;”
Requirement 22Verified

Elizabeth Campus Gate 7 Parking Garage National Capital Region SOL.: 47PB5126R0038 Office of Program and Project Management September 18th, 2026 16. LESSONS LEARNED WORKSHOP The Contractor’s key personnel shall attend and participate in a Lessons Learned Workshop, typically condu

Applies to: person

View source 1
01page 65View official source ↗
“Elizabeth Campus Gate 7 Parking Garage National Capital Region SOL.: 47PB5126R0038 Office of Program and Project Management September 18th, 2026 16. LESSONS LEARNED WORKSHOP The Contractor’s key personnel shall attend and participate in a Lessons Learned Workshop, typically conducted at approximatel”
Requirement 23Verified

In addition to Total Evaluated Price, the following non-price factors shall be used to evaluate offers: Phase 1 Factor 1 - Safety Performance Record (25%) Factor 2 - Relevant Experience of the Offeror (25%) Factor 3 - Key Personnel Qualifications (25%) Factor 4 - Past Performance

Applies to: person

View source 1
01page 74View official source ↗
“In addition to Total Evaluated Price, the following non-price factors shall be used to evaluate offers: Phase 1 Factor 1 - Safety Performance Record (25%) Factor 2 - Relevant Experience of the Offeror (25%) Factor 3 - Key Personnel Qualifications (25%) Factor 4 - Past Performance of Offeror (25%) Ph”

Financial capacity

2 findings
Requirement 1Verified

GSA Solicitation No. 47PB5126R0038 (b) The bidder shall furnish a bid guarantee in the form of a firm commitment, e.g., bid bond supported by good and sufficient surety or sureties acceptable to the Government, postal money order, certified check, cashier’s check, irrevocable let

Applies to: surety

View source 1
01page 6View official source ↗
“GSA Solicitation No. 47PB5126R0038 (b) The bidder shall furnish a bid guarantee in the form of a firm commitment, e.g., bid bond supported by good and sufficient surety or sureties acceptable to the Government, postal money order, certified check, cashier’s check, irrevocable letter of credit, or, u”
Requirement 2Verified

(2) Qualifications of Offerors Offerors submitting a proposal in response to this Solicitation shall submit with their proposal evidence of their financial responsibility and capacity to perform the Contract.

View source 1
01page 28View official source ↗
“(2) Qualifications of Offerors Offerors submitting a proposal in response to this Solicitation shall submit with their proposal evidence of their financial responsibility and capacity to perform the Contract.”

Joint ventures & teaming

20 findings
Requirement 1Conflicting sources

—

Conflicting sources

Applies to: subcontractor

View source 1
01page 1View official source ↗
“Subcontractor Joint Venture”
Requirement 2Conflicting sources

—

Conflicting sources

View source 1
01page 2View official source ↗
“Requirements of Joint Venture Offerors III.”
Requirement 3Conflicting sources

—

Conflicting sources

View source 1
01page 3View official source ↗
“Evaluation of Joint Venture Offers Document: C201-GC/JULY 2026 (The Solicitation) Page 3 of 77”
Requirement 4Conflicting sources

—

Conflicting sources

View source 1
01page 12View official source ↗
“The Government will evaluate the Offeror’s experience as a prime construction contractor, joint venture member, or construction contractor responsible for managing and delivering projects of comparable complexity.”
Requirement 5Conflicting sources

—

Conflicting sources

Applies to: subcontractor

View source 1
01page 14View official source ↗
“GSA Solicitation No. 47PB5126R0038 ● Offeror’s role on the project, including whether the Offeror performed as prime contractor, joint venture member, construction manager, or subcontractor ● Description of the Offeror’s specific responsibilities and scope of work ● Construction award date ● Date of”
Requirement 6Conflicting sources

—

Conflicting sources

View source 1
01page 17View official source ↗
“The Government will evaluate past performance of the construction firm, joint venture, or construction team proposed to perform the work.”
Requirement 7Conflicting sources

—

Conflicting sources

Applies to: subcontractor

View source 1
01page 18View official source ↗
“Offeror’s role on the project, including whether the Offeror performed as prime contractor, joint venture member, construction manager, or subcontractor; h.”
Requirement 8Conflicting sources

—

Conflicting sources

View source 1
01page 27View official source ↗
“8. Mentor-Protégé or Partnership Efforts”
Requirement 9Conflicting sources

—

Conflicting sources

View source 1
01page 30View official source ↗
“Consortium® qualifed.”
Requirement 10Conflicting sources

—

Conflicting sources

View source 1
01page 41View official source ↗
“DOE (Department of Energy) MSSLC (Municipal Solid State Street Lighting Consortium) model specification for LED roadway luminaires electrical immunity requirements for High Test Level 10kV / 10kKA.”
Requirement 11Conflicting sources

—

Conflicting sources

View source 1
01page 58View official source ↗
“DesignLights Consortium® (DLC) Premium qualified product and DLC qualified product.”
Requirement 12Conflicting sources

—

Conflicting sources

View source 1
01page 76View official source ↗
“Evaluation of Joint Venture Offerors In the evaluation of responsibility and non-price factors, information submitted for a party to the joint venture will only be evaluated to the extent that the terms of the joint venture agreement do not limit such party's performance or financial obligations as ”
Requirement 13Verified

If the Offeror submits a project performed as a joint venture member, the Offeror shall clearly identify its role, percentage of participation, scope of responsibility, and management responsibilities.

Applies when: If the Offeror submits a project performed as a joint venture member, the Offeror shall clearly identify its role, percentage of participation, scope of responsibility, and managemen

View source 1
01page 14View official source ↗
“If the Offeror submits a project performed as a joint venture member, the Offeror shall clearly identify its role, percentage of participation, scope of responsibility, and management responsibilities.”
Requirement 14Verified
Other sources may include, but are not limited to, past performance information retrieved through the Contractor Performance Assessment Reporting System (CPARS), using all CAGE/DUNS numbers of team members (partnership, joint venture, teaming arrangement, or parent company/subsidRead full requirement Close full requirement

Other sources may include, but are not limited to, past performance information retrieved through the Contractor Performance Assessment Reporting System (CPARS), using all CAGE/DUNS numbers of team members (partnership, joint venture, teaming arrangement, or parent company/subsid

View source 1
01page 19View official source ↗
“Other sources may include, but are not limited to, past performance information retrieved through the Contractor Performance Assessment Reporting System (CPARS), using all CAGE/DUNS numbers of team members (partnership, joint venture, teaming arrangement, or parent company/subsidiary/affiliate) iden”
Requirement 15Verified
GSA Solicitation No. 47PB5126R0038 Identify any mentor-protégé relationships, teaming arrangements, joint ventures, or other efforts that support meaningful small business participation. 9. Subcontracting Plan Coordination If the Offeror is other than a small business, describe hRead full requirement Close full requirement

GSA Solicitation No. 47PB5126R0038 Identify any mentor-protégé relationships, teaming arrangements, joint ventures, or other efforts that support meaningful small business participation. 9. Subcontracting Plan Coordination If the Offeror is other than a small business, describe h

Applies when: If the Offeror is other than a small business, describe how the Small Business Participation Plan

View source 1
01page 28View official source ↗
“GSA Solicitation No. 47PB5126R0038 Identify any mentor-protégé relationships, teaming arrangements, joint ventures, or other efforts that support meaningful small business participation. 9. Subcontracting Plan Coordination If the Offeror is other than a small business, describe how the Small Busines”
Requirement 16Verified

Requirements of Joint Venture Offerors (1) All offers submitted by joint ventures must include a copy of an executed joint venture agreement (with original signatures) which fully discloses the legal identity of each member of the joint venture, the relationship between the membe

View source 1
01page 29View official source ↗
“Requirements of Joint Venture Offerors (1) All offers submitted by joint ventures must include a copy of an executed joint venture agreement (with original signatures) which fully discloses the legal identity of each member of the joint venture, the relationship between the members, the form of owne”
Requirement 17Verified

(2) An authorized representative of each member of the joint venture must sign the SF 1442 accompanying an offer regardless of any agency relationship established between the members.

View source 1
01page 29View official source ↗
“(2) An authorized representative of each member of the joint venture must sign the SF 1442 accompanying an offer regardless of any agency relationship established between the members.”
Requirement 18Verified

The joint venture must also provide a certificate that identifies a principal representative of the joint venture with full authority to bind the joint venture.

View source 1
01page 29View official source ↗
“The joint venture must also provide a certificate that identifies a principal representative of the joint venture with full authority to bind the joint venture.”
Requirement 19Verified

(4) Representations and certifications, financial information, and past performance information must be submitted for each member of the joint venture.

View source 1
01page 29View official source ↗
“(4) Representations and certifications, financial information, and past performance information must be submitted for each member of the joint venture.”
Requirement 20Verified

(3) In the case of corporations that are joint venture members, the corporation secretary must certify that the corporation is authorized to participate in the joint venture, either by certifying in the joint venture agreement, or by submitting a separate certification to the Gov

Applies when: in the joint venture

View source 1
01page 29View official source ↗
“(3) In the case of corporations that are joint venture members, the corporation secretary must certify that the corporation is authorized to participate in the joint venture, either by certifying in the joint venture agreement, or by submitting a separate certification to the Government.”

Exclusions & responsibility

Verified
Reference No. 47PB5126R0038 NUMBER TITLE DATE 52.204-19 Incorporation by Reference of DEC 2014 Representations and Certifications 52.209-6 Protecting the Government’s Interest NOV 2025 (GSA Class Deviation When Subcontracting with Contractors RFO-2025-09) Debarred, Suspended, ProRead full requirement Close full requirement

Reference No. 47PB5126R0038 NUMBER TITLE DATE 52.204-19 Incorporation by Reference of DEC 2014 Representations and Certifications 52.209-6 Protecting the Government’s Interest NOV 2025 (GSA Class Deviation When Subcontracting with Contractors RFO-2025-09) Debarred, Suspended, Pro

Applies when: When Subcontracting with Contractors RFO-2025-09) Debarred, Suspended, Proposed for Debarment or Voluntarily Exclu

View source 1
01page 41View official source ↗
“Reference No. 47PB5126R0038 NUMBER TITLE DATE 52.204-19 Incorporation by Reference of DEC 2014 Representations and Certifications 52.209-6 Protecting the Government’s Interest NOV 2025 (GSA Class Deviation When Subcontracting with Contractors RFO-2025-09) Debarred, Suspended, Proposed for Debarment ”
Missing information4 checks · expand to review

A missing value is not a waiver. Check the source or ask the agency before relying on it.

Set-aside

Not found

—

Not found in reviewed sources

Small business size

Not found

—

Not found in reviewed sources

Required licenses

Not found

—

Not found in reviewed sources

Experience & references

Not found

—

Not found in reviewed sources

2 additional fields have no reviewed finding.

02

Deadlines & submission

When and how to submit, and whether you are still in time.

17 verified14 to confirm

Response deadline

Verified

2026-10-26T16:00:00-04:00

View source 1
01https://sam.gov/api/prod/opps/v2/opportunities/88f3d60c77564d889d1e69ca64a513c7 /data2/solicitation/deadlines/responseView official source ↗
“2026-10-26T16:00:00-04:00”

How to submit

2 findings
Requirement 1Verified

ELIGIBLE OFFERORS: All responsible business firms may submit a proposal which shall be considered by the agency.

View source 1
01notice bodyView official source ↗
“ELIGIBLE OFFERORS: All responsible business firms may submit a proposal which shall be considered by the agency.”
Requirement 2Verified

(5) Offerors shall submit proposals in response to this RFP in English, unless otherwise permitted by the RFP, and in U.S. dollars, unless the provision at FAR 52.225-17, Evaluation of Foreign Currency Offers, is included in the RFP.

Applies when: unless otherwise permitted by the RFP, and in U

View source 1
01page 57View official source ↗
“(5) Offerors shall submit proposals in response to this RFP in English, unless otherwise permitted by the RFP, and in U.S. dollars, unless the provision at FAR 52.225-17, Evaluation of Foreign Currency Offers, is included in the RFP.”

Required submission files

4 findings
Requirement 1Verified

The price proposal shall be one electronic document submitted separate from technical proposal.

View source 1
01page 9View official source ↗
“The price proposal shall be one electronic document submitted separate from technical proposal.”
Requirement 2Verified

Price Proposal (Phase 2 requirement) (1) Contents The Price Proposal shall consist of the SF 1442 and the Agreement, with prices and/or rates indicated for each price element shown on the pricing form included in Section II of the Agreement.

View source 1
01page 9View official source ↗
“Price Proposal (Phase 2 requirement) (1) Contents The Price Proposal shall consist of the SF 1442 and the Agreement, with prices and/or rates indicated for each price element shown on the pricing form included in Section II of the Agreement.”
Requirement 3Verified

Technical Proposal The Technical Proposal shall include the information requested below for the non-price factors described in Section VI.

View source 1
01page 10View official source ↗
“Technical Proposal The Technical Proposal shall include the information requested below for the non-price factors described in Section VI.”
Requirement 4Verified

The Offeror must submit a Past Performance Questionnaire (PPQ) included in the solicitation as Attachment 2, completed by the applicable client, for each project included in its proposal for Factor 4. Completed PPQs should be submitted with the proposal.

View source 1
01page 18View official source ↗
“The Offeror must submit a Past Performance Questionnaire (PPQ) included in the solicitation as Attachment 2, completed by the applicable client, for each project included in its proposal for Factor 4. Completed PPQs should be submitted with the proposal.”

Procurement contact

16 findings
Requirement 1Verified

Jennifer Silkensen · jennifer.silkensen@gsa.gov · 215-446-5099

View source 1
01https://sam.gov/api/prod/opps/v2/opportunities/88f3d60c77564d889d1e69ca64a513c7 /data2/pointOfContact/0View official source ↗
“Jennifer Silkensen · jennifer.silkensen@gsa.gov · 215-446-5099”
Requirement 2Verified

jennifer.silkensen@gsa.gov

View source 1
01from the postingView official source ↗
“be directed to Jennifer Silkensen, Contracting Officer, via email at jennifer.silkensen@gsa.gov. Potential offerors are responsible for monitoring and downloading t”
Requirement 3Verified
Receipt of Offers (1) Questions Regarding Phase 1: Submit questions regarding Phase 1 to the Contracting Officer on or before 4 PM ET October 8, 2026. Questions shall be submitted to the following: jennifer.silkensen@gsa.gov.Read full requirement Close full requirement

Receipt of Offers (1) Questions Regarding Phase 1: Submit questions regarding Phase 1 to the Contracting Officer on or before 4 PM ET October 8, 2026. Questions shall be submitted to the following: jennifer.silkensen@gsa.gov.

Applies when: before 4 PM ET October 8, 2026Must be met by: before 4 PM ET October 8, 2026

View source 1
01page 6View official source ↗
“Receipt of Offers (1) Questions Regarding Phase 1: Submit questions regarding Phase 1 to the Contracting Officer on or before 4 PM ET October 8, 2026. Questions shall be submitted to the following: jennifer.silkensen@gsa.gov.”
Requirement 4Verified

If the client requests, the client may submit a questionnaire directly to the Government's point of contact, via email at jennifer.silkensen@gsa.gov prior to Phase 1 proposal closing date.

Applies when: If the client requests, the client may submit a questionnaire directly to the Government's point of contact, via email at jennifer; prior to Phase 1 proposal closing dateMust be met by: prior to Phase 1 proposal closing date

View source 1
01page 19View official source ↗
“If the client requests, the client may submit a questionnaire directly to the Government's point of contact, via email at jennifer.silkensen@gsa.gov prior to Phase 1 proposal closing date.”
Requirement 5Needs confirmation

—

Needs confirmation

View source 1
01page 4View official source ↗
“Applicable TO BE COMPLETED BY CLIENT CLIENT INFORMATION CLIENT POINT OF CONTACT INFORMATION Name Title Phone Number Address PROJECT INFORMATION Contract Type Contract Title Contract Location Describe your role in the project: Date Questionnaire was completed (mm/dd/yy): Client’s Signature: Instructi”
Requirement 6Needs confirmation

—

Needs confirmation

View source 1
01page 7View official source ↗
“Electronic Submission of Proposals: Offers must be received by the GSA Point of”
Requirement 7Needs confirmation

—

Needs confirmation

Applies when: if applicable, number o

View source 1
01page 13View official source ↗
“For each project, the Offeror shall provide the following information: ● Project title ● Owner, client, tenant agency, or occupant ● Project location ● Owner/client point of contact, including name, title, phone number, and email address ● Project description, including gross square footage and, if ”
Requirement 8Needs confirmation

—

Needs confirmation

View source 1
01page 17View official source ↗
“Approved substitutions must be made at no additional cost to the Government and must not delay the project schedule. 5. CONTRACTOR’S DOCUMENT MANAGER (CDM) COBie The Contractor must designate a Document Manager to serve as the single point of contact for project documentation, document control, elec”
Requirement 9Needs confirmation

—

Needs confirmation

Applies when: within 14 calendar days after Notice to Proceed to confirm document control proceduresMust be met by: within 14 calendar days after Notice to Proceed to confirm document control procedures

View source 1
01page 17View official source ↗
“The Document Manager must coordinate with GSA, AECOM, ZGF, the GSA BIM point of contact, and other Project Delivery Team members within 14 calendar days after Notice to Proceed to confirm document control procedures, PMIS requirements, BIM Execution Plan requirements, COBie Information Delivery Plan”
Requirement 10Needs confirmation

—

Needs confirmation

View source 1
01page 18View official source ↗
“Owner/client point of contact, including name, title, phone number, and email address; e.”
Requirement 11Needs confirmation

—

Needs confirmation

View source 1
01page 18View official source ↗
“Ensure correct phone numbers and email addresses are provided for the client point of contact.”
Requirement 12Needs confirmation

—

Needs confirmation

View source 1
01page 24View official source ↗
“The Contractor shall participate in BIM and COBie coordination meetings with GSA, AECOM, ZGF, the GSA BIM point of contact, and other Project Delivery Team members.”
Requirement 13Needs confirmation

—

Needs confirmation

Applies when: within 14 calendar days after Notice to Proceed to confirm BIM and COBie requirements,Must be met by: within 14 calendar days after Notice to Proceed to confirm BIM and COBie requirements,

View source 1
01page 24View official source ↗
“The Contractor shall coordinate with GSA’s BIM point of contact within 14 calendar days after Notice to Proceed to confirm BIM and COBie requirements, including file formats, naming conventions, model exchange procedures, level of development expectations, data structure, asset information requireme”
Requirement 14Needs confirmation

—

Needs confirmation

View source 1
01page 28View official source ↗
“Where applicable, point of contact, including names and telephone numbers, are required for all contracts listed.”
Requirement 15Needs confirmation

—

Needs confirmation

Applies when: If the offeror requests an oral feedback meeting, the offeror should provide the following information: ● Primary point of contact

View source 1
01page 33View official source ↗
“If the offeror requests an oral feedback meeting, the offeror should provide the following information: ● Primary point of contact;”
Requirement 16Needs confirmation

—

Needs confirmation

View source 1
01page 56View official source ↗
“The Contractor shall designate a BIM, CDX & COBie Manager for the project to serve as the primary point of contact for BIM activities, COBie data, CDX requirements, model”

Bid opening

2 findings
Requirement 1Needs confirmation

—

Needs confirmation

Applies when: If this is a sealed bid solicitation, offers will be publicly opened at that time

View source 1
01page 1View official source ↗
“If this is a sealed bid solicitation, offers will be publicly opened at that time.”
Requirement 2Needs confirmation

—

Needs confirmation

Applies when: upon execution of contractual documents and bonds (including any necessary coinsuranMust be met by: upon execution of contractual documents and bonds (including any necessary coinsuran

View source 1
01page 6View official source ↗
“The Contracting Officer will return bid guarantees, other than bid bonds— (1) To unsuccessful bidders as soon as practicable after the opening of bids; and (2) To the successful bidder upon execution of contractual documents and bonds (including any necessary coinsurance or reinsurance agreements), ”

Formatting & signatures

5 findings
Requirement 1Verified
GSA Solicitation No. 47PB5126R0038 construction execution plan, project schedule, phasing plan, logistics plan, quality control plan, Site-Specific Safety and Health Plan, or risk-management plan as part of the Phase 1 submission. Page limits apply to narrative responses, includiRead full requirement Close full requirement

GSA Solicitation No. 47PB5126R0038 construction execution plan, project schedule, phasing plan, logistics plan, quality control plan, Site-Specific Safety and Health Plan, or risk-management plan as part of the Phase 1 submission. Page limits apply to narrative responses, includi

View source 1
01page 11View official source ↗
“GSA Solicitation No. 47PB5126R0038 construction execution plan, project schedule, phasing plan, logistics plan, quality control plan, Site-Specific Safety and Health Plan, or risk-management plan as part of the Phase 1 submission. Page limits apply to narrative responses, including text, tables, cha”
Requirement 2Verified

Cover pages, tables of contents, section dividers, required forms, and attachments expressly excluded by the RFQ do not count against the stated page limits.

View source 1
01page 11View official source ↗
“Cover pages, tables of contents, section dividers, required forms, and attachments expressly excluded by the RFQ do not count against the stated page limits.”
Requirement 3Verified

The Government will evaluate only the information submitted within the applicable page limits, except for specifically excluded attachments identified in the solicitation.

Applies when: within the applicable page limits, except for specifically excluded attachments identiMust be met by: within the applicable page limits, except for specifically excluded attachments identi

View source 2
01page 11View official source ↗
“The Government will evaluate only the information submitted within the applicable page limits, except for specifically excluded attachments identified in the solicitation.”
02page 20View official source ↗
“The Government will evaluate only the information submitted within the applicable page limits, except for specifically excluded attachments identified in the solicitation.”
Requirement 4Verified
Responses shall not merely restate solicitation requirements or include generic corporate marketing material. Page limits apply to narrative responses, including text, tables, charts, graphics, and figures, unless specifically excluded.Read full requirement Close full requirement

Responses shall not merely restate solicitation requirements or include generic corporate marketing material. Page limits apply to narrative responses, including text, tables, charts, graphics, and figures, unless specifically excluded.

Applies when: unless specifically excluded

View source 1
01page 20View official source ↗
“Responses shall not merely restate solicitation requirements or include generic corporate marketing material. Page limits apply to narrative responses, including text, tables, charts, graphics, and figures, unless specifically excluded.”
Requirement 5Verified

Cover pages, tables of contents, section dividers, required forms, price information, and attachments expressly excluded by the RFP do not count against the stated page limits.

View source 1
01page 20View official source ↗
“Cover pages, tables of contents, section dividers, required forms, price information, and attachments expressly excluded by the RFP do not count against the stated page limits.”

Mandatory forms

Verified
The Contract (1) The Contract consists of the SF1442, the Agreement, the Statement of Work, Specifications, Drawings, Exhibits, Amendments, Modifications, and other Attachments identified herein (collectively, the Contract Documents).Read full requirement Close full requirement

The Contract (1) The Contract consists of the SF1442, the Agreement, the Statement of Work, Specifications, Drawings, Exhibits, Amendments, Modifications, and other Attachments identified herein (collectively, the Contract Documents).

View source 1
01page 3View official source ↗
“The Contract (1) The Contract consists of the SF1442, the Agreement, the Statement of Work, Specifications, Drawings, Exhibits, Amendments, Modifications, and other Attachments identified herein (collectively, the Contract Documents).”
Missing information3 checks · expand to review

A missing value is not a waiver. Check the source or ask the agency before relying on it.

Questions due

Not found

—

Not found in reviewed sources

Site visit / pre-bid meeting

Not found

—

Not found in reviewed sources

Acknowledge amendments

Not found

—

Not found in reviewed sources

4 additional fields have no reviewed finding.

Continue your review

6 more sections are available once you sign in

Pricing & payment · Bonds & insurance · Evaluation & award · Scope & delivery · Labor, sourcing & compliance · Contract terms & risk

Sign in — free

Extracted from the public documents linked above. This is an information aid, not a determination of bid eligibility or legal advice. Verify the original wording and any addenda before submitting a bid.

Bid review
3 days left
See all 14